4
NASIRAHMAD Hera Bazaar, AL AIN, Abu Dhabi, UAE Cell number: +971-56-2324825 [email protected] Visa Type: transferable Visa Key acheivements Ericsson and ZTE BS/BTS Installation: (2G, 3G, 4G LTE, Power Swap) installation of Ericson RBS 6000 and 2000 series installation of ZTE BTS 8900, 8700 and rectifier (ZXDU300, ZXDU68, ZXDU58) Installation & commissioning/troubleshooting of RBS 6000 and 2000 series (6301, 6201, 6101, 6102) (2201, 2206, 2207) A: Performing Swap test for Feeder cable Quality check B: Implementation for Q1 for Alarms and monitoring & Fault finding Perform installation of 2G, 3G and 4G LTE equipment on sites. Supervision of Installation & commissioning process of (2G, 3G, 4G LTE) BTS sites. Maintain and manage Quality standards of (2G, 3G, 4G LTE) BTS sites according to given Specifications. Commissioning and Configuration of (2G, 3G, 4G LTE) BTS sites equipment (BTS 900/1800) according to plane. Expansion of RBS and TRX of GSM/DCS (900/1800) as per customer requirement Troubleshooting of alarms (internal and external) (2G, 3G, 4G LTE) alarm 2G 3G 4G LTE Integration and commissioning : Scratch loading on DUS and DUW using Hyper terminal Create IDB using OMT for DUG. Script loading on DUS and DUW using RBS Element Manager Software packages loading on flash using card reader IDB loading on DUG using OMT TCU Commissioning: Loading script on TCU using CYGWIN . Using ping command to check whether transmission network is reachable or not Transmission Installation: (link up gradation, Transmission node up gradation, link installation) Capacity upgrade, Traffic routing, Software upgrade 1+1 XPIC Link, 1+0 link, 2+2 XPIC Link, Space diversity Link Installation & commissioning of TN 20P, 6P, 2P. Hands on experience on Mini link Craft 13B for release 5 node configuration. Traffic shifting and traffic routing of 2G sites from MMU2 B, 2C, MMU 2 B4-34 to MMU2 K. Visibility of TN. XPIC,SD,PDH,SDH link commissioning, Cutover & trouble Shooting Perform the replacement and configuration of NERA IDU. Perform the troubleshooting of various Transmission Equipments by the help of interference test. Perform up gradation of TXN node from Release 2 &3 to Release 5.

nasirahmad 2-11-2016 cv

Embed Size (px)

Citation preview

Page 1: nasirahmad 2-11-2016 cv

NASIRAHMADHera Bazaar, AL AIN, Abu Dhabi, UAE

Cell number: +971-56-2324825 [email protected]

Visa Type: transferable Visa

Key acheivements

Ericsson and ZTE BS/BTS Installation: (2G, 3G, 4G LTE, Power Swap)

installation of Ericson RBS 6000 and 2000 series installation of ZTE BTS 8900, 8700 and rectifier (ZXDU300, ZXDU68, ZXDU58) Installation & commissioning/troubleshooting of RBS 6000 and 2000 series (6301, 6201, 6101, 6102) (2201, 2206, 2207)

A: Performing Swap test for Feeder cable Quality checkB: Implementation for Q1 for Alarms and monitoring & Fault finding

Perform installation of 2G, 3G and 4G LTE equipment on sites. Supervision of Installation & commissioning process of (2G, 3G, 4G LTE) BTS sites. Maintain and manage Quality standards of (2G, 3G, 4G LTE) BTS sites according to given Specifications. Commissioning and Configuration of (2G, 3G, 4G LTE) BTS sites equipment (BTS 900/1800) according to plane. Expansion of RBS and TRX of GSM/DCS (900/1800) as per customer requirement Troubleshooting of alarms (internal and external) (2G, 3G, 4G LTE) alarm

2G 3G 4G LTE Integration and commissioning: Scratch loading on DUS and DUW using Hyper terminal Create IDB using OMT for DUG. Script loading on DUS and DUW using RBS Element Manager Software packages loading on flash using card reader IDB loading on DUG using OMT

TCU Commissioning: Loading script on TCU using CYGWIN. Using ping command to check whether transmission network is reachable or not

Transmission Installation: (link up gradation, Transmission node up gradation, link installation) Capacity upgrade, Traffic routing, Software upgrade 1+1 XPIC Link, 1+0 link, 2+2 XPIC Link, Space diversity Link Installation & commissioning of TN 20P, 6P, 2P. Hands on experience on Mini link Craft 13B for release 5 node configuration. Traffic shifting and traffic routing of 2G sites from MMU2 B, 2C, MMU 2 B4-34 to MMU2 K. Visibility of TN. XPIC,SD,PDH,SDH link commissioning, Cutover & trouble Shooting Perform the replacement and configuration of NERA IDU. Perform the troubleshooting of various Transmission Equipments by the help of interference test. Perform up gradation of TXN node from Release 2 &3 to Release 5. Responsible to upgrade or downgrade the TN's software (Transmission Node) or Software baseline

as per requirement.Survey (2G, 3G, 4G LTE, Power Swap)

Perform Technical Site Survey (2G, 3G, 4G LTE) along with RNE and Civil Calculation of antenna tower loading, updating of database and track sheets. Supervising the evaluation & submission of design reports, TSSR's. Customer interaction for future availability of sites; Plan submission for height extension

