How NBS Building is used:
• Many practices start project specifications from scratch each time
• Not learning from any past projects • Inefficiencies persist • Inconsistency persists
• Project experience lost to next projects • Individual knowledge and skills not built upon • This even happens in dedicated project spec
teams (E.g. CT, SEH)
13/11/15 © ASWS & NGS '94-'13 4
How NBS Building works:
• Application of Templates in software • Link templates in a hierarchy • To ensure efficiency of effort
Project 3 L20 Timber doors & joinery
package
NBS Base
Project 3 J31 Liquid applied roofing
package
Project 3 N15 Signs
package
Project 3 LNN Contract 4 package
Project 1 Project 2 Project 3 Project 4.
Practice Texts Spec Manager’s
Practice Texts Architect’s team’s
Practice Texts Interior Designer’s
Practice Texts Graphic Designer’s
13/11/15 5
13/11/15 © ASWS & NGS '94-'13 6
How NBS Building can work:
• Templates • Hierarchy • Inheritance
• Linkages
? ? ? ✘"
✘"
ü
?✔" ✘"ü
?? ?
ü
?
û
û Fixed at Project
Fixed thereafter
Project Inherits from Practice Text
ü ü ? ✘"
ü ü
✘"
✘" ✘"û û
û û Can not be selected Can not be deleted
ü ? ? ? û
? ? ?? ? ???
?? ?
Unselected from NBS Base
NBS Base Text ? ? ?
? ? ?
?? ?? ?
Contract(s)
ü
??
Child of Practice Text Fixed thereafter
Contract Inherits from Project
deletedselected
selected
selected deleted
fixed fixed
fixed fixed
Send Contract to print
Child of Project
Child of NBS Base Parent of Project
Parent of Contract
Unselected from NBS Base
Selected at Practice Text
Fixed at Project Project Text(s)
û
Selected at Contract
Practice TEXT
Parent of Practice Text Unselectable at NBS Base Unselectable at NBS Base
Practice Text Inherits from NBS Base
Deleted at Practice Text
13/11/15 7
4 4
4 4
4 ?
? ?
?
? 8 8
8 8 8 8
8 8
? ? 8
? ? ? ? ? ?
? ?
4
ü ü ? 8
ü ü
8
8 8 û û
û û
ü ? ? ? û
? ? ? ? ? ? ? ?
? ? ?
ü
4 4
4 4
4 ?
? ?
?
?
?
? 8 8
8 8 8 8
8 8
? ? 8
? ? ? ? ? ?
? ?
4
? ?
?
? ? ?
? ?
NBS Base
? ? ?
? ? ?
? ? ? ? ?
? ?
ü ü ? 8
ü ü
8
8 8 û û
û û
ü ? ? ? û
? ? ? ? ? ? ? ?
? ? ?
? 4
4 4
?
4
?
4 4
4 4
? ? 8
8 ? 8
? ?
8
8
? 8 8
8 8 8 8
8 8
4
8
? ? ? 8
8
ü
? 4 8 ü
? ? ?
ü
?
û
û
ü ü ? 8
ü ü
8
8 8 û û
û û
û
Interior Designer’s
Proj 3 Package 4
û û
Spec Manager’s Architect’s team’s Engineers
Project 3 Project 2 Project 3 Project 4.
Proj3 J31 package Proj3 L20 package Proj3 N15 package
13/11/15 9
• Possible sources of information in addition to NBS: • ASWS work sections or embellishment of NBS • GBS work sections and product specifications • NES National Engineering Specifications (M&E) • PSA Property Services Agency (1991) • SPAB Conservation Spec • FIRA Furniture Spec, • SGD Landscape Spec, • TRADA Timber spec, NSSS, MoT,
• All these specifications can be used to create the Office Specification Template 13/11/15 10
How NBS Building can work:
Interior’s Spec
Other sources
NES
FIRA
PSA
Manufacturers
NSSS
Engineer’s Spec
Arch’s Spec
NBS
Practice Specification
Engineering NBS NBS
ASWS
NGS
NPS
Building NBS
Landscape Future?
13/11/15 11
13/11/15 © ASWS & NGS '94-'13 12
How NBS Building can work:
• Options on how templates can be used • Different practices and their workload can
dictate how this is done
Procurement methods Building type
Building type
Contract Contract
Project
Practice Spec
SPECIFICATION NBS
Project
Contract
Project Client
Project
13/11/15 13
13/11/15 14
“NBS Guidance”
“NBS Building”
“Good practice details”
“Fast-track” RIBACAD Product details
AutoCAD “Annotation
Manager” AutoCAD
AEC
“Product Selector
Plus”
“CIS” On Line
“Word processing”
“REMA Spacial
database”
Investing in Opportunities
www.GreenBuildingEncyclopaedia.uk
13/11/15 © ASWS & NGS '94-'13 15
Export to RTF
Apple File Exchange NBS
Building
Word for
Mac
Apple Mac
Word for
Windows
IBM PC Cut and Paste
Easy to use 'Windows'
based interactive
programme
Base & office Guidance
notes linked to clauses
A home for the Practice 'Corporate Knowledge'
Relational data-base
with editing by 'cut copy & paste'
& little typing
Intelligent use of project
feedback
Efficientproject
specificationpreparation
Clauses &work sectionin CPI: CAWS classification
Search manage and edit
specification system
13/11/15 16
Investing in Opportunities
www.GreenBuildingEncyclopaedia.uk
13/11/15 17
CI/SfB Keywords
Names
CPI CAWS
Search methods
Product Trade marks Company
Advisors Product types
Investing in Opportunities
www.GreenBuildingEncyclopaedia.uk
13/11/15 18
J Project
Planning
F Production Information
E Detail
Design
K Operations
on site
A Inception
L Completion
M Feedback
B Feasibility
C Outline
Proposal
Spec. developed in stages
D Scheme Design
H Tender Action
G Bills of
Quantities
Investing in Opportunities
www.GreenBuildingEncyclopaedia.uk
Specification: at what stage?
RIBA Plan of Work Stages 0 to 7 (or 8)