Natural Gas Engineering Hand Book (2005) Appendix E

Embed Size (px)

Citation preview

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    1/25

    Appen dix E

    T h e M i n i m u m G a s P r o d u c t i o n R a t e

    f o r C o n d e n s a t e R e m o v a l i n G a s W e l l s

    Data presented in this section were generated with Guo's method on thebasis of the following param eter values:

    Gas specific gravity:

    Hole inclination:

    Wellhead pressure:

    Wellhead temperature:

    Geothermal gradient:

    Condensate gravity:

    Condensate production rate:

    Water specific gravity:Water production rate:

    Solid make:

    Tubing ID:

    Conduit wall roughness:

    Maximum interfacial tension:

    1.08 water = 1

    1.66 to 3.5 in

    0.60 to 0.90 air =1

    Previous Page

    http://11339_appd.pdf/http://11339_appd.pdf/
  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    2/25

    Critical Production Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    1.66-in. Tubing, 0.60-S.G. Gas,100-psia Wellhead Pressure

    [OilMake, bb/day

    Depth (ft)Figure E-1 Critical gas production rate for condensate removal in 1.66-in

    tubing against 100 psia wellhead pressure, S.G. 0.60 gas.

    1.66-in. Tubing, 0.60-S.G. Gas,300-psia Wellhead Pressure

    OilMake, bb/day

    Depth (ft)Figure E-2 Critical gas production rate for condensate removal in 1.66-in

    tubing against 300 psia wellhead pressure, S.G. 0.60 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    3/25

    Critical Production Rate (M

    scf/d)

    Critical Production Rate (M

    scf/d)

    1.66-in. Tubing, 0.60-S.G. Gas,500-psia Wellhead Pressure

    OilMake, bb/day

    Depth (ft)Figure E-3 Critical gas production rate for condensate removal in 1.66-in

    tubing against 500 psia wellhead pressure, S.G. 0.60 gas.

    1.66-in. Tubing, 0.60-S.G. Gas,700-psia Wellhead Pressure

    Oil Make, bbl/day

    Depth (ft)Figure E-4 Critical gas production rate for condensate removal in 1.66-in

    tubing against 700 psia wellhead pressure, S.G. 0.60 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    4/25

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    5/25

    Critical Production Rate (M

    scf/d)

    Critical Production Rate (M

    scf/d)

    1.995-in. Tubing, 0.60-S.G. Gas,300-psia Wellhead Pressure

    OilMake, bbl/day

    Depth (ft)Figure E-7 Critical gas production rate for condensate removal in 1.995-in

    tubing against 300 psia wellhead pressure, S.G. 0.60 gas.

    1.995-in. Tubing, 0.60-S.G. Gas,500-psia Wellhead Pressure

    OlMake, bb /day

    Depth (ft)

    Figure E-8 Critical gas production rate for condensate removal in 1.995-intubing against 500 psia wellhead pressure, S.G. 0.60 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    6/25

    Critical P

    roduction Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    Depth (ft)

    Figure E-10 Critical gas production rate for condensate removal in 1.995-intubing against 900 psia wellhead pressure, S.G. 0.60 gas.

    OilMake, bb /day

    Depth (ft)Figure E-9 Critical gas production rate for condensate removal in 1.995-in

    tubing against 700 psia wellhead pressure, S.G. 0.60 gas.

    1.995-in. Tubing, 0.60-S.G. Gas,900-psia Wellhead Pressure

    fOilMake, bb /day

    1.995-in. Tubing, 0.60-S.G. Gas,700-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    7/25

    Critica

    l Production Rate (M

    scf/d)

    Critical Production Rate (M

    scf/d)

    2.375-in. Tubing, 0.60-S.G. Gas,100-psia Wellhead Pressure

    OilMake, bb/day

    Depth (ft)Figure E-11 Critical gas production rate for condensate removal in 2.375-in

    tubing against 100 psia wellhead pressure, S.G. 0.60 gas.

