NARUC Summer Committee Meetings North Dakota Pipeline Authority

Justin J. Kringstad July 23, 2013 – Denver, CO

Page 2: NARUC Summer Committee Meetings -   - Get a Free Blog Here

2 JJ Kringstad - North Dakota Pipeline Authority

Page 3: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Bakken-Three Forks Formations

3 JJ Kringstad - North Dakota Pipeline Authority

Mature Bakken

Bakken

Three Forks

Page 4: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Bakken-Three Forks Formations

4 JJ Kringstad - North Dakota Pipeline Authority

• Oil Play with associated natural gas production

• Largest oil field (in square miles) in North America (18,000 square miles)

• Development made possible by the combination of horizontal drilling and hydraulic fracturing

Page 5: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Natural Gas Flaring Facts/Challenges

5 JJ Kringstad - North Dakota Pipeline Authority

Primary Challenges • Size of resource • Young age of development • Harsh winter conditions • Resource potential still being

explored

Regulations • Flaring regulated by the ND

Industrial Commission/Oil & Gas Division with existing penalties and incentives in place to reduce flaring

Page 6: NARUC Summer Committee Meetings -   - Get a Free Blog Here

US Natural Gas Flaring

6 JJ Kringstad - North Dakota Pipeline Authority

Page 7: NARUC Summer Committee Meetings -   - Get a Free Blog Here

1. Economics Must Work

2. Understanding Production Potential

3. New Gas Gathering Pipelines

4. Enhancing Existing Gathering Pipelines

5. Adequate Gas Processing Capacity

6. Adequate Interstate Pipeline Capacity

7. Flaring Alternatives (Short & Long Term)

7

Keys to Reducing ND Flaring

7 JJ Kringstad - North Dakota Pipeline Authority

Page 8: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Raw Natural Gas

(1500+ BTU) Processing Plant

Consumer Quality Dry Natural Gas

Methane

($3.49 MMBTU)

NGL’S (8-12 gpm)

Y-Grade or Fractionated

Ethane

41.64%

Propane

28.33%

Butane

16.53%

Natural Gasoline

13.51%

8

*Using NGL breakdown from the July 2012 BENTEK Natural Gas Study

Rich Natural Gas

8 JJ Kringstad - North Dakota Pipeline Authority

Page 9: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Forecasting Williston Basin Gas Production

Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.

Today

9 9 JJ Kringstad - North Dakota Pipeline Authority

Page 10: NARUC Summer Committee Meetings -   - Get a Free Blog Here

GREEN – % of gas captured and sold

Why is the gas being flared? Blue – Lack of pipelines Red – Challenges on existing infrastructure

May 2013 Data – Non-Confidential Wells Statewide

Solving the Flaring Challenge

10 JJ Kringstad - North Dakota Pipeline Authority

Page 11: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Capturing the 15% Faster Well Connections

First Time Gas Sales Per Month

11 11 JJ Kringstad - North Dakota Pipeline Authority

Page 12: NARUC Summer Committee Meetings -   - Get a Free Blog Here

12

ND Gas Gathering Statistics

12 JJ Kringstad - North Dakota Pipeline Authority

Page 13: NARUC Summer Committee Meetings -   - Get a Free Blog Here

North Dakota Pipeline Miles

2,353 miles of new pipe in 2011

Roughly Distance from Seattle to Washington DC

2012 Data Available Q3 2013

13 13 JJ Kringstad - North Dakota Pipeline Authority

Page 14: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Older, lower pressure wells connected to plant

New, high pressure well causes older wells to flare

Capturing the 13% Additional Compression

14 14 JJ Kringstad - North Dakota Pipeline Authority

Page 15: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Capturing the 13% Looping Existing Pipelines

15 15 JJ Kringstad - North Dakota Pipeline Authority

Page 16: NARUC Summer Committee Meetings -   - Get a Free Blog Here

NGL buildup in gathering pipelines reduces area for gas to flow

Capturing the 13% Frequent Pigging

More of an issue in winter months due to lower ground temperature causing

more liquids to drop out

16 16 JJ Kringstad - North Dakota Pipeline Authority

Page 17: NARUC Summer Committee Meetings -   - Get a Free Blog Here

5 New or Expanding Gas Plants 2013-2015

(See Website for Details)

17

Natural Gas Processing & Transmission

17 JJ Kringstad - North Dakota Pipeline Authority

Page 18: NARUC Summer Committee Meetings -   - Get a Free Blog Here

18

ND Gas Plant Capacity

18 JJ Kringstad - North Dakota Pipeline Authority

Page 19: NARUC Summer Committee Meetings -   - Get a Free Blog Here

19

Page 20: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Flaring Alternatives

November 5, 2012 – EERC Associated Gas Use Study December 18, 2012 – Natural Gas Flaring Alternatives (Company Presentations) February 27, 2013 – EERC Use of Associated Gas to Power Drilling Rigs

20 JJ Kringstad - North Dakota Pipeline Authority

Page 21: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Strengthening Landowner Relations

21 JJ Kringstad - North Dakota Pipeline Authority

Page 22: NARUC Summer Committee Meetings -   - Get a Free Blog Here

22

ND Wellhead Recovery Estimates

22 JJ Kringstad - North Dakota Pipeline Authority

Estimate Data/Assumptions: April 2013 Production Data Oil Price of $88/bbl, Natural Gas/NGL Wellhead Price of $8.00/MCF

Page 23: NARUC Summer Committee Meetings -   - Get a Free Blog Here

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: [email protected]

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

23 JJ Kringstad - North Dakota Pipeline Authority

Contact Information