1 . “Oyu To l goi”
project: The project cost is
approx. 4,000.0 million US
$ and with 5 years of im-
plementation period. Ex-
ploitation of Oyu Tolgoi
copper ore deposit and
construction of copper ore
concentrator plant with
capacity of 35.0 million
tons per annum (100,000.0
tons/day). Further, the
capacity will increase to
56.0 million tons per an-
num (150,000.0 tons/day).
Open-cut and underground
mining technologies will
be used. Underground
mining will be the block
case mine method.
Natural Resources & Mining Processing
NATIONAL DEVELOPMENT AND INNOVATION COMMITTEE
Government Agency of Mongolia
Inside: Project Titles
“Oyu Tolgoi” “Oyu Tolgoi” “Oyu Tolgoi” “Oyu Tolgoi”
“Tavan Tolgoi” “Tavan Tolgoi” “Tavan Tolgoi” “Tavan Tolgoi”
1
2
“Copper Smelting Plant”
“Steel & Metallurgical
Complex”
3
4
“Coke-Chemical Plant”
“Oil Refinery Plant”
5
6
“Tavan Tolgoi Power
Station”
“Power Plant #5 in
Ulaanbaatar City”
7
8
Altanbulag-Zamin Uud
Highway”
“New Railway”
9
10
“Launching National
Satellite “
“Housing Supply”
11
12
“Energy Production from
Waste and Biomass”
13
www.ndic.gov.mn
2. “Tavan Tolgoi”
project: The project cost
is approx. 800.0 million
US $ with 3 years of imple-
mentation period. The
coal mine’s geological de-
posit is approx. 6.4 billion
tons of coal, from which
2.5 billion with high qual-
ity coking coal and the rest
is energy coal. The coal
mine’s capacity is up to
20.0 million tons per an-
num and the coal refinery
plant will produce 15.0
million tons of coke con-
centrate per annum. En-
ergy coal will be supplied
to Tavan tolgoi power sta-
tion and the rest will be
supplied to the refinery
plant at Tavan tolgoi . The
refinery plant will be the
base for further develop-
ment of coke-chemical in-
dustry in Mongolia.
“Khar Khorum 13th
Century”
14
Coal Deposit Spread in Mongolia
The Government’s
Medium Term
Priority Areas:
• Natural
Resources &
Mining Processing
• Infrastructure
Development
• Human Develop-
ment & Environ-
mental Protection
2
3. “Copper Smelting
Plant” project: The pro-
ject cost is approx. 1,000.0
million US$, and its imple-
mentation period is 2
years. Copper concentrate
will be processed at the
copper smelting plant in
Sainshand region, Mongo-
lia. The plant’s produc-
tion capacity is expected
to be 70,000.0 tons of
cathode copper per an-
num.
Natural Resources & Mining Processing
NATIONAL DEVELOPMENT AND INNOVATION COMMITTEE
Government Agency of Mongolia
The Government’s
Medium Term
Priority Areas:
• Natural
Resources &
Mining Processing
• Infrastructure
Development
• Human Develop-
ment & Environ-
mental Protection
www.ndic.gov.mn
4. “Steel & Metalurgical
Plant” project: The
project cost is approx.
1,000.0 million US $, and
its implementation period
is 3 years. The plant is
expected to process 2.0
million tons of iron ore
and produce steel and
iron products, such as
steel plates, railway rails
and other large-sized
metal parts. Pre-
feasibility study is made.
Detailed feasibility study
(FS) needs to be carried
out. The plant will be lo-
cated in either Darkhan
or Sainshand regions,
Mongolia.
Black Metallurgical Deposit Spread in Mongolia
Copper Deposit Spread in Mongolia Inside: Project Titles
“Oyu Tolgoi”
“Tavan Tolgoi”
1 2
“Copper Smelting Plant” “Copper Smelting Plant” “Copper Smelting Plant” “Copper Smelting Plant”
“Steel & Metallurgical “Steel & Metallurgical “Steel & Metallurgical “Steel & Metallurgical
Complex” Complex” Complex” Complex”
3
4
“Coke-Chemical Plant”
“Oil Refinery Plant”
5
6
“Tavan Tolgoi Power
Station”
“Power Plant #5 in
Ulaanbaatar City”
7
8
Altanbulag-Zamin Uud
Highway”
“New Railway”
9
10
“Launching National
Satellite “
“Housing Supply”
11
12
“Energy Production from
Waste and Biomass”
13
“Khar Khorum 13th
Century”
14
3
need to be carried out.