    2.375-in. Tubing, 0.60-S.G. Gas,300-psia Wellhead Pressure

    OilMake, bbl/day

    Depth (ft)

    Figure E-12 Critical gas production rate for condensate removal in 2.375-intubing against 300 psia wellhead pressure, S.G. 0.60 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    8/25

    Critical P

    roduction Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    2.375-in. Tubing, 0.60-S.G. Gas,500-psia Wellhead Pressure

    OilMake, bbl/day

    Depth (ft)Figure E-13 Critical gas production rate for condensate removal in 2.375-in

    tubing against 500 psia wellhead pressure, S.G. 0.60 gas.

    2.375-in. Tubing, 0.60-S.G. Gas,700-psia Wellhead Pressure

    OIMake, bbl/day

    Depth (ft)

    Figure E-14 Critical gas production rate for condensate removal in 2.375-intubing against 700 psia wellhead pressure, S.G. 0.60 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    9/25

    Critica

    l Production Rate (M

    scf/d)

    Critical P

    roduction Rate (M

    scf/d)

    Depth (ft)

    Figure E-16 Critical gas production rate for condensate removal in 2.875-intubing against 100 psia wellhead pressure, S.G. 0.60 gas.

    OilMake, bb/day

    Depth (ft)Figure E-15 Critical gas production rate for condensate removal in 2.375-in

    tubing against 900 psia wellhead pressure, S.G. 0.60 gas.

    2.875-in. Tubing, 0.60-S.G. Gas,100-psia Wellhead Pressure

    OilMake, bb/day

    2.375-in. Tubing, 0.60-S.G. Gas,900-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    10/25

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    11/25

    Critica

    l Production Rate (M

    scf/d)

    Critical Production Rate (M

    scf/d)

    Depth (ft)

    Figure E-20 Critical gas production rate for condensate removal in 2.875-intubing against 900 psia wellhead pressure, S.G. 0.60 gas.

    OilMake, bb/day

    Depth (ft)Figure E-19 Critical gas production rate for condensate removal in 2.875-in

    tubing against 700 psia wellhead pressure, S.G. 0.60 gas.

    2.875-in. Tubing, 0.60-S.G. Gas,900-psia Wellhead Pressure

    ,OilMake, bbl/day

    2.875-in. Tubing, 0.60-S.G. Gas,700-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    12/25

    Critical P

    roduction Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    3.5-in. Tubing,0.60-S.G. Gas,100-psia Wellhead Pressure

    OilMake, bb /day

    Depth (ft)Figure E-21 Critical gas production rate for condensate removal in 3.5-in

    tubing against 100 psia wellhead pressure, S.G. 0.60 gas.

    3.5-in. Tubing,0.60-S.G. Gas,300-psia Wellhead Pressure

    OilMake bbl/day

    Depth (ft)

    Figure E-22 Critical gas production rate for condensate removal in 3.5-intubing against 300 psia wellhead pressure, S.G. 0.60 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    13/25

    Critica

    l Production Rate (M

    scf/d)

    Critical P

    roduction Rate (M

    scf/d)

    3.5-in. Tubing,0.60-S.G. Gas,500-psia Wellhead Pressure

    OilMake bbl/day

    Depth (ft)Figure E-23 Critical gas production rate for condensate removal in 3.5-in

    tubing against 500 psia wellhead pressure, S.G. 0.60 gas.

    3.5-in. Tubing,0.60-S.G. Gas,700-psia Wellhead Pressure

    OilMake bb/day

    Depth (ft)

    Figure E-24 Critical gas production rate for condensate removal in 3.5-intubing against 700 psia wellhead pressure, S.G. 0.60 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    14/25

    Critical P

    roduction Rate (M

    scf/d)

    Critical Production Rate (M

    scf/d)

    Depth (ft)

    Figure E-26 Critical gas production rate for condensate removal in 1.66-intubing against 100 psia wellhead pressure, S.G. 0.70 gas.

