Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Navigating the Code:

Operator Qualification

Joey Bass

August 2019

Page 2: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Operator Qualification or OQ

Page 3: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

No OQ could cause an AOC

Page 4: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Covered Task

1. Performed on a pipeline facility;

2. Operations or maintenance task

3. Performed as a requirement of this part

4. Affects the operation or integrity of the pipeline.

Page 5: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Qualified

(a) Performs an assigned covered tasks; and

(b) Recognize and react to Abnormal Operating Conditions “AOC’S”.

Page 6: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Evaluations methods

• Written or oral examination

• History review

• Performance - on the job training or simulations

• Other assessment.

Page 7: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

On the Job Performance

• PHMSA has determined that there are no covered tasks to date where observation of on-the-job performance is an adequate, sole method for examining or testing qualification; and;

• Observation of on-the-job performance does not measure the individual’s ability to recognize and react to abnormal operation conditions (AOC’s).

Page 8: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Covered Task (1 of 2)

Page 9: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Covered Task (2 of 2)

• A qualified individual performing a covered task should possess:

– Knowledge

– Skill

– Ability

Page 10: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Knowledge

• Understanding gained through experience or study

• Operational knowledge

• Written instruction

• An organization that correlates to pipeline facilities (NACE)

Page 11: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Skill

• Is a demonstrable competency to perform a given task well, arising from talent, training or practice.

• Previous working experience

• Working under supervision of a qualified individual

• Simulated exercises

Page 12: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Ability

• Is the capacity to do or act, physically and/or mentally.

• Ability is understood to be broader than simply “physical capability” and includes such attributes as mechanical ability.

Page 13: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Common task vs. Position Task

• Common tasks:

– Tasks required for safe operations, such as leak investigation, valve operation, and pinch-offs.

• Position specific tasks:

– Tasks required for specific personnel such as corrosion evaluation, weld inspection, and coating application.

Page 14: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Covered Task Examples

• Locating existing facilities

• Hot tapping and stopping

• Regulator calibration or repair

• Valve operation and maintenance

Page 15: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Qualified (1 of 2)

Page 16: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Qualified (2 of 2)

• The operator is required to

− qualify the tasks using the company program and

− ensure that contracted parties are qualified.

Page 17: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Qualified Responsibilities

• Operators must determine re-evaluation intervals

• Some covered tasks are identified standards. (API,ASME,NACE,PPI,)

• Operators must notify OPS (or State agency) of significant modifications to their program.

Page 18: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Significant Changes Examples

• Includes but is not limited to:

• Increasing evaluation intervals.

• Increasing span of control ratios.

• Eliminating covered tasks.

• Mergers and/or acquisition changes.

• Evaluation method changes such as written vs. observation.

• Wholesale changes made to OQ plan

Page 19: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Training (1 of 2)

Page 20: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Training (2 of 2)

• Define skills and knowledge.• Initiate qualification assessments.• Present developed audit-able training

program(s).• Measure performance/effectiveness of

qualifications.• Retain detailed records of classroom, field, and

simulated assessments.• Perform refresher and an ongoing performance

training program(s).

Page 21: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Training Records

• OQ records are required for all individuals and contractors under the operator qualification program.

Page 22: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Guidance Interpretation & Advisories

Page 23: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Interpretation

Interpretation #PI-09-0003 192, 195 Date: 6-24-2009

• Non-Employees including emergency personnel must be qualified to perform covered tasks.

• Notification on Safe Excavation Practices and the use of Qualified Personnel to oversee all Excavations and Backfilling Operations.

Page 24: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Advisory

Advisory Bulletin ADB-09-03 192, 195 1-17-2006

• Defined “Significant” and Observation of on-the-job performance” additionally requires operators to notify PHMSA or state entity of significant changes to their OQ programs.

Page 25: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Inspections (1 of 2)

• Does the training program provide adequate documentation?

• Is the training program being reviewed?

• What is the change process and how is it being implemented?

• Off the self plans verses the operators program

Page 26: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Inspections (2 of 2)

• Is training sufficient and specific for the covered task and include AOC’s?

• Is there criteria defined and a process established for the re-evaluation or re-training of personnel?

• Does the operator have personal that does not meet expectations?

Page 27: Navigating the Code: Operator Qualification...Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide) Navigating the Code: Operator Qualification Joey Bass

Railroad Commission of Texas | June 27, 2016 (Change Date In First Master Slide)

Questions