HI! I’MNATHAN &

I DESIGN!

I’m Nathan - a 24 year old Building Designer from

Geelong. My passion for Ar-chitecture extends from my long established love for all design and is enhanced by it’s diverse problem solving scenarios and its real world implications.

I can appreciate most styles of architecture however I am inclined toward mod-ern styles with bold but well articulated statements and

intentions.

Professionally I am results driven and competitive. Everyday I need to be better than I was yesterday. I am looking for a design firm that will utilize the skills I have developed in a challenging capacity, all the while providing an environ-ment in which I can further develop my abilities and knowledge.

Nathan Peucker [email protected]

Email for contact number

Page 5: Nathan Peucker Architectural Folio

03

MY WORK

01. The Poika Pod Pages 04-05

02. UCI Designs Pages 06-07

03. 13th Beach Family Home Pages 08-09

04. Second Storey Pages 10-13

05. Residential Construction Pages 14-17

06. Horizon Centre Pages 18-21

07. Growing Inn Pages 22-31

09. Ryrie Retail + Pages 32-45

10. The Home of Tomorrow Pages 46-49

2010

2013

2014

Miscellaneous Residential

Commercial

Page 6: Nathan Peucker Architectural Folio

04

01THE POIKA POD

My first design brief was to create my

own ‘personal space’ sited at Bells Beach. This space could be designed to be anything we want-ed.

With the site being relatively obscured, I felt having a self serviced unit would be great home way from home - a space in which one could disassociate from every day life and just relax with the ambiance of the coast.

The beautiful context made it clear to me that the design should have minimal impact on the site. This drove the insect -like stilt structure that supports the ‘pod’.

The aesthetics were inspired by McBride Charles Ryan’s Klein Bot-tle House and the pod was design to embrace passive ESD principles (including ventilation and lighting).

Student Project - Miscellaneous Bells Beach, Victoria The Gordon Tafe 2010

Page 7: Nathan Peucker Architectural Folio

The Poika Pod2010 05

Software Used

Google SketchUp

GoogleLayout

Adobe Illustrator

Page 8: Nathan Peucker Architectural Folio

In 2010 Geelong was the host to the UCI Road World Championships, a tourna-ment second only to the Tour de France.

In conjunction with the City of Greater Geelong and the UCI Committee - The Gor-don found the opportunity to deliver the Advanced Building Design students a real world project.

The brief was to create a ceremony stage and time

trials starting ramp that embraced both it’s purpose and Geelong’s waterfront.

The premise of this proj-ect is that the best design would be selected and actu-ally implemented.

While these designs were one of the five groups short-listed, the UCI committee decided to go with standard portable set ups.

While learning Autodesk 3ds Max I intend on re-visiting old projects and using it’s capabilities to improve design presentations. This is the first - using 3DS Max and MentalRay.

02UCI DESIGNS

Student Project - Miscellaneous Geelong, Victoria The Gordon Tafe 2010

06

Page 9: Nathan Peucker Architectural Folio

Software Used

UCI Designs2010 07

Google SketchUp

GoogleLayout

Adobe Illustrator

Page 10: Nathan Peucker Architectural Folio

My first residential de-sign project was a family home situated at the 13th Beach Golf Course Estate. It was conducted in groups of two and was to focus on the require-ments of ResCode as well as covenant design guidelines.

The design guidelines required the use of modern design elements as well as an articulated facade.

While it was important to me that we acknowl-edged the design guide-lines, I also felt the need

to tastefully separate this family home from the existing paradigm of this gated community, and my teammate strongly agreed.

This was the driving force behind features such as the butterfly roofs and the side access for the garage freeing up the front facade for livable space and design features.

Care was also taken to ensure the access of natural light and ventila-tion for most habitable spaces of the building.

03Student Project - Residential Connewarre, Victoria The Gordon Tafe 2010

13TH BEACH HOME

08

Page 11: Nathan Peucker Architectural Folio

Light Scale: 1:20Heat

South Westerly Breeze

Light Passage Ventilation

A couple aspects of our concept which help reduce the reliance on power con-suming devices

Natural light is provided to the toilet and bathroom through the use of double glazed windows. By design these windows prevent direct heat from the sun entering the building but still allow natural light to filter through. Reducing the need for artificial lighting during the day

Louvre windows, sliding windows and sliding doors have been situated to allow the cool south west breeze to flow through the house, in particular the living areas. (Living rooms, Dining area and the Kitchen). This not only reduces the need for air-conditioning but also keeps the air throughout the house fresh

N

5

13th Beach Design Guidelines ResCode

6.2.5: The building height allowable on remaining lots must not exceed 8 metres as measured from natural ground level.

6.3.1: Building envelopes for dwellings, car-ports and garages and such structure must be set back at:(a) 5 metres from a road boundary;(b) 5 metres from any Golf Course boundary; and(c) 2 metres from a side boundary.

6.2 Dwelling Type

6.3 Building Setbacks

6.5 Pools and Fences6.5.1: Pools may be built within side set-backs. To the Golf Course boundary, pools must be setback 1.2m. To the roadside boundary the pool and fencing must be set-back 5.0m.

6.6 Materials and Colours6.6.2 Roofs must be Lysate's Woodlands Grey Colorbond metal decking or equivalentcolour from other manufacturers (corrugated iron above 5deg pitch).

A5 Site CoverageThe site area covered by buildings should not exceed 60 per cent

A6 PermeabilityThe site area covered by buildings should not exceed

A9 Parking ProvisionTwo car spaces should be provided per dwelling with:

metres wide and covered or capable of being covered.

long and 2.6 metres wide.

If the car spaces are provided in a garage, carport or otherwise constrained by walls, a double space may be 5.5 metres wide measured inside the garage or carport.

6.9 Garages and Carports

each site.

6.6.3 Materials for walls are preferred to be at the darker end of the spectrum of materi-als and colours approved by the Design Committee.

6.6.5 All external brick or block walls to be rendered. All finishes must be of first rate quality to completely cover brick and block-work.

We’ve worked to provide a solution which complies with 13th Beach Committee Design Guidelines and the Victorian ResCode Standards. Here are relevant clauses that we’ve adhered to...

6

Floor Plan

We aimed for an open plan layout with as few hallways as possible. As a result a free and -

nate most areas with sunlight, saving energy by minimizing the need for artificial lighting.

Main living spaces are situated to the rear (north) side of the building to make the most of the winter sunlight. A large amount of glass is also used in the facade to encour-age natural sunlight, which in turn reduces the need for artificial heating and lighting.

A lavish outdoor entertainment area, with plenty of room for family and friends makes the place a hosts dream. Featuring an outdoor barbecue which is integrated with the internal kitchen, allowing you to prepare meals inside and pass them out through the double hung window.

Large bedrooms for all, with even the stand-ard bedrooms providing enough room for a queen sized bed and a large desk with space to spare.

An unconventional approach has been taken with the garage, taking advantage of the

large nature of the site. It has been situated down the side of the house, leaving room at the front for a more articulated facade. This also results in more parking space in the driveway

nate most areas with sunlight, saving energy by minimizing the need for a

Garage

Living Space

OutdoorEnt. Area

KitchenDining

LivingSpaceStudy

Laun

dry

Master Bedroom

W.C.

BathBed 1

Bed 2

Entry

Ens.

Line

n

RobeRobe

4.5m x 3m

4m x 5m

Approx. 6m x 7m

6.4m x 6m 2.4m x 2m

1m x 1.5

3.7m x 3m

3.7m x 3m

3.4m x 4.5m

2.6m x 2.5m6m x 5m2.5m x 3.5m

1.75

m x

2.5

m

1.9m

x 3

.5m

W.I.

R.

N

Scale 1:100B 2

1

Floor Plan

Concept SchematicPoika & Pricey Design

Floor Plan

Site Plan

Elevations

Light Passage

Ventilation

Letter of Acceptance

Compliance Checklist

Team Work Log Book

13th Beach Golf Course Villa

Four Weeks

Project..........................................Address.......................................

Stage.............................................

Time Spent................................N

1

2

3

5

5

6

7

@

@

Site Analyses

Plantation DriveSite Plan

We took advantage of the wider site by situat-ing the garage on the side of the house and providing rear access to the carport for the golf buggy

NScale 1:200

2

0 2 6 8 10

North Elevation

South Elevation

Scale 1:100

Scale 1:100

3

A grand rear facade with strong use of fenestration provides an awe-inspiring aesthetic and lights up the house with healthy natural light

Roof Pitch 5°

Roof Pitch 30°

Second row are wind-open awning windows to allow ventilation

North facing windows provide warm winter sunlight to second living space

Woodland Grey

Cladding

Eaves provide shading from windows

Carport for Golf Buggy

Double Glazed windows provide light to bathroom and water closet

Rendered brick cavity wall with dark finish as per design guidelines

with barbecueStacked sliding doors to provide flow between inside and outside entertainment

South facing windows to be double glazed to reduce heat from sunlight

Additional shading from the evening sun is provided by the west neighbouring house. This helps prevent the house from heating up too much during the summer

nights.

with barbecue

West Elevation

East Elevation

Scale 1:100

Scale 1:100

4

Double Garage

Two 1000L ‘Ultra-Slim’ water tanks

Double hung window to pass food through

Slate Tiles - SlateDiscount ‘Slate Product 27’

Slate Tiles - SlateDiscount ‘Slate Product 27’

CHH - Shadow Clad ‘Groove’ with Chalet finish

Legend:SW - Stormwater

P - PowerS - Sewer

T - TelecomH - Hydrant

Site Analysis

82 6 8 10

Scale 1:200

Legend:SW - Stormwater

P - PowerS - Sewer

T - TelecomH - Hydrant

Site Analysis

102 6 8 10

Scale 1:200

1) Photo of Lot 136 Plantation Drive, taken from the roadside (South) boundary

3) Photo of Lot 136 Plantation Drive’s west side neighbour side neighbour.

2) Photo of Lot 136 Plantation Drive, taken from the rear (North) boundary

2

Building Envelope Area: 553m2

Vehicle Entry Point: None defined

Vegetation: LawnPrevailing weather: South West

Slope: Slight fall towards NorthNeighbour details: See next page

Drive as being the most appropriate site due to site being larger than Fourth Loop and the North facing rear boundary.

With North being at the back of this site we immediately envisioned situating our main

living areas at the rear of our building in a way that would directly integrate them with the outdoor entertainment facilities.

We also instantly found an advantage in the not only larger, but wider site. Making it easier to design a more open floor plan

while situating the garage on the side of the property.

A slight aesthetic issue with the site is the fire hydrant out front, however we felt this wasn’t going to affect our design.

7

Site Analysis

Connewarre

1) Photo of Lot 52 Fourth Loop, taken from the roadside (East) boundary

3) Photo of Lot 52 Fourth Loop’s North side neighbour side neighbour.

2) Photo of Lot 52 Fourth Loop, taken from the rear (West) boundary2) Photo of Lot 52 Fourth Loop, taken from the rear (West) boundary

Site Area: 705m2

2

Vehicle Entry Point: None defined

Vegetation: LawnPrevailing weather: South West

Slope: NoneNeighbour details: See next page

9

Site Analysis

Connewarre

Software Used

13th Beach Home2010 09

Google SketchUp

GoogleLayout

Adobe Illustrator

Adobe Photoshop

Page 12: Nathan Peucker Architectural Folio

Following the design of our first residential building, our class was charged providing a pre-liminary set of working drawings, sans details.

However in addition to the original develop-ment, the brief had been adjusted to incorporate a second storey for the

residence.

This new space was to be a new master bedroom and was to be architec-turally styled based on that of a famous archi-tect of our choosing.

For my particular design, I chose to embrace the brutalist and monolith-

ic forms employed by Tadao Ando whose work I was drawn to.

Student Project - Residential Connewarre, Victoria The Gordon Tafe 2010

04SECOND STOREY ADDITION

10

Page 13: Nathan Peucker Architectural Folio

Second Storey Addition2010 11

Page 14: Nathan Peucker Architectural Folio

04SECOND STOREY ADDITIONStudent Project - Residential Connewarre, Victoria The Gordon Tafe 2010

12

Page 15: Nathan Peucker Architectural Folio

Software Used

Second Storey Addition2010 13

AutodeskAutocad

Page 16: Nathan Peucker Architectural Folio

05RESIDENTIAL CONSTRUCTION

DETAILS

Student Project - Residential The Gordon Tafe 2010

14

Page 17: Nathan Peucker Architectural Folio

Res. Construction Details 2010 15

Page 18: Nathan Peucker Architectural Folio

05SECOND STOREY ADDITIONStudent Project - Residential The Gordon Tafe 2010

16

Page 19: Nathan Peucker Architectural Folio

Software Used

Res. Construction Details 2010 17

AutodeskAutocad

Page 20: Nathan Peucker Architectural Folio

In 2013 I continued my Diploma, with a design brief was to create a community learning/library learning facility in Torquay.

The single storey build-ing was to integrate with the immediate surround-ings as possible.

My objective was to create a design that embraced Torquay’s rela-tively young endeavour to incorporate contem-porary architecture.

I also pursued various passive ESD principals (particularly lighting, ventilation and thermal mass).

Finally I wanted to take advantage of the con-text, by maintaining views of the beautiful scenery with a green roof.

I aimed to implement a dynamic but bold form, which extends from the purpose of the space itself.

06THE HORIZON CENTRE

Student Project - Commercial Torquay, Victoria The Gordon Tafe 2013

18

Page 21: Nathan Peucker Architectural Folio

THEHORIZONCENTRE

WHY HORIZONI have chosen to name this project The Hori-zon Centre. This reflects the ability to clearly view the horizon from the implemented green roof.

More importantly The Horizon Centre and it’s surrounds are a source of information and experience. These two valuable assets are what empowers individuals to take advan-tage of opportunities that may lay over the horizon.

Perhaps most importantly, ‘The Horizon Centre’ is quite an ambiguous name, and was intended to be that way through design. A byproduct of this ambiguity will be imagination among people as they generate their own theories and conclu-sions about the significance of the name.

1

Nathan Peucker (10100689)

Corner of Zeally Bay Road & The Esplanade, Torquay

A STORY FOR EVERYONE

Each facade of the building has been designed to repre-sent various facets that a learning centre should provide or promote.

THE KEY ISINTEGRITY

All of these various traits are tied together by the use of con-crete as a cladding material. Concrete in construction is a strong material which provides integrity, an attribute that bonds these four traits togeth-er.

NORTH - INNOVATION1:200

1:200

1:200

1:200

EAST - PURPOSE

SOUTH - SIMPLICITY

SOUTH - CREATIVITY

2

DESIGNMy primary goal was to design a community centre for learning and development. It needed to be a design that capti-vates the local communi-ty and invites them to uti-lize the facility.

AESTHETIC DESIGNArchitectural style of libraries in the Geelong Region are, in a general sense, outdated.

Many of the venues have not been updated in over 10 years which provides a stagnant appearance in a sector that should always have a contem-porary feel.

On the contrary, there are a few examples of modern libraries in the Geelong Region which take a contemporary ap-proach.

GOALSTorquay’s local architec-ture (particularly on The Esplanade) is in a com-parable predicament. With many of the com-mercial buildings being of a past era.

In response to these fac-tors I have chosen to take a more contempo-rary approach to the design with the intention of setting a benchmark of design for future de-velopments in the area.

Examples Of Comparably Outdated Architectural Style: (From Top to Bottom) Geelong Library, Ocean Grove Library, Queenscliffe Library, Corio Library

Examples Of Comparably Outdated Architectural Style in Torquay

Examples Of Comparably Contemporary Architectural Style: (From Top to Bottom) Bannockburck Library, Waurn Ponds Library

3

4

FUNCTIONAL GOALSThe goal that was most import-ant to me, was the creation of a space that enables members of the community to come to-gether as groups or individuals and take part in the opportunity to learn, discover and imagine in a sociable environment.

