36
1 Home Building Technology Services Home Building Technology Services 1 Presented by Joe Nagan Joe Nagan, Home Building Technology Services Ventilation Best Practices & Ventilation Best Practices & airflow verification airflow verification National Weatherization Conference National Weatherization Conference Home Building Technology Services Home Building Technology Services 2 Home Building Technology Services Home Building Technology Services 3 FIELD RESEARCH FIELD RESEARCH

National Weatherization Conference Ventilation Best .... Nagan... · Cooking. 9. Breathing. 9. Plants. 9. Pets. 9. ... ‘Ventilation strategies’ & equipment ... Stack head mounted

  • Upload
    hatuyen

  • View
    215

  • Download
    1

Embed Size (px)

Citation preview

1

Home Building Technology ServicesHome Building Technology Services 1

Presented by

Joe NaganJoe Nagan, Home Building Technology Services

Ventilation Best Practices &Ventilation Best Practices &

airflow verificationairflow verification

National Weatherization ConferenceNational Weatherization Conference

Home Building Technology ServicesHome Building Technology Services 2

Home Building Technology ServicesHome Building Technology Services 3

FIELD RESEARCHFIELD RESEARCH

2

Home Building Technology ServicesHome Building Technology Services 4

Objectives for this session:Objectives for this session:

Review ventilation design strategies

Review multiple installation challenges

Discuss YOUR YOUR concerns

NOTE: Questions are encouraged during this presentation, jump right in !

Home Building Technology ServicesHome Building Technology Services 5

Reasons to ventilateReasons to ventilate??PeoplePeople-- IAQIAQ

Building durabilityBuilding durability

PostPost--weatherizationweatherization

Home Building Technology ServicesHome Building Technology Services 6

BlowerBlower--door testing confirms door testing confirms tightness goalstightness goals!!

3

Home Building Technology ServicesHome Building Technology Services 7

ISSUESISSUES that that should beshould be considered:considered:INDOOR AIR QUALITYINDOOR AIR QUALITY

* ventilation:ventilation: fresh air and moisture control

COMBUSTION SAFETYCOMBUSTION SAFETY* back drafting: back drafting: sooting and combustion gases

TIGHTER BUILDINGS CHECKLISTTIGHTER BUILDINGS CHECKLISTTIGHTER BUILDINGS CHECKLIST

Home Building Technology ServicesHome Building Technology Services 8

“A house is said to have poor Indoor Air Quality when the inside air contains enough of a substance to adversely affect thecomfort, health or safety of the occupants”

Generally speaking;

Home Building Technology ServicesHome Building Technology Services 9

‘‘Natural draftNatural draft’’ water heater spillagewater heater spillage

4

Home Building Technology ServicesHome Building Technology Services 10

‘‘SEVERESEVERE’’ back drafting!back drafting!

Home Building Technology ServicesHome Building Technology Services 11

‘Moisture’ sources in homesConstructionBathingCookingBreathingPlantsPetsLifestyle/hobbiesUnsealed sump pitsHumidifiersCombustion appliances

Some Some too wettoo wet, some too dry, some too dry

Home Building Technology ServicesHome Building Technology Services 12

Bathroom issuesBathroom issues

moisturemoisture

odors odors

5

Home Building Technology ServicesHome Building Technology Services 13

MoistureMoisture or or temperaturetemperature problemproblem??

Home Building Technology ServicesHome Building Technology Services 14

‘‘PollutantPollutant’’ sources in homessources in homesHygiene productsCleanersCookingSmokingPetsLifestyle/hobbiesUnsealed sump pits Attached garagesCombustion appliances ‘Every home will be different’

Home Building Technology ServicesHome Building Technology Services 15

Bathroom sources: Bathroom sources: hygiene products/cleanershygiene products/cleaners

6

Home Building Technology ServicesHome Building Technology Services 16

Laundry room sources: Laundry room sources: cleaning products/softenerscleaning products/softeners

Home Building Technology ServicesHome Building Technology Services 17

Basement sources: Basement sources: catch all for junk and moisturecatch all for junk and moisture

Home Building Technology ServicesHome Building Technology Services 18

‘‘Ventilation strategiesVentilation strategies’’ & equipment& equipmentSpot exhaustSpot exhaust

