58
National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Embed Size (px)

Citation preview

Page 1: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

National Readjustment of NAD 83

Indiana Society of Professional Land SurveyorsIndianapolis, IN

January 18, 2008

Page 2: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NATIONAL SPATIAL REFERENCE SYSTEM(NSRS)

Consistent National Coordinate System

• Latitude • Longitude

• Height • Scale

• Gravity• Orientation

and how these values change with time

Page 3: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

ACRONYMS US

Page 4: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NATIONAL SPATIAL REFERENCE SYSTEM

North American Datum of 1983 (NAD 83)North American Vertical Datum of 1988 (NAVD 88)

First civilian datums designed to be consistent with space-based observations (GPS)

First civilian datums to be best-fitting globally not locally

First geodetic reference systems to be Accessible through Continuously Operating Reference Stations (CORS) and derived products

First geodetic reference systems to be available free from WWW

Only reference system to freely integrate data fromoutside sources

MULTIPURPOSE – Supports Geodesy, Geophysics, Land Surveying, Navigation, Mapping, Charting and GIS

ACTIVE – Accessible through Continuously Operating Reference Stations (CORS) and derived products

Page 5: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

• A horizontal datum is the coordinate system that we use to locate ourselves on the earth– Involves the origin and orientation of

coordinate axes • geocentric cartesian (X,Y,Z)• Usually the origin is near the center

of mass of the earth• one axis intersects the earth’s

surface at the intersection of the prime meridian and the equator

– and a reference ellipsoid• Latitude Longitude and height• Specific geodetic datums are usually

given distinctive names. – North American Datum of 1983, – International Terrestrial

Reference Frame (YYYY)– WGS84

Horizontal DatumsHorizontal Datums

+Z

-Y

+X

XY

Zb

a

H

Cartesian systemX = -2691542.5437 mY = -4301026.4260 mZ = 3851926.3688 m

Lat Lon = 37o 23’ 26.38035” N = 122o 02’ 16.62574” W

H = -5.4083 m

Page 6: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

GEODETIC DATUMS

Classical

Horizontal – 2 D (Latitude and Longitude) (e.g. NAD 27, NAD 83 (1986)) Vertical – 1 D (Orthometric Height) (e.g. NGVD 29, NAVD 88)

Contemporary

PRACTICAL – 3 D (Latitude, Longitude and Ellipsoid Height) Fixed and Stable – Coordinates seldom change (e.g. NAD 83 (1996) or NAD 83 (NSRS 2007))

SCIENTIFIC – 4 D (Latitude, Longitude, Ellipsoid Height, Velocity) –

Coordinates change with time (e.g. ITRF00, ITRF05)

Page 7: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

HORIZONTAL DATUMS

8 Constants 3 – specify the location of the origin of the coordinate

system.

3– specify the orientation of the coordinate system.

2 – specify the dimensions of the reference ellipsoid

b

a

N

Page 8: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

UNITED STATESELLIPSOID DEFINITIONS

CLARKE 1866 a = 6,378,206.4 m 1/f = 294.97869821

GEODETIC REFERENCE SYSTEM 1980 - (GRS 80)a = 6,378,137 m 1/f = 298.257222101

WORLD GEODETIC SYSTEM 1984 - (WGS 84) a = 6,378,137 m 1/f = 298.257223563

BESSEL 1841 a = 6,377,397.155 m 1/f = 299.1528128

Page 9: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

International Earth Rotation and Reference System Service

(IERS)(http://www.iers.org)

The International Terrestrial Reference System (ITRS) constitutes a set of prescriptions and conventions together with the modeling required to define origin, scale, orientation and time evolution

ITRS is realized by the International Terrestrial Reference Frame (ITRF) based upon estimated coordinates and velocities of a set of stations observed by Very Long Baseline Interferometry (VLBI), Satellite Laser Ranging ( SLR), Global Positioning System and GLONASS (GNSS), and Doppler Orbitography and Radio- positioning Integrated by Satellite ( DORIS).

