Report on the investigation of

the structural failure of

MSC NapoliEnglish Channel

on 18 January 2007

Marine Accident Investigation BranchCarlton HouseCarlton PlaceSouthampton

United Kingdom SO15 2DZ

Report No 9/2008 April 2008

Page 2: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

Extract from

The United Kingdom Merchant Shipping

(Accident Reporting and Investigation)

Regulations 2005 – Regulation 5:

“The sole objective of the investigation of an accident under the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005 shall be the prevention of future accidents through the ascertainment of its causes and circumstances. It shall not be the purpose of an investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.”

NOTE

This report is not written with litigation in mind and, pursuant to Regulation 13(9) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2005, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame.

Cover photograph courtesy of Marine Nationale

Further printed copies can be obtained via our postal address, or alternatively by: Email: [email protected] Tel: 023 8039 5500 Fax: 023 8023 2459 All reports can also be found on our website: www.maib.gov.uk

Page 3: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

CONTENTS PageGLOSSARY OF ABBREVIATIONS AND ACRONYMS

SYNOPSIS 1

SECTION 1 - FACTUAL INFORMATION 31.1 Particulars of MSC Napoli and accident 31.2 Background 41.3 Narrative 4

1.3.1 Hull failure 41.3.2 Abandonment 71.3.3 Post-accident events 8

1.4 Environmental conditions 121.5 Loaded condition 14

1.5.1 On sailing Antwerp 141.5.2 Deadload 15

1.6 Vessel design and construction 161.6.1 Overview 161.6.2 Hull framing 161.6.3 Material 181.6.4 Bureau Veritas rules and calculations 18

1.7 Hull condition 191.7.1 Survey 191.7.2 Material tests 201.7.3 Post-build repairs to welds 231.7.4 Previous damage 25

1.8 Classification rule developments 261.9 Load and strength assessments 27

1.9.1 DNV 271.9.2 BV 27

1.10 Slamming and hull whipping 281.11 Container audit 281.12 Container ship industry 29

1.12.1 Growth 291.12.2 Advantages 301.12.3 Container ship design 301.12.4 World fleet 30

SECTION 2 - ANALYSIS 322.1 Aim 322.2 Similar accidents 322.3 Structural analyses 322.4 Loading 33

2.4.1 General 332.4.2 Static loading condition 332.4.3 Wave loading 342.4.4 Slamming and hull whipping 35

2.5 Vessel capacity (strength) 352.5.1 Keel section modulus distribution 352.5.2 Buckling strength requirement 352.5.3 Buckling strength assessment 362.5.4 Hull construction and condition 38

Page 4: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

2.6 IACS – Unified Requirements 392.7 Immediate action taken to identify ships vulnerable to localised buckling 402.8 Vessel operation 40

2.8.1 Speed and heading in heavy weather 402.8.2 Operation of the main engine without a governor 412.8.3 Departure and arrival hull loading conditions 41

2.9 Weight of containers 422.10 Container ship industry 42

2.10.1 Environment and culture 422.10.2 Industry code of best practice 43

2.11 Abandonment 44

SECTION 3 – CONCLUSIONS 453.1 Safety issues contributing to the accident which have resulted in recommendations 453.2 Other safety issues identified during the investigation also leading to recommendations 463.3 Safety issues identified during the investigation which have not resulted in recommendations but have been addressed 46

SECTION 4 - ACTION TAKEN 474.1 Classification Societies 474.2 International Chamber of Shipping 474.3 Maritime and Coastguard Agency 47

SECTION 5 – RECOMMENDATIONS 48

Figures, Tables and Annexes

Figure 1 Ship’s track as recorded by AIS (UTC)

Figure 2 Forward engine room arrangement showing fracture line

Figure 3 MSC Napoli following the structural failure

Figure 4 Recovery of the crew

Figure 5 MSC Napoli under tow

Figure 6 MSC Napoli beached at Branscombe Bay

Figure 7 MSC Napoli – forward section

Figure 8 MSC Napoli – aft section

Figure 9 Tidal Stream Atlas for 1020 UTC

Figure 10 Surface analysis for 1100 UTC

Page 5: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

Figure 11 Departure condition on leaving the berth in Antwerp

Figure 12 Condition on leaving the River Schelde

Figure 13 MSC Napoli profile showing 0.4L amidships region and engine room

Figure 14 Extract of shell expansion drawing

Figure 15 Path of fracture line established during dive surveys

Figure 16 Forward section of hull in Belfast dock

Figure 17 Localised plate buckling – port sea chest

Figure 18 Starboard side hull collapse near lower sea chests

Figure 19 Comparison of tensile steel results with expected yield stress ranges

Figure 20 Transverse floor and longitudinal girder number 3 at 6050mm off centre line (including fillet weld connection) inside sea chest, frame number 84 starboard side prior to removal from the vessel

Figure 21 Macrophoto of specimen taken from sample removed from the sea chest showing weld repair

Figure 22 Macrograph of specimen taken from sample removed from the starboard sea chest showing detail of fatigue crack and repair

