National Roads Meeting
January 29, 2013
1
New Folks (Since our last New Folks (Since our last
meeting)meeting)• Emilee Blount – New Director• Ed James – New Deputy Director• Ehab Hanna – New Assistant Director for Capital Resources• Carl Zulick – New Geospatial Management Officer (Vice Dull)• Rosana Barkawi – FLH Program Manager• Lisa McBride – GIS Program Manager• Alex Gavrisheff– T&D Deputy Center Manager• Michael Braymen – Assistant GIS PM• Leslie Boak – Assistant Roads O&M Program Manager• Kathryn Kaufman – Assistant Facilities and Sustainability PM• Chris Campbell – Assistant Facilities and Sustainability PM• Raj Krishnamoorthy – Assistant Environmental PM• Juliana Walton – Executive Assistant to the Directors of Eng.
& MGM• Mike Tippie – Signs & Traffic Control (20% of his time)• Donna Kim– Budget Coordinator
o Detailed into Energy & Sustainability (Vice Wiersma)• Deidra McGee– Budget Coordinator (Detail)
Folks on ContractFolks on Contract
• John Bell– Roads O&M• Ellen Lafayette– FLH Program Manager • Merv Eriksson – Bridges• Carol Russel – “Script Queen”
Capital Improvement and MaintenanceCapital Improvement and Maintenance
4
FY 2011 Enacted
FY 2012 Enacted
Program Changes
FY 2013 President's
BudgetPercent of Program
Change
Capital Improvement & Maintenance Total $472,644 $394,089 ($47,710) $346,379 -12%
Total Full-Time Equivalents 2,858 2,591 (270) 2,321 10%
Facilities $135,000 $75,664 $23,799 $99,463 31% Roads $195,195 $182,525 ($24,707) $157,818 -14% Trails $88,381 $81,851 $134 $81,985 -0%
Deferred Maintenance & Infrastructure Improvement $9,158 $9,121 ($2,008) $7,113 -22%
Legacy Roads & Trails $44,910 $44,928 ($44,928) $0 -100%
National CIM EOY BalancesAs Percent of Total Budget
Authority(CMFC+CMII+CMLG+CMRD+CMTL)
*FY06 & FY07 does not include CMLG
Washington Office, latest update May 17, 2012
FY 2006 - FY 2011
Percent of National CIM Carryover by BLI
(FY07 & FY06 do not include CMLG)
Washington Office, latest update May 17, 2012
M$
FY 2002 - FY 2013 (PB)
National CMRD (Roads) with CMLG,
CRRD-ARRA, TRTR and IRR Included
Washington Office, latest update March 2, 2012
7
Washington Office, latest update March 2, 2012
8
FY 2002 - FY 2013 (PB)
National CMRD (Roads)
$M
Federal Highway Funding
2006-2012
Washington Office, latest update May 17, 2012
9
48.2
M$
FY 2002 - FY 2013 (PB)
National CMFC (Facilities) with CP09,
CRFR-ARRA, RSI Included
Washington Office, latest update March 2, 2012
10
FY 2002 - FY 2012
National CMFC (Facilities)
11Washington Office, latest update March 2, 2012
$1,000’s
FY 2003 - FY 2013
National CMFC (Facilities)
and Cost Pool 9
Washington Office, latest update May 18, 2012
12
2012 COST Pool 9 (CP09) Initial Assessment and Allocation by Unit (dollars in thousands)
Unit Total Initial Assessment Total Initial Allocation $/s.f.R1 $5,453.0 $5,453.0 $2.41R2 $3,381.0 $3,381.0 $2.51R3 $6,200.0 $6,200.0 $3.97R4 $4,571.0 $4,571.0 $2.31R5 $8,600.0 $8,600.0 $2.30R6 $9,053.0 $9,053.0 $2.39R8 $5,000.0 $5,000.0 $2.61R9 $6,000.0 $6,000.0 $2.21R10 $2,229.0 $2,229.0 $4.09FPL $588.0 $588.0 $1.48IITF $63.0 $63.0 $2.33
RMRS $824.0 $824.0 $1.99NRS $731.0 $731.0 $1.51PNW $568.0 $568.0 $2.05PSW $353.0 $353.0 $1.47SRS $888.0 $888.0 $1.99
Grey Towers $115.0 $115.0 $3.34SD $286.0 $286.0 $5.54
MTDC $106 $106 $1.48Wood Education $97.0 $97.0 $1.45
$55,000.0 $55,000.0 $2.46 avg.