Plate tectonics is accommodated giving each coordinate a velocityPlate tectonics is accommodated giving each coordinate a velocity

ITRF89, ITRF90, ITRF91, ITRF92, ITRF93, ITRF94, ITRF95, ITRF96, ITRF97, ITRF2000, ITRF2005

Page 10: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

International Global Navigation Satellite Systems Service (IGS)

International Laser Ranging Service (ILRS)

International Very Long Baseline Service (IVS)

International DORIS Service (IDS)

International Terrestrial Reference Frame4 Global Independent Positioning Technologies

Page 11: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

DATUM = WGS 84(G730)5 USAF GPS Tracking Stations5 DMA Evaluation Stations Datum redefined with respect to the International Terrestrial Reference Frame of 1992 (ITRF92) +/- 20 cm in each component (Proceedings of the ION GPS-94 pgs 285-292)

DATUM = WGS 84(G873)5 USAF GPS Tracking Stations7 NIMA Evaluation Stations Datum redefined with respect to the International Terrestrial Reference Frame of 1994 (ITRF94) +/- 10 cm in each component (Proceedings of the ION GPS-97 pgs 841-850)

DATUM = WGS 84RELEASED - SEPTEMBER 1987BASED ON OBSERVATIONS AT MORE THAN 1900 DOPPLER STATIONS

DATUM = WGS 84(G1150)Datum redefined with respect to the International Terrestrial Reference Frame of 2000 (ITRF00) +/- 2 cm in each component (Proceedings of the ION GPS-02) http://earth-info.nima.mil/GandG/sathtml/IONReport8-20-02.pdf

HOW MANY WGS 84s HAVE THERE BEEN????

WORLD GEODETIC SYSTEM 1984http://earth-info.nga.mil/GandG/publications/tr8350.2/tr8350_2.html

Page 12: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Tectonic Plates NUVEL-1A

Page 13: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

ITRF00 vs NAD83 velocities

NAD83

Page 14: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Seismic cycle

• Seismic cycle consists of 2 main phases– Inter-seismic phase when

elastic strain accumulates in the crest around the fault• Strain is widely distributed

– co-seismic phase when elastic strain is converted to slip on the fault

Page 15: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

model of the secular field

• An analytical model representing horizontal crustal motion

– Incorporates all major active faults in a single model.

– Provides a more accurate model of crustal deformation in western US

• data comprise – 4890 GPS velocities– 170 fault slip rates from

paleoseismic & paleomag studies – 258 fault slip vectors taken from

earthquakes and geologic studies

Page 16: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Earthquakes in Contiguous US

Page 17: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

MEADES RANCH 1891 – KANSASOrigin for USSD-NAD-NAD27

Page 18: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

COMPARISON OF DATUM ELEMENTS

NAD 27 NAD 83

ELLIPSOID CLARKE 1866 GRS80 a=6,378,206.4 m a=6,378,137 m 1/f = 294.9786982 1/f = 298.257222101

DATUM POINT Triangulation Station NONE Meades Ranch, Kansas Earth Mass Center

ADJUSTMENT 25k Stations 250k Stations few hundred Base lines 30k EDMI base lines

few hundred Astro Az 5k Astro Azimuths Doppler and VLBI

1.8 million observations

Page 19: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NAD 27 to NAD 83 (86)

Page 20: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Results of NAD83(86)

• Network Accuracy - 1 Meter

• Local Accuracy – First-Order (1 part in 100,000)

Second-Order (1 part in 50,000)

Third-Order (1 part in 10,000)

Page 21: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NAD 83(86) NETWORK PROBLEMS

NOT “GPSABLE”

POOR STATION ACCESSIBILITY

IRREGULARLY SPACED

POSITIONAL ACCURACY

Page 22: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

HARN/HPGN ADJUSTMENT

A-Order Adjusted to VLBI-Existing FBN-CORS

B-Order Adjusted to A-Order

Existing Horizontal (Conventional & GPS) Readjusted to A/B-Order

New Adjustment Date Tag e.g. NAD83(1997)