Figure 23 MSC Napoli aground in 2001

Figure 24 Extent of bottom damage

Figure 25 Waterlogged containers in hold

Figure 26 Comparison of DNV and BV load and capacity assessments

Figure 27 Comparison of wave bending moments

Figure 28 Keel section modulus

Figure 29 Frame 82

Table 1 Steel sample thickness measurements

Table 2 Distribution of the world container fleet by capacity and classification society

Table 3 Summary of buckling strength checks conducted by BMT SeaTech

Page 6: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

Annex A Control of the main engine

Annex B Crew details

Annex C Summary, recommendations, opinion and conclusions in respect of 21 samples removed from the forward half of the container ship MV MSC Napoli

Annex D Det Norske Veritas report on load and strength assessment

Annex E Bureau Veritas report on load and strength assessment

Annex F Executive summary of the University of Southampton’s whipping calculations on the MSC Napoli 2D hydroelasticity calculations

Annex G BMT SeaTech buckling strength calculations

Page 7: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

GLOSSARY OF ABBREVIATIONS AND ACRONYMS

AB - Able Bodied seaman

BV - Bureau Veritas

CGM - Compagnie Générale Maritime

CROSS - Centre Regional Operationnel de Surveillance et de Sauvetage

DNV - Det Norske Veritas

DSC - Digital Selective Calling

ECR - Engine control room

EPIRB - Emergency Position Indicator Radio Beacon

FE - Finite element

GM - Metacentric height

GS - General Service

IACS - International Association of Classification Societies

ICS - International Chamber of Shipping

IMO - International Maritime Organization

ISM Code - International Management Code for the Safe Operation of Ships and for Pollution Prevention

kW - Kilowatt

LR - Lloyd’s Register

MCA - Maritime and Coastguard Agency

MF - Medium Frequency

MNm - Mega Newton metre

MOU - Memorandum of Understanding

MRCC - Marine Rescue Co-ordination Centre

MSC - Mediterranean Shipping Company

P&I - Protection and Indemnity

PMS - Planned Maintenance System

Page 8: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

rpm - Revolutions per minute

SAR - Search and Rescue

SART - Search and Rescue Transponder

SHI - Samsung Heavy Industries

SMS - Safety Management System

SOLAS - International Convention for the Safety of Life at Sea

SOSREP - Secretary of State Representative

STCW - International Convention on Standards of Training, Certification and Watchkeeping incorporating the 1995 Amendments

TEU - Twenty foot equivalent unit (container size)

UTC - Universal co-ordinated time

VHF - Very High Frequency

All times in this report are UTC + 1 unless otherwise stated

Page 9: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

SYNOPSIS During the morning of 18 January 2007, when on passage in the English Channel, the 4419 TEU container ship MSC Napoli encountered heavy seas, causing the ship to pitch heavily. The ship was making good a speed of 11 knots and the height of the waves was up to 9m. At about 1105, the vessel suffered a catastrophic failure of her hull in way of her engine room. The master quickly assessed the seriousness of the situation and decided to abandon ship. Following the broadcast of a distress call at 1125, the 26 crew abandoned the vessel in an enclosed lifeboat. They were later recovered by two Royal Navy helicopters. There were no injuries.

MSC Napoli was subsequently taken under tow towards Portland, UK but, as the disabled vessel approached the English coast, it became evident there was a severe risk she might break up or sink, and she was intentionally beached in Branscombe Bay on 20 January 2007. A number of containers were lost overboard when the vessel listed heavily after beaching.

The investigation has identified a number of factors which contributed to the failure of the hull structure, including:

The vessel’s hull did not have sufficient buckling strength in way of the engine room.•

The classification rules applicable at the time of the vessel’s construction did not •require buckling strength calculations to be undertaken beyond the vessel’s amidships area.There was no, or insufficient, safety margin between the hull’s design loading and its •ultimate strength.The load on the hull was likely to have been increased by whipping effect.•

The ship’s speed was not reduced sufficiently in the heavy seas.•

In view of the potential vulnerability of other container ships of a similar design, the MAIB requested the major classification societies to conduct urgent checks on the buckling strength of a number of ship designs. Over 1500 ships were screened, of which 12 vessels have been identified as requiring remedial action; a further 10 vessels were identified as being borderline and require more detailed investigation; and the screening of 8 container ships was still in progress at the time of publication. Remedial action has either been completed, planned, or is being arranged; where necessary, operational limitations have been agreed or strongly advised until the remedial work has been completed.

Recommendations have been made to the International Association of Classification Societies, which are intended to increase the requirements for container ship design, consolidate current research into whipping effect, and to initiate research into the development and use of technological aids for measuring hull stresses on container ships. Recommendations have also been made to the International Chamber of Shipping with the aim of promoting best practice within the container ship industry, and to Zodiac Maritime Agencies, with reference to its safety management system.