While this ideology is not new, there is currently no venue in Torquay that provides such an important space.

VIEWSPerhaps the most important asset of this project is the site. It is a rectangular, relatively flat site that is oriented directly north.

More importantly the site has impressive views that are often unachievable on a non-resi-dential site.

The East boundary overlooks Bass Strait, with natural coast-ing landscaping on the shore.Taylors Park is situated across the road from the North bound-ary. This beautiful untouched

nature reserve provides a calming sensation.

My intentions were to maxi-mize the exposure to these views in such a way that leaves them unobstructed.

OUTDOOR AREASThe site is situated in relatively quiet portion of Torquay. This make it ideal for outdoor areas.

Outdoor areas provide a more comfortable and natural envi-ronment and as such result in an enriched experience.

As such, it is abundantly clear how important the use of out-door environments for reading, relaxing and socializing. There-fore this is one of my key objec-tives.

LITERATURE & INFORMA-TIONOne of The Horizon Centre’s key functions is servicing the area as a library. By traditional definition this a space that holds a large collection of

books.

However, consideration today needs to be made as to the role of technology in the storage and accessibility of informa-tion.

Many publications are avail-able on the Internet and people are progressively becoming more comfortable and efficient with accessing this informa-tion.

However, 38% of the popula-tion over 15 years old of the Torquay & Jan Juc area are over the age of 55. This demo-graphic, and some of the younger age group, are gener-ally less capable or even com-fortable with computers.

This means there is a require-ment to have traditional litera-ture in the library with the abili-ty to recycle the space to a more technologically inclined environment.

Photos of the nearby scenery: Top: Bass Strait, Middle and Bottom: Taylors Park

5

KEYFEATURES

The Horizon Centre is an ap-proach that strongly promotes contemporary architecture within the Torquay area.

It has been designed to instill fas-cination in community members passing by, with hope that their curiosity alone will be enough to draw them in to the community centre.

GREEN ROOFThe context of this site is truly unique with beautiful yet diverse scenery on both the North & East sides. Failure to enable the com-munity to absorb such an envi-ronment would poor use of such a resource.

As such, one of the key features of this building that makes it truly unique is the implementation of the traffic-able green roof.

This provides an elevated open space which will facilitate an un-obstructed and unprecedented view of this natural luxury.NATURAL LIGHTING AND VEN-TILATIONIn a community centre one of the most important factors of patron enjoyment is environment.

Through the design stage I have attempted to help enhance this environment by using as much natural ventilation and lighting as possible.

What sets this project aside from others is the use of a central courtyard (which also serves as the access point for the green roof). It allows soft ambient light to filter through the gallery. This central courtyard is situated in be-tween the high point of raked ceil-ings and also incorporates awning windows to allow head to escape.

FLEXIBLE SPACETechnology is progressively causing a paradigm shift in the way we access information.

To suggest that hard copy infor-mation will always be the focus of libraries would be an act of igno-rance to a future with very real

potential.

To help future proof the building no shelving has been designed for permanence. The Horizon Centre building that provides a large and flexible space for com-munity use.

At this point and time, it is appro-priate to have a large collection of physical literature, however in the future these needs may need to be reassessed and changes in space utilization may occur.

Photos of the nearby scenery: Top: Bass Strait, Middle and Bottom: Taylors Park

A simulated view from the green roof

3D Render depict-ing the effective-ness of the inter-nal courtyard

THELAYOUT

The layout designed for the Horizon Centre strongly focus-es on the community oriented nature of the building.

Entrances and exists are locat-ed on both main roads with an outdoor cafe area located on The Esplanade.

These spaces provide an envi-ronment for social interaction but also allow for private use of the facility.

Multipurpose rooms have also been implemented with enough room for 20 students (both rooms combined) in a class room set up.

6

ESD Section

1:200

N

SITE AND CONTEXT

It is proposed that the building be tied into the Foreshore & Taylor’s park by the use of subtly modified pedestrian crossings.

To link The Horizon Centre to the business district, thought provok-ing signage is to be implemented along the residential fencing.

LIBRARY | TAYLOR’S PARK

DIS

CO

VE

R

LEA

RN

SITE FEATURES: - 21 Carparks (including 2 dis-abled)- 2 Bike racks- 106m of outdoor cafe space- 880 Square meters unbuilt

-280 Square meters of green roof

7N

ZEALLY BAY RD

The

Espl

anad

e

1:250

pedestrian crossings.

To link The Horizon Centre to the

LIBRARY | TAYLOR’S PARK

DIS

CO

VE

R

LEA

RN

LIBRARY | FORESHORE

INS

PIR

ATION

INFO

RM

ATIO

N

DISCOVERYOURHORIZON THE

HORIZONCENTRE

ESDSTATEMENT

81:100

The last major priority was to ensure The Horizon Centre implemented a high caliber of sustainable design.

Green Roof

GREEN ROOFThe green roof is arguably the iconic feature of The Horizon Centre. It’s pur-pose is to provide use to a space that would ordinari-ly be neglected. As a result of this implementa-tion it provides an addi-tional function to the build-ing and a place for social interaction. It doesn’t serve a environmental purpose as water will be drained onto another roof then stored in tanks.

Rain and Grey Water CollectionTanks are to be installed underground to store col-lected rainwater and grey water. This water will be used for operating toilets and maintaining the grounds.

This reduces demand on local water supply and building operation costs.

NATURAL VENTILA-TION AND LIGHTINGAwning windows are to be implemented on both the north and south sides of the building. This will pro-mote cross ventilation.

The internal courtyard is provided with awning win-dows at a higher point of a raked ceiling which helps act as a solar chimney promoting natural convec-tion.

To maximize light natural light penetration the court-yard has been made from curtain glass.

These passive tech-niques reduce the demand on fossil fuel powered electricity and help put the building into a more self sufficient cate-gory, further reducing op-erational costs.

SOLAR DESIGNSteps are to be made to ensure the sun is being used as much as possi-ble. Large amounts of cur-tain glass have been situ-ated on the north facade to maximize solar heat during winter. Photo-vol-taic cells have also been added to power the build-ing.

CLADDINGOver 95% of the cladding

will be cast insitu con-crete.

This has low embodied energy (1.9MJ/Kg) but when all construction is taken into consideration it may not be as environ-mentally appropriate.

This factor is negated by the thermal mass proper-ties.

This was primarily approached from a economical and environmental sense, however sociological aspects were also taken into consideration.

Software Used

The Horizon Centre2013 19

AutodeskRevit

Autodesk 360 Cloud Rendering

Adobe Photoshop

Adobe Illustrator

Page 22: Nathan Peucker Architectural Folio

THE HORIZON CENTRE

SheetNumber

SheetName

DrawingName

A000 Cover Sheet {3D}A100 SITE PLAN Site PlanA101 FLOOR PLAN Floor PlanA200 ELEVATIONS NorthA200 ELEVATIONS WestA201 ELEVATIONS EastA201 ELEVATIONS SouthA300 SECTIONS Section A-AA300 SECTIONS Section B-B

produced byNathan Peucker &Steven Nikolovski

Corner of Zealley bay Road &The Eslanade, Torquay

THE HORIZON CENTRE

SheetNumber

SheetName

DrawingName

A000 Cover Sheet {3D}A100 SITE PLAN Site PlanA101 FLOOR PLAN Floor PlanA200 ELEVATIONS NorthA200 ELEVATIONS WestA201 ELEVATIONS EastA201 ELEVATIONS SouthA300 SECTIONS Section A-AA300 SECTIONS Section B-B

produced byNathan Peucker &Steven Nikolovski

Corner of Zealley bay Road &The Eslanade, Torquay

A

A300

A

A300

B

A300

B

A300

1

1

2

2

3

3

4

4

5

5 6

7

7

A A

B B

C CD DE E

F F

NO

RTH

N

47.63 m81° 34' 57"

50.3

0 m

8° 1

2' 0

0" 50.3

0m

8°36

' 26"

47.28 m81° 34' 57"

ZEALLY BAY ROAD

THE

ESPL

ANAD

E

1.9m

Palin

gFe

nce

1:75

1:10

0

1:75

1:10

0

1:75

1:10

0

1:75

1:10

0

1:75

1:10

0

1:75

1:10

0

1:75

1:10

0

1:75

1:10

0

1:81

1:67

1:81

1:67

1:81

1:67

1:81

1:67

1:81

1:67

1:81

1:67

1:1

RIG

HT

OF

WAY

8760

8808

9052

9314

9548

9621

88408840

9182

9423

9760

9811

9811 98119536

93409255

9044

8970

8970 8925

8925

9271

9603

9513

9482

9801

9696

9793

1007810173

10089

9753

10123

10057

10160

10053

10152

8735

8891

84268442

89248882

86568722

8698

9870

900021

34

56

78

91

21

10 11 12 13 14 15 16 17 18 19 20 21

10167

10088

9938

9830

9983

1:24

1:26

S.W.P.

S.W.P.

LOADING

BOU

ND

ARY

6020

BOUNDARY

12155

S.W.P.

S.W.P.

L.P.D

.

1000

0 R.L.

9500

R.L.

9000

R.L.

8500

R.L.

T.B.M

. = 80

00R.L.

AGR

ICU

LTU

RE

PIPE

AGRICULTURE PIPE

AGR

ICU

LTU

RE

PIPE

S.D.

S.D.

S.D.

S.D.

S.D.

S.D.

S.D.

CARPARK

CAR

PAR

K

W.T.W.T.BATT

ERFA

LL

BATTER

FALL

BATTER

FALL

BATT

ERFA

LL

1

2

3

Drawing Legend:S.W.P. Storm WaterL.P.D. Legal Point ofDischargeW.T. Water Tank (Underground -

5000L)S.D. Syphonic Drain

Stormwater Drainage (Site &Car Park)Rainwater Drainage (Roof)

project addresspoikalovskiD E S I G N S T U D I O S project number

nathan peucker & steven nikolovski

A1

1 : 200THE HORIZONCENTRE

Corner of Zealley Bay Road &The Esplanade, Torquay SITE PLANA408223

22/05/2013

A100

1 : 200Site Plan

1

Finish Floor Level: 9000 R.L.

Total Site Area: 9386.94m²Building Foot Print: 547.68m² (23%)Entrance Area: 6.50m² (0%)Outdoor Area: 80.00m² (3%)Footpaths Area: 184.57m² (8%)Car Park Area: 594.65m² (25%)Remaining Site Area: 973.54m² (41%)

Car Parks: 21 (2 Disabled)

DN

REF.

A

A300

A

A300

B

A300

B

A300

1

1

2

2

3

3

4

4

5

5

6

6

7

7

A A

B B

C C

D D

E E

2945

90

Sto

r e2

2100

90Vo

id91

090

90

Offi

c e

3425

90

Kitc

h en

3100

90

Mal

e

1800

300

300 C

lea n

er

1260

90

Fem

ale

1830

90

WC

1655

90

Dis

. WC

2000

90

Sto

r e1

2990

90

Mul

t ipur

pose

Roo

m2

3985

120

Mul

t ipur

pose

Roo

m1

5135

300

2002

5

300

6575

250

Cou

rtyar

d

5750

250

6600

300

90

Caf

e

5360

300

5750

1830

90

Pas

s age

1500

90

600

275

Various

2840 90

Passage

2225 90

Male

1920 90

WC

2930 90

1573

90

Kitchen

4405 90445

90

90 1235 250300 26375 300

Cafe

5575 90

300

Multipurpose Rooms

5575 90 4195 250

Entrance

1930 250 4810 250

Courtyard

3680 250 5095 300

26975

29 m²

MULTIPURPOSEROOM 1

22 m²

MULTIPURPOSEROOM 2

7 m²STORE 1

6 m²DIS. W.C.

9 m²FEMALE

4 m²CLEANER

8 m²MALE

14 m²KITCHEN

10 m²OFFICE

358 m²GALLERY

21 m²COURTYARD

30 m²CAFE3 m²

STORE 2

LOAD BEARINGDOUBLE STUD120MM STEELSTUD WALL

EQ EQ

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

9000 RL

SANITARY COMPARTMENTS:LAMINEX MULTIPURPOSEPARTITIONING SYSTEM

F F

W1

W2

OPERABLEWALL :HUFCOR -SERIES 8000

U.C.

U.C.

UTI

LITI

ES

W3

W4

W5

W6

W7

W8

TO Z

EALL

EY B

AY R

D

SANITARY COMPARTMENTS:LAMINEX MULTIPURPOSEPARTITIONING SYSTEM

PAS

SAG

E

OUTDOORSEATING AREA

D2

D3

D1

D4

D5

D6

D7

D8

D9

D16 D10

D11

D12

D15

D14

D13

D17

D18

D19

RECEPTIONIST DESK:REFER TO JOINERYDETAILS

W9 W10 W11 W12

C.C. C.C.

Grid

6850

Grid

2585

Grid

1400

Grid

2015

Grid

6875

250

GARDEN

SEAT

SEAT

SEAT

1225

250

1825

250

1200

250

1800

250

1200

250

1800

250

CW1 CW2

CW3

CW4

CW

7

CW8

CW

9

9000

ZEALLEY BAY ROAD

THE

ESPL

ANAD

E

From Boundary

6965

CARPARK

CAR

PAR

K

47 28 m81° 34' 57"

50.3

0m

8°36

' 26"

50.3

0 m

8° 1

2' 0

0"

47.63 m81° 34' 57"

9000

REINFORCEDCONCRETE 300MMCAST IN PLACE

REINFORCEDCONCRETE 300MMCAST IN PLACE

REINFORCEDCONCRETE 300MMCAST IN PLACE

9000

358 m²GALLERY

CW5 CW6

1:14

D.P.

D.P.

D.P.

D.P.

Grid

9820

Grid

1405

Grid

6150

Grid

3930

Grid

5370

Grid

5770

NO

RTH

N

D.P.

D.P.

Carpet tiles on raisedaccess floorCeramic tiles onraised access floorBoral timber decking

project addresspoikalovskiD E S I G N S T U D I O S project number

nathan peucker & steven nikolovski

A1

1 : 100THE HORIZONCENTRE

Corner of Zealley Bay Road &The Esplanade, Torquay

FLOORPLANA408223

22/05/2013

A101 1 : 100Floor Plan

1

D.P.D.P.

D.P.D.P.

D.P.

D.P.

Drawing Legend:

06THE HORIZON CENTREStudent Project - Commercial Torquay, Victoria The Gordon Tafe 2013

20

Page 23: Nathan Peucker Architectural Folio

F.F.L

9000

FUNC. F.C.H

12050

A

A300

A

A300

GALLERY LOW F.C.H.

13550

GALLERY HIGH F.C.H.

13800

A B C D E

SLAB

8800

F

UPPER ROOF

14580

LOWER ROOF

13080

COLORBONDCUSTOM FOLDEDFASCIA

REINFORCEDCONCRETE 300MMCAST IN SITU. -REFER TO ENGINEERSPECIFICATIONS

780

250

470

1030

3050

300

5780

6850 2585 1400 2015 6875

19725

A.J.

A.J.

1 : 100West

2

F.F.L

9000

FUNC. F.C.H

12050

GALLERY LOW F.C.H.

13550

GALLERY HIGH F.C.H.