Page 23: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

REGIONAL CORS NETWORK

Page 24: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

SPRINGFIELD (ILSA), ILLINOIS

_____________________________________________________________________________ | || Antenna Reference Point(ARP): SPRINGFIELD CORS ARP || -------------------------------------------------- || PID = DH3759 || || || ITRF00 POSITION (EPOCH 1997.0) || Computed in June 2005 using 14 days of data. || X = 33385.872 m latitude = 39 46 43.08683 N || Y = -4908474.031 m longitude = 089 36 37.07435 W || Z = 4059224.563 m ellipsoid height = 152.900 m || || ITRF00 VELOCITY || Predicted with HTDP_2.7 June 2005. || VX = -0.0168 m/yr northward = -0.0018 m/yr || VY = -0.0015 m/yr eastward = -0.0168 m/yr || VZ = -0.0012 m/yr upward = 0.0003 m/yr || || || NAD_83 (CORS96) POSITION (EPOCH 2002.0) || Transformed from ITRF00 (epoch 1997.0) position in Jun. 2005. || X = 33386.406 m latitude = 39 46 43.06026 N || Y = -4908475.428 m longitude = 089 36 37.05230 W || Z = 4059224.662 m ellipsoid height = 154.039 m || || NAD_83 (CORS96) VELOCITY || Transformed from ITRF00 velocity in Jun. 2005. || VX = 0.0000 m/yr northward = 0.0000 m/yr || VY = 0.0000 m/yr eastward = 0.0000 m/yr || VZ = -0.0000 m/yr upward = 0.0000 m/yr ||_____________________________________________________________________________|

ITRF00 – NAD 83(CORS96)Horiz = 0.973mEHt = 1.139m

Page 25: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

IMPROVING POSITIONAL ACCURACY

TIME NETWORK LOCALNETWORK SPAN ACCURACY ACCURACY

NAD 27 1927-1986 10 METERS (1 part in 100,000)

NAD83(86) 1986-1990 1 METER (1 part in 100,000)

HARN 1990-1997 0.1 METER B-order (1.0 ppm) A-order (0.1 ppm)

CORS 1996 - 0.01 meter 0.01 meter

Page 26: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

National Geodetic Survey, Retrieval Date = DECEMBER 6, 2007 KB0684 *********************************************************************** KB0684 DESIGNATION - ASSUMPTION KB0684 PID - KB0684 KB0684 STATE/COUNTY- IL/CHRISTIAN KB0684 USGS QUAD - ASSUMPTION (1982) KB0684 KB0684 *CURRENT SURVEY CONTROL KB0684 ___________________________________________________________________ KB0684* NAD 83(2007)- 39 31 12.72891(N) 089 02 56.47681(W) ADJUSTED KB0684* NAVD 88 - 196.394 (meters) 644.34 (feet) ADJUSTED KB0684 ___________________________________________________________________ KB0684 EPOCH DATE - 2002.00 KB0684 X - 81,771.588 (meters) COMP KB0684 Y - -4,926,226.861 (meters) COMP KB0684 Z - 4,037,138.456 (meters) COMP KB0684 LAPLACE CORR- -0.20 (seconds) DEFLEC99 KB0684 ELLIP HEIGHT- 164.133 (meters) (02/10/07) ADJUSTED KB0684 GEOID HEIGHT- -32.27 (meters) GEOID03 KB0684 DYNAMIC HT - 196.282 (meters) 643.97 (feet) COMP KB0684 KB0684 ------- Accuracy Estimates (at 95% Confidence Level in cm) -------- KB0684 Type PID Designation North East Ellip KB0684 ------------------------------------------------------------------- KB0684 NETWORK KB0684 ASSUMPTION 0.57 0.41 1.76 KB0684 ------------------------------------------------------------------- KB0684 MODELED GRAV- 980,049.7 (mgal) NAVD 88 KB0684 KB0684 VERT ORDER - FIRST CLASS I KB0684 KB0684.The horizontal coordinates were established by GPS observations KB0684.and adjusted by the National Geodetic Survey in February 2007. KB0684 KB0684.The datum tag of NAD 83(2007) is equivalent to NAD 83(NSRS2007). KB0684.The horizontal coordinates are valid at the epoch date displayed above. KB0684.The epoch date for horizontal control is a decimal equivalence KB0684.of Year/Month/Day. KB0684 KB0684.The orthometric height was determined by differential leveling KB0684.and adjusted in June 1991. KB0684 KB0684.Photographs are available for this station.

