National status and activities reports Romania – ADFJ
Budapest, December 8th-9th, 2015
Agenda• Hydrography • Hydrology• Inland ECDIS – ENC• RoRIX• Projects
signalization
Hydrography• Bottlenecks monitoring
• AFDJ monitors, as a base service for maintenance of the fairway, some bottlenecks on maritime and river side of the Danube.
Maritime Danube
Bara SulinaTulcea upstream Mm40-Mm41Isaccea Mm56-Mm58Prut upstream Mm73-Mm74
Most important River Danube
Seimeni km289-292Caragheorghe km342-km345Corabia km626-km633Bechet km676-km678
Hydrography• Bottlenecks monitoring – Prut upstream Mm73-Mm74
Month
Data Ship Eq Chart
01 27.01.2015 S4 SB 5 lines
02 05.02.201527.02.2015
D2S4
MBSB
5 lines + DTM5 lines
03 19.03.201529.03.2015
D2S4
MBSB
5 lines + DTM5 lines
04 23.04.2015 S4 SB 5 lines
05 15.05.201519.05.201522.05.201528.05.2015
S4D2S4S4
SBMBSBSB
5 lines5 lines + DTM5 lines5 lines
06 22.06.201526.06.201528.06.2015
D2D2S4
SBMBSB
5 lines5 lines + DTM5 lines
Month
Data Ship Eq Chart
07 06.07.201514.07.201521.07.201527.07.2015
S4S4D2D2
SBSBMBMB
5 lines5 lines5 lines + DTM5 lines + DTM
08 03.08.201514.08.201528.08.2015
D1S4D2
MBSBMB
5 lines + DTM5 lines5 lines + DTM
09 28.09.2015 D1 MB 5 lines + DTM
10 12.10.201528.10.2015
S4S4
SBSB
5 lines5 lines
11 08.11.201513.11.201529.11.2015
S4S4S4
SBSBSB
5 lines5 lines5 lines
12
Hydrography• Maritime Danube
• in spring 2015 AFDJ finalized a complete hydrographic survey on Sulina Canal (about 70 km)
• base on this survey we updated the ENC cells with position of groins• in autumn 2015 AFDJ performed hydrographic survey on the whole Chilia arm
between - fairway and Romanian bank• the last similar hydrographic survey was conducted in 2005 for border treaty
with Ukraine.• survey from autum will be used for Chilia IENC, and for the RIS Index for Chilia
arm
• Gauge station monitoring of water level
• In present we have 23 gauges in which we measure level and water temperature
• This date are publish on administration site www.afdj.ro and with help of NtSstandard this date are also send to www.roris.ro
• Using a web-service develop on NEWADA duo projects water level are available also on FIS portal www.danubeportal.com
Hydrology
Hydrology• Automatic sensor for monitoring of water level
• In 5 location Tulcea, Isaccea, Galati, Braila and Harsova are mounted automatic sensor for water level and water temperature.
• This sensor provide date on a interval of 6 hour.
Hydrology• Automatic sensor for monitoring of water level
• In other 8 location Gruia, Cetate, Calafat, Bechet, Corabia, TurnuMagureleZimnicea, Giurgiu was mounted automatic sensor for water level and water temperature in IRIS and NEWADA projects
• In future we want to collect date from all automatic sensor in one application• A new feasibility study was done for for Rehabilitation and Extension of the
Hydro-meteo Stations for Romanian sector – HyQ project
Inland ECDIS – ENC• Official charts producer for the entire Romanian Inland Waterways
based on Ministry of Transport Order No. 1057/2007. • Charts are for use with Inland Electronic Chart Display and / or
Information Systems (ECDIS).• ENCs are according to the Inland ECDIS standard 2.1. • Free of charge Inland ENCs on www.afdj.ro, www.danubeportal.com,
www.d4d-portal.info• Available on www.roris.ro portal under section webECDIS base on
user rights• A new edition are under development• This should respect Inland ECDIS 2.3
Inland ECDIS – ENC• Update Frequency published for sectors on the Danube
Mounth Mm0-Mm47
Mm47-Km175
Km175-Km297
Km297-Km375
Km610-Km845
Km845-Km1045
Jan. 20.01
Feb. 18.02 09.02 13.02
March 24.03 17.03 18.03 24.03
April
May 13.05 20.05
June 10.06 11.06 17.06 24.06 22.06
July 01.07 22.07
Aug. 03.0817.08
Sep. 09.09 21.09
Oct. 26.10 26.10 21.10 21.10
Nov. 6.11
AFDJ GALATIInland ENCs
Romanian Naval
AuthorityRIS AUTHORITIES
PARTNERS
COMPANIESUsers / Skippers
• Distribution IENCs to Beneficiary
Inland ECDIS – ENC
RoRIX• Romania RIS index tool• In IRIS Europe 3 AFDJ develop a pilot web based application designed for
the day-to-day management of the reference data• The aim of this application was a single point of access to the national RIX
Index, at any time, for any interested party• Manages multiple versions• Manages a working version• Allows multiple, distributed access to the working version• Introduces workflows, history, catalog
• Beta testing the 2.0 aligned with the RIS Index Encoding Guide 2.0• Full access rights mechanism: users/groups/roles• System ergonomics improvement (user interface and functional)
under development• Version 2.0 deployment early 2016, with full RIS Index data integrated • Automation integration plan with all RIS systems at national and
European level• Geographical functions development
RoRIX
Projects• BORD• SF Sulina• HyQ Danube• FAIRway Danube• FAST Danube
BORD• Name: Creation of a support system for hydrographical works
on the Danube meant to assure minimum navigation depths• Overall Objective of the project is to improve the safety of navigation of the Danube,
in compliance with the European Directives and the Danube Commission's recommendations.