13800

B

A300

B

A300

1 2 3 4 5 6 7

SLAB

8800

N.G.L.22 m²

MULTIPURPOSEROOM 2

358 m²GALLERY

21 m²COURTYARD

D1

250MM HOLLOWCORE WITH80MM SCREED GRADED AT

1:100

250MM HOLLOWCORE WITH 80MMSCREED GRADED AT 1:100

REINFORCED CONCRETE 300MMCAST IN SITU. - REFER TO

ENGINEER SPECIFICATIONS

13MM BORAL STANDARDPLASTERBOARDREINFORCEDCONCRETE 300MMCAST IN SITU. -REFER TO ENGINEERSPECIFICATIONS

AWS DOOR

AIR VENT - AS PER MECHANICALENGINEER SPECS

AWS GLAZINGCONCRETE SLAB EDGE BEAM450MM WIDE 600 DEEP - TOENGINEER SPECIFICATIONS

ASP ACCESSFLOORING RAISEDACCESS FLOOR

358 m²GALLERY

RONDO SUSPENDE CEILINGSYSTEM

13MM BORAL STANDARDPLASTERBOARD

F

OPERABLE WALL :HUFCOR - SERIES 8000

ASP ACCESS FLOORING RAISEDACCESS FLOOR

DOOR VOID

NON-COMPACTED FILL

FOOTPATH FALL TOMATCH SITE

F F FF

F F

FF F

F

F

F

FFF

F

F

FF

F

F

F

F

F

F

F

F

FF

FF

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

460UB82.1 UNIVERSAL BEAM

PFC 100x502x BGC CEMENT

1200MM WIDESHEETING 24MM &

18MM

CAST INSITU FILL

460UB82.1UNIVERSAL BEAM

LYSAGHT C10019100MM CEE

PURLINS @ 600CENTRES

577053703930615014059820

32445

930

UPPER ROOF

14580

LOWER ROOF

13080

780

250

470

1030

3050

200

5780

CARPARK

AGGREGATE FILLAGRICULTURE PIPE 100MM

CONCRETE SLAB EDGEBEAM 450MM WIDE 600MM

DEEP - TO ENGINEERSPECIFICATIONS

CONCRETE UPSTAND

250UB37.3 UNIVERSAL BEAMCAST INSITU FILL

EAVE SET OUT

1975

CONCRETE SLAB INTERMEDIATEBEAM 300MM WIDE 600MM DEEP -

TO ENGINEER SPECIFICATIONS

POLY****** VAPOUR BARRIER100MM COMPACTED SANDBED

200MM CONCRETE RAFT SLAB

REINFORCED CONCRETE 300MMCAST IN SITU. - REFER TO

ENGINEER SPECIFICATIONS

150MM CONCRETE RAFT SLAB

50MM SCREED AT 1:100 TOCENTRE

CW1 CW2 CW3 CW4 CW5 CW6

AWS SINGLE GLAZED WINDOW

JARRAH HARDWOOD SEAT -REFER TO JOINERY DETAILS

RONDO SUSPENDE CEILINGSYSTEM - REFER TO LEVELSFOR SLOPE

250MM HOLLOWCORE WITH 80MMSCREED GRADED AT 1:100

250UB37.3 UNIVERSAL BEAMCAST INSITU FILL

460UB82.1 UNIVERSAL BEAMCAST INSITU FILL

90X45 TREATED PINE JOISTS AT500MM

ELMICH VERSIJACK TO PROVIDEJOISTS WITH MAX SPAN OF 900MM

BORAL 32MM x 130MM JARRAHDECKING

RELN RAIN DRAIN

FOOTPATH

CAST IN SITUCONCRETE COLUMNS

SHADOWCLADUNDER EAVE

COLORBOND CUSTOMFOLDED FASCIA

BORAL 32MM x 130MM JARRAHDECKING

2/120MM x 45MM TREATED PINEBEARER SPACED AT 1500MM MAX.

90MM x 45MM TREATED PINEFLOOR JOIST SPACED AT 600MM

1020

150

350 D

COMPACTED FILL100x100 CONCRETE STUMP

CONCRETE PAD FOOTING 350MMDIAMETER

75MM x 150MM POST SPACED AT1200MM MAX

150MM x 50MM TREATED PINERETAINING WALES

CONCRETE

330

NON-COMPACTED FILL (BATTER)AGGREGATE FILL

AGRICULTURE PIPE 100MM

930

450

F.F.L

9000

FUNC. F.C.H

12050

A

A300

A

A300

GALLERY LOW F.C.H.

13550

GALLERY HIGH F.C.H.

13800

ABCDE

SLAB

8800

F

358 m²GALLERY

ENTRANCED6D7D15

D1

REINFORCEDCONCRETE 250MMCAST IN SITU. -REFER TOENGINEERSPECIFICATIONS

AWS GLAZING

AWS DOOR

N.G.L.

UPPER ROOF

14580

LOWER ROOF

13080

780

250

470

1030

3050

200

5780

6875 2015 1400 2585 6850

19725

NON-COMPACTED FILLAGGREGATE FILL

AGRICULTURE PIPE 100MM

CONCRETE SLAB EDGEBEAM 450MM WIDE 600MM

DEEP - TO ENGINEERSPECIFICATIONS

250MM HOLLOWCORE WITH 80MMSCREED GRADED AT 1:100

250UB37.3 UNIVERSAL BEAM

CONCRETE SLAB INTERMEDIATEBEAM 300MM WIDE 600MM DEEP -

TO ENGINEER SPECIFICATIONS

VAPOUR BARRIER100MM COMPACTED SANDBED

200MM CONCRETE RAFT SLAB

CONCRETE SLAB INTERMEDIATEBEAM 300MM WIDE 600MM DEEP -

TO ENGINEER SPECIFICATIONS

ASP ACCESS FLOORING RAISEDACCESS FLOOR

RECEPTION DESK REFER TOJOINERY DETAILS

250MM HOLLOWCORE WITH 80MMSCREED GRADED AT 1:100

250UB37.3 UNIVERSAL BEAM

RECEPTION

REINFORCED CONCRETE 300MMCAST IN SITU. - REFER TO

ENGINEER SPECIFICATIONS

RONDO SUSPENDE CEILINGSYSTEM

13MM BORAL STANDARDPLASTERBOARD

460UB82.1 UNIVERSAL BEAM

CAST INSITU FILL

CONCRETE UPDSTAND

SHADOWCLADUNDER EAVE

COLORBOND CUSTOMFOLDED FASCIA

SHADOWCLADUNDER EAVECOLORBOND CUSTOMFOLDED FASCIA

W9

250

Ent

ranc

e

2150

1030

150

1

2

3

CONCRETE STEPPED PATH

150MM CONCRETE RAFT SLAB

50MM SCREED AT 1:100 TO STRIPDRAIN

90X45 TREATED PINE JOISTS AT500MM

ELMICH VERSIJACK TO PROVIDEJOISTS WITH MAX SPAN OF 900MM

BORAL 32MM x 130MM JARRAHDECKING

RELN RAIN DRAIN

930

STAINLESS STEELHANDRAIL ANDBALUSTRADES

project addresspoikalovskiD E S I G N S T U D I O S project number

nathan peucker & steven nikolovski

A1

1 : 50THE HORIZONCENTRE

Corner of Zealley Bay Road &The Esplanade, Torquay SECTIONSA408223

22/05/2013

A300

1 : 50Section A-A

A

1 : 50Section B-B

B

NP

F.F.L

9000

FUNC. F.C.H

12050

GALLERY LOW F.C.H.

13550

GALLERY HIGH F.C.H.

13800

B

A300

B

A300

1 2 3 4 5 6 7

SLAB

8800

UPPER ROOF

14580

LOWER ROOF

13080

COLORBONDCUSTOM FOLDEDFASCIA

REINFORCEDCONCRETE 300MMCAST IN SITU. -REFER TO ENGINEERSPECIFICATIONS

AIR VENT - AS PER MECHANICALENGINEER SPECS

W9 W10 W11 W12

577053703930615014059820

32445

780

250

470

780

250

3050

200

5780

A.J.A.J.

A.J.

A.J.

A.J.

A.J.A.J.A.J.

1 : 100South

1

F.F.L

9000

FUNC. F.C.H

12050

A

A300

A

A300

GALLERY LOW F.C.H.

13550

GALLERY HIGH F.C.H.

13800

ABCDE

SLAB

8800

F

UPPER ROOF

14580

LOWER ROOF

13080

SHADOWCLADUNDER EAVE

REINFORCED CONCRETE 300MMCAST IN SITU. - REFER TO

ENGINEER SPECIFICATIONS

JARRAH HARDWOOD SEAT -REFER TO JOINERY DETAILS

AWS DOOR

COLORBONDCUSTOM FOLDED

FASCIAAWS GLAZING

W5W6W7W8

W1W2W3

D2

AWS GLAZING

CORRUGATEDWOODLAND GRAY

COLORBONDCUSTOM FOLDEDFASCIA

780

250

470

1030

3050

200

5780

6875 2015 1400 2585 6850

19725

STAINLESS STEELHANDRAIL ANDBALUSTRADES

1 : 100East

2

F.F.L

9000

FUNC. F.C.H

12050

GALLERY LOW F.C.H.

13550

GALLERY HIGH F.C.H.

13800

B

A300

B

A300

1234567

SLAB

8800

UPPER ROOF

14580

LOWER ROOF

13080

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F F

F

F F

F F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

COLORBONDCUSTOM FOLDEDFASCIAREINFORCEDCONCRETE 300MMCAST IN SITU. -REFER TO ENGINEERSPECIFICATIONS

REINFORCED CONCRETE 300MMCAST IN SITU. - REFER TO

ENGINEER SPECIFICATIONS

AWS SINGLE GLAZED WINDOW

CW1CW2CW4CW5CW6

D1W4D3

COLORBONDCUSTOM FOLDED

FASCIA

REINFORCEDCONCRETE 300MM

CAST IN SITU. -REFER TOENGINEER

SPECIFICATIONSAWS DOOR

AWS GLAZING

CORRUGATEDWOODLAND GRAY

5770 5370 3930 6150 1405 9820

32445

200

3050

1030

4702

5078

0

5780

STAINLESS STEELHANDRAIL ANDBALUSTRADES

1 : 100North

1

The Horizon Centre2013 21

Page 24: Nathan Peucker Architectural Folio

0758 CORIO STREET

One of my most enjoy-able projects was 58 Corio Street. This project provided many design challenges which helped develop my skill as a designer.

The design was to be a mixed use develop-ment consisting of a hospitality component on the ground floor and

residential apartments above.

I chose to implement an implied interpretation of the context into my design while ensuring the scheme maintained an identity.

The restaurant was de-signed to be alluring with the ‘fins’ encouraging

people to gaze into the building to discover what was within.

I felt the units needed to be a more subtle addi-tion, a counterpoint to the restaurant, to en-hance privacy in a public space. As such they are monolithic in design and set back from the street front.

Student Project - Commercial Geelong, Victoria The Gordon Tafe 2013

22

Page 25: Nathan Peucker Architectural Folio

An engaging proposal that will not only embrace Geelong’s recent interest in contem-porary architecture but will also set expectations for the future of G e e l o n g ’ s streetscape and will challenge how the region a p p r o a c h e s building design in future.

This scheme however is about more than setting standards.

58 Corio Street is a context-rich opportunity which allows for the repurpose of land that once was the location of a popular hangout and transform it into a mixed use development that combines modern apartments and a restaurant bar facility. This needs to be achieved with a commer-

cially viable public venue while maintaining the privacy and comfort of the apartments.

The objective was to design a response that creates a sense of allure without being overstated. The resulting style is a harmonious but indirect integration of both the traditional and c o n t e m p o r a r y elements that can be found within the street scape

The restaurant /bar facade com-prises of a series of vertical timber fins. This screen obscures the inte-rior of the restau-rant, requiring that people physically approach the building to discov-er the beautiful venue within.

This repetitious feature is an-

chored to the site through two large brick walls that mark the entrance.

Upon entering the restaurant/bar you are immediately met with a perpen-dicular brick wall, a point in which you must to decide be-tween the lounge bar or the restau-rant.

This design deci-sion is about much more than ensur-ing structured cir-culation, it is about creating a clear transition from out-side to in. The oc-cupants are no longer in Geelong, they are in a cut-ting edge but beautifully rustic world filled with tempting aromas, delicious food and refreshing bever-ages but most im-portantly a com-fortable atmo-sphere.

The design of the

apartments has been conducted in such a way that provides a coun-terpoint to the rest of the scheme. The goal was to make it aestheti-cally pleasing but not let it draw at-tention from the restaurant below.

To accomplish this, a dark and monolithic form has been devised with large subtrac-tions for the balco-ny spaces. This form is continued through to the ground floor where the residential access point is.

The setback of the apartments en-sures that shad-owing from nearby buildings is mini-mized and that oc-cupant privacy is provided from the street.

58 Corio Street || nathan peucker

E.S.D. Statement

RESIDENTIAL FLOOR PLAN (LEVELS 1 & 2)1:200

RESTAURANT FLOOR PLAN(LEVEL 1)1:200

SITE PLAN1:500

SITE PLAN1:500

nathan peucker || 58 Corio Street

58 Corio Street is located in central Geelong. This scheme includes four 2-bedroom apartments to capitalise on the young adult demo-graphic who are likely to be looking for residences as close to the CBD as possible.

These apartments are split across levels one and two, which have identical layouts. The living areas enjoy a North accent to reduce need for mechanical heating in winter.

SECTION A-A1:200

SECTION B-B1:200

A

BB

BB

A

A A

The restaurant/bar facility has been designed to provide a social and dining experience that does not replicate the standard hospitality model in Geelong. The restaurant is divided up into sections to provide a more intimate experience.

The lounge bar is just that, a place to drink and socialise, with couches and bar stools provided. The intention is for this space to be used in a way that prioritises social interaction and making new connections, making patrons naturally comfortable which relieves the need for excessive alcohol consumption and improves the desirability of the venue to all demographics.

ESD

This scheme proudly implements the following principles to help ensure various forms of sustainability:

Environmental-Photovoltaic Cells-North aspect for residential units with shaded windows.-Double-glazed windows.-Natural lighting to all habitable spaces in apartments-Graywater & Stormwater collection and recycling-All electrical and water fittings to have maximum achievable star ratings where applicable-All light fittings to be LED -Reverse Cycle Air Conditioning-Hydronic heating.-Bike racks provided to both SOUs and the restaurant facility to encourage building occupants to cycle. -No parking for restaurant/bar. This will encourage staff and patrons to walk or utilize readily available public transport.-Recycling provided to both residential and restaurant/bar.

Social/Economical-Units to have comfortable atmosphere through low VOC paints and hydronic heating.-Units to have access to community vegetable garden.

BUILDING LIFE CYCLE

USAGE STATISTICS

Material SourcingMaterials are to be sourced through means of recycling wherever possible. All concrete is to be manufactured from recycled aggre-gate, the timber fins are to be sourced from old railway sleepers and bricks to be sourced from second hand distributors.

In addition to this, all structural timber will be sourced from renew-able plantations with the relevant certification.

Building OccupancySystems that are implemented as part of the design proposal are to be maintained to ensure maximum building performance. Where possible, upgrades should be made to increase environmental sustainability.

DemolitionMost materials within this scheme can be recycled and this opportu-nity taken advantage of. All timber and brickwork fins can go on to be repurposed. Steel melted down and incorporated into new products and concrete can have the aggregate recycled into other products. Were possible fenestration will be removed from the site in whole segments and reused as is, otherwise they will be recycled based on materials (glass & metal).

