13
1 Natural Gas Transmission Pipelines Brisbane City Council Meeting June 6, 2011

Natural Gas Transmission Pipelines

Embed Size (px)

DESCRIPTION

Natural Gas Transmission Pipelines. Brisbane City Council Meeting June 6, 2011. Natural Gas Transmission Pipelines. PG&E provides 4.3 million customer accounts with natural gas service PG&E’s top priority is safety Comprehensive pipeline inspection and monitoring programs - PowerPoint PPT Presentation

Citation preview

Page 1: Natural Gas Transmission Pipelines

1

Natural Gas Transmission Pipelines

Brisbane City Council Meeting

June 6, 2011

Page 2: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

2

Natural Gas Transmission Pipelines PG&E provides 4.3 million customer accounts

with natural gas service

PG&E’s top priority is safety

Comprehensive pipeline inspection and monitoring programs

- Monitor pipelines on a 24-hour basis

- Conduct regular pipeline assessments

- Any issues identified as a threat to public safety are immediately addressed

Page 3: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

3

Enhancing the Safety of the System

Reduction in Gas PressureAccelerated Leak SurveyRoutine Pipeline PatrolsCathodic Protection SurveysIntegrity Assessments

Page 4: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

4

Natural Gas Transmission Pipelines

Page 5: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

5

Natural Gas Transmission Pipelines PG&E uses data it collects during routine

surveys to help plan and prioritize future work

Evaluation takes into consideration the following criteria:

- Potential for third party damage

- Potential for corrosion

- Potential for ground movement

- Physical design and characteristics

Page 6: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

6

Natural Gas Transmission Pipelines PG&E determines which segments warrant

further evaluation, monitoring or future action- Top 100 list

- Document used to inform future work plans

- As conditions change and work is completed year to year, PG&E reevaluates the segments included on the list

- No Brisbane segments appear on the Top 100 list

- Pipelines in Brisbane- Line 101 runs along Bayshore Boulevard

- Line 132 runs through San Bruno Mountain State Park, crosses West Hill Place and north to Guadalupe Canyon Parkway

Page 7: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

77Lines 101 and 132

Page 8: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

8

Natural Gas Transmission Pipelines

Pipeline 2020 Program Modernize Critical Pipeline Infrastructure

Expand the Use of Automatic and Remotely Operated Shut-Off Valves

Spur Development of Next-Generation Inspection Technologies

Develop Industry-Leading Best Practices

Enhance Public Safety Partnerships

Page 9: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

9

What is hydrostatic testing?• PG&E will be performing a hydrostatic pressure test

on a segment of natural gas pipeline.

• This involves pressurizing a section of pipe with water to a much higher level than the pipe will ever operate at with natural gas.

• This verifies the capability of a pipeline to safely operate and can also reveal weaknesses that could lead to defects and leaks.

Page 10: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

10

Customer outreach efforts:PG&E has a comprehensive plan for customer and community outreach regarding our tests and field work:• Letters sent to all residents and businesses near the area

where testing will take place, with the following information:

• Project fact sheets will be included with the letters that will describe the work, what customers can expect, and when the work will be completed

• Open Houses where customers can have their questions answered by PG&E representatives and subject matter experts

• Door hangers placed on residences nearest to construction activity to remind them of work just prior to it taking place

• Recorded reminder messages delivered by telephone

• Post-test letter informing residents and businesses of the test results

Page 11: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

1111Work area:

Page 12: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

12

Where to go for more information:• Customer Care gas specialist representatives are

available to answer questions about natural gas pipelines or the work being done in the area at 1-888-743-7431, between 7 a.m. and 6 p.m., Monday through Friday.

• Online information about the project, PG&E’s Natural Gas Transmission System and our Pipeline Safety Programs at: www.pge.com/gassystem.

Page 13: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

13

ResourcesWebsite: www.pge.com

Pipeline Information Line: 1-888-743-7431

Customer Call Center: 1-800-743-5000

Contractors “Call Before You Dig”: 811