Natural Disaster Management Project

Embed Size (px)

Citation preview

  • 8/2/2019 Natural Disaster Management Project

    1/12

  • 8/2/2019 Natural Disaster Management Project

    2/12

    Point of Contact Pakorn Apaphant, GISTDA

    Hiromichi Fukui, Keio University/JAXA

  • 8/2/2019 Natural Disaster Management Project

    3/12

    From WGISS 22A project profile was proposed

    To support DI 06-01

    Presentations

    Related projects/TTs from WGISS

    Discussion

    To add value of the Project

    how could it support a GEOSS task

  • 8/2/2019 Natural Disaster Management Project

    4/12

    DI-06-09: Use of Satellite

    for Risk Management Led by WMO and China

    With Reference to a multi-hazard approach, define andfacilitate implementation of a virtual constellation for risk

    management. The task will include:

    Development of dedicate software tools to be used

    in short term, to facilitate the analysis of coverage for criticalcoverage for critical observations and,

    in medium term, to implement the user interface with theoperators for products ordering and retrieval, and to performdata integration and reprocessing.

  • 8/2/2019 Natural Disaster Management Project

    5/12

    Origin of the task team Use of Satellite for risk management

    has been indicated as Task DI-06-09 in

    GEO 2007-2009 Work Plan.

    The medium term goal isto implementthe user interface with the operators for

    products ordering and retrieval and toperform data integration andreprocessing.

  • 8/2/2019 Natural Disaster Management Project

    6/12

    Coordination among agencies has establishedsuch as Sentinel Asia and ASIAES

    to make use of space related technologies fordisaster and risk management.

    To develop a prototype to support themedium goal of DI06-09

    using existing tools in Sentinel Asia and ASIAES

    developed by WGISS member agencies

  • 8/2/2019 Natural Disaster Management Project

    7/12

    Objectives To make use of technologies and tools

    developed by WGISS/CEOS to support

    GEOSS task DI 06-09

    To prototype user interface for orderingand retrieval of relevant data

    integration service for better access ofsatellite imageries of Natural disasterrisk areas in Asia.

  • 8/2/2019 Natural Disaster Management Project

    8/12

    Implement strategy June 07 Sep 08 (1 year 3 months)

    June 2007 September 2007

    To coordinate with the DI 06-09 taskleaders (CSA and CNES), who shallcontribute for this task

    To design a prototype

  • 8/2/2019 Natural Disaster Management Project

    9/12

    October 2007 April 2008 (WGISS 24)

    To develop a prototype to support task

    requirement using tools available inSentinel Asia and ASIAES systems

    To test capability of the prototype

    April 2008-September 2008 (WGISS 25) To document project summary and report

  • 8/2/2019 Natural Disaster Management Project

    10/12

    Deliverables

    User interface

    For ordering and retrieval of relevant data

    Data integration services.

    Potential External Partnerships

    Space Agencies in Asia Pacific

  • 8/2/2019 Natural Disaster Management Project

    11/12

    Relationship with WGISS Goal NDM activities relate to access, archiving and

    exchange of satellite images. The systems

    will be also interconnected and interoperable

    NDM will coordinate with CEOS and NonCEOS members..

    NDM will provide forums throughinternational coordination such as Sentinel

    Asia, ASIAES project, and APAN network

  • 8/2/2019 Natural Disaster Management Project

    12/12

    Thank youfor your consideration