Site Area: 594m²Building Footprint: 424m² (71%)

Total Floor Area: 1088m²Lettable Commercial Area: 393m² (36%)Total Residential Area: 554m² (51%)Total Vertical Transport/Foyer Area: 141m² (13%)

SITE PLLLLALLLLLLLLLLLLLLLL N1:1:::1:::1:::1::::::1:::::1::::::5050505055050505055055055050505505550055550505505050005055055505555005555005500050000000000000000000000000000

Corio Street

Corio Street Gore Place

Gor

e Pl

ace

Gor

e Pl

ace

Moo

rabo

ol S

tree

t

N

N

Software Used

58 Corio Street2013 23

AutodeskRevit

Autodesk 360 Cloud Rendering

Adobe Photoshop

Adobe Illustrator

Page 26: Nathan Peucker Architectural Folio

N

B

A301

B

A301

A

A300

A

A300

Res.M'box

LIFT

FOYER

OUTDOORDINING

Street Seating / Bike Rack

Res

iden

t Par

king

ENTRANCE/COURTYARD

Vegetable Garden

2

2

B B

C C

D D

E E

F F

A A5

A401

10A402

7A401

----

G G

1

1

H H

3

3

BAR/DINING

COOL ROOM

CLEAN.

DIS. WC

FEMALEHALL

SERV

ICES

MALE

KITCHEN

SERVICEENTRANCE

AS1428COMPLIANTRAMP

DN

DN

DN

RESIDENTIALREFUSE

COMMERCIALREFUSE

A403

3

4

A400

4

A400

W.I.R.

ENS.

BATH

W.C.

MASTER BEDL'DRY

W.C.

BED

BATH

DINING

BALCONY

KITCHEN

LOUNGE

KITCHEN

DINING

BALCONY

LIFT

L'DRYMASTER BED

BED

MORETHANLINES

1 : 100

GROUND FLOOR PLAN99 8

0758 CORIO STREETStudent Project - Commercial Geelong, Victoria The Gordon Tafe 2013

24

Page 27: Nathan Peucker Architectural Folio

N

FOYER

OUTDOORDINING

ENTRANCE/COURTYARD

BAR/DINING

COOL ROOM

CLEAN.

DIS. WC

FEMALEHALL

SERV

ICES

MALE

KITCHEN

SERVICEENTRANCE

B

A301

B

A301

A

A300

A

A300

W.I.R.

ENS.

BATH

W.C.

MASTER BEDL'DRY

W.C.

BED

BATH

DINING

BALCONY

KITCHEN

LOUNGE

KITCHEN

DINING

BALCONY

LIFT

LINEN ROBE

Robe

Line

n

2

2

B B

C C

D D

E E

F F

A A

G G

1

1

H H

3

3

11A402

HVAC

L'DRYMASTER BED

BED

HVAC

A403

3

vbnvn

4

A400

4

A400

MORETHANLINES

1 : 100

FIRST FLOOR PLAN87

58 Corio Street2013 25

Page 28: Nathan Peucker Architectural Folio

Level 1 FFL15245

Ground FFL

10660

Level 2 FFL18770

Parapet22800

2

Ground F.C

.H.

14660

Slab10550

Level 1 FCH

18145

3A400

2A400

1A400

Level 2 FCH

21670

13

1130290062529005854000110

12250

80857830

15915

1235 43 6453 678

13

BOUNDARY

910

111214

1516

71718

19

19 2021

FOOTPATH

22 23

3 2 24

25 26 27

28 29

30 31 7 24

24

KITCHEN

BATHW.C.

KITCHENLIFT

COOLRO

OM

KITCHEN

BED

STAIRS

PASSAGE

PASSAGE

W.C.

BATHBED

MORE

THAN

LINES

1 : 50

Section B-BB1

EXTERNAL

PARAPETWALL

WITH

FRL120/120/120.

CONSTRU

CTIONCO

NSISTS

OF:

•300M

Mx3000M

M'AN

THRA

ZINC'VM

ZINC

INTERLO

CKINGPAN

ELS•

25MM

RONDOTO

PHAT

SPACEDAT

1200MM

MAX

•3LAYERS

OFGYPRO

CK16M

MFYRCH

ECK•

92MM

RONDO

STEELSTU

DWALL

FILLEDWITH

GLASS

WOOLBATTS

ACHIEVINGR2.8

•9M

MFIBRE

COMPRESSED

SHEETING

250M

MEXTRU

DED

FOAM

INSU

LATION

3270M

MREIN

FORCED

CONCRETE

SLABAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

413M

MSU

PACEILPLASTERBO

ARDFIXED

TO28M

MRO

NDOFU

RRINGCH

ANNELS

SPACEDAT

600MM

MAXIM

UM

5EXTERN

ALWALL

WITH

FRL120/120/120.

CONSTRU

CTIONCO

NSISTS

OF:

•300M

Mx3000M

M'AN

THRA

ZINC'VM

ZINC

INTERLO

CKINGPAN

ELS•

25MM

RONDO

TOPHAT

SPACEDAT

1200MM

MAX

•3LAYERS

OFGYPRO

CK16M

MFYRCH

ECK•

92MM

RONDO

STEELSTU

DWALL

FILLEDWITH

GLASS

WOOLBATTS

ACHIEVINGR2.8

•GYPRO

CK10M

MSTAN

DARD

PLASTERBOARD

6RESIDEN

TIALRAISED

FLOOR,CO

NSTRU

CTIONCO

NSISTS

OF:

•TO

NGUENGRO

OVE

20MM

GRAN

DEFLO

ORIN

GWITH

VECCHIO

FINISH

OSLO

COLO

UR

•22M

MSTRU

CTAFLORPARTICLE

BOARD

•70M

Mx35M

MMGP12

FLOORJOIST

SPACEDAT

500MM

•200M

MDEEP

VERSIJACKSTO

PROVIDE

SUPPO

RTTO

FLOORJOISTS

ATMAXIM

UM

SPANOF1200M

M

7PRECAST

CONCRETE

SANDW

ICHPAN

EL50M

MCO

NCRETE,50M

MRIG

IDINSU

LATION50M

MCO

NCRETE.

TOACH

IEVERVALU

EOFR1.8

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONS.FRL

120/120/120

8RECYCLED

BRICKWALL

NONLO

ADBEARIN

G

9250M

Mx1150M

MCO

NCRETE

UPSTAN

DAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

10AG

RICULTU

REDRAIN

11SCREED

FLOORWITH

WATERPRO

OFMEM

BRANE,

ADHESIVE

ANDVIN

YLFLO

ORIN

G.1:100

FALLTO

DRAIN

S

12150M

MSLAB

ONGRO

UNDAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

130.2M

MVAPO

URBARRIER

14CO

MPACTED

SANDBED

15KITCH

ENFIT

OUTAS

PERSCHEDU

LE

16REIN

FORCED

SLABONGRO

UNDRIB

BEAMAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

17150M

MPRECAST

CONCRETE

PANEL

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONS

FRL120/120/120

18LIFT

SHAFT,PITAN

DOVERH

EADSPACE

FORSCHIN

DLER

5500MRL

19REIN

FORCED

SLABONGRO

UND

EDGEBEAM

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONS

20150M

MPRECAST

CONCRETE

PANEL

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONSCLAD

WITH

300MM

x3000M

M'AN

THRA

ZINC'VM

ZINCINTERLO

CKINGPAN

ELS.CLADDING

FIXEDBY

25MM

RONDO

TOPHAT

SPACEDAT

1200MM

MAX

FRL120/120/120

21FIRE

RATEDEXIT

(STAIRSOBSCU

REDBY

SECTIONCU

TLO

CATION)

22FEATU

REWALL

PRECASTCO

NCRETE

SANDWICH

PANEL

100MM

CONCRETE,50M

MRIG

IDINSU

LATION150M

MCO

NCRETE.TO

ACHIEVE

RVALU

EOFR1.8

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONS.FRL

120/120/120

23REIN

FORCED

150MM

CONCRETE

LANDIN

GAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

24PARAPET

CAPPINGAN

DSTIFFEN

EDFLASH

ING

25REIN

FORCED

150MM

CONCRETE

SLABAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

26RO

OFSARKIN

G

27LYSAG

HTKLIP

LOK700

HISTRENGTH

ATPITCH

OF1

DEGREE

28STEEL

CLEATBO

LTEDTO

EQUAL

ANGLE.EQ

UAL

ANGLE

BOLTED

TOSLAB

29LYSAG

HTZED100

SPACEDAT

2000MAXIM

UM

BOLTED

TOSTEEL

CLEAT

30LYSAG

HTCEE100

31150M

Mx600M

MBO

XGUTTER

SUPPO

RTEDONBO

XGUTTER

HANGER

SPACEDAT

600MM.BO

XGUTTER

HANGER

FIXEDTO

'C'SECTIONS

0758 CORIO STREETStudent Project - Commercial Geelong, Victoria The Gordon Tafe 2013

26

Page 29: Nathan Peucker Architectural Folio

Level 1 FFL15245

Ground FFL

10660

Level 2 FFL18770

HALLW

AYLO

UNGE

BALCONY

PASSAGE

HALLW

AYLO

UNGE

BALCONY

Parapet22800

BC

DE

Ground F.C

.H.

14660

F

Slab10550

A

Level 1 FCH

18145

Level 2 FCH

21670

GH

11001100

43604060

40604060

40604060

2390

27050

1130290062529005854000110

12250

1235 467

857

99

101112

13145151617

11 18 19

20

20 21 20 23

32

22

21 24 25 21 26 27 12829

3031

5

33

34

4

A400

4

A400

PASSAGE

BAR/DINING

CLEAN>

COOLRO

OM

MORE

THAN

LINES

1 : 50

Section A-AA

1PARAPET

CAPPINGAN

DSTIFFEN

EDFLASH

ING

2150M

MPRECAST

CONCRETE

PANEL

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONSCLAD

WITH

300MM

x3000M

M'AN

THRA

ZINC'VM

ZINCINTERLO

CKINGPAN

ELS.CLADDIN

GFIXED

BY25M

MRO

NDO

TOPHAT

SPACEDAT

1200MM

MAX

FRL120/120/120

9TILE

FLOORONSCREED,G

RADED

AT1:100

TODRAIN

AGE

POINTS

3REFU

SECH

UTE

SPACE.REFUSE

CHUTE

TOBE

INSTALLED

ASPER

MAN

UFACTU

RERSPECIFICATIO

NS.CHU

TESTO

BEPRO

VIDEDFO

RGEN

ERALGARBAG

EAN

DRECYCLEABLE

GARBAG

E

4150M

MPRECAST

CONCRETE

PANEL

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONS

FRL120/120/120

5PRECAST

CONCRETE

SANDW

ICHPAN

EL50M

MCO

NCRETE,50M

MRIG

IDINSU

LATION50M

MCO

NCRETE.TO

ACHIEVE

RVALU

EOFR1.8

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONS.FRL

120/120/120

6100M

MCAST

INSITU

CONCRETE

RETAININGWALL

7REIN

FORCED

SLABONGRO

UND

EDGEBEAM

ASPER

STRUCTU

RALEN

GINEER

SPECIFICATIONS

8200M

MREIN

FORCED

CONCRETE

SLABAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

10150M

MSLAB

ONGRO

UNDAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

110.2M

MVAPO

URBARRIER

12CO

MPACTED

SANDBED

13BAR

WITH

STONEBEN

CHTO

PAN

D16M

MPARTICLE

BOARD

CARCASS

14CO

NCRETE

COLU

MNWITH

TIMBER

CLADDING

15AW

STHERM

ALHEART

SERIES826

FIXED

16TO

NGUENGRO

OVE

20MM

GRAN

DEFLO

ORIN

GWITH

VECCHIO

FINISH

OSLO

COLO

URFIXED

TO90x45

MGP12

FLOORJOIST

SPACEDAT

500MM

17REIN

FORCED

SLABONGRO

UNDRIB

BEAMAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

18150M

MCO

NCRETE

RAMPAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

19TIM

BERFRAM

ED1900M

Mx2700M

MDOORWITH

FIXED1900M

Mx600M

MWINDO

WABO

VE

20RECYCLED

BRICKWALL

NONLO

ADBEARIN

G

21270M

MREIN

FORCED

CONCRETE

SLABAS

PERSTRU

CTURAL

ENGINEER

SPECIFICATIONS

22100M

MSCREED

GRADED

AT1:100

TODRAIN

AGEPO

INTS

23PARAPET

CAPPINGAN

DFLASH

ING

24SLATE

TILEONSCREED

GRAD

EDAT

1:100TO

DRAINOFF

BALCONY

25SKY

GLASS

FRAMELESS

BALUSTRADE

2650M

MEXTRU

DED

FOAM

INSU

LATION

27EXTERN

ALPARAPET

WALL

WITH

FRL120/120/120.

CONSTRU

CTIONCO

NSISTS

OF:

•300M

Mx3000M

M'AN

THRA

ZINC'VM

ZINC

INTERLO

CKINGPAN

ELS•

25MM

RONDOTO

PHAT

SPACEDAT

1200MM

MAX

•3LAYERS

OFGYPRO

CK16M

MFYRCH

ECK•

92MM

RONDO

STEELSTU

DWALL

FILLEDWITH

GLASS

WOOLBATTS

ACHIEVINGR2.8

•9M

MFIBRE

COMPRESSED

SHEETING

28AW

SCEN

TREGLAZE

GLAZIN

G

29RESIDEN

TIALRAISED

FLOOR,CO

NSTRU

CTIONCO

NSISTS

OF:

•TO

NGUENGRO

OVE

20MM

GRAN

DEFLO

ORIN

GWITH

VECCHIO

FINISH

OSLO

COLO

UR

•22M

MSTRU

CTAFLORPARTICLE

BOARD

•70M

Mx35M

MMGP12

FLOORJOIST

SPACEDAT

500MM

•200M

MDEEP

VERSIJACKSTO

PROVIDE

SUPPO

RTTO

FLOORJOISTS

ATMAXIM

UM

SPANOF1200M

M

30LYSAG

HTKLIP

LOK700

HISTRENGTH

ATPITCH

OF1

DEGREE

REFERTO

SECTIONBBFO

RSU

BSTRUCTU

REDETAILS

31150M

Mx600M

MBO

XGUTTER

SUPPO

RTEDONBO

XGUTTER

HANGER

SPACEDAT

600MM.BO

XGUTTER

HANGER

FIXEDTO

'C'SECTIONS

32DO

WNPIPE

ASPER

HYDRAU

LICEN

GINEER

SPECIFICATIONS

33'AN

THRA

ZINC'VM

ZINCINTERLO

CKINGPAN

ELSFIXED

TOSLAB

VIA25M

MRO

NDOTO

PHAT

SPACEDAT

1200MM

MAX

3413M

MSU

PACEILPLASTERBO

ARDFIXED

TO28M

MRO

NDO

FURRIN

GCHAN

NELS

SPACEDAT

600MM

MAXIM

UM

58 Corio Street2013 27

Page 30: Nathan Peucker Architectural Folio

Ground FFL10660

Slab10550

1

250MM x 1150MM CONCRETEUPSTAND AS PER STRUCTURALENGINEER SPECIFICATIONS

REINFORCED SLAB ON GROUNDEDGE BEAM AS PER STRUCTURALENGINEER SPECIFICATIONS

0.2MM VAPOUR BARRIER

COMPACTED SANDBED

150MM SLAB ON GROUND ASPER STRUCTURAL ENGINEERSPECIFICATIONS

DOWELS CAST IN UPSTAND *

LEVELLING SHIMS *

WATERPROOF GASKET/GROUTSTOP *

DOWEL POCKET *

GROUT *

REINFORCEMENT OMITTEDFROM UPSTAND FOR CLARITY

*PRECAST SANDWICH PANELCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

PRECAST CONCRETE SANDWICHPANEL 50MM CONCRETE, 50MMRIGID INSULATION 50MMCONCRETE. TO ACHIEVE R VALUEOF R1.8 AS PER STRUCTURALENGINEER SPECIFICATIONS

SANDWICH PANEL TIE

200 50 50 150

VINYL FLOORING ON SCREED

WATERPROOF MEMBRANE

250

160MM AGRICULTURE PIPE

AGGREGATE

1150

150

1000

1120

N.G.L.