The plant is proposed to
built in Sainshand region,
Mongolia
5. “Coal-Chemical Plant”
project: The project cost
is approx. 1,000.0 million
US $ and implementation
period is 2 years. The
plant is expected to pro-
duce combustible gas,
methanol, DME and other
chemical products by
processing brown coal and
develop coal-chemical in-
dustry. Clean coal tech-
nology will be applied to
produce clean fuel that
solve heat supply and air
pollution problems of ur-
ban settlements. Coal
chemical industry devel-
opment program and FS
Natural Resources & Mining Processing
NATIONAL DEVELOPMENT AND INNOVATION COMMITTEE
Government Agency of Mongolia
The Government’s
Medium Term Top
Priority Areas:
• Natural
Resources &
Mining Processing
• Infrastructure
Development
• Human Develop-
ment & Environ-
mental Protection
www.ndic.gov.mn
6. “Oil Refinary Plant”
project: The project cost is
approx. 900.0 million US $
and the implementation
period is 3 years. The
plant’s refinery capacity is
1.0 million tons of crude
oil per annum. Mongolia
is becoming an oil produc-
ing nation. An appropri-
ate technology will be se-
lected to process domestic
crude oil and a refinery
will be constructed to
meet domestic demand
for petroleum and petro-
leum products. MMRE is
currently conducted 3 fea-
sibility studies on oil re-
finery projects.
Crude Oil Deposit Spread in Mongolia
Inside: Project Titles
“Oyu Tolgoi”
“Tavan Tolgoi”
1 2
“Copper Smelting Plant”
“Steel & Metallurgical
Complex”
3
4
“Coke“Coke“Coke“Coke----Chemical Plant” Chemical Plant” Chemical Plant” Chemical Plant”
“Oil Refinery Plant” “Oil Refinery Plant” “Oil Refinery Plant” “Oil Refinery Plant”
5
6
“Tavan Tolgoi Power
Station”
“Power Plant #5 in
Ulaanbaatar City”
7
8
Altanbulag-Zamin Uud
Highway”
“New Railway”
9
10
“Launching National
Satellite “
“Housing Supply”
11
12
“Energy Production from
Waste and Biomass”
13
“Khar Khorum 13th
Century”
14
4
project study, imple-
mentation plan and
negotiations with po-
tential investors need
to be started.
7. “Tavan Tolgoi Power
Station” project: The pro-
ject cost is approx. 400.0
million US $ and imple-
mentation period is 2.5
years. The plant will be
built near Tavan Tolgoi
coal deposit. The power
plant's installed capacity
is 300.0 MWt. The plant
has modern technology
power plant connected
with the central electric-
ity grid. The plant will
consume less water and
equipped with air cooler
and dry ash disposal sys-
tems etc. PPP (public pri-
vate- partnership) scheme
is considered for the plant
construction. Detailed
Infrastructure Development
NATIONAL DEVELOPMENT AND INNOVATION COMMITTEE
Government Agency of Mongolia
The Government’s
Medium Term Top
Priority Areas:
• Natural
Resources & Min-
ing Processing
• Infrastructure
Development
• Human Develop-
ment & Environ-
mental Protection
www.ndic.gov.mn
8. “Power Plant #5 in
Ulaanbaatar City” pro-
ject: The project cost is
approx. 300.0 million US $
and implementation period
is 3 years. The installed
capacity is 300.0 MWt of
electricity and 700.0 kcal
of heating production.
The plant will supply
new energy sources for heating and elec-
tricity supply to Ulaanbaatar City. Feasi-
bility study is underway and the feasibil-
ity study is funded by the ADB.
Inside: Project Titles
“Oyu Tolgoi”
“Tavan Tolgoi”
1 2
“Copper Smelting Plant”
“Steel & Metallurgical
Complex”
3
4
“Coke-Chemical Plant”
“Oil Refinery Plant”
5
6
“Tavan Tolgoi Power “Tavan Tolgoi Power “Tavan Tolgoi Power “Tavan Tolgoi Power
Station” Station” Station” Station”
“Power Plant #5 in “Power Plant #5 in “Power Plant #5 in “Power Plant #5 in
Ulaanbaatar City”Ulaanbaatar City”Ulaanbaatar City”Ulaanbaatar City”
7
8
Altanbulag-Zamin Uud
Highway”
“New Railway”
9
10
“Launching National
Satellite “
“Housing Supply”
11
12
“Energy Production from
Waste and Biomass”
13
“Khar Khorum 13th
Century”
14
5
Ulaanbaatar and Zamiin-
Uud cities. Project pre-
feasibility study is made.
9. “Altanbulag-Zamin
Uud Highway” project:
The project cost is approx.
1,200.0 million US $ and
implementation period is 5
years. This is the first high
way that the Government
of Mongolia proposes. The
highway length is 990.0
km connecting the north
and south boarders of
Mongolia. This highway
will connect transit trans-
portation between Europe
and Asia The highway
has two directions con-
necting Altanbulag,
Infrastructure Development
NATIONAL DEVELOPMENT AND INNOVATION COMMITTEE
Government Agency of Mongolia
The Government’s
Medium Term Top
Priority Areas:
• Natural
Resources & Min-
ing Processing
• Infrastructure
Development
• Human Develop-
ment & Environ-
mental Protection
www.ndic.gov.mn
10. “New Railway” pro-
ject: The project cost is
approx. 800.0 million US$
and implementation period
is 4 years. Consists of 3
projects that construct
prime railway links from
Tavan Tolgoi to Gashuun
Sukhait; from Nariin
Sukhait to Shivee
Khuren; and a link be-
tween Tavan Tolgoi, Tsa-
gaan Suvarga, Zuunba-
yan and Sainshand. This
railway project will be the
main railway system in
Southern Mongolia and
will be connected to the central railway system of Mon-
golia.