    OilMake, bb/day

    Depth (ft)Figure E-25 Critical gas production rate for condensate removal in 3.5-in

    tubing against 900 psia wellhead pressure, S.G. 0.60 gas.

    1.66-in. Tubing, 0.70-S.G. Gas,100-psia Wellhead Pressure

    OilMake, bbl/day

    3.5-in. Tubing,0.60-S.G. Gas,900-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    15/25

    Critica

    l Production Rate (M

    scf/d)

    Critical P

    roduction Rate (M

    scf/d)

    1.66-in. Tubing, 0.70-S.G. Gas,300-psia Wellhead Pressure

    OilMake, bb/day

    Depth (ft)Figure E-27 Critical gas production rate for condensate removal in 1.66-in

    tubing against 300 psia wellhead pressure, S.G. 0.70 gas.

    1.66-in. Tubing, 0.70-S.G. Gas,500-psia Wellhead Pressure

    OilMake, bb/day

    Depth (ft)

    Figure E-28 Critical gas production rate for condensate removal in 1.66-intubing against 500 psia wellhead pressure, S.G. 0.70 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    16/25

    Critical P

    roduction Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    1.66-in. Tubing, 0.70-S.G. Gas,700-psia Wellhead Pressure

    OilMake, bb/day

    IOilMake, bb /day

    Depth (ft)Figure E-29 Critical gas production rate for condensate removal in 1.66-in

    tubing against 700 psia wellhead pressure, S.G. 0.70 gas.

    1.66-in. Tubing, 0.70-S.G. Gas,900-psia Wellhead Pressure

    Depth (ft)

    Figure E-30 Critical gas production rate for condensate removal in 1.66-intubing against 900 psia wellhead pressure, S.G. 0.70 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    17/25

    Critica

    l Production Rate (M

    scf/d)

    Critical Production Rate (M

    scf/d)

    OilMake, bb /day

    1.995-in. Tubing, 0.70-S.G. Gas,300-psia Wellhead Pressure

    OilMake, bb /day

    1.995-in. Tubing, 0.70-S.G. Gas,100-psia Wellhead Pressure

    Depth (ft)Figure E-31 Critical gas production rate for condensate removal in 1.995-in

    tubing against 100 psia wellhead pressure, S.G. 0.70 gas.

    Depth (ft)

    Figure E-32 Critical gas production rate for condensate removal in 1.995-intubing against 300 psia wellhead pressure, S.G. 0.70 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    18/25

    Critical P

    roduction Rate (M

    scf/d)

    Critical Production Rate (M

    scf/d)

    1.995-in. Tubing, 0.70-S.G. Gas,500-psia Wellhead Pressure

    JOil Make, bb/day

    OilMake, bb/day

    Depth (ft)

    Figure E-34 Critical gas production rate for condensate removal in 1.995-intubing against 700 psia wellhead pressure, S.G. 0.70 gas.

    Depth (ft)Figure E-33 Critical gas production rate for condensate removal in 1.995-in

    tubing against 500 psia wellhead pressure, S.G. 0.70 gas.

    1.995-in. Tubing, 0.70-S.G. Gas,700-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    19/25

    Critical Production Rate (M

    scf/d)

    Critical P

    roduction Rate (M

    scf/d)

    piMake bb/day

    OilMake, bbl/day

    1.995-in. Tubing, 0.70-S.G. Gas,900-psia Wellhead Pressure

    Depth (ft)Figure E-35 Critical gas production rate for condensate removal in 1.995-in

    tubing against 900 psia wellhead pressure, S.G. 0.70 gas.

    2.375-in. Tubing, 0.70-S.G. Gas,100-psia Wellhead Pressure

    Depth (ft)

    Figure E-36 Critical gas production rate for condensate removal in 2.375-intubing against 100 psia wellhead pressure, S.G. 0.70 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    20/25

    Critical P

    roduction Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    OilMake, bb/day

    OilMake, bb /day

    Depth (ft)

    Figure E-38 Critical gas production rate for condensate removal in 2.375-intubing against 500 psia wellhead pressure, S.G. 0.70 gas.