BOUNDA

RY

40

MORETHANLINES

1 : 10

SLAB EDGE BEAM DETAIL1

Parapet22800

Level 2 FCH21670

LYSAGHT KLIP LOK 700 HI STRENGTH ATPITCH OF 1 DEGREE

LYSAGHT ZED100 SPACED AT 2000MAXIMUM BOLTED TO STEEL CLEAT

VMZINC 'ATHRA ZINC' STIFFENEDPARAPET FLASHING

PLY WOOD

3 LAYERS OF 16MM GYPROCKFYRCHECK PLASTERBOARD

1

28MM RONDO FURRING CHANNELSSPACED AT 600MMMAXIMUM

13MM SUPACEIL PLASTERBOARD

92MM STEEL STUD WALL

WALL WOOL BATTS TO ACHIEVEMINIMUM R VALUE OF R2.8

RONDOWALL TRACK 680 92MM

BORAL LINEAR COVE CORNICE

GYPROCK 10MM STANDARDPLASTERBOARD

25MM RONDO TOP HAT SPACED AT1200MMMAX

300MM x 3000MM 'ANTHRA ZINC'VMZINC INTERLOCKING PANELS

270MM REINFORCED CONCRETEROOF SLAB AS PER STRUCTURALENGINEER SPECIFICATIONS

TIMBER BLOCKING

STEEL CLEAT BOLTED TO EQUALANGLE50MM EQUAL ANGLE RAMSETBOLTED TO SLAB

50MM EXTRUDED FOAM INSULATION

SARKING

151NOM.

SARKING

Level 2 FFL18770

Level 1 FCH18145

1

28MM RONDO FURRING CHANNELSSPACED AT 600MMMAXIMUM

13MM SUPACEIL PLASTERBOARD

92MM STEEL STUD WALL

WALL WOOL BATTS TO ACHIEVEMINIMUM R VALUE OF R2.8

3 LAYERS OF 16MM GYPROCK FYRCHECKPLASTERBOARD

25MM RONDO TOP HAT SPACED AT1200MMMAX

300MM x 3000MM 'ANTHRA ZINC'VMZINC INTERLOCKING PANELS

RONDOWALL TRACK 680 92MM

BORAL LINEAR COVE CORNICE

GYPROCK 10MM STANDARDPLASTERBOARD

22MM STRUCTAFLOR PARTICLE BOARD

70MM x 35MMMGP12 FLOOR JOISTSPACED AT 500MM

200MM DEEP VERSIJACKS TO PROVIDESUPPORT TO FLOOR JOISTS AT MAXIMUMSPAN OF 1200MM

GYPROCK 10MM STANDARDPLASTERBOARD

270MM REINFORCED CONCRETEROOF SLAB AS PER STRUCTURALENGINEER SPECIFICATIONS

TONGUE N GROOVE 20MM GRANDE FLOORINGWITH VECCHIO FINISH OSLO COLOUR

RONDO P50 SHADOWLINE

270NOM.

35 NOM.

SARKING

*

*

*

*

*

REINFORCEMENT OMITTEDFROM UPSTAND FOR CLARITY

*PRECAST SANDWICH PANELCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

N.G.L.

BOUNDA

RY

MORETHANLINES

1 : 10

WALL AND ROOF DETAIL2

1 : 10

WALL AND FLOOR DETAIL3

0758 CORIO STREET

*

*

*

*

*

REINFORCEMENT OMITTEDFROM UPSTAND FOR CLARITY

*PRECAST SANDWICH PANELCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

N.G.L.

BOUNDA

RY

1A400

3A400

2A400

MORETHANLINES

Student Project - Commercial Geelong, Victoria The Gordon Tafe 2013

28

Page 31: Nathan Peucker Architectural Folio

CONCRETE ANCHORS ASPER STRUCTURALENGINEERSPECIFICATIONS WELDEDTO FIN FRAME

300MM x 300MMCONCRETE COLUMN CASTIN SITU AS PERSTRUCTURAL ENGINEERSPECIFICATIONS

FINS FIXED TO COLUMN

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

3D CORNER FIN DETAIL4

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

5A401

7A401

MORETHANLINES

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

Ground F.C.H.14660

3

40 50 300 50 40

480

4025

0

240 MM x 40MMMERBAUTREATED TO H5, FINISHED WITHCABOT'S AQUADECK DECKING OIL

300MM x 300MM PRECASTREINFORECED CONCRETECOLUMN AS PER STRUCTURALENGINEER SPECIFICATIONS

40MM x 50MMMGP12 BATTEN

270MM REINFORCED CONCRETEROOF SLAB AS PER STRUCTURALENGINEER SPECIFICATIONS

40MM SHADOW LINE

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

1 : 10

COLUMN-SOFFIT DETAIL8

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

B

3

D

A401

D

A401

240 MM x 40MMMERBAUTREATED TO H5, FINISHED WITHCABOT'S AQUADECK DECKING OIL

MITRE JOINT

40MM x 50MMMGP12 BATTEN

300MM x 300MM PRECASTREINFORECED CONCRETECOLUMN AS PER STRUCTURALENGINEER SPECIFICATIONS

240 240

190 100 190

40 50 300 50 40

480

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

1 : 10

COLUMN PLAN DETAIL7

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

Ground FFL10660

Ground F.C.H.14660

Slab10550

MERBAU TREATED TO H5,FINISHED WITH CABOT'SAQUADECK DECKING OIL

PRECAST 300MM x 300MMCONCRETE COLUMN AS PERSTRUCTURAL ENGINEERSPECIFICATIONS

40

250

3420

250

40

4039

2015

0

190

100

190

480

40MM SHADOW LINE

40MM SHADOW LINE

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

1 : 50

COLUMN ELEVATION6

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

A

125MM x 25MMMERBAUTREATED TO H5, FINISHED WITHCABOT'S AQUADECK DECKING OIL

25MM x 25MMMERBAUTREATED TO H5, FINISHED WITHCABOT'S AQUADECK DECKING OIL

TRUSS FRAME CONSTRUCTEDFROM ONE STEEL DURAGAL 25MMSHS. CONSTRUCTED AS PERSTRUCTURAL ENGINEERSPECIFICATIONS

475

500

400

30075

300

300MM x 300MM CONCRETECOLUMN CAST IN SITU AS PERSTRUCTURAL ENGINEERSPECIFICATIONS

CONCRETE REINFORCEMENT ASPER STRUCTURAL ENGINEERSPECIFICATIONS

FIN ANCHOR AS PER STRUCTURALENGINEER SPECIFICATIONS FILLETWELDED TO FIN TRUSS

FIN

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

24MM VIRIDIAN SUPERGREYPERMATECH E INSULATED GLAZING

AWS THERMALHEART SERIES 826FRONTGLAZE JAMB WITH NO SUB

JAMB

AWS THERMAL HEART SERIES 826FIXED

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

1 : 10

FIN & COLUMN DETAIL5

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

Level 1 FFL15245

Ground FFL10660

Ground F.C.H.14660

Slab10550

A

250

100

270

100 500

5040

900

10015

011

0

TRUSS FRAME CONSTRUCTEDFROM ONE STEEL DURAGAL25MM SHS. CONSTRUCTED ASPER STRUCTURAL ENGINEERSPECIFICATIONS

FIN

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

150MM x 110MM CONCRETEUPSTAND AS PER STRUCTURALENGINEER SPECIFICATIONS

THICKENED EDGE OF SLAB AS PERSTRUCTURAL ENGINEERSPECIFICATIONS

260

310

35

100MM x 100MM CONCRETEUPSTAND/KERB AS PER

STRUCTURAL ENGINEERSSPECIFICATIONS

270MM REINFORCED CONCRETEROOF SLAB AS PER STRUCTURAL

ENGINEER SPECIFICATIONS

AWS THERMALHEART SERIES 826FRONTGLAZE HEAD AND SUB

HEAD

2520

2520

100 600 100 200

150

AWS THERMAL HEART SERIES 826FIXED

24MM VIRIDIAN SUPERGREYPERMATECH E INSULATED

GLAZING

AWS THERMALHEART SERIES 826FRONTGLAZE SILL & SUB SILL

TONGUE N GROOVE 20MMGRANDE FLOORING WITH

VECCHIO FINISH OSLO COLOUR

90MM X 45MMMGP12 FLOORJOIST SPACED AT 500MM

GALVANISED FIN ANCHORWELDED TO FIN TRUSS REFER

TO STRUCTURAL ENGINEERSPECIFICATIONS

GALVANISED FIN ANCHORWELDED TO FIN TRUSS REFER TO

STRUCTURAL ENGINEERSPECIFICATIONS

REINFORCED SLAB ON GROUNDBEAM AS PER STRUCTURALENGINEER SPECIFICATIONS

COMPACTED FILL

0.2MM VAPOUR BARRIER

N.G.L.

COMPACTED SANDBED

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

1 : 20

FIN SECTION C-CC

58 Corio Street2013 29

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

Ground FFL10660

Slab10550

3

250

4020

90

40 50 300 50 40

240 MM x 40MMMERBAUTREATED TO H5, FINISHED WITHCABOT'S AQUADECK DECKING OIL

300MM x 300MM PRECASTREINFORECED CONCRETECOLUMN AS PER STRUCTURALENGINEER SPECIFICATIONS

40MM x 50MMMGP12 BATTEN

40MM SHADOW LINE

TONGUE N GROOVE 20MMGRANDE FLOORING WITHVECCHIO FINISH OSLO COLOUR

90MM X 45MMMGP12 FLOORJOIST SURROUNDING CONCRETECOLUMN BASE

150MM SLAB ON GROUND ASPER STRUCTURAL ENGINEERSPECIFICATIONS

COMPACTED SANDBED

COMPACTED FILL

REINFORCED SLAB ON GROUNDBEAM AS PER STRUCTURALENGINEER SPECIFICATIONS

DOWELS CAST IN SLAB *

PACKER PLATE *

GROUT STOP *

DOWEL POCKET *

GROUT *

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

1 : 10

COLUMN-SLAB DETAIL9

REINFORCEMENTOMITTED FOR CLARITY

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHODAPPLICABLE FOR NORTHEAST CORNER COLUMNONLY.

CONNECTION METHOD APPLICABLE FOR FINSLOCATED ON THE NORTH AND EAST FACADES.NOT APPLICABLE FOR CORNERS.

FLOOR AND ROOF UPSTAND AND FLOOR SLABTHICKENING ARE TO BE POUREDSIMULTANEOUSLY TO PREVENT VISUALAPPEARANCE OF SEPARATE POURS.

FIN ANCHORS ARE TO BE TIED TO WITHCONCRETE REINFORCEMENT STEEL

NORTH EAST CORNER OF SLAB TO BE ABOVENATURAL GROUND LEVEL

N.G.L.

TIMBER PANELS TO FINISH40MM BELOW CONCRETE SLABSOFFIT AND 40MM ABOVEGROUND FFL TO PROVIDESHADOW LINE

Ground FFL10660

Ground F.C.H.14660

Slab10550

3

8A401

9A401

FIRST FLOOR CONSTRUCTIONOMITTED FOR CLARITY

*

*

*

*

*

REINFORCEMENT OMITTEDFOR CLARITY

*COLUMN TO SLABCONNECTION ELEMENTS ASPER STRUCTURAL ENGINEERSSPECIFICATIONS

MORETHANLINES

1 : 50

COLUMN SECTION D-DD

Page 32: Nathan Peucker Architectural Folio

0758 CORIO STREET23

084

019

0

150

80

135 60 1780 60 135

40

2170

40

RECYCLED BRICK

10MMMORTAR JOINT

300MM x 300MM PRECAST COLUMN

CAST IN SITU CONCRETE RAMP

TIMBER FRAMED 1900MM x2700MM DOORWITH FIXED1900MM x 600MMWINDOW ABOVE

MORETHANLINES

1 : 10

ENTRY DETAIL10

REF.

REF.

10A402

11A402

MORETHANLINES

C

3

92MM STEEL STUD WALL

WALL WOOL BATTS TO ACHIEVEMINIMUM R VALUE OF R2.8

3 LAYERS OF 16MM GYPROCK FYRCHECKPLASTERBOARD

25MM RONDO TOP HAT SPACED AT1200MMMAX

300MM x 3000MM 'ANTHRA ZINC'VMZINC INTERLOCKING PANELS

RONDO MAXIJAMB 200 STUD

RONDO P50 SHADOWLINE

SARKING

GYPROCK 10MM STANDARD PLASTERBOARD

150

200

VMZINC INTERLOCKING PANEL FIXINGCLIP

MORETHANLINES

1 : 10

UNIT WALL DETAIL11

Student Project - Commercial Geelong, Victoria The Gordon Tafe 2013

30

Page 33: Nathan Peucker Architectural Folio

A403

3

E

A403

E

A403

Ground FFL10660

Slab10550

E

A403

LAMINEX STAINLESS STEEL FISNISH

GLASS RACK SPACEGLASS RACK SPACE

CAESAR STONE 'JET BLACK'

MORETHANLINES

1 : 50

GROUND FLOOR PLAN1

1 : 20

JOINERY ELEVATION3

Ground FFL10660

900

200

1100

150 180 600

380

50

100

5235

816

358

16

80

1645

016

88

20MMMDF CUPBOARD LEAFCLADDED WITH LAMINEX STAINLESSSTEEL

STAINLESS STEEL HANDLE

16MMMALAMINE MDF CARCAS

20MM CAESAR STONE 'JET BLACK'

20MMMERBAU

LAMINEX STAINLESS STEEL FINISH

MORETHANLINES

1 : 20

JOINERY SECTION E-EE

58 Corio Street2013 31

Page 34: Nathan Peucker Architectural Folio

08RYRIE RETAIL+

In the final year of my di-ploma we had one major group project.

We were to propose a scheme consisting of a retail typology of our choice that would reju-venate and re-imagine Geelong’s retail industry.

There was also to be a link between the main

street (Ryrie Street) and the otherwise dilapidat-ed alley behind the site.

Once deciding on a typology of clothes and book stores, each mem-ber of our group came up with a concept.

My concept was chosen and as such we devel-oped my design.

I wanted to incorporate contemporary style that is not seen in the main streets of Geelong, taking cues from some developments in Mel-bourne (like the RMIT’s modern development in an otherwise traditional context).

Additionally I wanted bold forms to be the

key design, allowing the building to be perceived as more dynamic.

While I lead the design process, my team was undeniably valuable es-pecially when it came to broadening my horizons in design styles.

Student Project - Commercial Geelong, Victoria The Gordon Tafe 2014

32

Page 35: Nathan Peucker Architectural Folio

Ryrie Retail+2014 33

Page 36: Nathan Peucker Architectural Folio

08RYRIE RETAIL+Student Project - Commercial Geelong, Victoria The Gordon Tafe 2014

34

Page 37: Nathan Peucker Architectural Folio

Software Used

0.2

D E S I G N E X T R A O R D I N A I R E S

GROUPFOURGROUP

G - 4

FOUR

EST. 2014 RYRIERETAIL+

The objective of Ryrie Retail+ is to broaden the horizons of what can be expected in the Geelong CBD. Geelong is cur-rently experiencing an industrial and economical para-digm shift, with the manufacturing sector in continuous decline Group Four has decided that there is no better time to show that Geelong and it’s citizens are here to stay.