Page 27: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

KB0684.The X, Y, and Z were computed from the position and the ellipsoidal ht. KB0684.The ellipsoidal height was determined by GPS observations KB0684.and is referenced to NAD 83. KB0684 KB0684.The geoid height was determined by GEOID03. KB0684 KB0684 KB0684; North East Units Scale Factor Converg. KB0684;SPC IL W - 317,315.488 796,100.180 MT 1.00005484 +0 42 40.6 KB0684;SPC IL W - 1,041,059.23 2,611,872.01 sFT 1.00005484 +0 42 40.6 KB0684;SPC IL E - 316,974.300 238,460.283 MT 1.00002161 -0 27 19.6 KB0684;SPC IL E - 1,039,939.85 782,348.45 sFT 1.00002161 -0 27 19.6 KB0684;UTM 16 - 4,376,511.174 323,870.958 MT 0.99998195 -1 18 15.2 KB0684 KB0684! - Elev Factor x Scale Factor = Combined Factor KB0684!SPC IL W - 0.99997425 x 1.00005484 = 1.00002909 KB0684!SPC IL E - 0.99997425 x 1.00002161 = 0.99999586 KB0684!UTM 16 - 0.99997425 x 0.99998195 = 0.99995620 KB0684 KB0684: Primary Azimuth Mark Grid Az KB0684:SPC IL W - ASSUMPTION 1920 TP 1976 010 03 10.2 KB0684:SPC IL E - ASSUMPTION 1920 TP 1976 011 13 10.4 KB0684:UTM 16 - ASSUMPTION 1920 TP 1976 012 04 06.0 KB0684 KB0684|---------------------------------------------------------------------| KB0684| PID Reference Object Distance Geod. Az | KB0684| dddmmss.s | KB0684| KB1363 ASSUMPTION 1920 TP 1976 APPROX. 0.5 KM 0104550.8 | KB0684| KB0685 ASSUMPTION RM 2 7.062 METERS 01146 | KB0684| KB1368 ASSUMPTION AZ A PT 1976 489.179 METERS 0994730.6 | KB0684| KB1367 ASSUMPTION AZ MK 483.552 METERS 1001424.8 | KB0684| KB1362 ASSUMPTION A PT 1976 9.725 METERS 24325 | KB0684| KB1361 ASSUMPTION MUN TANK 145.607 METERS 24654 | KB0684| CI6654 ASSUMPTION RM 21.330 METERS 26717 | KB0684| KB0686 ASSUMPTION RM 3 26.388 METERS 27304 | KB0684|---------------------------------------------------------------------| KB0684 KB0684 SUPERSEDED SURVEY CONTROL KB0684 KB0684 ELLIP H (10/15/04) 164.141 (m) GP( ) 4 2 KB0684 NAD 83(1997)- 39 31 12.72890(N) 089 02 56.47672(W) AD( ) B KB0684 ELLIP H (07/17/98) 164.137 (m) GP( ) 4 1 KB0684 NAD 83(1986)- 39 31 12.73871(N) 089 02 56.46320(W) AD( ) 2 KB0684 NAD 27 - 39 31 12.59480(N) 089 02 56.15910(W) AD( ) 2 KB0684 NAVD 88 (07/17/98) 196.39 (m) 644.3 (f) LEVELING 3 KB0684 NGVD 29 (??/??/92) 196.484 (m) 644.63 (f) ADJ UNCH 1 1 KB0684 KB0684.Superseded values are not recommended for survey control. KB0684.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums. KB0684.See file dsdata.txt to determine how the superseded data were derived.