    Depth (ft)Figure E-37 Critical gas production rate for condensate removal in 2.375-in

    tubing against 300 psia wellhead pressure, S.G. 0.70 gas.

    2.375-in. Tubing, 0.70-S.G. Gas,500-psia Wellhead Pressure

    2.375-in. Tubing, 0.70-S.G. Gas,300-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    21/25

    Critical Production Rate (M

    scf/d)

    Critical P

    roduction Rate (M

    scf/d)

    OilMake, bbl/day

    OilMake, bb/day

    2.375-in. Tubing, 0.70-S.G. Gas,700-psia Wellhead Pressure

    Depth (ft)Figure E-39 Critical gas production rate for condensate removal in 2.375-in

    tubing against 700 psia wellhead pressure, S.G. 0.70 gas.

    2.375-in. Tubing, 0.70-S.G. Gas,900-psia Wellhead Pressure

    Depth (ft)

    Figure E-40 Critical gas production rate for condensate removal in 2.375-intubing against 900 psia wellhead pressure, S.G. 0.70 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    22/25

    Critical Production Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    OilMake, bb/day

    OilMake bbl/day

    Depth (ft)

    Figure E-42 Critical gas production rate for condensate removal in 2.875-intubing against 300 psia wellhead pressure, S.G. 0.70 gas.

    Depth (ft)Figure E-41 Critical gas production rate for condensate removal in 2.875-in

    tubing against 100 psia wellhead pressure, S.G. 0.70 gas.

    2.875-in. Tubing, 0.70-S.G. Gas,300-psia Wellhead Pressure

    2.875-in. Tubing, 0.70-S.G. Gas,100-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    23/25

    Critica

    l Production Rate (M

    scf/d)

    Critical P

    roduction Rate (M

    scf/d)

    OilMake bb/day

    OilMake, bb/day

    2.875-in. Tubing, 0.70-S.G. Gas,500-psia Wellhead Pressure

    Depth (ft)Figure E-43 Critical gas production rate for condensate removal in 2.875-in

    tubing against 500 psia wellhead pressure, S.G. 0.70 gas.

    2.875-in. Tubing, 0.70-S.G. Gas,700-psia Wellhead Pressure

    Depth (ft)

    Figure E-44 Critical gas production rate for condensate removal in 2.875-intubing against 700 psia wellhead pressure, S.G. 0.70 gas.

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    24/25

    Critical Production Rate (M

    scf/d)

    Critica

    l Production Rate (M

    scf/d)

    OilMake, bb /day

    OilMake bbl/day

    Depth (ft)

    Figure E-46 Critical gas production rate for condensate removal in 3.5-intubing against 100 psia wellhead pressure, S.G. 0.70 gas.

    Depth (ft)Figure E-45 Critical gas production rate for condensate removal in 2.875-in

    tubing against 900 psia wellhead pressure, S.G. 0.70 gas.

    3.5-in. Tubing,0.70-S.G. Gas,100-psia Wellhead Pressure

    2.875-in. Tubing, 0.70-S.G. Gas,900-psia Wellhead Pressure

  • 8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix E

    25/25

    Critica

    l Production Rate (M

    scf/d)

    Critical P

    roduction Rate (M

    scf/d)

    OilMake, bb/day

    OilMake bb/day

    3.5-in. Tubing,0.70-S.G. Gas,300-psia Wellhead Pressure

    Depth (ft)Figure E-47 Critical gas production rate for condensate removal in 3.5-in

    tubing against 300 psia wellhead pressure, S.G. 0.70 gas.

    3.5-in. Tubing,0.70-S.G. Gas,500-psia Wellhead Pressure

    Depth (ft)

    Next Page