The iconic triangular facade on Ryrie Street extends the purpose of the building to the external fabric, acting as a street side catalogue by providing space for store mer-chandise.

The rear facade comprises of a large mesh which allows moderated natural light and ventilation to enter the entire building, providing a more natural feeling space and a more comfortable experience. A section of double glazing helps light up he building further. The oors have been designed and shaped to maximize the penetration of light from this glazing.

49% of the site has been made permanently accessible to the public and facilitates tra c between Market Square and Ryrie Street. This space provides a cafe, entertain-ment stage, soft landscaping and sanitary amenities (lockable)

SITE AREARETAIL TYPOLOGY

357m2CLOTHING/BOOKS SITE USAGE

100%PUBLIC SPACE

49%

GROUND FLOOR

181m2181m181m2THIRD FLOOR

238m2

FIRST FLOOR

238m2GROUND ($4750/m2)

$1.7m FIRST ($3400/m2)

$1.3m SECOND FLOOR

239m2

PROBABLE COST

$6.5mTHIRD ($3400/m2)

$1.3m ROOF ($3000/m2)

$0.9m

SECOND ($3400/m2)

$1.3mGroup Four believes that the issue with Geelong’s ailing retail sector is not to do with topology itself, but the way these typologies are addressed.

Clothing - The aim of our clothing compo-nent is to sell high quality community cre-ated merchandise which will provide unique attire for everybody. Books - The bookstore provides a large selection of titles including as much special interest as possible. Combined with read-ing areas makes the experience more relaxed and provides social opportunities.

20%

26.5%

26.5%

27%

Ryrie Retail+

Community Refuse Space

Bicycle Rack

153 - 159Ryrie Street, Geelong

0.2

D E S I G N E X T R A O R D I N A I RE S

GROUPFOURGROUP

G - 4

FOUR

EST. 2014

GROUND

SECTION A-A SECTION B-B

FIRST SECOND THIRD

<<N

ORTH

SITE

This scheme proudly implements the following principles to help ensure vari-ous forms of sustainability:

Environmental-Photovoltaic Cells.-North facade comprises of a permeable screen, allowing natural ventilation and light to enter the building while providing shade.-Double-glazing.-Lightwell also incorporated in the roof to further allow natural lighting.-Lightwell tted with operable glazing to enable night time heat purging.-Stormwater collection.-All electrical and water ttings to have maximum achievable star ratings where

ESD SUMMARY

BUILDING LIFE CYCLEMaterial SourcingMaterials are to be sourced through means of recycling wherever possible. All concrete is to be manufactured from recycled aggregate.

In addition to this, all structural and cladding timber will be sourced from renewable plantations with the rele-vant certi cation.

Building OccupancySystems that are implemented as part of the design proposal are to be main-tained to ensure maximum building performance. Where possible, up-grades should be made to increase environmental sustainability through-out the building life-cycle.

DemolitionMost materials within this scheme can be recycled and this opportunity should be taken advantage of. Steel melted down and incorporated into new products and concrete can have the aggregate recycled into other products. Were possible fenestration will be removed from the site in whole segments and reused as is, otherwise they will be recycled based on materi-als (glass & metal).

For further information, please refer to the ESD Report included with the design proposal.

applicable-All light ttings to be LED -Reverse Cycle Air Conditioning-Parking is not provided. Bike racks are provided and public transport to be pro-moted as part of the information centre.-The Community refuse space will pro-mote recycling and reduce the number of trucks required for garbage collection locally.

Social/Economical-Natural ventilation provided through rear facade.-Upper oors designed to maximize light permeability.

Ryrie Retail+ takes advantage of innova-tive and contemporary design while intro-ducing new functionality into the Geelong retail paradigm. Some features include:-Large open public space -Sheltered outdoor entertainment area-Large bookstore complete with lounge and information services.-Community based clothes store. Collab-oration do be arranged with local fashion designers, learning institutions and the online platform Etsy.com.-Strong emphasis on healthy movement.

SCHEME FEATURESElevator is relatively obscured inside book store with stairs being an obvious option. Additionally a bike rack is provided in the rear lane.-Soft landscaping on ground oor. -Community refuse project as a place for nearby businesses to dispose of garbage.-Custom designed street furniture-Strong emphasis on indoor environment comfort.-Green wall.

1:200

Book Store Book StoreMen’s Clothing Women’s

Clothing

Change

Chan

ge

Book Store

Reading Booths

Cafe

Public Space

Sanitary FacilitiesStage

Stairs Stairs Stairs Stairs

Sec.StoreStore

Men’s Clothing

Women’s Clothing

Change

Change

Store

RYRIE STREET

MO

ORA

BOO

L ST

REET

ROCK

O’C

ASH

ELL

LAN

E

1:200 1:200

1:200 1:200

1:200 1:500

Ryrie Retail+2014 35

AutodeskRevit

Autodesk 360 Cloud Rendering

Autodsk Revit

Server

Adobe Illustrator

Adobe Photoshop

Page 38: Nathan Peucker Architectural Folio

UP

UP

EXISTING PARALLELPARKING

19.7

0 m

19°

32' 3

1"

18.2

0 m

19°

32' 3

1"

13.80 m70° 27' 29"

19.20 m70° 27' 29"

5.40 m70° 27' 29"

EXISTING FOOTPATH

BICYCLE LANE

GASGAS

GAS

GAS

TELETELE

WATER

WAT

ER

WAT

ER

SWG SWG

ELEC

ELEC

ELEC

1

1

2

2 3

3

4

4

A A

B B

C C

RO

CK

O'C

ASH

ELL

LAN

E

3490

ROCK O'CASHELL LN

3310

A

A300

A

A300

B

A301

B

A301

ELE

C

SETO

UT

1100

ELEC

RYRIE STREET

ROCK

O'C

ASHE

LLLA

NE

RYR

IEST

REE

TEA

STBO

UN

D

8530

'T&G BUILDING'

1.50

m19

° 32

' 31"

'GASMART BUILDING'

EXISTING MEDIAN STRIP

EXISTING 'T&G BUILDING' VERANDA EXISTING 'GASMART BUILDING' VERANDA

18500 RL

PROPOSED REFUSECENTRE

SETOUT

725

PROPOSEDDEVELOPMENT

N

TELE TELE

18500 RL

18500 RL

18252 RL

18000 RL

18000 RL

TBM 18450 RL

PROPOSED FOOTPATH

3850

1:100 FALLTO GRASS

1:10

0FA

LL

TOG

RAS

S

1:100 FALLTO GRASS

1:100 FALLTO GRASS

1:100 FALLTO GRASS

1:10

0 FA

LLTO

GR

ASS

REFUSE CEN. SETOUT4675

REF

USE

CEN

.SET

OU

T

3710

18500 RL

18000 RL18000 RL

TRAFFIC DIRECTION

TRAFFIC DIRECTION

DP DP

DP DP

AG

RIC

ULT

UR

AL P

IPE

AG

RIC

ULT

UR

AL P

IPE

LPD

WT

OVERFLOW

1 : 100SITE PLAN1

STORM WATER TO BE RETAINED

OTHER DRAINAGE - TO LPD

LEGAL POINT OF DISCHARGE

WATERTANK - TANKMASTA 5000LUNDERGROUND WATER TANK WITHEXTENDED COLLAR

TELECOMS PIT

MAINS TELECOM

MAINS SEWERAGE

MAINS WATER

MAINS GAS

MAINS ELECTRICITY

LEGEND

LDP

WT

GAS

WATER

SWG

ELEC

TELE

08RYRIE RETAIL+Student Project - Commercial Geelong, Victoria The Gordon Tafe 2014

36

Page 39: Nathan Peucker Architectural Folio

1

1

2

2 3

3

4

4

A A

B B

C C

A

A300

B

A301

B

A301

1:47

1:35

1:35

1:47

1:50

NDP DP

S

S

DP DP

BG BG

SG

SG

CLE

RES

TOR

Y

AF

AF

AF

AF

AF

+ PF

AF

+ PF

AF

+ PF

AF

+ PF

AF

+ PF

AF

+ PF

AF

+ PF

AF + PF

AF + PF

AF

AF + PF

AF + PF

AFAF

RYRIE STREET

RO

CK

O'C

ASH

ELL

LAN

E

'T&G BUILDING' 'GASMART BUILDING'

LYSAGHT KLIP-LOK 700 HI-STRENGTH @ MIN 1 DEGREE

SCREED ROOF @ 1:50 MIN

6370

CLERESTORY

5590 7240

3095

CLE

RES

TOR

Y

1260

025

05

VER

AND

A

3000

VERANDA

6700 500

PUBLIC SPACE

3700 500

VERANDA

7700

1:6

1:6

TANKED CEMENT SHEETING - BLACK

1 : 100ROOF PLAN1

Ryrie Retail+2014 37

Page 40: Nathan Peucker Architectural Folio

UP

27262524232221201918171615

1413121110

987

UP

1

1

2

2 3

3

4

4

A A

B B

C C

A

A300

A

A300

B

A301

B

A301

1A400

A2022

OVE

RAL

L

1820

0

OVERALL

19200

PUBLIC SPACE

13800 5400

390

RAMP

105090

STAGE

2585

PUBLIC SPACE

9685 0300

CLEANER

1860 90

SAN. COMPS

2850 300

200

DIS.

1600 90

SAN. COMPS

3180 330

200

FIRE STAIRS

4900 300

FRONT GLAZING

4600

ANGLE WALL

1400

ENTRANCE

6545 200

CAFE

6125 330

350

OVE

RAL

L

1970

0

GR

GR

GR

1234

DN

STAGE

48 m²

GROUND BOOKSTORE

18500 RLPOLISHED CONCRETE

4 m²

DIS. TOILET

3 m²

CLOSET

11 m²

MALE

10 m²

FEMALE

18000 RL

18000 RL

TILES

TILES

TILES18000 RL

SLATE TILES18000 RL

33 m²

CAFE

18500 RLSLATE TILES

163 m²

PUBLIC SPACESLATE TILES

18500 RL

24 m²

CAFE BOH

18564 RLENVIRO RUBBER

18500 RL

18000 RLPUBLIC SPACE

D1

D3

D4

D5

D2

D6

D7

FALL FROM BUILDINGTO ORIGINAL FOOTPATHOR 1:100 FALL WHICH EVERIS GREATEST

EXISTING ABUTTING WALLINDICATIVE ONLY TO BE CONFIRMEDON SITE

EXISTING ABUTTING WALLINDICATIVE ONLY TO BE CONFIRMEDON SITE

PROPOSED VERANDA

ARTICULATION JOINTFC2FC1 FC3

FC4

FC5

FC6

FC7

FC8

W2W1FG1 FG2

G4

G5

G6

G7

18470 RL

18000 RL

18252 RLENVIRO RUBBER

ENVIRO RUBBER

THER

MO

MAS

STH

ERM

OM

ASS

THER

MO

MAS

STH

ERM

OM

ASS

SH

ADO

WC

LAD

GLA

SS

WAL

L

THERMOMASS

PROPOSED VERANDA

2A400

EXISTING FOOTPATHEXISTING FOOTPATH

GASMART BUILDINGT&G BUILDING

FUFU

PRECAST COLUMNCLADDED WITHSHADOWCLAD

DR

AIN

AGE

DR

AIN

AGE

DRAINAGE

SH

ADO

WC

LAD

FIRE STAIRS

DR

DR

SERVICECORE

SERVICE CORE

300

STA I

RS

1550

240

FEM

ALE

TOIL

ETS

3330

90

MAL

ETO

ILE T

S

3330

90

CO

RE

1750

150

8670

200

N

1400

1400

350

PUBLIC SPACE

13420

4738

STAIRS

9032

300

BOOKSTORE

5670 1993

STAIRS

2839 5663 2375 300

300

ELEVATOR

2025 3245 400

PUBLIC SPACE

11924150

CORE796

300

400

8140

150

LIFT

1800

150

CO

RE

1485

6075

1140

STAG

E

3030

2160

4840

D8

1680

2080

1400

RAM

P

6020

D8

200

CAF

E

9410

9026

0090

HAL

LWAY

3690

90 CLE

ANER

1440

90

STAI

RS

1700

300

60

D7

680

SHI P

PIN

GC

ON

TAI N

ER

9830

200

400

BOO

KSTO

RE

1147

0

440

D1

920

990

D2

920

420

D3

920

5480

300 3495 220 2260 350

150

GRID

4850

GRID

8900

GRID

5150 150

560

GR

ID

7390

GR

ID

8735

1515

150

GRID

4850

GRID

7645

GRID

6405 150

1:100 FALLTO GRASS

1:10

0FA

LL

TOG

RAS

S

1:100 FALLTO GRASS

1:100 FALLTO GRASS

1:100 FALLTO GRASS

1:10

0 FA

LLTO

GR

ASS

GR

EEN

WAL

L

BENCH

BEN

CH

DP DP

DP DP

AG

RIC

ULT

UR

AL P

IPE

AG

RIC

ULT

UR

AL P

IPE

LPD

WT

OVERFLOW

A

1 : 100GROUND FLOOR1

GRASS

DOOR

WINDOW - 3495mm X 1700mm AND 2260mm X 1700mmHUFCORE BF2 VERTICAL FOLDING WINDOWSPOWDERCOATED BLACK

FACADE COLUMN

DR -DRAIN DP - DOWN PIPE

FACADE GLAZING -24mm VIRIDIAN PERFORMATECHE CLEAR #2 DOUBLE GLAZING

STREET FURNITURE

6mm SPLASHBACK COMPANY 'KIWI GREEN' PROSATINSPLASHBACK GLASS ATTACHED TO 8.5mm CEMINTELRENDALINE CEMENT SHEETING

1200mm x 12MM CHH TIMBER SHADOWCLAD NATURALWITH TEXTURE GROOVE FINISH

THERMOMASS- 250mm AND 300mm PANELS

90mm STEEL STUD WALL

200mm GREEN WALL VERTIGO PRO SYSTEM WITHASSORTED FERNS

SLATE TILE - 450mm X 300mm PARISIAN SAW EDGETILE - EDWARD SLATE AND STONE

FLOOR TILES - ALASKA CHARCOAL 600mm X 300mm

ENVIRO COMFORT PLUS ANTI-FATIGUEMATTING - BLACK

SNOWDRIFT BORALSTONE POLISHED CONCRETE- BORAL

LEGEND

GR

D1

FC

FG

FU

W1

ENVIRORUBBER

POLISHEDCONCRETE

DR DP

UP

S

200

1

1

2

2 3

3

4

4

A A

B B

C C

A

A300

A

A300

B

A301

B

A301

4A400

----

74 m²

LEVEL 1 BOOKSTORE

91 m²

LEVEL 1 BOOKSTORE

NDP DP

DP DP

4A401

15 m²

FIRE STAIRS

3 m²

SECURITY

3 m²

STORAGE

97 m²

ATRIUM

13 m²

SHIPPING CONTAINERWALKWAY

LIFTSHAFT

SERVICECORE

SERVICECORE

1 : 100LEVEL 12

08RYRIE RETAIL+Student Project - Commercial Geelong, Victoria The Gordon Tafe 2014