13Washington Office, latest update March 2, 2012
FY 2002 - FY 2013 (PB)
National CMII
14Washington Office, latest update March 2, 2012
FY 2002 - FY 2013 (PB)
National CMTL (Trails)
15Washington Office, latest update March 2, 2012
Washington Office, latest update March 2, 2012
16
Region, Cumulative
Bridges Constructed
Total
R1, 137 R2, 38 R3, 10 R4, 129 R5, 64 R6, 151 R8, 78 R9, 42 R10, 139
Bridges Constructed (2000
– 2011)
Washington Office, latest update March 12, 2012
17
Dam Hazard Classifications
Washington Office, latest update March 2, 2012
18
Road Maintenance Level Road Maintenance Level TrendsTrends
FS Road Mileage FS Road Mileage TrendTrend
RAR Moved to WorkPlan in RAR Moved to WorkPlan in
FY2013FY2013
Washington Office, March 1-3, 2011
21
ACCOMPLISHMENT_CD (OLD) ACCOMPLISHMENT_NAME (OLD)
ACCOMPLISHMENT_CD (NEW) ACCOMPLISHMENT_NAME (NEW)
None None FATAL-NON-VEH-HCNumber of fatalities in road accidents with no highway legal vehicle involved on high clearance roads
FATAL-NON-VEH-PCNumber of fatalities in road accidents with no highway legal vehicle involved on passenger car roads
FATAL-VEH-HCNumber of fatalities in road accidents with highway legal vehicle involved on high clearance roads
FATAL-VEH-PCNumber of fatalities in road accidents with highway legal vehicle involved on passenger car roads
BRDG-CNSTR-RCNSTR Bridges constructed or reconstructed BRDG-DSPSL Number of Bridges Removed, Disposed or Transferred BRDG-NEW-ML1-2 Number of bridges constructed or replaced on ML 1 & 2 roads BRDG-NEW-ML3-5 Number of bridges constructed or replaced on ML 3-5 roads BRDG-REHB-ML1-2 Number of bridges rehabilitated on ML 1&2 roads BRDG-REHB-ML3-5 Number of bridges rehabilitated on ML 3-5 roads
RD-HC-IMP Miles of high clearance system roads improvedRD-HC-CNSTR Miles of new high clearance system roads constructed RD-HC-RCNSTR Miles of existing high clearance system roads reconstructed
RD-HC-MAINT Miles of high clearance system roads receiving maintenance RD-ML1-MAINT Miles of closed (ML 1) system roads maintained
RD-ML2-MAINT Miles of high clearance (ML 2) system roads maintained
RD-PC-MAINTMiles of passenger car system roads receiving maintenance RD-ML3-MAINT Miles of passenger car (ML 3) system roads maintained
RD-ML4-MAINT Miles of passenger car (ML 4) system roads maintained RD-ML5-MAINT Miles of passenger car (ML 5) system roads maintainedRD-PC-IMP Miles of passenger car system roads improvedRD-PC-CNSTR Miles of new passenger car system roads constructed RD-PC-RCNSTR Miles of existing passenger car system roads reconstructed
RD-DECOM Miles of road decommissionedRD-DECOM-NON-SYS Miles of unauthorized road decommissioned
RD-DECOM-SYS Miles of National Forest System Road decommissioned
RD-STORMiles of National Forest System Road placed into long term storage
STRM-CROS-MITG-STD
Number of stream crossings constructed or reconstructed to provide for aquatic organism passage
STRM-CROS-MITG-STD
Number of stream crossings constructed, reconstructed or removed to provide for aquatic organism passage
• Enter Accomplishments Quarterly• Enter accomplishments in individual Plans• Core BLIs include CMRD, CMLG, CMII, HTER,ERBA,
CFLR, NFRR, etc.• Use OTHR BLI for Cooperator Work• Integrated Accomplishments
o Enter in Timber Sale or Stewardship Workplans
Washington Office, March 1-3, 2011
22
RAR Moved to WorkPlan in RAR Moved to WorkPlan in
FY2013FY2013
GARP – Geospatial GARP – Geospatial
Accomplishment Reporting Accomplishment Reporting
ProgramProgram• Phase 1 includes Road Decommissioning (Both System
and Unauthorized Roads) and AOP.• We will likely have to move toward mandating use of
the Road Maintenance Planning Module (RMP) in the next few years.