• Specific Objective: setting in place a network of geodesic landmarks in support of the topo-hydrographical works on the Danube, for the monitoring of the minimum navigation depths and the improvement of fairway maintenance activities (floating and costal signalling, topo-hydrographic surveys, dredging).
• Aim of the project: to create a network of geodesic landmarks along the Romanian Danube sector, the Danube-Black Sea Canal and Poarta Alba - Midia - NavodariCanal, network to be used for the river bed dynamics monitoring and meant to provide exact data for the realisation of accurate ENCs
BORD• a total of 144 locations with 3 landmarks each location • a distance of around 10 km between locations• one location have 3 types of landmarks: one reference, one witness, and
one azimuthal
• lot 1: CDMN – PAMN =12 loc• lot 2: Delta = 22 loc• lot 3 Galati – Calarasi = 36 loc• lot 4 Calarasi – Ostrovul Mare = 52 loc• lot 5 Izvorul Frumos – Bazias = 21 loc
SF Sulina• Name: Feasibility Study for bank protection on the Sulina
Channel - Final Round• Overall Objective of this project is the feasibility study for the Sulina canal bank
protection in order to improve water transport infrastructure on the Danube.• Specific Objective: consists in determining the remaining work necessary to achieve
the Sulina canal to improve water transport infrastructure and protecting the Danube Delta Biosphere Reserve and through all the stages leading up to obtain financing works.
• Project is the preliminary stage for design and execution of works for calibration banks of Sulina Canal
• will complete drafting specifications and financing application for the design and execution results.
SF Sulina• Activities :• Topographic and hydrographic survey of Sulina Canal banks in the areas
proposed for analysis.• Making a hydromorphological 2D mathematical model on Sulina Canal and
use the model to study the existing shore protection works and future one.• Inventory of existing shore embankments, groins and breakwaters on the
Sulina Canal.• Geological, geomorphological and geotechnical synthesis study on sectors
where are not sufficient information• Analysis of the technical and proposals solution
HyQ Danube• Name: "Feasibility Study for Rehabilitation and Extension of the
Hydro-meteo Stations Network for Maintenance of NavigationalConditions on the Danube River in Romania"
• To ensure and improve the safety of navigation conditions on theRomanian sector of the Danube by providing current hydrological datain real time to users and exchange of hydrological data;
– Existing network – 23 stations;
– Future network – 64 locations, additional sensors – discharge, sediment,visibility, waves.
• Finalized : end of 2015;
FAIRway Danube• The main goal of the Global Project is to implement the "Fairway
Rehabilitation and Maintenance Master Plan of the Danube and its navigable tributaries"
• The aim of the Master Plan is to reach and ensure good navigation conditions throughout the year by providing a minimum level of service.
• Elaborate coordinated national action plans for the deployment of the "Fairway Rehabilitation and Maintenance Master Plan".
• Procure the necessary equipment to carry out pilot activities for hydrological services in the five concerned countries (Bulgaria, Croatia, Hungary, Romania and Slovakia);
• Allow the identification of innovative approaches for fairway rehabilitation and upgrade.
• Prepare documentation for implementation of future selected measures that further support the deployment of the "Fairway Rehabilitation and Maintenance Master Plan".
FAST Danube• Name: "Technical Assistance for Revising and Complementing the
Feasibility Study Regarding the Improvement of Navigation Conditions on the Romanian-Bulgarian Common Sector of the Danube and Complementary Studies"
• Improving the navigation along the Romanian-Bulgarian common section of the Danube (river km 845.5 to river km 375);
• Developing an integrated approach in the Danube by increasing navigation avoiding unexpected negative impact on the river system and ecology;
• Supporting modal split by fostering the use of inland waterway transport.
Thank you for your attention