38

Page 41: Nathan Peucker Architectural Folio

1 2

3 4

A

B

C

A

A300

B

A301

22510 RL

20700 RL

20700 RL

20700 RL

22510 RL

22510 RL

22510 RL

20900 RL20900 RL

33 m²

CAFE

48 m²

GROUND BOOKSTORE

4 m²

DIS. TOILET

11 m²

MALE

10 m²

FEMALE3 m²

CLOSET

PLYWOODPLYWOOD

GYPROCKPLASTERBOARD

GYPROCKPLASTERBOARD

PLYWOOD

GYPROCKPLASTERBOARD

GYPROCKPLASTERBOARD

20900 RL

N

1500

2250

1 : 100GROUND FLOOR1

DN

UP

1

1

2

2 3

3

4

4

A A

B B

C C

A

A300

A

A300

B

A301

B

A301

73 m²

MENS CLOTHING STORE95 m²

FEMALE CLOTHING STORE

NDP DP

DP DP

97 m²

ATRIUM

13 m²

SHIPPING CONTAINERWALKWAY

LIFTSHAFT

SERVICECORE

SERVICECORE

7 m²

STORAGE

14 m²

FIRE STAIRS

CHANGEROOMS

CHANGEROOMS

1 : 100LEVEL 21

DN

1

1

2

2 3

3

4

4

A A

B B

C C

A

A300

A

A300

B

A301

B

A301

77 m²

MALE CLOTHING STORE 93 m²

FEMALE CLOTHING STORE

N98 m²

ATRIUM

12 m²

SHIPPING CONTAINERWALKWAY

SERVICECORE

LIFTSHAFT

CHANGEROOMS

SERVICECORE

CHANGEROOMS

7 m²

STORAGE

14 m²

FIRE STAIRS

1 : 100LEVEL 32

Ryrie Retail+2014 39

Page 42: Nathan Peucker Architectural Folio

LEVEL 1

23510

LEVEL 1

23510

GROUND FLOOR

18500

GROUND FLOOR

18500

LEVEL 2

27500

LEVEL 2

27500

LEVEL 3

31490

LEVEL 3

31490

ROOF PLAN

35480

ROOF PLAN

35480Level 3 Ceiling

34480

Level 3 Ceiling

34480

Level 2 Ceiling

30490

Level 2 Ceiling

30490

Level 1 Ceiling

26500

Level 1 Ceiling

26500

Ground Ceiling

22510

Ground Ceiling

22510

6980

1 2 3 4

A

A300

4850 7645 6405

4010

1000

2990

1000

2990

1000

2990

1000

1861 1880 1880

Atrium Roof

37480

Atrium Roof

37480

FG1

FG2

FG3

FG4 FG5

FG6

FG8

FG7

FG9

FG10FG11

FG12

FG13 FG14 FG15 FG16

FG17 FG18 FG19

FG20FG21FG22

EXISTING T&G BUILDING

EXISTING GASMART BUILDING

W3 W4 W5

1898

0

2000

BOU

ND

ARY

BOU

ND

ARY

12345

6789

101112

1314

W1 W2

LEVEL 1

23510

LEVEL 1

23510

GROUND FLOOR

18500

GROUND FLOOR

18500

LEVEL 2

27500

LEVEL 2

27500

LEVEL 3

31490

LEVEL 3

31490

ROOF PLAN

35480

ROOF PLAN

35480Level 3 Ceiling

34480

Level 3 Ceiling

34480

Level 2 Ceiling

30490

Level 2 Ceiling

30490

Level 1 Ceiling

26500

Level 1 Ceiling

26500

Ground Ceiling

22510

Ground Ceiling

22510

1234 A

A300

5150 8900 4850

4010

1000

2990

1000

2990

2990

1000

1000

18900

Atrium Roof

37480

Atrium Roof

37480

1957 1957

1994

1994

1994

1994

1994

EXISTING T&G BUILDINGEXISTING GASMART BUILDING

2000

1898

0

9970

W6 W7

W8 W9

W10 W11

W12 W13

W14 W15

BOU

ND

ARY

BOU

ND

ARY

1516171819

2021222324

1 : 100SOUTH ELEVATION1

1 : 100NORTH ELEVATION2

1. CLERESTORY 12600X5590MM– CAPRAL ALUMINIUM FRAMING– REFER TO SHOP DRAWINGS FOR SPECIFICATIONS

2. WINCO LF550 FRAMELESS LOUVER WINDOW SYSTEM

3. KIWI GREEN PROSATIN SPLASHBACK GLASSFIXED TO CEMINTEL RENDERLINE CEMENT SHEETING

4. 24MM VIRIDIAN PERFORMATECH E CLEAR #2 DOUBLE GLAZED GLASS

5. EXISTING T&G BUILDING

6. AWNING

7. KIWI GREEN PROSATIN SPLASHBACK GLASSFIXED TO CEMINTEL RENDERLINE CEMENT SHEETING

8. CUSTOM MADE FOLDED STEEL STAIRCASE

9. PROPOSED FOOTPATH – SLATE TILES

10. SHADOWCLAD TIMBER CLADDING

11. 24MM VIRIDIAN PERFORMATECH E CLEAR #2 DOUBLE GLAZED GLASS

12. EXISTING GASMART BUILDING

13. CAPRAL 419 FLUSHLINE DOUBLE GLAZED ALUMINIUM FRAME -POWDER COATED BLACK

14. SHADOWCLAD TIMBER CLADDING

15. CLERESTORY 12600X5590MM– CAPRAL ALUMINIUM FRAMING– REFER TO SHOP DRAWINGS FOR SPECIFICATIONS

16. PERFORATED TRIANGULAR ALUMINIUM SCREEN

17. WINCO LF550 FRAMELESS LOUVER WINDOW SYSTEM

18. PERFORATED TRIANGULAR ALUMINIUM SCREEN

19. EXISTING GASMART BUILDING

20. 24MM VIRIDIAN PERFORMATECH E CLEAR #2 DOUBLE GLAZED GLASS

21. PERFORATED TRIANGULAR ALUMINIUM SCREEN

22. CUSTOM MADE FOLDED STEEL STAIRCASE

23. DISABLED ACCESS RAMP

24. EXISTING T&G BUILDING

08RYRIE RETAIL+Student Project - Commercial Geelong, Victoria The Gordon Tafe 2014

40

Page 43: Nathan Peucker Architectural Folio

1. CLERESTORY 12600X5590MM– CAPRAL ALUMINIUM FRAMING– REFER TO SHOP DRAWINGS FOR SPECIFICATIONS

2. EXISTING T&G BUILDING

3. PRECAST CONCRETE SANDWICH PANEL 50MM CONCRETE, 50MM THERMOMASS RIGID INSULATION & 200MM CONCRETE. TO ACHIEVE R-VALUE OF 1.8

4. SHADOWCLAD TIMBER CLADDING

5. SHADOWCLAD TIMBER CLADDING

6. 24MM VIRIDIAN PERFORMATECH E CLEAR #2 DOUBLE GLAZED

7. AWNING

8. CAPRAL 419 FLUSHLINE DOUBLE GLAZED ALUMINIUM FRAME -POWDER COATED BLACK

9. PRECAST CONCRETE SANDWICH PANEL 50MM CONCRETE, 50MM THERMOMASS RIGID INSULATION & 200MM CONCRETE. TO ACHIEVE R-VALUE OF 1.8

10. PROPOSED FOOTPATH – SLATE TILES

11. CLERESTORY 12600X5590MM– CAPRAL ALUMINIUM FRAMING– REFER TO SHOP DRAWINGS FOR SPECIFICATIONS

12. PRECAST CONCRETE SANDWICH PANEL 50MM CONCRETE, 50MM THERMOMASS RIGID INSULATION & 200MM CONCRETE. TO ACHIEVE R-VALUE OF 1.8

13. PERFORATED TRIANGULAR ALUMINIUM SCREEN

14. SHADOWCLAD TIMBER CLADDING

15. PROPOSED FOOTPATH – SLATE TILES

16. CAPRAL 419 FLUSHLINE DOUBLE GLAZED ALUMINIUM FRAME -POWDER COATED BLACK

17. SHADOWCLAD TIMBER CLADDING

18. 24MM VIRIDIAN PERFORMATECH E CLEAR #2 DOUBLE GLAZED

19. AWNING

100

700

100

914

900

340 420 580 420 340

2100

NERO 130X800 CERFL2010

VIRIDIAN DECORMIRROR

100MM KICKER WITH STAINLESS STEEL WRAP FINISH

CAROMA G-SERIES E HANDS-FREE BASIN TAP

LAMINEX LAMINATE ASH WHITELIANO SEMI RECESSED VANITY BASIN - 420X470MM

LAMINEX LAMINATE LICORICELINEA

ALASKA CHARCOAL 600X300/03262WATER MOISTURE BARRIER

GROUT WITH 1:50 FALL

Precast Concrete

Otis elevatorstainless steelfinish

Laminex Laminate Ash White

Polished ConcreteFloor Slab

BC3

900

222

BC2

600

335

BC1

900 BC1

BC2

BC3

BC4 BC5

BC6

BC7

BC8

BC4

1350

370

DES

K

1000

BC5

800

1430

BC6

800

1010

BC7

1350

BC8

450

1825

BC3

1600 2725

BC6

1900 90

815

BC2

2200 1115

BC4

1100 245

BC5

800 1865

2035

BC1

1200 700

DESK

1800 715

BC7

900 160

BC8

550 80

1200mm x 12MM CHH TIMBERSHADOWCLAD NATURAL WITHTEXTURE GROOVE FINISH

120mm CHH TIMBERSHADOWCLAD NATURAL WITHTEXTURE GROOVE FINISH

BOOK SHELVES FINISHED WITH LAMINEXLAMINATE LICORICE LINEA

1 : 50MEN'S BATHROOM INTERIOR1 1 : 50

GROUND BOOKSTORE INTERIOR2

LEVEL 1

23510

LEVEL 1

23510

GROUND FLOOR

18500

GROUND FLOOR

18500

LEVEL 2

27500

LEVEL 2

27500

LEVEL 3

31490

LEVEL 3

31490

ROOF PLAN

35480

ROOF PLAN

35480Level 3 Ceiling

34480

Level 3 Ceiling

34480

Level 2 Ceiling

30490

Level 2 Ceiling

30490

Level 1 Ceiling

26500

Level 1 Ceiling

26500

Ground Ceiling

22510

Ground Ceiling

22510

ABCB

A301

Atrium Roof

37480

Atrium Roof

37480

4010

1000

2990

1000

2990

1000

2990

1000

2000

1898

0

8735 739015153000 2060

BOU

ND

ARY

BOU

ND

ARY

123

8765

910

4

LEVEL 1

23510

LEVEL 1

23510

GROUND FLOOR

18500

GROUND FLOOR

18500

LEVEL 2

27500

LEVEL 2

27500

LEVEL 3

31490

LEVEL 3

31490

ROOF PLAN

35480

ROOF PLAN

35480Level 3 Ceiling

34480

Level 3 Ceiling

34480

Level 2 Ceiling

30490

Level 2 Ceiling

30490

Level 1 Ceiling

26500

Level 1 Ceiling

26500

Ground Ceiling

22510

Ground Ceiling

22510

A B CB

A301

4010

1000

2990

1000

2990

1000

2990

1000

7390 8735

Atrium Roof

37480

Atrium Roof

37480

2000

1898

0

2060

Lower Ground Floor

18000

Lower Ground Floor

18000

11121314

1516171819

1 : 100EAST ELEVATION1

1 : 100WEST ELEVATION2

Ryrie Retail+2014 41

Page 44: Nathan Peucker Architectural Folio

LEVEL 1

23510

GR

OU

ND

FLOO

R

18500

LEVEL 2

27500

LEVEL 3

31490

RO

OF PLAN

35480

Level 3 Ceiling

34480

Level 2 Ceiling

30490

Level 1 Ceiling

26500

Ground C

eiling

22510

AB

C

B

A301

5A400

5A401

2A401

Atrium R

oof

37480

4010 1000 200010002990100039902990

18980

309512600

2205

17905

3000

1234568

FG21

FG19

FG16

FG10

FG8

9 710111217 15

G4

G5

G6

G7

87357390

14 13

163 m²

PUBLIC

SPACE

18 16

20 21

Lower G

round Floor

18000N

.G.L

19

RYR

IE STREET

RO

CK O

'CASH

EL LANE

13 m²

SHIPPING

CON

TAINERW

ALKW

AY

97 m²

ATRIU

M

13 m²

SHIPPING

CON

TAINERW

ALKW

AY

97 m²

ATRIU

M

98 m²

ATRIU

M

12 m²

SHIPPING

CON

TAINERW

ALKW

AY

CLER

ESTOR

Y

Draw

n by

Date

Project number

OFFIC

E CON

TAC

T(03) 8317 3464contact@

groupfour.com.au

12.15, 401 Docklands D

riveD

ocklands, 3008, VIC

RYR

IER

ETAIL+

153-159 RY

RIE

ST, G

EE

LON

G 3220 V

ICR

YRIE RETAIL+

URGENT CO

NTACTG

emm

a Hurley

0433 011 555Yasem

in Orhan

0433 011 576Steven N

ikolovski0433 011 568

Nathan Peucker

0433 011 545

REVISIO

NS

Client:

C.O

.G.G

.

Section A-A

1401

16/16/2013

Yasemin O

rhan

A300

A300- S

ection A-A

1 : 50SEC

TION

A - AA

1.C

LERESTO

RY 12600X5590M

M– C

APRAL ALU

MIN

IUM

FRAM

ING

– REFER

TO SH

OP D

RAW

ING

S FOR

SPECIFIC

ATION

S

2.W

INC

O LF550 FR

AMELESS LO

UVER

WIN

DO

WSYSTEM

3.460X200M

M U

NIVER

SAL BEAMS

4.LYSAG

HT 152M

M ZED

PUR

LIN

5.LYSAG

HT KLIP-LO

K 700 HI-STR

ENG

TH @

MIN

1 DEG

REE

6.450X450M

M LO

ADBEAR

ING

REC

TANG

ULAR

CO

LUM

N

7.35M

M TO

P HAT

8.KIW

I GR

EEN PR

OSATIN

SPLASHBAC

K GLASS

FIXED

TO C

EMIN

TEL REN

DER

LINE C

EMEN

TSH

EETING

9.24M

M VIR

IDIAN

PERFO

RM

ATECH

E CLEAR

#2D

OU

BLE GLAZED

GLASS

10.H

AND

RAIL W

ITH G

RAD

E “A” SAFETY GLASS

HELD

WITH

GLASS C

LAMPS

11.C

USTO

M M

ADE FO

LDED

STEEL STAIRC

ASE

12.13M

M PLASTER

BOAR

D FIX

ED TO

RH

S

13.AW

NIN

G

14.24M

M VIR

IDIAN

PERFO

RM

ATECH

E CLEAR

#2D

OU

BLE GLAZED

GLASS

15.KIW

I GR

EEN PR

OSATIN

SPLASHBAC

K GLASS

FIXED

TO C

EMIN

TEL REN

DER

LINE C

EMEN

TSH

EETING

16.150M

M SAN

D BED

17.600M

M W

IDE ED

GE BEAM

18.VAPO

UR

BARR

IER

19.PR

OPO

SED FO

OTPATH

– SLATE TILES

20.D

ISABLED AC

CESS R

AMP

21.PER

FOR

ATED TR

IANG

ULAR

ALUM

INIU

MSC

REEN

No.

