10
NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & CONCEPT DESIGN REPORT

NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

NASHUA MIDDLE SCHOOLS

2019 FACILITY ANALYSIS& CONCEPT DESIGN REPORT

Page 2: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

HARRIMAN 2 / NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT

Page 3: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

STEERING COMMITTEE / Richard Dowd – Alderman, Ward 2 / Jahmal Mosley, Ed.D. – Superintendent of Schools / Donna Fitzpatrick – Assistant Superintendent for

Secondary Schools / Shawn Smith – Director of Plant Operations / Carl Dubois – Harvey Construction

JOINT SPECIAL SCHOOL BUILDING COMMITTEE (JSSBC) / BOE Members

/ Raymond Guarino / William Mosher / Dorothy Oden / Susan Porter / Heather Raymond

/ NSD Administrators / Jahmal Mosley / Donna Fitzpatrick / Daniel Donovan / Shawn Smith

/ BOA Members / Richard Dowd, Chairman of JSSBC / Mary Ann Melizzi Golja / Patricia Klee / Ernest Jette / Lori Wilshire

ARCHITECTS AND ENGINEERS / Mark Lee – Harriman / Lisa Sawin – Harriman / Jamie Ouellette – Harriman / Dan Bisson – Harriman / Sam Forgue – Harriman / Howard Snyder – Harriman / James Fortin – Harriman / Jeff Cormier – Harriman / Jeremie Briggs – Harriman / Richard Marchessault – Harriman / Emilie Waugh – Harriman

CONSTRUCTION MANAGER / Carl Dubois – Harvey Construction / John Beaver – Harvey Construction

COMMUNITY FORUM ATTENDEES (JUNE 3, 2019) / Jessica Brown / Gabriel Falzarano / Ian Atwell / S. Coffy / Donna Fitzpatrick / R. McNally / Anne McCubrey / Sinead Crook / Tanya Brandt / Fran Nutter-Upham / Kim McCarthy / Lori Wilshire / Mary Ann Melizzi-Goja / Richard Dowd / Laura Graudons / Mr. Pearson / Catherine Belanger / Denise Rock-O’Hara / Darcy Rock-O’Hara / Shaunna O’Neil

ACKNOWLEDGMENTSINTRODUCTION

NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT / 3HARRIMAN

Page 4: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

HARRIMAN 4 / NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT

Page 5: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

TABLE OF CONTENTSINTRODUCTION

NASHUA MIDDLE SCHOOLS STUDY / Project Goals and Objectives / Facility Analysis / Educational Programming / Concept Design / Financial and Energy Analysis / Conclusion

11111111111212

1EXECUTIVE SUMMARY

NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT / 5HARRIMAN

Page 6: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

FACILITY ANALYSIS OVERVIEW

EXISTING CONDITIONS / FINDINGS / Elm Street Middle School

/ Site Analysis / Architectural and Code Analysis / Structural Analysis / Mechanical Analysis / Plumbing Analysis / Fire Protection Analysis / Electrical Analysis

/ Fairgrounds Middle School / Site Analysis / Architectural and Code Analysis / Structural Analysis / Mechanical Analysis / Plumbing Analysis / Fire Protection Analysis / Electrical Analysis

/ Pennichuck Middle School / Site Analysis / Architectural and Code Analysis / Structural Analysis / Mechanical Analysis / Plumbing Analysis / Fire Protection Analysis / Electrical Analysis

SURVEYS, STUDIES, AND REPORTS / Elm Street Middle School

/ AHERA / Hazardous Material Report / Site Survey / Traffic Study / Roof Trac Report / Floor Cores and Ceiling Panel Evaluation / Snow Load Report

/ Fairgrounds Middle School / AHERA / Site Survey / Traffic Study / Snow Load Report

/ Pennichuck Middle School / AHERA / Site Survey / Traffic Study / Geotechnical Report

/ New Nashua Middle School / Site Survey / Traffic Study / Preliminary Geotechnical Engineering Report / Geotechnical Engineering Report

RECOMMENDATIONS / Elm Street Middle School / Fairgrounds Middle School / Pennichuck Middle School

13

15161621445354636678788498

104106112114124124130147152155161162

171171172227273275301339359375377379381383385387389391393459461465467507

581582588592

2FACILITY ANALYSIS

TABLE OF CONTENTS (CONT.)INTRODUCTION

HARRIMAN 6 / NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT

Page 7: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

PROGRAMMING OVERVIEW

SPACE ALLOCATION SUMMARY

EMS PROGRAMMING / Online Programming Survey Summary / Summary of Principal Interview

FMS PROGRAMMING / Online Programming Survey Summary / Summary of Principal Interview

PMS PROGRAMMING / Online Programming Survey Summary / Summary of Principal Interview

SUMMARY OF PROGRAMMING INFORMATION / All Middle Schools Online Programming Survey

Summary / Special Education Director Interview / High School Career Technical Education (CTE)

Director Interview / Director of Athletics and Wellness Interview

COMMUNITY FORUM SUMMARY / Summary and Conclusion / Meeting Minutes

597

599

603604613

615616623

625626635

637638

644646

647

649649652

3PROGRAMMING

TABLE OF CONTENTS (CONT.)INTRODUCTION

NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT / 7HARRIMAN

Page 8: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

CONCEPT DESIGN OVERVIEW

EXISTING BUILDING FLOOR PLANS / Elm Street Middle School Existing Floor Plans / Fairgrounds Middle School Existing Floor Plan / Pennichuck Middle School Existing Floor Plan

EMS RENOVATION / ADDITION / Design Narrative / Site Plan / Floor Plans

FMS RENOVATION / ADDITION / Design Narrative / Site Plan / Floor Plan

PMS RENOVATION / ADDITION / Design Narrative / Site Plan / Floor Plan

NEW NASHUA MIDDLE SCHOOL / Design Narrative / Site Plan / Floor Plans / Massing Diagrams

4CONCEPT DESIGN

TABLE OF CONTENTS (CONT.)INTRODUCTION

661

663665671673

675675676677

681681682683

685685686687

689689690691695

HARRIMAN 8 / NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT

Page 9: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

5FINANCIAL ANALYSIS

FINANCIAL ANALYSIS OVERVIEW

ELM STREET MS COSTS

NEW NASHUA MS COSTS

FAIRGROUNDS MS COSTS

PENNICHUCK MS COSTS

ENERGY COST ANALYSIS SUMMARY

LIFE CYCLE COST ANALYSIS

CONSTRUCTION COSTS / Elm Street Middle School / Fairgrounds Middle School / Pennichuck Middle School / New Nashua Middle School

NASHUA PROJECT BUDGET / Elm Street Middle School / New Nashua Middle School / Fairgrounds Middle School / Pennichuck Middle School

TABLE OF CONTENTS (CONT.)INTRODUCTION

699

701

703

705

707

709

711

713714727743759

775776777778779

NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT / 9HARRIMAN

Page 10: NASHUA MIDDLE SCHOOLS 2019 FACILITY ANALYSIS & …€¦ · PROJECT TEAM / Owner – Nashua School District / Architect – Harriman / Construction Manager – Harvey Construction

HARRIMAN 10 / NASHUA MIDDLE SCHOOLS FACILITY ANALYSIS & CONCEPT DESIGN REPORT