Upload
kapil-singh
View
219
Download
0
Embed Size (px)
Citation preview
8/2/2019 Natural Disaster Management Project
1/12
8/2/2019 Natural Disaster Management Project
2/12
Point of Contact Pakorn Apaphant, GISTDA
Hiromichi Fukui, Keio University/JAXA
8/2/2019 Natural Disaster Management Project
3/12
From WGISS 22A project profile was proposed
To support DI 06-01
Presentations
Related projects/TTs from WGISS
Discussion
To add value of the Project
how could it support a GEOSS task
8/2/2019 Natural Disaster Management Project
4/12
DI-06-09: Use of Satellite
for Risk Management Led by WMO and China
With Reference to a multi-hazard approach, define andfacilitate implementation of a virtual constellation for risk
management. The task will include:
Development of dedicate software tools to be used
in short term, to facilitate the analysis of coverage for criticalcoverage for critical observations and,
in medium term, to implement the user interface with theoperators for products ordering and retrieval, and to performdata integration and reprocessing.
8/2/2019 Natural Disaster Management Project
5/12
Origin of the task team Use of Satellite for risk management
has been indicated as Task DI-06-09 in
GEO 2007-2009 Work Plan.
The medium term goal isto implementthe user interface with the operators for
products ordering and retrieval and toperform data integration andreprocessing.
8/2/2019 Natural Disaster Management Project
6/12
Coordination among agencies has establishedsuch as Sentinel Asia and ASIAES
to make use of space related technologies fordisaster and risk management.
To develop a prototype to support themedium goal of DI06-09
using existing tools in Sentinel Asia and ASIAES
developed by WGISS member agencies
8/2/2019 Natural Disaster Management Project
7/12
Objectives To make use of technologies and tools
developed by WGISS/CEOS to support
GEOSS task DI 06-09
To prototype user interface for orderingand retrieval of relevant data
integration service for better access ofsatellite imageries of Natural disasterrisk areas in Asia.
8/2/2019 Natural Disaster Management Project
8/12
Implement strategy June 07 Sep 08 (1 year 3 months)
June 2007 September 2007
To coordinate with the DI 06-09 taskleaders (CSA and CNES), who shallcontribute for this task
To design a prototype
8/2/2019 Natural Disaster Management Project
9/12
October 2007 April 2008 (WGISS 24)
To develop a prototype to support task
requirement using tools available inSentinel Asia and ASIAES systems
To test capability of the prototype
April 2008-September 2008 (WGISS 25) To document project summary and report
8/2/2019 Natural Disaster Management Project
10/12
Deliverables
User interface
For ordering and retrieval of relevant data
Data integration services.
Potential External Partnerships
Space Agencies in Asia Pacific
8/2/2019 Natural Disaster Management Project
11/12
Relationship with WGISS Goal NDM activities relate to access, archiving and
exchange of satellite images. The systems
will be also interconnected and interoperable
NDM will coordinate with CEOS and NonCEOS members..
NDM will provide forums throughinternational coordination such as Sentinel
Asia, ASIAES project, and APAN network
8/2/2019 Natural Disaster Management Project
12/12
Thank youfor your consideration