1

Page 10: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

2

Rep

rodu

ced

cour

tesy

of F

otoF

lite

MS

C N

apol

i

Page 11: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

3

- FACTUAL INFORMATIONSECTION 1

PARTICULARS OF 1.1 MSC Napoli AND ACCIDENT

Vessel details

Registered Owner : Metvale Limited

Registered Operator : Zodiac Maritime Agencies Limited

Port of registry : London

Flag : United Kingdom

Type : Container (4,419 TEU)

Built : 1991 – Samsung Heavy Industries Co Ltd Koje, South Korea

Classification society : Det Norske Veritas (DNV) from 2002Bureau Veritas (BV) 1991 – 2002

Class notation (BV) : 1A1 DG-P EO

Length overall : 275.66m

Breadth : 38.18m

Gross tonnage : 53,409

Engine power and type : 38792kW Sulzer 10RTA84C

Service speed : 24.10kts (when built)

Accident details

Time and date : 1102 LT 18 January 2007

Location of incident : Lat 49º 19.8' N Long 004º 34.8' W, 146º Lizard Point 45nm

Persons on board : 26

Injuries/fatalities : None

Damage : Constructive total loss

Page 12: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

4

1.2 BACKGROUNDMSC Napoli was built in 1991. She was originally named CGM Normandie and registered in France. The vessel’s name was changed to Nedlloyd Normandie in 1995 and to CMA CGM Normandie in 2001. She was purchased by Metvale Limited in September 2002 when her registration was also changed to the UK flag. The vessel continued under charter to CMA/CGM until November 2004 when she was chartered by Mediterranean Shipping Company (MSC) and renamed MSC Napoli. Her initial trading route with MSC was between the eastern Mediterranean and north west Europe, but from November 2006 MSC Napoli plied between South Africa and northwest Europe; her charter speed was 21.5kts.

The vessel’s port rotation was: Cape Town – Port Elizabeth – Durban – Port Elizabeth – Cape Town – Las Palmas – Felixstowe – Hamburg – Antwerp – Le Havre – Sines – Las Palmas.

On 29 December 2006, MSC Napoli sailed from Cape Town at the start of her north-bound voyage 4 days behind schedule. To save time, her charterer cancelled the planned port calls at Hamburg and Le Havre and arranged for the cargo that was planned to be loaded and discharged at those ports, to be transhipped at Antwerp instead.

When the vessel arrived at Felixstowe on the morning of 13 January 2007, she was 6 days behind her original schedule following the failure of one of her four main engine turbochargers. A second main engine turbocharger failed during the passage between Felixstowe and Antwerp; her main engine governor was also not operational1. All four turbochargers were working when the vessel sailed from Antwerp, but the main engine governor remained out of action. At the time of the accident, MSC Napoli was on passage from Antwerp, Belgium to Sines, Portugal, with a crew of 262. Her ETA in Sines was 1800 on 19 January 2007.

NARRATIVE1.3 1.3.1 Hull failure

MSC Napoli departed her berth in Antwerp at 0812 on 17 January 2007. After disembarking her river pilot at 1521, the vessel passed through the Dover Strait before transiting the English Channel during the early hours of the following morning. The weather worsened overnight, and a deck log entry made during the 0400-0800 watch stated “Vessel rolling and pitching moderately, vessel pounding heavily at times. Seaspray over focsle”. By the time MSC Napoli was about 45 miles south east of the Lizard Point in Cornwall, England (Figure 1), she was heading into storm force winds. The vessel was occasionally pitching heavily into high seas but was no longer rolling to any significant extent. Her course was 240º and her engine was at a speed which normally resulted in a vessel speed of 17kts3. She was making good a speed of 11 knots over the ground and her master was content with the vessel’s motion and considered that there would be no damage caused to the forward containers.

1 Details of the control of the main engine are at Annex A.2 Details of the crew are at Annex B.3 Company instructions to the master stated “Under no circumstances should the vessel be forced to proceed in rough weather at speeds which could cause severe damage to the vessel’s structure and engines and endanger the lives of the crew. Engine rpm shall be reduced to the extent that the vessel makes headway without causing shuddering and excessive vibration.”

Page 13: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

5

Shortly after 1100, the ship encountered several large waves, which were described as “quite powerful strikes”. One of the crew found it extremely difficult to stand in a shower cubicle during this period due to the vessel’s movement. At about 1105 a loud crashing or cracking sound was heard. At the same time, the third assistant engineer, on watch in the engine control room (ECR), acknowledged an alarm indicating a high level of fluid in the engine room bilge. This was immediately followed by further bilge alarms and an engine room flood alarm.

The first assistant engineer quickly joined the third assistant engineer in the ECR. He telephoned the chief engineer on the bridge and informed him of the situation, while the third assistant engineer went to the bottom plates in the engine room to investigate the cause of the alarms. On arrival, the third assistant engineer saw water spraying from the general service (GS) pump delivery pipe just forward of the main engine. The pump was not running and he quickly shut both its delivery and suction valves. This stopped the water flow. The delivery pipe had sheared cleanly across, and the two sections had separated by about 150mm. The third assistant engineer also saw a large quantity of water sloshing from side to side under the engine room bottom plates. As he started to return to the ECR, the tank top forward of the main engine appeared to open up across the ship (Figure 2), and a “wall of oily water” shot upwards before cascading down across the pump flat and bottom plates. The third engineer quickly evacuated the area and returned to the ECR.