• System Road Decommissioning is relatively easy – if we use RMP.
• Unauthorized roads are not required to be entered into Infra, nor placed on the GIS coverage.
• Watershed folks are tracking this in the Watershed Improvement Tracking (WIT) system.
• We need to work with watershed folks so we’re not duplicating effort.o They may already be putting these in GIS.o Consider allowing them to enter the tabular data in Infra.
Washington Office, March 1-3, 2011
23
New Road Use Permit & Application New Road Use Permit & Application
FormForm• Need for a permit to allow for:
o Use of a Road, Trail or Area not designated for use on an MVUM or closed by order. Fire closure, mineral use, etc
o Oversize or overweight vehicles.o Non-Federal Commercial Useo Maintain or plow snow on an NFSR
• Permit Application Formso FS-7700-40 Application For a Permit for Use of Roads, Trails and Areas
Restricted by Regulation or Order (Base Application)o FS-7700-40a Commercial Use Attachment o FS-7700-40b Oversize Vehicle Attachment. State or local forms can also be
used.
• Permit Formso FS-7700-41 Non-Federal Commercial Road Use Permit.
• Non-Federal Commercial Use• Maintaining or Plowing snow on an NFSR
o FS-7700-48 Permit for Use of Roads, Trails and Areas Restricted by Regulation or Order.
• All other uses.
• OMB requires count of Forms completed. o Hoping e-forms will do this for us.o May need to require Regions to send us numbers starting next year.
Washington Office, March 1-3, 2011
24
New Random Sample New Random Sample
MethodologyMethodology• For the last few years we have reporting DM on
just Passenger Car Roads• Sean Puckett with the Volpe Center helped
develop a new methodology for this.• Only Sample Passenger Car Roads.• 340 segments• Stratified by Region based on proportion of PC
system in that region.
Washington Office, March 1-3, 2011
25
Regional Sample SizesRegional Sample SizesRegion Sample Size
(Segments)Sample Size
(% of Total Sample)
1 68 20.0%
2 32 9.4%
3 24 7.1%
4 35 10.3%
5 43 12.6%
6 49 14.4%
8 51 15.0%
9 35 10.3%
10 3 0.9%
Total 340 100%
Washington Office, March 1-3, 2011
26
Interdependency of Roads Funding and Agency Goals
Transportation System*
* The Forest Service is in the process of identifying the minimum road system necessary to provide safe access with minimal environmental impacts for the administration, utilization, and protection of NFS lands.
LegendInner ring: Themes2nd ring: Activities3rd ring: OutcomesOuter ring: Opportunities to leverage funds with CI&M AppropriationsWatershed Condition FrameworkFederal Highway Administration RequirementsNational Forest Road & Trail Act and Travel Management Rule
11/6/12
Possible FY2015 President’s Budget Possible FY2015 President’s Budget
ActivitiesActivities• Access
o Public Use & Recreationo Forest Productso Resource Projectso Protection (Fire Access)o Administration
• Preservation & Safetyo Road & Bridge Maintenanceo Pavement Preservationo Safety, Signs & Traffic Control
• Restorationo Aquatic Organism Passageo Decommissioning/Storageo Best Management Practices/Storm Proofing
• Ecologic Performance Measureso Miles of road where BMPs have been implemented
Washington Office, March 1-3, 2011
28
Performance MeasuresPerformance Measures• Ecological Performance Measures
o Miles of road where BMPs have been implemented
Washington Office, March 1-3, 2011
29
QUESTIONS??QUESTIONS??
Washington Office, March 1-3, 2011
30
Drain Dip/Water Bar Drain Dip/Water Bar SurveySurvey
• Mark Russell - SDTDC
Washington Office, March 1-3, 2011
31