Description

Date

08RYRIE RETAIL+Student Project - Commercial Geelong, Victoria The Gordon Tafe 2014

42

Page 45: Nathan Peucker Architectural Folio

LEVEL 1

23510

GR

OU

ND

FLOO

R

18500

LEVEL 2

27500

LEVEL 3

31490

RO

OF PLAN

35480

Level 3 Ceiling

34480

Level 2 Ceiling

30490

Level 1 Ceiling

26500

Ground C

eiling

22510

12

33

4A

A300

3A401

1A401

3A400

Atrium R

oof

37480

48 m²

GR

OU

ND

BO

OK

STOR

E

163 m²

PUBLIC

SPACE

33 m²

CAFE

24 m²

CAFE B

OH

74 m²

LEVEL 1 BOO

KSTOR

E

48507645

12555150

3556040

55906910

300

19195

4010 2990 1000 2990 1000 2990 1000 2000

91 m²

LEVEL 1 BOO

KSTOR

E

73 m²

MEN

S CLO

THING

STOR

E

95 m²

FEMALE C

LOTH

ING

STOR

E

93 m²

FEMALE C

LOTH

ING

STOR

E

77 m²

MALE C

LOTH

ING

STOR

E

1000

18980

12

356

7894

101112131617 15 1420 1921222324 18

28 27 26 25

NEIG

HBO

UR

ING

BUILD

ING

NEIG

HBO

UR

ING

BUILD

ING

Lower G

round Floor

18000

CLER

ESTOR

Y

Draw

n by

Date

Project number

OFFIC

E CON

TAC

T(03) 8317 3464contact@

groupfour.com.au

12.15, 401 Docklands D

riveD

ocklands, 3008, VIC

RYR

IER

ETAIL+

153-159 RY

RIE

ST, G

EE

LON

G 3220 V

ICR

YRIE RETAIL+

URGENT CO

NTACTG

emm

a Hurley

0433 011 555Yasem

in Orhan

0433 011 576Steven N

ikolovski0433 011 568

Nathan Peucker

0433 011 545

REVISIO

NS

Client:

C.O

.G.G

.

Section B-B

1401

16/16/2013

Yasemin O

rhan

A301

A301- S

ection B-B

1 : 50SEC

TION

B - BB

1.C

LERESTO

RY 12600X5590M

M– C

APRAL ALU

MIN

IUM

FRAM

ING

– REFER

TO SH

OP D

RAW

ING

S FOR

SPECIFIC

ATION

S

2.W

INC

O LF550 FR

AMELESS LO

UVER

WIN

DO

W SYSTEM

3.460X200M

M U

NIVER

SAL BEAMS

4.450X450M

M LO

ADBEAR

ING

REC

TANG

ULAR

C

OLU

MN

5.LYSAG

HT KLIP-LO

K 700 HI-STR

ENG

TH @

MIN

1 DEG

REE

6.TAR

GETTI – R

OU

ND

CEILIN

G-M

OU

NTED

FLUO

RESC

ENT LIG

HT FIX

TUR

E– R

EFER TO

MAN

UFAC

TUR

ERD

OC

UM

ENTATIO

N FO

R SPEC

IFICATIO

NS

7.LYSAG

HT 152M

M ZED

PUR

LIN

8.R

ON

DO

KEY-LOC

K CO

NC

EALED C

EILING

SYSTEM

9.PAR

APET CAPPIN

G W

ITH PAR

APETBO

ARD

AN

D FLASH

ING

10.SH

ADO

W C

LAD TIM

BER C

LADD

ING

ABOVE

NEIG

HBO

UR

ING

BUILD

ING

11.30M

M PER

MEABLE M

ESH/FO

AM

12.G

YPRO

CK EC

08 CO

MPLETE

PLASTERBO

ARD

FIXED

TO R

ON

DO

FUR

RIN

G C

HAN

NELS

SPACED

AT 600MM

MAX

IMU

M

13.300M

M TH

ERM

OM

ASS INSU

LATEDC

ON

CR

ETE SAND

WIC

H PAN

EL

14.H

AND

RAIL W

ITH G

RAD

E “A” SAFETYG

LASS H

ELD W

ITH G

LASS CLAM

PS

15.C

ON

CR

ETE SLAB AND

JOIST

CO

NSTR

UC

TION

FOR

ALL UPPER

STOR

EY LEVELS

16.SH

ADO

W C

LAD IN

TERN

AL WALL

CLAD

DIN

G

17.150M

M U

PPER FLO

OR

SLAB – POLISH

EDC

ON

CR

ETE FLOO

R FIN

ISH

18.EX

ISTING

ABUTTIN

G BU

ILDIN

G W

ALLAN

D

SUBSTR

UC

TUR

E– D

RAW

N IN

DIC

ATIVE ON

LY TO BE

CO

NFIR

MED

ON

SITE

19.150M

M G

RO

UN

D FLO

OR

SLAB – POLISH

EDC

ON

CR

ETE FLOO

R FIN

ISH

20.300M

M U

PSTAND

21.VAPO

UR

BARR

IER

22.600M

M W

IDE ED

GE BEAM

23.300M

M W

IDE PILE

24.AG

RIC

ULTU

RE D

RAIN

25.C

USTO

M M

ADE FO

LDED

STEELSTAIR

CASE

26.AG

RIC

ULTU

RE D

RAIN

27.15O

MM

SAND

BED

28.600M

M W

IDE IN

TERN

AL BEAM

N.G

.L

No.

Description

Date

Ryrie Retail+2014 43

Page 46: Nathan Peucker Architectural Folio

ROOF PLAN

35480

Level 3 Ceiling

34480

CAPRAL ALUMINIUM FRAMING - REFER TO SHOP DRAWINGS FOR SPECIFICATIONS

WINCO LF550 FRAMELESS LOUVRE WINDOW SYSTEM

FLASHING

LYSAGHT KLIP-LOK 700 HI-STRENGTH @ MIN 1 DEGREE

LYSAGHT 152 ZED PURLIN

STEEL STUD WALL

UB460

RONDO KEY-LOCK CONCEALED CEILING SYSTEM

GYPROCK EC08 COMPLETE PLASTERBOARD

BOX GUTTER &HANGER

GROUND FLOOR

18500

1

300

300MM THERMOMASS INSULATED CONCRETE SANDWICH PANEL

30MM PERMEABLE MESH/FOAM

DOWEL BAR

GROUT

SILICONE SEALANT

LEVELING SHIMS

300MM UPSTAND

VAPOUR BARRIER

EDGE BEAM

PILE

EXISTING ABUTTING BUILDING WALL AND SUBSTRUCTURE-DRAWN INDICATIVE ONLY TO BE CONFIRMED ON SITE

150MM SAND BED

150

150

600330

Lower Ground Floor

18000

1 : 10CLERESTORY DETAIL2

1 : 10EDGE BEAM DETAIL1

CAPRAL ALUMINIUM FRAM

GROUND FLOOR

18500

1

300

300MM THERMOMASS INSULATED CONCRETE SANDWICH PANEL

30MM PERMEABLE MESH/FOAM

DOWEL BAR

GROUT

SILICONE SEALANT

LEVELING SHIMS

300MM UPSTAND

VAPOUR BARRIER

EDGE BEAM

PILE

EXISTING ABUTTING BUILDING WALL AND SUBSTRUCTURE-DRAWN INDICATIVE ONLY TO BE CONFIRMED ON SITE

150MM SAND BED

150

150

600330

Lower Ground Floor

18000

1 : 10EDGE BEAM DETAIL1

ROOF PLAN

35480

Level 3 Ceiling

34480

1

LYSAGHT KLIP-LOK 700 HI-STRENGTH @ MIN 1 DEGREEZED PURLIN

RONDO KEY-LOCK CONCEALED CEILING SYSTEM

GYPROCK EC08 COMPLETE PLASTERBOARD

PARAPET FLASHING

PARAPET BOARD

300MM THERMOMASS INSULATED CONCRETE SANDWICH PANEL

30MM PERMEABLE MESH/FOAM

EXISTING ABUTTING BUILDING WALL AND SUBSTRUCTURE-DRAWN INDICATIVE ONLY TO BE CONFIRMED ON SITE

SHADOW CLAD TIMBER CLADDING CONNECTED TO TOP HATS

APRON FLASHING

1 : 10PARAPET DETAIL3

08RYRIE RETAIL+

STEM

3

600

7018

044

106

500

525

8MM BLACKSEALANT JOINT

THE SPLASHBACK COMPANY'KIWI GREEN' PROSATINSPLASHBACK GLASS

24MM VIRIDIAN PERFORMATECHE CLEAR #2 DOUBLE GLAZED

CAPRAL 419 FLUSHLINE DOUBLEGLAZED ALUMINIUM FRAME- POWDER COATED BLACK

90mm STEEL STUD WALL

10mm PLASTERBOARD

275mm X 1325mm PRECAST PANEL

STEEL ANGLES

CAPRAL 419 FLUSHLINE DOUBLEGLAZED ALUMINIUM FRAME- POWDER COATED BLACK

24MM VIRIDIAN PERFORMATECHE CLEAR #2 DOUBLE GLAZED

12MM CHH TIMBER SHADOWCLADNATURAL WITHTEXTUREGROOVE FINISH

CAPRAL 419 FLUSHLINE DOUBLE GLAZED ALUMINIUM FRAME - POWDER COATED BLACK

90mm STEEL STUD WALL

350mm X 100m STEEL PFC

CEMINTEL RENDALINECEMENT SHEETING

STEEL PLATES

BOUNDARY

PLYWOOD CEILING PANELS 1500mm X 2250mmNATURAL BB FINISHED IN AUSTRAL REDICLEAR- AUSTRAL

300 325 150

300 375 100

1875

Drawn by

Date

Project number

RYRIERETAIL

Client: C.O

Det

16/16/

YO, GH

A4 1 : 10

TRIANGLE AND TIMBER FACADEJUNCTION4

Student Project - Commercial Geelong, Victoria The Gordon Tafe 2014

44

Page 47: Nathan Peucker Architectural Folio

ROOF PLAN

35480

Level 3 Ceiling

34480

CLYSAGHT 152 ZED PURLIN

LYSAGHT KLIP-LOK 700 HI-STRENGTH @ MIN 1 DEGREE

ENVIROSEAL ROOF SARKING

460X200MM UB

RONDO KEY-LOCK CONCEALED CEILING SYSTEM

CEMINTEL RENDALINE CEMENT SHEETING

KIWI GREEN PROSATIN SPLASHBACK GLASS

STEEL PLATE

TUBLINE RHS

35MM TOP HAT

24MM VIRIDIAN PERFORMATECHE CLEAR #2 DOUBLE GLAZED GLASS

GYPROCK EC08 COMPLETE PLASTERBOARD

FLASHING

1 : 10FRONT FACADE DETAIL5

3

SHADOWCLAD TIMBER CLADDING

300MM THEMOMASS INSULATED CONCRETE SANDWICH PANEL

TOP HAT

ANGLE BRACKET

PERFORATED TRIANGULAR ALUMINIUM SCREEN

150MM GREEN WALL STRUCTURE

150MM PRECAST PANEL

FOLIAGE

1 : 10

GREEN WALL & PERFORATEDSCREEN DETAIL4

LEVEL 3

31490

Level 2 Ceiling

30490

HANDRAIL WITH GRADE "A" SAFTEY GLASSHELD WITH GLASS CLAMPS

STEEL CONNECTION PLATE

150MM UPPER FLOOR SLAB

COLLAPSIBLE WALL TRACK

CONCRETE SLAB AND JOIST CONSTRUCTION

460X200MM UB

PERFORATED TRIANGULAR METAL SCREEN

RONDO KEY-LOCK CONCEALED CEILING SYSTEM

GYPROCK ECO8 COMPLETE PLASTERBOARD

1 : 10UPPER FLOOR SLAB DETAIL3

8MM BLACK SEALANTJOINT

24MM VIRIDIAN PERFORMATECHE CLEAR #2 DOUBLE GLAZED

THE SPLASHBACKCOMPANY'KIWI GREEN' PROSATINSPLASHBACK GLASS

CAPRAL 419 FLUSHLINE DOUBLEGLAZED ALUMINIUM FRAME- POWDER COATED BLACK

2.5MM STEEL PLATE *

35MM TOP HAT12MM CHH TIMBER SHADOWCLAD

NATURAL WITH TEXTUREGROOVE FINISH CEMINTEL RENDALINE

CEMENT SHEETING

THE SPLASHBACK COMPANY'KIWI GREEN' PROSATINSPLASHBACK GLASSCEMINTEL RENDALINECEMENT SHEETING

70

50

250

50

110°

150 180

35MM TOP HAT

250MM PRECAST CONCRETEPANEL*

ANCHORED BOLT *

1 : 10

TRIANGULAR FACADE TOCONCRETE PANEL DETAIL2

1

PRECAST CONCRETE SANDWICHPANEL 50MM CONCRETE, 50MM

THERMOMASS RIGID INSULATION &200MM CONCRETE. TO ACHIEVE R-

VALUE OF 1.8 *

30MM ELMICH VERSICELL0.2 MM VAPOUR BARRIER

ANCHORED BOLT *

NON-STANDARD 330x175x12.5STEEL RHS *

2.5MM STEEL PLATE*

150x150x10 STEEL EQUAL ANGLE,TRIMMED TO EXTENT OF

BOUNDARY *

35MM TOP HATSARKING

CEMINTEL RENDALINE CEMENTSHEETING

THE SPLASHBACK COMPANY'PANTHER BLACK' PROSATIN

SPLASHBACK GLASS8MM WEATHER PROOF

SEALANT - BLACK 319

70

PLASTIC SHIMSWELDED JOINT *

PLASTIC SHIMS

350

80 310 40

139

180

70

30 50 50 200 50

340

60

12mm CHH TIMBER SHADOWCLADNATURAL WITHTEXTURE GROOVE FINISH

WELDED JOINT *

30 350

35MM TOP HAT

10MM STEEL PLATE *8MM BLACK SEALANT JOINTCAPRAL 419 FLUSHLINE DOUBLEGLAZED ALUMINIUM FRAME -POWDER COATED BLACK24MM VIRIDIAN PERFORMATECH ECLEAR #2 DOUBLE GLAZED

8MM BLACK SEALANT JOINT

THE SPLASHBACK COMPANY'PANTHER BLACK' PROSATINSPLASHBACK GLASS

THE SPLASHBACK COMPANY 'KIWIGREEN' PROSATIN SPLASHBACKGLASS

BOUNDARY

1 : 5

SOUTH WEST CORNER FACADEDETAIL1

Ryrie Retail+2014 45

Page 48: Nathan Peucker Architectural Folio

09HOME OF TOMORROW

After completing my study, one of the course facilitators, Greg Jones regarding a competition his company, GJP Architects was entering.

Greg has a traditional skill-set when it comes to Architectural presentation and wanted to provide an entry that was on par with many presentations today.

All of the presentation works were created in less than a week, based on the hand draw-ings he had provided.

In addition to his actual design, I wanted to create an emotion-al connection with the viewer by showing the home used in a

family context.

All plan drawings were digitally cleaned and coloured in Pho-toshop, emulating use of copic markers to tie it in with Greg Jones’ style.

Competition Entry - Residential Sydney, New South Wales GJP Architects 2014

46

Page 49: Nathan Peucker Architectural Folio

Software Used

Home of Tomorrow2014 47

AutodeskRevit

Autodesk 360 Cloud Rendering

Adobe Photoshop

Adobe Illustrator

Page 50: Nathan Peucker Architectural Folio

09HOME OF TOMORROWCompetition Entry - Residential Sydney, New South Wales GJP Architects 2014

48

Page 51: Nathan Peucker Architectural Folio

Home of Tomorrow2014 49

Page 52: Nathan Peucker Architectural Folio

50

THANKS FOR YOUR TIME

My folio aims to showcase my capabilities at a rela-tively juvenile point of my career.

I am quite happy with the quality and types of work I have been able to pro-duce with no professional experience. I am however, extremely eager to devel-op myself and my skills within a real world context, through an Architectural firm that can provide a

challenging environment.

If you saw something you like, please contact me so you can discover first-hand my full potential.

Thank you for your consid-eration,

Nathan Peucker

Nathan Peucker [email protected]

Email for contact number

Page 53: Nathan Peucker Architectural Folio
Page 54: Nathan Peucker Architectural Folio

52

HAVE AN

EXCELLENT DAY!