Site Alarms (Power Swap) verify post alarms post alarms includes rectifier module faulty, ac main failure, GLO temperature, door open, generator set, Gem active,

Gem failure, ob light Alarm patching with crone puncher

Page 2: nasirahmad 2-11-2016 cv

Verify pre alarms and taking snap shots in computer Pre Preliminary acceptance test and Preliminary acceptance test (PAT)

Pre ATP and ATP of the sites Dealing with the customer to ensure the work done is appropriate Quickly respond to the customer by resolving issues and closing Trouble Tickets timely

PROJECTS

ERICSSON - ETISALAT UAE (2G, 3G, 4G LTE) NETWORK MODRENIZATION PHASE-2 ZTE-MOBILINK SWAP (2G, 3G) ERICSSON – MOBILINK (2G, 3G) EXPANSION PROJECT ERICSSON MOBILINK (2G, 3G) SWAP PROJECT ERICSSON WARID (2G, 3G, 4G LTE) SWAP PROJECT

ZTE TELENOR NEW ROLLOUT PROJECT ZTE-TP (2G, 3G) SWAP C&N ZTE TELENOR (2G, 3G) VEGA PROJECT ZONG (2G, 3G, 4G) SURVEY PROJECT ZONG 3G OSS INSTALLAION PROJECT ZONG 4G INSTALLATION PROJECT ZONG POWER SWAP PROJECT

EMPLOYEMENT

Sublime Wireless LLC (Ericsson – ETISALAT UAE Network Modernization Project)May 2016 – September 2016BSS/RAN EngineerSWI is one the of the largest independently owned Wireless Consulting Services Firms in the United States with local presence in North America, United Kingdom, Middle East and Asia. SWI is a leader in providing advanced ICT services to wireless, wire-line, Public Safety, M2M and Enterprise domains.Our areas of expertise include Strategic Consulting, Engineering Services (RAN, Transport, and Core) and Deployment Services catered to the communications industry. Our team provides cost-effective highly technical solutions that have helped our customers launch and manage 4G /LTE, 3G, and 2G Networks.

RELACOM (Ericsson – MOBILINK (2G, 3G) Transmission Project), Central Region, PakistanJuly 2015–April 2016BSS/RAN EngineerRELACOM (Ericsson – WARID (2G, 4G LTE) Project), Central Region, Pakistan December 2014 – June 2015 BSS/RAN EngineerRELACOM (ZTE – ZONG (2G, 3G, 4G LTE) Project), Central Region, Pakistan February 2014 – November 2014BSS/RAN engineerRELACOM (ZTE-TELENOR Project), North Region, Pakistan January 2013 – February 2014BSS/RAN engineerRELACOM Pakistan was incorporated in 2004, has grown rapidly over the past 12 years and has played a major role in the expansion and development of the Pakistani Telecommunications Industry.

As the Telecommunications Industry in Pakistan has developed so has Relacom Pakistan, initially concentrating in 2004 on the building of network rollout, today we are involved in solar projects, power, HR, construction and managed services. In Pakistan we

Page 3: nasirahmad 2-11-2016 cv

have worked for all major telecom operators and vendors and have undertaken network deployment in every province in the country.

EDUCATION AND QUALIFICATIONS

Bachelor of Science (BS): Telecommunications – SARHAD University, KPK, Pakistan CGPA 3.8/4.0 2012 Faculty of Science (FSC): BISE – Peshawar, KPK, Pakistan Grade A 2008 Secondary School Certificate (SSC): BISE – Malakand, KPK, Pakistan Grade A 2006

TRAINING TCU Commissioning 2G, 3G, 4G LTE Integration, commissioning , installation and troubleshooting link up gradation, Transmission node up gradation, link installation Survey (2G, 3G, 4G LTE) Installation & commissioning of TN 20P, 6P, 2P. Installation & commissioning/troubleshooting of RBS 6000 series (6301, 6201, 6101, 6102) Capacity upgrade, Traffic routing, Software upgrade 1+1 XPIC Link, 1+0 link, 2+2 XPIC Link, Space diversity Link Troubleshooting of BTS (BS8700, SDR8900A) and rectifier (ZXDU300, ZXDU68, ZXDU58) post alarms includes rectifier module faulty, ac main failure, GLO temperature, door open, generator set, Gem active, Gem

failure, ob light Microsoft Typing speed 40 – 50 words per minute

INTEREST AND HOBBIESI AM A VERY KEEN SPORTS PERSON CURRENTLY PLAYING CRICKET AS AN ALL ROUNDER AND HOBBIES INCLUDE JOGGING

REFERENCES Taimor Shahid: Project Manager, Sublime Wireless LLC, Abu Dhabi, UAE: [email protected]

+971-559041511 ZakirUllah: Planning and control manger, Relacom, Islamabad, Pakistan: [email protected] .pk

+92-300-9333963 Zaheer khan: Project Manger, Ericsson subcontractor Relacom, lahore, Pakistan: [email protected]

+92-345-8293291 Basharat Jan: Project Manger, ZTE subcontractorRelacom, Islamabad, Pakistan: [email protected]

+92-345-8293214 Rahim Shah: President, Shookar Investment LLC, USA: [email protected], +01-770-572-4142 Mr. Samiullah: Sale executive In charge, Al- Saud FurnitureTrade G LLC,Sharjah: [email protected]

+97152-9139255