Inside: Project Titles
“Oyu Tolgoi”
“Tavan Tolgoi”
1 2
“Copper Smelting Plant”
“Steel & Metallurgical
Complex”
3
4
“Coke-Chemical Plant”
“Oil Refinery Plant”
5
6
“Tavan Tolgoi Power
Station”
“Power Plant #5 in
Ulaanbaatar City”
7
8
AltanbulagAltanbulagAltanbulagAltanbulag----Zamin Uud Zamin Uud Zamin Uud Zamin Uud
Highway”Highway”Highway”Highway”
“New Railway”“New Railway”“New Railway”“New Railway”
9
10
“Launching National
Satellite “
“Housing Supply”
11
12
“Energy Production from
Waste and Biomass”
13
“Khar Khorum 13th
Century”
14
6
11. “Launching National
Satellite” project: The
project cost is approx.
600.0 million US$ and im-
plementation period is 5
years. The project aim is
to launch a small-scale
satellite designed for in-
formation and communi-
cation systems in Mongo-
lia. The project pre-
feasibility study is made.
Detailed feasibility study
and implementation plan
will be done by
ICTPA by 2012.
Infrastructure Development
NATIONAL DEVELOPMENT AND INNOVATION COMMITTEE
Government Agency of Mongolia
The Government’s
Medium Term Top
Priority Areas:
• Natural
Resources & Min-
ing Processing
• Infrastructure
Development
• Human Develop-
ment & Environ-
mental Protection
www.ndic.gov.mn
12. “Housing Supply”
project: The project cost is approx. 2,100.0 million US $ and implementation period is 4 years. The pro-ject aim is to construct:
-41,200.0 households new apartment buildings in new towns and residen-tial districts;
-24,800.0 household apartment buildings within the framework of re-development plan of ger area into housing dis-tricts;
-9,000.0 household apart-ment buildings to im-prove population density;
-14,000.0 household apartment buildings in satellite cities;
-5,000.0 household apartment buildings in the regional hub cities;
-6,000.0 household apartments in aimag and local ar-eas.
Inside: Project Titles
“Oyu Tolgoi”
“Tavan Tolgoi”
1 2
“Copper Smelting Plant”
“Steel & Metallurgical
Complex”
3
4
“Coke-Chemical Plant”
“Oil Refinery Plant”
5
6
“Tavan Tolgoi Power
Station”
“Power Plant #5 in
Ulaanbaatar City”
7
8
Altanbulag-Zamin Uud
Highway”
“New Railway”
9
10
“Launching National “Launching National “Launching National “Launching National
Satellite “Satellite “Satellite “Satellite “
“Housing Supply”“Housing Supply”“Housing Supply”“Housing Supply”
11
12
“Energy Production from
Waste and Biomass”
13
“Khar Khorum 13th
Century”
14
7
13. “Energy Production
from Waste and Biomass”
project: The project cost
is approx. 200.0 million
US $ and implementation
period is 1 year. Produc-
tion of a combustible gas
from organic waste and
biomass processing. The
production case is tested.
Detailed project study is
made.
Human Development & Environmental Protection
NATIONAL DEVELOPMENT AND INNOVATION COMMITTEE
Government Agency of Mongolia
The Government’s
Medium Term Top
Priority Areas:
• Natural
Resources & Min-
ing Processing
• Infrastructure
Development
• Human Develop-
ment & Environ-
mental Protection
www.ndic.gov.mn
14. “Khar Khorum 13th
Century” project: The
project cost is approx.
500.0 million US$ and im-
plementation period is 5
years. The project capac-
ity is to receive up to 1.0
million tourists per year.
The project plans to build
modern technology mu-
seum and exhibits, inter-
national standard hotels,
airport and other service
facilities in the ancient
Mongolian Empire’s capi-
tal- Khar-khorum. Pre-
feasibility study is made
at the Ministry of Tour-
ism and Environment.
Inside: Project Titles
“Oyu Tolgoi”
“Tavan Tolgoi”
1 2
“Copper Smelting Plant”
“Steel & Metallurgical
Complex”
3
4
“Coke-Chemical Plant”
“Oil Refinery Plant”
5
6
“Tavan Tolgoi Power
Station”
“Power Plant #5 in
Ulaanbaatar City”
7
8
Altanbulag-Zamin Uud
Highway”
“New Railway”
9
10
“Launching National
Satellite “
“Housing Supply”
11
12
“Energy Production from “Energy Production from “Energy Production from “Energy Production from
Waste and Biomass”Waste and Biomass”Waste and Biomass”Waste and Biomass”
13
“Khar Khorum 13th “Khar Khorum 13th “Khar Khorum 13th “Khar Khorum 13th
Century”Century”Century”Century”
14