Page 28: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008
Page 29: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

TIME POSITIONDATUM SPAN Lat/Long/E Hgt POSITION SHIFT

USSD/NAD 1901 – 1927 39-31-12.70400 89-02-56.05500

Undetermined

NAD 27 1927 – 1986 39-31-12.59480 89-02-56.15910 4.186 m (13.73 ft)

Undetermined

NAD 83 (86) 1986 – 1997 39-31-12.73871 89-02-56.46320 8.512 m (27.93 ft)

Undetermined NAD 83 (97) 1997 – 2007 39-31-12.72890

89-02-56.47672 0.442 m (1.45 ft) 164.141

NAD 83 (07) 2007 – (?) 39-31-12.72891 89-02-56.47681 0.002 m (0.06 ft)

164.133 0.008 m (0.03 ft)

POSITIONAL CHANGESStation: ASSUMPTION (KB0684)

Page 30: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Reasons for Readjustment

• Multiple epoch dates• Inconsistencies between states• Need to be Consistent with CORS• Compute Network and Local accuracies• Some HARNs exhibit 4 – 7 cm difference with CORS

September 24, 2003 NGS Executive Steering Committee approved a plan for the readjustment of the horizontal positions and ellipsoid heights for GPS stations in the contiguous United States.

Orthometric Height adjustment will not be attempted

Page 31: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NSRS(2007) READJUSTMENT of NAD 83

ONLY GPS DATA WAS USED

CONTINUOUSLY OPERATING REFERENCE STATIONS FEDERAL BASE NETWORK (A & B)COOPERATIVE BASE NETWORK (B)

USER DENSIFICATION NETWORK (First)AIRPORT SURVEYS (B & First)

Page 32: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

www.ngs.noaa.gov/NationalReadjustment

Page 33: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Errors

• All real observations contain errors– Two types of errors

• Random errors which mean to zero

• systematic errors which do not

• Least square will only give improved results if your errors are predominantly random

Random error

Systematic error

Page 34: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Example of redundancySuppose we are trying to determine the distance between two points

We have 5 measurementsall have equal precisionAny one measurement is enough to determine the distance but because every measurement contains measurement errors so each measurement gives a slightly different result

71 32 4 5 6 8 9 1110 12

502.100

401.100

300.100

299.99

198.99

try

try

try

try

try

Page 35: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Observation equations

• This means that each time we add an equation, we have one unknown residual to solve for plus the distance

• So we will never have enough equations to solve for the unknowns

300.100 vx

198.99 vx 299.99 vx

401.100 vx

502.100 vx

• For each observation we can write an equation relating the parameter we are trying to determine (the distance) to the observation and the residual.

Page 36: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Least Square condition

• Since we do not have 1 equation per unknown

• We have to add at least one more so we have enough information to determine all of the unknowns

• We add a condition that the sum of the squares of all of the residuals is a minimum

• This just means that the data is as close to the parameters (in this case the mean value) as possible

residuals theare

minimum2

v

v

Page 37: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Weighting• All least square adjustments include All least square adjustments include

some sort of estimate of the accuracy some sort of estimate of the accuracy of the measurementsof the measurements

• This allows measurements that are This allows measurements that are precise to have more importance (or precise to have more importance (or weight) than approximate weight) than approximate measurementsmeasurements

• The weighting for each observation is The weighting for each observation is equal to the inverse square of the equal to the inverse square of the standard deviationstandard deviation

• The idea is that if then error is small The idea is that if then error is small the weighting the weighting is largethe weighting the weighting is large

211

1

iiw

Page 38: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Minimally Constrained Adjustment

• Hold the minimum number of control points fixed to allow the least square process to work

– One fixed point for GPS

– 2 for triangulation survey without distance measurements

• The purpose of this adjustment is to

– Check the internal consistency of the network

– Detect blunders or ill-fitting observations

– Obtain accurate error estimates

How big do you make the bolt holes?

Page 39: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Residuals

• Residuals are the difference between the observed survey measurements and values calculated form coordinates from the least squares adjustment

– They follow a known statistical distribution

• and we can use statistics to identify observations with residuals are large enough to represent blunders that should be investigated further

1 2 3 41234

Critical Critical

Outliers Outliers

residualfor error Estimated

ResidualResidualStandard

Page 40: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Fully Constrained Adjustment• Hold all control points in the network fixed at values from

the NGS database

– Minimum of 2 for GPS surveys– 3 for triangulation survey without distance

measurements• The purpose of this adjustment is to

– Reference the network to existing control and develop final coordinates for the new control points that are being established

– Verify existing control. – If any control points are wrong

• the standard error of unit weight and residuals will increase compared to the minimally constrained adjustment

Page 41: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Helmert Blocks Each state will comprise a separate block of data.