Remote spot exhaust & multiRemote spot exhaust & multi--pointpoint

Balanced flow with Balanced flow with HeatHeat and/or and/or ENERGYENERGY recoveryrecovery

7

Home Building Technology ServicesHome Building Technology Services 19

Typical bath exhaust fan doing spot ventingTypical bath exhaust fan doing spot venting

Home Building Technology ServicesHome Building Technology Services 20

Rated for wet location w/GFI protectionRated for wet location w/GFI protection-- mount in showermount in shower

Home Building Technology ServicesHome Building Technology Services 21

Bathroom fan spot ventilation wall switchBathroom fan spot ventilation wall switch

8

Home Building Technology ServicesHome Building Technology Services 22

Typical bath exhaust fan doing double dutyTypical bath exhaust fan doing double duty**

Home Building Technology ServicesHome Building Technology Services 23

Bath fan mounted in main part of homeBath fan mounted in main part of home

Home Building Technology ServicesHome Building Technology Services 24

Acceptable whole building ventilation controlAcceptable whole building ventilation control

Mounted in the main part of home accessible to the owner. Wire in parallel with bathroom fan or remote spot fan doing double duty. (not 3-way operation)

Ventilation system

Many control options available- check with vendors

9

Home Building Technology ServicesHome Building Technology Services 25

Broan-Nutone model 744BroanBroan--NutoneNutone model 744model 744

Home Building Technology ServicesHome Building Technology Services 26

Can lightCan light

44”” exhaust ductexhaust duct

Home Building Technology ServicesHome Building Technology Services 27

Broan Broan ‘‘SmartSenseSmartSense’’Intelligent Ventilation systemIntelligent Ventilation system

Automates their Automates their QTXE QTXE 80/11080/110

cfm rated fanscfm rated fans

Uses house wiring to communicateUses house wiring to communicate

ASHRAE 62.2 readyASHRAE 62.2 ready

10

Home Building Technology ServicesHome Building Technology Services 28

66--inch connection allows for less restrictive ductinginch connection allows for less restrictive ducting

Home Building Technology ServicesHome Building Technology Services 29

XX--1010 automation technology automation technology

Home Building Technology ServicesHome Building Technology Services 30

Common house wiring is used !Common house wiring is used !

11

Home Building Technology ServicesHome Building Technology Services 31

PanasonicPanasonicAutomated fan

Low speed continuous

30-80 cfm

High speed boost

* 80 cfm

* motion sensor

* wall switch

* adjustable boost off time delay

* 1-60 minutes

ASHRAE 62.2 ready

Home Building Technology ServicesHome Building Technology Services 32

80 CFM high speed w/variable continuous80 CFM high speed w/variable continuous

Home Building Technology ServicesHome Building Technology Services 33

Occupancy sensor activation modelOccupancy sensor activation model

12

Home Building Technology ServicesHome Building Technology Services 34

Built in automation/controlsBuilt in automation/controls

Continuous Continuous CFMCFM speed controlspeed control

High speed High speed boost time delayboost time delay

Home Building Technology ServicesHome Building Technology Services 35

The The ‘‘ULTIMATEULTIMATE’’

ManMan’’s fan!s fan!

Home Building Technology ServicesHome Building Technology Services 36

Quiet remote inQuiet remote in--line fan combinationline fan combination

13

Home Building Technology ServicesHome Building Technology Services 37

Remote mounted exhaust ventilation systemRemote mounted exhaust ventilation system

Home Building Technology ServicesHome Building Technology Services 38

Mounting issuesMounting issues

Home Building Technology ServicesHome Building Technology Services 39

Dampers on each branchDampers on each branch

14

Home Building Technology ServicesHome Building Technology Services 40

Stack head mounted close to sourceStack head mounted close to source

Home Building Technology ServicesHome Building Technology Services 41

Very low power draw by fanVery low power draw by fan

Home Building Technology ServicesHome Building Technology Services 42

Stack headsStack heads can be used with most remote fans as well as with HRV/ERVHRV/ERV’’ss

15

Home Building Technology ServicesHome Building Technology Services 43

Home Building Technology ServicesHome Building Technology Services 44

Very low power draw by CFLVery low power draw by CFL

Home Building Technology ServicesHome Building Technology Services 45

Range hoods should be ducted to the outsideRange hoods should be ducted to the outside

16

Home Building Technology ServicesHome Building Technology Services 46

Venmar S31301LSVenmar S31301LS 2 speed range hood

Home Building Technology ServicesHome Building Technology Services 47

CFLCFL’’ss will fit in cabinet!!