Figure 1

Ship’s track as recorded by AIS (UTC)

Page 14: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

6

Following the call from the first assistant engineer, the chief engineer informed the master that the engine room might be flooding. He then quickly made his way to the ECR, where the third assistant engineer briefed him on what he had seen. The chief engineer went down to the bottom plates to assess the situation. He saw a lot of water swirling across the tank tops and under the bottom plates and, what appeared to be cracks, in the tank top. He also saw what he thought was a large fracture in the side shell plating on the starboard side close to the sea chest. Additionally, many of the

Figure 2

Forward engine room arrangement showing fracture line

Tank top line of fracture

G.S. pump

Page 15: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

7

cooling pumps in the pump flat had stopped operating. The chief engineer stopped the main engine before returning to the ECR, from where he informed the master of the situation. Having concluded that the ship had suffered serious structural failure, he then ordered all personnel to leave the engine room.

1.3.2 AbandonmentAfter talking to the chief engineer, the master went onto the starboard bridge wing from where he could see that the ship’s side plating directly below the bridge was bulging outwards. He also saw what appeared to be a vertical fracture below the waterline as the ship rolled to port. When similar damage was seen on the port side, the master assessed that MSC Napoli had ‘broken her back’ (Figure 3), and decided to abandon the vessel.

A distress message was sent via MF DSC at 1125 and the crew started to assemble on the bridge. A few minutes later, the vessel lost all electrical power. However, lighting was soon restored when the ship’s emergency generator started automatically.

By now, the ship was stopped in the water, with her starboard side exposed to the wind and sea. Consequently, the master sent the bosun and three of the crew to prepare the port lifeboat for launch4. Others were sent to the provision locker to get cases of bottled water. After all crew had been accounted for, the master sounded the

4 It was evident during the investigation that the master had placed a great deal of emphasis on the importance of safety drills and the maintenance of lifesaving equipment, and that the preparation and lowering of lifeboats had been well-practiced in accordance with company policy.

Figure 3

MSC Napoli following the structural failure

Hull fracture

Reproduced courtesy of Marine Nationale

Page 16: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

8

emergency alarm of seven long, and one short blasts on the ship’s whistle to indicate to the crew to make their way to the lifeboat station. He then called Ushant Traffic on VHF radio to advise that he and his crew were abandoning into the lifeboat.

The master and third officer were the last to enter the lifeboat, having collected the SART, EPIRB and a number of the ship’s documents. The lifeboat engine had been started and, following verbal confirmation from the chief officer that all 26 crew members were on board, the master ordered the chief engineer to lower the lifeboat by hauling down on the remote lowering wire.

The lifeboat smoothly descended the 16 metres to the sea. Once waterborne, the bosun released the fore and aft falls from inside the lifeboat. However, the crewman sitting nearest the forward painter release could not pull the release pin sufficiently far to allow the painter to disengage. He was squeezed between two other crew and his movement was restricted by his immersion suit. The painter was eventually cut by the chief engineer, who had a knife, and was able to reach the painter via the lifeboat’s forward hatch.

After clearing MSC Napoli, the lifeboat was manoeuvred to a position between 1 and 1½ miles away from the stricken vessel. The master then activated the EPIRB and the SART. The motion of the lifeboat was violent and the atmosphere in the lifeboat was very uncomfortable; all of the crew suffered from sea sickness. Although the lifeboat was certified to accommodate up to 32 persons, the 26 crew wearing immersion suits and lifejackets were very cramped. They were very warm and several felt faint and de-hydrated. The situation became more tolerable after the crew cut off the gloves from their immersion suits with the chief engineer’s knife. This allowed them to use their hands more effectively, and they were able to drink from plastic drinking water bottles they had brought with them.

On receipt of the “Mayday”, CROSS Corsen initiated the assistance of a SAR helicopter and a tug. When the crew abandoned, Falmouth MRCC was also requested to assist. Falmouth MRCC activated two SAR helicopters, R193 and R194 (Figure 4).

The first helicopter arrived at the scene at 1150. Initially, a highline5 could not be passed to the lifeboat due to the severe weather conditions. However, at about 1230, a diver was lowered from R194 into the sea and swam to the lifeboat. A highline was rigged and the helicopter crew recovered 13 survivors from the lifeboat. R193 took over the winching operation at 1325, and by 1409 the remaining 13 survivors had been recovered.

1.3.3 Post-accident eventsFollowing the successful abandonment of the vessel, MSC Napoli was taken in tow to Portland, Dorset. A towline was connected (Figure 5) but, as the disabled vessel approached the south coast of England, concern increased regarding her condition. In order to prevent the vessel from breaking up or sinking at sea, she was beached in Branscombe Bay on 20 January 2007 (Figure 6). A number of containers were lost overboard when the vessel listed heavily after beaching.

5 A highline transfer is a method of lifting survivors from a confined area such as a lifeboat or liferaft into a helicopter. The technique involves the attachment of a messenger to the helicopter’s winch hook to enable the hook to be accurately controlled and positioned by the persons in the confined space.

Page 17: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

9

During the following 5 months, most of the vessel’s fuel oil and the remaining containers were removed. MSC Napoli was refloated on 9 July 2007, but it was soon apparent that she was in a poor condition and she was re-beached 3 days later.

On 20 July 2007, the vessel was separated using explosive charges approximately in way of where the hull had failed on 18 January 2007 (Figures 7 and 8). The forward section was then towed to the Harland and Wolff shipyard in Belfast for recycling. The after section remains off Branscombe at the time this report was published.