Page 42: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Helmert Blocks

CORS/CGPS provided control at the top blockCGPS coordinates were determined by Scripps’ Sector utility projected to the 2007.0 epoch.

An attempt was made to create a separate block of data for each state to minimize the number of junction observations between blocks.

California, Florida, Minnesota, North and South Carolina were broken into multiple blocks because of the number of stations located in these blocks.

Page 43: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

HB 1

HB 2

HB 3

HB 4

HB 5

HB8HB 9

HB16HB 17

FLGA AL MS

HB 18

NC SC

HB 19

HB 32

HB 33

HB10

HB11

HB 20

HB 21

HB 22

HB 23

HB 6

HB 7

HB 12

HB 13

HB 24

HB 25

HB 26

HB 27

HB 14

HB15

HB28

HB 29

HB 30

HB 31

HB 34

HB 35

HB 36

HB 37

HB 38

HB 39

HB 40

HB 41

HB 42

HB 43

HB 44

HB 45

HB 46

HB 47

HB 48

HB 49

HB 50

HB 51

OR WA CA AK PR VQ

VA WV MD PA DC DE NY NJ CT MA ME NH RI VT LA AR TN KY MO IL IN OH MI WI MN IA ND SD NE KS OK TX NM AZ CO UT NV ID MT WY

HELMERT BLOCKING STRATEGY

This is how each state fits into the National Readjustment

You are here

Page 44: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

The National Readjustment General Comments

The CORS/CGPS sites were the control

Only GPS projects participated

The FBN/CBN Surveys are a key element since these are high accuracy (2 cm) surveys that tie the HARN to the CORS throughout the contiguous United States and provide more accurate values for the ellipsoid heights of most HPGN stations.

Page 45: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NEW STANDARDS FOR GEODETIC CONTROL

(http://fgdc.er.usgs.gov/standards/status/swgstat.html)

• local accuracy -------------- adjacent points• network accuracy ---------- relative to CORS

• Numeric quantities, units in cm (or mm)• Both are relative accuracy measures• Will not use distance dependent expression• Order/Class codes will no longer be used

Page 46: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

SHIFTS (National results)

< 5 cm. in the horizontal component with an average shift of 2.2

cm.

< 10 cm. in the vertical component with an average shift of 4.6 cm.

Page 47: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

ILLINOIS STATISTICS

• Total # of Stations: 2515• Max Horizontal Shift: 0.106

(m)• Average Hz Shift: 0.011 (m)• Max Vertical Shift: 0.173

(m)• Average Vt. Shift: 0.014 (m)

Page 48: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008
Page 49: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NAD 83 Adjustment 2007 - Ellipsoid Height

Page 50: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Time-line for National Readjustment Positions and Ellipsoid Heights

All projects loaded in the NGS database prior to November 15, 2005 were included in the National Readjustment

Projects submitted after 11/15/2005 were accepted and loaded into the database but were not included in the readjustment

Completed adjustment by February 10, 2007 deadline

New Datasheets including new positions and network accuracies available now.

Project Report (pending)

Page 51: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

For Stations not Included

NGS recommends that NAD 83 data that is NOT part of the NSRS readjustment be readjusted by contractor/user with the original observations.

Because of the relatively small shifts anticipated, a

model such as NADCON will NOT be developed between previously determined GPS coordinates.