Home Building Technology ServicesHome Building Technology Services 48

LowLow spee speedd power draw

High speedHigh speed power draw

17

Home Building Technology ServicesHome Building Technology Services 49

Remember:Remember:

1 CFM out = 1 CFM in

We know where the air is leaving, where does the air come in

Applied physics and building science

?Always comply Always comply wwiith th code lcode liimmiits fts foor r ddee--pressuripressurizatzatiioonn

DeDe--pressuripressurizzaatitionon con conccernernss wiwith exhath exhaust onust onllyy

Home Building Technology ServicesHome Building Technology Services 50

Compact HRV/ERV whole house unitCompact HRV/ERV whole house unit--as small as 70 cfmas small as 70 cfm

Home Building Technology ServicesHome Building Technology Services 51

Very low Very low power consumption!!

18

Home Building Technology ServicesHome Building Technology Services 52

Broan Broan ERVERV90HC: 90HC: side or top connections

Home Building Technology ServicesHome Building Technology Services 53

BREEZE from RenewBREEZE from RenewAireAire

Home Building Technology ServicesHome Building Technology Services 54

PrePre--filtersfilters

19

Home Building Technology ServicesHome Building Technology Services 55

‘‘DIRECT MOUNTDIRECT MOUNT’’ HRV or ERV now availableHRV or ERV now available-- no blowersno blowers

Home Building Technology ServicesHome Building Technology Services 56

Control has both ASHRAE 62.2 or Control has both ASHRAE 62.2 or ‘‘%%’’ time run functionstime run functions

Home Building Technology ServicesHome Building Technology Services 57

Tandem Tandem termination fitting & grille

20

Home Building Technology ServicesHome Building Technology Services 58

Exhaust air outExhaust air out

Fresh air inFresh air in

Home Building Technology ServicesHome Building Technology Services 59

HRVHRV’’s and ERVs and ERV’’s have their own controlss have their own controls

Home Building Technology ServicesHome Building Technology Services 60

Line voltage dual function controlLine voltage dual function control

21

Home Building Technology ServicesHome Building Technology Services 61

HRV or ERV function:HRV or ERV function: balanced flow with balanced flow with HEATHEAT and/or and/or MOISTUREMOISTURE recoveryrecovery

Stale air from houseStale air from house

Fresh air from outsideFresh air from outside

Stale air to outsideStale air to outside

Tempered air to houseTempered air to house

Home Building Technology ServicesHome Building Technology Services 62

At this point we have only spent At this point we have only spent some MONEYsome MONEY!!

The only thing that matters is:The only thing that matters is:Does it work Does it work –– how wellhow well??

Did we meet our design goalsDid we meet our design goals??

yesyes//nono

Home Building Technology ServicesHome Building Technology Services 63

Benefits

The ONLY way to know if your equipment is working

Learn what does and doesn’t work

Reduce callbacks

Create paper trail

Manage expectations

Airflow testingAirflow testing

# 1 problem: Very few people test anything

22

Home Building Technology ServicesHome Building Technology Services 64

All ventilation systems All ventilation systems must be testedmust be tested for flowfor flow

Home Building Technology ServicesHome Building Technology Services 65

Poor ducting installationPoor ducting installation

# # 22 problem: NASTY restrictive ductworkproblem: NASTY restrictive ductwork

Exit grille here !

Home Building Technology ServicesHome Building Technology Services 66

80 CFM fan 480 CFM fan 4’’ from outside grille:from outside grille:tested airflow: 31 cfm31 cfm for a whoppingwhopping 39%39%

of rated airflow

What was the What was the designdesign airflow ?airflow ?

