NAS Planning and Integration Reimbursable Agreements Prepared for: 2018 Southwest Airport Conference Presented by: Grady Cunningham Manager, NAS Planning Date: January 31, 2018 Federal Aviation Administration Federal Aviation Administration

NAS Planning Federal Aviation and Integration · 1/31/2018  · [email protected] . Federal Aviation Administration •NAS Planning & Integration . Any questions? Federal Aviation

  • Upload
    others

  • View
    2

  • Download
    1

Embed Size (px)

Citation preview

  • NAS Planning and Integration Reimbursable Agreements

    Prepared for: 2018 Southwest

    Airport Conference

    Presented by: Grady Cunningham

    Manager, NAS Planning

    Date: January 31, 2018

    Federal Aviation Administration

    Federal Aviation Administration

  • What is a Reimbursable Agreement?

    • A Reimbursable Agreement is a legal document executed by an FAA Contracting Officer and a Sponsor under which the Sponsor provides funding to the FAA for materials, supplies, equipment, and/or services supporting the Sponsor’s initiative.

    • A Reimbursable Agreement provides resources to protect the operation of the National Airspace System (NAS).

    Federal Aviation Administration

    •NAS Planning & Integration

  • When is a Reimbursable Agreement required?

    When a Sponsor’s project impacts an FAA facility by:

    1. Requiring relocation, replacement, or modification of an FAA facility due to the Airport’s or Sponsor’s improvement and/ or project

    2. Impairing the technical and operational characteristics of an FAA facility

    3. Requiring FAA Engineering Services Involvement

    Federal Aviation Administration

    •NAS Planning & Integration

  • When should you contact our office?

    • Ideally – 4 to 5 years before construction

    • Allows NPI to research future FAA equipment replacements and integrate into sponsors project

    • FAA - 3 year budget cycle (2022 in progress)

    • Reduces/prevents multiple runway shutdowns

    • De-conflict projects that may pose a risk to operations – Operational Risk Management (ORM)

    Federal Aviation Administration

    •NAS Planning & Integration

  • What services will the FAA provide for Reimbursable Agreements?

    FAA services can include:

    • Technical Analysis, Site Selection

    • Engineering, Engineering Design Support/Oversight

    • Equipment Specifications

    • Equipment Upgrades as a Target of Opportunity

    • Construction Oversight

    • Installation & Testing

    • Flight Inspection

    Federal Aviation Administration

    •NAS Planning & Integration

  • Reimbursable Agreement Options • Full Reimbursable Agreement

    • Engineering • Construction • Engineering and Construction

    • Limited • Engineering (Design Review & Construction Oversight)

    • Preliminary Design Review Agreement (PDRA) • Small Scale Reimbursable Agreement (SSRA)

    • Design Review • Cable Relocation • Special Event • Travel

    Federal Aviation Administration

    •NAS Planning & Integration

  • Reimbursable Agreement Limitations and Considerations

    • Full and Limited RA’s • Not to exceed 5-years performance • Able to address most every situation • Improved Cost Estimate • Improved project scope development and expectations • Efficient use of resources - may not be necessary to create

    multiple Agreements. • Full takes 6-8 months to develop • Limited takes 2-4 months to develop

    Federal Aviation Administration

    •NAS Planning & Integration

  • Reimbursable Agreement Limitations and Considerations

    • PDRA and SSRA • Limitations to intent of Agreement. Reimbursable

    Agreement templates are “locked” and users can only enter into Agreement specific information such as Sponsor name, address, funding amount, and period of performance.

    • Limited to maximum estimated cost up to $100K plus overhead.

    • Limited to maximum duration of 3 years • PDRA and SSRA can be established in 6-weeks to 9-weeks

    Federal Aviation Administration

    •NAS Planning & Integration

  • Reimbursable Timeline

    Federal Aviation Administration

    •NAS Planning & Integration

  • Points of Contact • Grady Cunningham – Manager NAS Planning and Integration

    (817)222-4956 [email protected]

    Lead Planners • Pam Durrant – DFW Metroplex

    (817)222-4609 [email protected] • Moni Jacob – Arkansas, Louisiana, North Texas

    (817)222-4413 [email protected] • Steve Juricek – South Texas, Houston Metroplex

    (817)222-4894 [email protected] • Miguel Negrete – West Texas, Oklahoma, New Mexico

    (817)222-4619 [email protected]

    Federal Aviation Administration

    •NAS Planning & Integration

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

  • Any questions?

    Federal Aviation Administration

    11

  • The End

    Federal Aviation Administration

    12