Page 52: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

National Geodetic Survey, Retrieval Date = NOVEMBER 30, 2007 KG0640 *********************************************************************** KG0640 FBN - This is a Federal Base Network Control Station. KG0640 DESIGNATION - MEADES RANCH RESET KG0640 PID - KG0640 KG0640 STATE/COUNTY- KS/OSBORNE KG0640 USGS QUAD - MEADES RANCH (1978) KG0640 KG0640 *CURRENT SURVEY CONTROL KG0640 ___________________________________________________________________ KG0640* NAD 83(2007)- 39 13 26.71218(N) 098 32 31.74604(W) ADJUSTED KG0640* NAVD 88 - 600.3 (meters) 1969. (feet) GPS OBS KG0640 ___________________________________________________________________ KG0640 EPOCH DATE - 2002.00 KG0640 X - -734,972.580 (meters) COMP KG0640 Y - -4,893,188.504 (meters) COMP KG0640 Z - 4,011,982.822 (meters) COMP KG0640 LAPLACE CORR- -2.96 (seconds) DEFLEC99 KG0640 ELLIP HEIGHT- 573.979 (meters) (02/10/07) ADJUSTED KG0640 GEOID HEIGHT- -26.35 (meters) GEOID03

National Geodetic Survey, Retrieval Date = NOVEMBER 30, 2007 DI3428 *********************************************************************** DI3428 CORS - This is a GPS Continuously Operating Reference Station. DI3428 DESIGNATION - KSU1_KSUN_KS2006 CORS ARP DI3428 CORS_ID - KSU1 DI3428 PID - DI3428 DI3428 STATE/COUNTY- KS/RILEY DI3428 USGS QUAD - SWEDE CREEK (1982) DI3428 DI3428 *CURRENT SURVEY CONTROL DI3428 ___________________________________________________________________ DI3428* NAD 83(CORS)- 39 06 02.67730(N) 096 36 34.09342(W) ADJUSTED DI3428* NAVD 88 - DI3428 ___________________________________________________________________ DI3428 EPOCH DATE - 2002.00 DI3428 X - -570,503.804 (meters) COMP DI3428 Y - -4,923,592.374 (meters) COMP DI3428 Z - 4,001,208.587 (meters) COMP DI3428 ELLIP HEIGHT- 326.622 (meters) (01/??/07) ADJUSTED DI3428 GEOID HEIGHT- -29.93 (meters) GEOID03 DI3428 HORZ ORDER - SPECIAL (CORS) DI3428 ELLP ORDER - SPECIAL (CORS)

NAD 83 (2007) and NAD 83 (CORS)

Page 53: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

NAD83 coordinates NAD83 coordinates 1997 adjustment1997 adjustment

Order of station Order of station in the old systemin the old system

Superseded coordinates Superseded coordinates do not include do not include NAD83(97)NAD83(97)

ME2940 DESIGNATION - TRYNER RESET ME2940 PID - ME2940 ME2940 STATE/COUNTY- IL/COOK ME2940 USGS QUAD - HARVEY (1993) ME2940 ME2940 *CURRENT SURVEY CONTROL ME2940 ___________________________________________________________________ ME2940* NAD 83(1997)- 41 35 09.16178(N) 087 43 48.51810(W) ADJUSTED ME2940* NAVD 88 - 209. (meters) 686. (feet) SCALED ME2940 ___________________________________________________________________ ME2940 LAPLACE CORR- -1.66 (seconds) DEFLEC99 ME2940 GEOID HEIGHT- -33.27 (meters) GEOID99 ME2940 HORZ ORDER - FIRST ME2940.The horizontal coordinates established by classical geodetic methods ME2940.and adjusted by the National Geodetic Survey in October 1999. ME2940; North East Units Scale Converg. ME2940;SPC IL E - 546,283.293 350,296.268 MT 1.00000612 +0 24 ME2940;UTM 16 - 4,604,055.820 439,140.542 MT 0.99964558 -0 29 ME2940 ME2940: Primary Azimuth Mark Grid Az ME2940:SPC IL E - TRYNER 1944 AZ MK 1959 046 20 05.8 ME2940:UTM 16 - TRYNER 1944 AZ MK 1959 047 13 11.8 ME2940 ME2940 ME2940 SUPERSEDED SURVEY CONTROL ME2940 ME2940 NAD 83(1986)- 41 35 09.16596(N) 087 43 48.52531(W) AD( ) 1 ME2940 NAD 27 - 41 35 09.04476(N) 087 43 48.35065(W) AD( ) 1 ME2940 ME2940.Superseded values are not recommended for survey control. ME2940.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums. ME2940 ME2940 STATION DESCRIPTION ME2940 ME2940'DESCRIBED BY COAST AND GEODETIC SURVEY 1956 (WNM) ME2940'THE STATION WAS FOUND IN GOOD CONDITION BUT FLUSH ME2940'WITH THE GROUND AS THE ME2940'RIGHT-OF-WAY HAS BEEN GRADED AT THIS LOCATION. OBSERVATIONS