23

Home Building Technology ServicesHome Building Technology Services 67

Installation problemsInstallation problems

All trades must be on the same page:All trades must be on the same page:crushed piping courtesy of siding/grille installer

Home Building Technology ServicesHome Building Technology Services 68

Design airflow was Design airflow was 5050 cfmcfm

Removed excess ducting and retestedRemoved excess ducting and retestedNow have 6666 cfm or 83 %83 % of rated flow

Home Building Technology ServicesHome Building Technology Services 69

Smooth bend radius over top plateSmooth bend radius over top plate

24

Home Building Technology ServicesHome Building Technology Services 70

Roof exit can work OKRoof exit can work OK

Home Building Technology ServicesHome Building Technology Services 71

Always provide support for Always provide support for anyany flex pipingflex piping

Gable end terminationGable end termination

Home Building Technology ServicesHome Building Technology Services 72

Testing tells all: case closedTesting tells all: case closed

Tested airflow from a Tested airflow from a 110110 cfm fan: cfm fan: OUCH !OUCH !

25

Home Building Technology ServicesHome Building Technology Services 73

Any problem with a little extra ?Any problem with a little extra ?

Soffitt guy doesnSoffitt guy doesn’’t do ductingt do ducting

Home Building Technology ServicesHome Building Technology Services 74

# # 33 Problem; poor choice of termination grillesProblem; poor choice of termination grilles

Select low restriction typesSelect low restriction types

Home Building Technology ServicesHome Building Technology Services 75

Readout from a Readout from a 110110 CFM rated fanCFM rated fan

57%57%

26

Home Building Technology ServicesHome Building Technology Services 76

Fitting design and manufacturing criticalFitting design and manufacturing critical

44”” fittingfitting

Home Building Technology ServicesHome Building Technology Services 77

3 5/83 5/8”” actualactual

Know your componentsKnow your components

Home Building Technology ServicesHome Building Technology Services 78

4141 cfm gain for a cfm gain for a 6565% improvement:% improvement:

95%95%

27

Home Building Technology ServicesHome Building Technology Services 79

Gable end fitting: very good flowGable end fitting: very good flow

Home Building Technology ServicesHome Building Technology Services 80

Duct design issuesDuct design issues

May have to increase duct May have to increase duct ““diameterdiameter””

4 x 6 transition4 x 6 transition

Home Building Technology ServicesHome Building Technology Services 81

150 cfm fan150 cfm fan:: 2626’’ ffrromom ou outtssidide:e:

testestted aed aiirflrfloow: w: 14140 cfm 0 cfm -- 9393%% ofof ra ratedted

Larger diameter Larger diameter ““foolsfools”” the fanthe fan

Support flexSupport flex--pipe on woodpipe on wood

28

Home Building Technology ServicesHome Building Technology Services 82

Seal ducting to exit grilleSeal ducting to exit grille

May be able to reduce back down to 4May be able to reduce back down to 4””

Home Building Technology ServicesHome Building Technology Services 83

Good ducting & grilles are the keyGood ducting & grilles are the key!!

This puppy is This puppy is haulhaul’’in the mailin the mail

Home Building Technology ServicesHome Building Technology Services 84

THANK YOUTHANK YOU

CONTACT INFO:

Joe Nagan – Home Building Technology Services

W804 County Trunk ZZ

Kaukauna, Wisconsin 54130

920-766-7578 office

920-427-5292 cell

[email protected]

29

Home Building Technology ServicesHome Building Technology Services 85

Home Building Technology ServicesHome Building Technology Services 86

THANK YOUTHANK YOU

Home Building Technology ServicesHome Building Technology Services 87

30

Home Building Technology ServicesHome Building Technology Services 88

Home Building Technology ServicesHome Building Technology Services 89

Home Building Technology ServicesHome Building Technology Services 90

What impact does this have ?What impact does this have ?

SoSome prme prograograms hms haave ave addooppted ted the nethe newestwest VentilatiVentilatioon Stann Standard: dard: AASSHRAHRAEE 62.2 62.2

31

Home Building Technology ServicesHome Building Technology Services 91

ASHRAE 62.2 ventilation requirementsASHRAE 62.2 ventilation requirementsWhole building ventilationWhole building ventilation-- per table 4.1aper table 4.1a

Spot ventilationSpot ventilation•• bathroomsbathrooms-- 50 cfm intermittent or 20 cfm continuous50 cfm intermittent or 20 cfm continuous