Figure 4

Recovery of the crew

Reproduced courtesy of Marine Nationale

Page 18: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

10

Figure 5

MSC Napoli under tow

Figure 6

MSC Napoli beached at Branscombe Bay

Reproduced courtesy of Marine Nationale

Page 19: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

11

Figure 7

MSC Napoli - forward section

Figure 8

MSC Napoli - aft section

Page 20: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

12

ENVIRONMENTAL CONDITIONS1.4 The wind was south west storm force 10 to 116. There was a swell running from the south west and the wave height was estimated to have been between 5m and 9m. The distance between successive wave peaks was 150m, with an interval of between 9 and 10 seconds. The charted depth of water was about 80m.

High water at Dover on 18 January was at 1120. The predicted tidal stream at 1120 is shown at Figure 9. The tidal range was 60% of the spring range.

The following weather forecasts were issued by the U.K. Meteorological Office and received on board MSC Napoli on 17 and 18 January:

At 1130 on 17 JanuaryGerman Bight Humber Thames Dover Wight Portlandsouthwesterly 6 to gale 8 increasing severe gale 9, perhaps storm 10later. rough or very rough, occasionally high in Portland later.Rain. moderate or good

At 0015 on 18 JanuaryWight Portland Plymouthsouthwesterly 6 or 7, increasing gale 8 to storm 10, perhaps violentstorm 11 later. Very rough becoming high. rain or showers. moderate,occasionally poor

6 On the Beaufort scale, a wind strength of force 11 (violent storm) indicates the wind has a mean velocity of between 56 knots and 63 knots (28.5-32.6m/s). In conjunction with the high wind speed, exceptionally high waves with a probable height of up to 11.5m are possible.

Figure 9

Tidal Stream Atlas for 1020 UTC

Position of MSC Napoli at time of structural failure

Reproduced by permission of the Controller of HMSO and the UK Hydrographic Office

Page 21: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

13

At 0505 on 18 JanuaryWight Portland Plymouthsouthwesterly 7 to severe gale 9, occasionally storm 10, perhapsviolent storm 11 later. Very rough or high rain or showers.moderate, occasionally poor

The surface analysis chart for 1100 UTC on 18 January 2007 is shown at Figure 10.