Datasheets for excluded station

Page 54: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

AC8865 DESIGNATION - MDW 11 AC8865 PID - AC8865 AC8865 STATE/COUNTY- IL/COOK AC8865 USGS QUAD - BERWYN (1993) AC8865 *CURRENT SURVEY CONTROL AC8865 ___________________________________________________________________ AC8865* NAD 83(2007)- 41 47 16.93979(N) 087 45 01.58973(W) ADJUSTED AC8865* NAVD 88 - 184.35 (meters) 604.8 (feet) GPS OBS AC8865 ___________________________________________________________________ AC8865 EPOCH DATE - 2002.00 AC8865 X - 186,951.240 (meters) COMP AC8865 Y - -4,759,161.802 (meters) COMP AC8865 Z - 4,228,179.637 (meters) COMP AC8865 LAPLACE CORR- -1.12 (seconds) DEFLEC99 AC8865 ELLIP HEIGHT- 150.966 (meters) (02/10/07) ADJUSTED AC8865 GEOID HEIGHT- -33.40 (meters) GEOID03 AC8865 AC8865 ------- Accuracy Estimates (at 95% Confidence Level in cm) -------- AC8865 Type PID Designation North East Ellip AC8865 NETWORK AC8865 MDW 11 0.63 0.49 1.74 AC8865.The horizontal coordinates were established by GPS observations AC8865.and adjusted by the National Geodetic Survey in February 2007. AC8865.The datum tag of NAD 83(2007) is equivalent to NAD 83(NSRS2007). AC8865.The horizontal coordinates are valid at the epoch date displayed above. AC8865.The orthometric height was determined by GPS observations and a AC8865.high-resolution geoid model. AC8865.The geoid height was determined by GEOID03. AC8865; North East Units Scale Factor Converg. AC8865;SPC IL E - 1,865,890.79 1,143,212.42 sFT 1.00000388 +0 23 18.4 AC8865! - Elev Factor x Scale Factor = Combined Factor AC8865!SPC IL E - 0.99997632 x 1.00000388 = 0.99998020 AC8865 SUPERSEDED SURVEY CONTROL AC8865 ELLIP H (09/22/04) 150.961 (m) GP( ) 4 1 AC8865 NAD 83(1997)- 41 47 16.93986(N) 087 45 01.58965(W) AD( ) B

NAD83 (NSRS2007) datasheet

Epoch dateEpoch date

Datum tagDatum tag

Ellip Ht GPSEllip Ht GPS

Ortho height Ortho height

accuracyaccuracy

Page 55: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

ITRF00 to NAD 83 (CORS96)

Page 56: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

New procedures for data submission for horizontal projects

• All projects will have to be adjusted using only NSRS2007 control points

• All projects will have to have at least one CORS tie• No error scaling is required now

– The program MODGEE.EXE will not be run• Changes soon may be required in the final free

adjustment– This may involve weighting the control using

accuracies form the datasheets

Page 57: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

Geoid 06Earth’s Surface

hh

h hh

HH

HH

H

NNNN

N

Ellipsoid

Composite Geoid

A new geoid GeoidA new geoid Geoid Warped to fit NRSR2007 ellipsoid Warped to fit NRSR2007 ellipsoid heights will be released soonheights will be released soon

The next height datumThe next height datum will be based on the gravity geoid will be based on the gravity geoid

Gravity GeoidGravity Geoid

0.27m in Joilet IL

Page 58: National Readjustment of NAD 83 Indiana Society of Professional Land Surveyors Indianapolis, IN January 18, 2008

IGA Crustal deformation for the midwest