•• kitchenkitchen-- 100 cfm hood ducted to outside100 cfm hood ducted to outside

Home Building Technology ServicesHome Building Technology Services 92

FLOORAREA (2ft)

BEDROOMS

0-1BEDROOMS

2-3BEDROOMS

4-5BEDROOMS

6-7 BEDROOMS

>7< 1500 30 45 60 75 90

1501-3000 45 60 75 90 1053001-4500 60 75 90 105 1204501-6000 75 90 105 120 1356001-7500 90 105 120 135 150

>7500 105 120 135 150 165

CONTINUOUS MINIMUM FLOWCONTINUOUS MINIMUM FLOW

TABLE 4.1a

Home Building Technology ServicesHome Building Technology Services 93

Intermittent systems require a larger flow rate than continuous systems. The flow rate is related to the fractional on-time as noted in the following equation: Qf = Qr / (ef)where:

Qf = fan flow rate

Qr = flow requirement from table 4.1

e = ventilation effectiveness from table 4.2

f = fractional on-time

32

Home Building Technology ServicesHome Building Technology Services 94

Daily fractional on-time, f Ventilation effectiveness, e

< 35% 0.33

> 35% < 60% 0.50

> 60% < 80% 0.75

> 80% 1.0

Ventilation effectiveness for intermittent operating systems

TABLE 4.2

Home Building Technology ServicesHome Building Technology Services 95

EXAMPLE:

A fan operated 30% of the time with cycle times of 4 hours ( six cycles per day) with a ventilation air requirement of 40 cfm will have a ventilation effectiveness of 30% ( from table 4.2). The fan flow will have to equal or exceed 404 cfm.

40 cfm / ( 0.33 x 0.30 ) = 404 cfm

* Suggest that you design for continuous operation to keep equipment smaller.

Home Building Technology ServicesHome Building Technology Services 96

Popular equipment choices for whole Popular equipment choices for whole building ventilation/spot to satisfy building ventilation/spot to satisfy

ASHRAE 62.2ASHRAE 62.2exhaust fan mounted in main part of homeexhaust fan mounted in main part of home

remote mounted exhaust fan ducted to homeremote mounted exhaust fan ducted to home

small HRV or ERVsmall HRV or ERV

remote fan doing double dutyremote fan doing double duty**

exhaust fan mounted in a bathroom doing exhaust fan mounted in a bathroom doing double dutydouble duty**

range hoodrange hood

Equipment - overview

33

Home Building Technology ServicesHome Building Technology Services 97

*DISCLAIMERDISCLAIMER::

Any reference or comment about a particular product or brand is NOT TO BE construed as an endorsement of such

Products shown in this presentation represent only a ‘small sample’ of those available. Please visit your local distributor(s) for information on products available in your area

The author of and presenter of this material has NO FINANCIAL interest, or business ties with any product supplier or manufacturer

Opinions and comments presented are solely that of the author and presenter: Joe Nagan- HBTS

Home Building Technology ServicesHome Building Technology Services 98

Home Building Technology ServicesHome Building Technology Services 99

Stack head w/built in damperStack head w/built in damper

34

Home Building Technology ServicesHome Building Technology Services 100

Stack head w/built in pinStack head w/built in pin--type CFLtype CFL

Home Building Technology ServicesHome Building Technology Services 101

Home Building Technology ServicesHome Building Technology Services 102

Please visit and THANK all the Vendors!Please visit and THANK all the Vendors!

ask them about their completeask them about their complete product selectionproduct selection

observe all codes and applicable standardsobserve all codes and applicable standards

TEST every system: itTEST every system: it’’s in YOUR best interest!s in YOUR best interest!

35

Home Building Technology ServicesHome Building Technology Services 103

MultiMulti--point remote point remote exhaustexhaust

Home Building Technology ServicesHome Building Technology Services 104

Illustra

tion

: Bu

ildin

g S

cien

ce C

orp

ora

tion

Exhaust only, point sourceBath fans

Range hood vented outside (optional)

36

Illustra

tion

: Bu

ildin

g S

cien

ce C

orp

ora

tion

Exhaust only, remote mountInline or multi-port fan

Range hood vented outside (optional)

Illustra

tion

: Bu

ildin

g S

cien

ce C

orp

ora

tion

Balanced with heat/energy recovery

Range hood vented outside (optional)