01

02

03

04

05

07

08

09

10

11 12

13

14

15

16

17

18

19

20

21

48

50

50

52

52

54

54

56

56

58

58

60

60

62

64

64

6618

16

16 14 12

10

10

8 6

6

4

4

2

2

0

0

2

2 4 6 8

10

10

12

12

SCALE OF NAUTICAL MILEST E N U C E M T T

P E E G P C P TN

455055665

GEOSTROPHIC WIND SCALEN N T E V

E E G P C P E T NN

4550556065

0

500

100

150

200

CONTOUR

fee

L

971

L

971

L

965

996

994992

992

990

990

988

88

986

986

984

984

984

984

982

982

982

982

982

980

980

980

980

980

980

980

978

978

978

978

978

978

978

978

978

978

978

978

978978

97

978

978

976976

976

976

976

976

976

976

97676

976

9 6

976

976

976

976

976

97

6

974

74

974

974

974

74974

974

974

974

974

974974

974

974

974

974

9

972

972

972

972

972

972972

972

972

72

972

972

980

980

980

980

980

980 980

980

980

98

0

970

970

970

970

970

97

970

970

968

968

968

968

982

982

982

982

982

982

982

98

982

966

966

984

984

984

984

84 984

984

984

986

986

986

986

86 986

98

986

988

988

988

988

988 988

9 8

9 8

990

990

990

990

9900

990

990

992

992

992

9 2

992

992

992

994

994

994

994

994994

99

4

996

996

96

996996

996996

996

998

998

998

998998

998998

998

1000

1000

1000

1 00 10001000

1000

1002

1002

1002

1002 10021002

100

1004

1004

1004100 1004

100410

1006

1006

10061006 1006

100610061008

1008

10081008 008

10081008

1010

10101010

101

1010

1010

012

1012

1012 1012 1012

1012

1012

1014

1014

1014

1 4 10 4

1014

1014

1016

10161016

0112

14 875

03779

30 11 08

11 8928

03796

1219

8 0

1 57

5613

14

7 09

14 11741

1213

14 1291

07207

1205

14 1211

4012

06

4 088 25

14 13039

1219

13 09454

212

217 09

13 08341

1213

7 11

14 0643

812

0515 063

47

62

6

7 16

14 0963

207

13 00158

52

0812 007

1

652

0

1225

14 27

10

13 00858

6511

037 08

1 08043

65 012

6137 18

1 1033

62 021 7 05

14 076

70 0511

0631

7011

187 22

4 0459

6012

02

7 0

4 133

61

00

3 076 16

85813 1 71

3 021 7 06

12 1245

861

03 028

35 0211

214

12 02843

561

06

13 0467

120

4 92

56 012

066 207 28

1 0177

60 101

15

30

13 99952

6 02117 06

14 9 24

162

13 9134

57 117 13

13 9543

50 112 21

13 9785

501

914

13 9 5

60117 15

13 9121

6 22115 227 28

14 92647

3 132

2 095 157 18

12 9 43

25 1011 8

12 9747

45 112

0912

353

40 2411

2 096 12

12 92543

35 07115 067 11

12 98343

3 16095 045 07

10 992

3 2112

2073126 16

12 9259

15 16107 10

10 6943

50 10

0715

11 025

35 16092037 06

81310 0553

7 309

1 022

2 0033

6011

05

13 977

43 3209

47 5

09 95443

0107 0

07 5

58 160 0

10 04349

6 39088 10

0 0100

7 2609

1237

12 847

8 2709

31226

1339

60 610

13 0485

5012

27

1423

5 2

024 508

12 984

5611

24

1 066 108 18

13 96648

5812

8Q7 04

13 9619

57

8

50

5810

8Q9

15

704317

11 9325811

10

3 107 20

1 92144

5128Q

028 0

1 278

11

13 93876012 0

13 92606

1

13 9241

1211

8Q9073

12 91644

212

09

1 017 02

12 017

6012

04

2 065 07

13 0335

007

4 206 0

1 8673

58 0411

1 127 18

13 87239

6611

8Q902

14 668

1611

813 849

3011

7Q02

11 9339

6410

05

7 28 22

12 88752

5011

08

75 208 35

12 90542

251

0

068 09

12 94

57 327Q9

1

13 87748

712

8Q948

13 8797

50 711 08

12 83841

5 7211

2126

12 852

50 710

11 8699

5 61105 167 29

12 8913

67 109

11 90725

5 641

1 103 156 17

40

56 3010

3 048 10

12 964

5 221 8 08

12 454

3117 30

13 9479

86 06

2245

6011 8029

6308

2 203 357 56

12 81443

08050

11 793

0716

5 15

10 86857 64

0716

6 75 0

11 862

007

6

50

11 847

7009

1

1856

11 859

1911

115 07

13 82747

084Q9

29317

11 88850

5010 10

10 8994

07

8Q9

24

321

09 864

01095

12 859

70

7

0452

8

10 914

0558

6247 35

9497

7005

3

204 30

10 759

804

5

120

09 8749

5805

77

112418

7 50

10 89447 2

022

30

11 8049

801 8

0 0

11 789

49065Q9

2050

1053

8000

12 797

69055Q9

0925

0 749

5807

8Q9

18

2556

0 79438

004

2

35

1 53

060

6 16

11 7855

4006

30

650

10 7587

806

1

48

1 747

866Q9

0356

11 78149

77

15

19

0

11 80756

58

56 451

111416

12 79758

611

148

21

13 84558

84 351

13 861

56 7310

12 78754

8011

0

12 567

5 861

121518

12 7952

5011

12 46

5 261

3 37 58 8

13 8830

270

1 8590

60 2911

07 38 6

13 8935 50 34

11

13 8847

0707501

07 635 35

16 05

1512 91639

0503

113122636

08 694

54

8Q94 05

09 6748

57 1300

003

07

1 70

6304

02

07

4 6

08 693

6502

00

2156 56

04 697

604

0

1 05315731

06 69

57011 058 08

02 6 7

5803

05

120

330

6 40

10 7343

607

20250

08 727002

26

33348

09 727

0519

142356

08 748

701

2 64

50

08 725

6704

8Q9273

05689

6 31 6

041Q9

06

700

11

2

10 731

803

24

5 5

6621 74545

005

133 5

11 337

0459

225

06 764

825705

0

1

06

6057Q9

9

08 6 9

7905 3

08 735

702

63

3204 34

09 85343 02

30

118

3 40

09 79

049

7 8502

8272

0259

6 24

09 81847

6904

40

23

3

07 76254

852606

13

15

5 34

837

6803

10

6 1

5 4

06 75543

207

0 766

45 12087 06

09 7925

5 103091 065 10

82510 85

43 2047 0

05 97

40 1067 0

07 5935

5 93047 07

05 78029

5 12067 0

07 787

27 106

06 785

5 126107 04

11 7621

02

06 74

342

06 75331

01

05 759

2502

761

7 0003

6Q92437

04 725

7201

20

1 23 7

73

604

93

04 737

7503

49

7 36

05 746

6801

723

01 712

6-0

12437

00 738

700

10734

00 737

84 00

5

-011 40

001 725

69-01

840

7 0

01 722

70 012

8Q90

49

04 726

1100 03

00 718

4301 6

01 712

5 1701

Q94

02 7 6

77022Q9

462 0

05 7281

61 036

8Q9152

08 67444

49758

0213

03 788

56 90

1642

6 7 023

6 6103

0 802

-05

01 753

0004

04 26

8-03

02

3 107 5

-02 71

2102

06 751

-0802

-07 732

4-04

-02 720

1102

0002

02 722

-02

00 716

-060

-02 727

1103

05 720

603

06 734

-0006

0 724

03-10

-10 739

-0102

-

07-07

-05 729

302

06 743

12-01

00 74

-02

-01

01-03

-01 720

-02

00

02

02 750

-03

-03 729

02

06

-0

-03

231

04 755

61

05 752

1701

04 756

-08

-07

001

2

05 33

75 003

2 12718

05 730

0206

07 7230113

0 741

02 0

06 389

0990009S/06B/10

5110EGGD

0983

08F/08B/40

711EGBE

0988210 /05

711E B

76

2F/30

310EG H

0979

-04F/20

6

00

EKVG

0977

03S/08B/12

04EKBI

976

03S/07B/10

05EKEB

-04

-02

-04

-03

-02

-01

56 504

39

05 7

6 8405

05 81

40 108

52

22

08 80

4 107067 04

06 80

40 0103 04

8112 7879

27 0094 057 10

0 8063

5 8610

6 106 20

8312 8409

3 3707 05

10 9239

58 2909 5

10 97045

6009

13 6

8 330709

10 014

3

59 83 0

04 813

58 860

1 1019

11 8549

50 400

2 075 117 18

12 89541

5 4109

4137 20

11 9335

09

09 31

04

10

58 3209

93 276 40

14 93139

02

0

4 2709

023077 11

52

1325

13 05649

1213

14 1291

6512

10

93

13 37

1325

13 06754

120

13 1031

6613

014 142

3

70 0417 20

1435

7 07118 7

13 0569

12

13 1123

6 0810

5137 18

1 0639

11

12 9609

8611

14 0395

58 0911

7 108 30

13 01643

1

14 9

7

-00

00

11

13

0800

01 713

7 511

170

1 8312

29 600

11 77658

210

11 77845

-04

-01

-07

-04 736

26 201

4 105 23

9545

1202

14 1455

02

04

6502 3

05 785

57 7404

1 13 95 47 6

0 771

6403

1 8522732

05 785

302

0 798

71 59763

03

102557

0 796

6 7503

05 07

0603 72

01-02

01 715

-1002

-09 737

-04

-02

-4108

05 717

06-04

04 700

-02

01 720

0410

7 806

04

04

11

1

-01

01 935

-0207

5 742

7703

06 704

73 0309

00

05 751

7027006

7Q9

08513

075

82123Q9

2

12 853

*Q*

04*Q0

6 7335

609

05

31361

10 840

020

08 804

8375

058Q9

86

10 7791

58 113

230

6 683

12007Q9

6

00 69

36 0801

8Q93

6 5

1 1203

7Q940

0 6955

82032Q9

119

05 6852

70067Q9

13750

07 7167

58010Q

03 13

3009

32

4 137 1

11 91051

97

03F/18S/25

06

0 83

10B/28

471

0970

03B/12B/30

605

0980

09S 25B 34

3812

0992511S/10B/18

4213

1006

07F/22B/39

421

097

B/1

09

0969

03B/1

06

0974

-05S/37

03

972

-0 F/30

07

09714-01S/08

S/40

00

971

-01F/18

03

970

0F/05S/1B/1

01

0972

00S/10B/16

01

0979307B/05B/ 0

09

0977

-08F/40S/57

B/600

0972

003

S 10B 15

00

0976

-0/30/55

0

974

-04S/25

-02

0380

0909

08

11

830

55.4N 12.4W62105

0847

1 15

12

12

980

51.0N 13.4W62081

126

0916

14

12

070

48.7N 12.5W62029

05

1018

09

11

868

53.5N 19.4W62108

1231

1 13

13

12

983

50.1N 6.1W62107

70640 5

39

090910

788

48-00

62133

0704

11 713

108

08

07

795

53.5N 8.6EDBFR

11506

07 80742

53.9N 8.7EDBBI

1106

07

07

785

53.9N 8.7EDBFH

1305

07 77144

54.0N 8.0EDBJM

11806

06 78846

54.0N 8.4EDFPC

107

08

08

762

3

53.9N 7.9EDBCK

90 311

0 07

12

11

866

51.4N 2.0E62170

1

08

62094

6

0913

11

10

906

961

6 305

01

0 10

13

12

954

04

62091

13

0608

09

10

772

912

62103

18

1 12

13

12

995

9800

63112

02

0 07

06 7 1

77

6213206 695

96 11

2142

07

12 780

3601

62116

0605

06 719

387

6212109 764

60

62119

0 05

07 707

72521

01

62111

0604

06

03

6305706 730

98-00

631 5

05

0 07

05 744

3411

BATFR0312 996

4

2

BATFR02

0313

11

931

3

11

BATFR1712

11

862

3

20

93

20

T FN

98

LF4B

0810

05 7 5

12

62163

36

1 14

13

13

122

18111411

05

10

809

LDB 1135Z11Z Thursday 18th Jan 07

CF FORM31A11Z Thursday 18th Jan 07

MSL PRESSURE (mb) DT 11Z 18/ 1/ 7 T+ 0 VT 11Z 18/ 1/ 7The Met Office

Figure 10

Surface analysis for 1100 UTC

Page 22: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

14

LOADED CONDITION1.5 1.5.1 On sailing Antwerp

It was intended that MSC Napoli would have a maximum draught of 13m on completion of container operations at Antwerp to allow her to sail at any state of the tide. The maximum permitted draught to leave the port was about 15m.

In an attempt to achieve the desired draught, various ballast configurations were input to the vessel’s loading computer7 together with the planned distribution and weights of the containers to be loaded. The only condition that enabled a maximum aft draught of 13m resulted in harbour and sea bending moments8 of about 88% and 116% (Figure 11) of their respective maxima. This condition, which required the ship to be ballasted forward during the cargo operations, was approved by the master, on the basis that the bending moments would be reduced to within the seagoing limit, by adjusting the ballast configuration during the river transit towards the open sea. When loaded, it was normal for the vessel to be in a ‘hogged’ condition9.

MSC Napoli departed Antwerp on 17 January with 2318 containers on board, of which about 700 were stowed on deck. The ship’s draught on departure was 13m aft and 12.6m forward. After passing through the harbour locks at about 1000, the chief officer adjusted the ballast during the passage down the river as planned. This action was

7 MSC Napoli was equipped with an Easecon version 4.01 loading computer. The computer was approved by BV on 28 January 2000. When the ship’s classification was changed in 2002, DNV re-checked the computer for accuracy against the vessel’s loading manual and issued a letter of approval on 21 June 2002. Following the accident on 18 January, the loading computer was again checked for accuracy and found to be correct.8 Seagoing bending moments are 76% of harbour bending moments or still water bending moments. The 24% difference is the margin of safety required to allow for wave loading at sea.

9 Hogging is the stress a ship experiences that causes the center of the hull to bend upward.

Figure 11

Departure condition on leaving the berth in Antwerp

Page 23: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

15

completed by 1510 and had the effect of reducing the seagoing bending moments to 99% of the allowed maximum (Figure 12) and of increasing the draught aft to about 13.5 metres. The pilot was not informed of the changes in draught and trim.

To facilitate berthing at any state of the tide at Antwerp, the vessel had arrived at the port on 120% of her maximum permissible seagoing bending moments. Data recovered from the ship’s loading computer indicated that the vessel had arrived or departed from berths or other ports on several occasions on up to 122% of her maximum permissible seagoing bending moments.

1.5.2 Deadload10

Before sailing from Antwerp, the chief officer read the vessel’s draught marks forward, amidships and aft from the dockside, after first ensuring the vessel was upright. The draughts were then entered into the loading computer and the deadweight corresponding to the recorded draughts was calculated and compared against the calculated loaded deadweight. The deadload on departure from Antwerp (having used a constant of 483MT to allow for known weights such as fuel, water ballast, spares etc) was about 1250MT.

MSC Napoli often had large deadloads on completion of loading. In May and June 2005 MSC arranged for two draught surveys to determine the cause of the discrepancies, but no significant deadload was found on these occasions.

10 The deadload is the difference between a vessel’s deadweight calculated from her observed draught and a vessel’s deadweight calculated from known weights such as cargo, fuels and water ballast. In theory, the deadload should be the difference between the calculated or estimated weight of cargo and the actual cargo on board, although other ‘unknown weights’ such as accumulated mud in ballast tanks can also contribute. There is no evidence to suggest that a significant amount of mud had accumulated in MSC Napoli’s ballast tanks prior to her departure from Antwerp.

Figure 12

Condition on leaving the River Schelde

Page 24: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

16

VESSEL DESIGN AND CONSTRUCTION1.6 1.6.1 Overview

MSC Napoli was designed and built by Samsung Heavy Industries (SHI), South Korea and was a post-panamax container ship, i.e. her beam was too great to enable her to transit the Panama Canal. At the time of her construction, she was one of the largest container ships to have been built. SHI based her design on the design of an existing smaller vessel, but increased the breadth in order to increase the carrying capacity. MSC Napoli had no sister vessels.

The vessel had seven cargo holds, with the engine room and accommodation block situated at approximately 3/4L from forward between No 6 and No 7 holds (Figure 13). Containers were carried within the cargo holds and also above deck on the hatch covers. The location of the engine room and accommodation block was not uncommon for a container ship.

While the underwater hull form was relatively fine with a low block coefficient11, the deck at the ends of the ship above water were wider in order to increase the stowage space for deck containers, and resulted in moderately large bow and stern flare angles.

1.6.2 Hull framingForward of the engine room the hull was longitudinally framed, i.e. the shell plate was reinforced by closely spaced stiffeners (longitudinals) which ran in the fore and aft direction. Generally, the longitudinals were spaced at 870mm intervals in the bottom structure and supported by transverse floors spaced a maximum of 3200mm apart.

11 The shape of a hull is often expressed in terms of measured ratios, known as hull coefficients, which compare the immersed section of a hull shape to that of rectangular shapes of the same overall dimensions. The block coefficient (Cb) is the principal measure of a vessel’s underwater hull form. The block coefficient of MSC Napoli was 0.609 whereas the block coefficient of an oil tanker would typically be about 0.9.

Figure 13

MSC Napoli profile showing 0.4L amidships region and engine room

0.4L

Page 25: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

17

Aft of the engine room forward bulkhead (frame 88) the bottom structure and lower portion of the side shell up to the 4th deck (9620mm above base) changed to being transversely framed with plate floors spaced at 800mm (Figure 14). There was an area of framing transition in the bottom structure aft of frame 88 where longitudinals from the cargo hold region continued aft for a short distance before termination or replacement by intercostal stiffeners.

Additional structural changes occurring in way of the engine room and accommodation block included the reduction in thickness from 44mm to 36mm of the upper deck plate, the reduction in depth and thickness of the hatch coaming, and the discontinuation of wing tanks.

Figure 14

Extract of shell expansion drawing

Page 26: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

18

1.6.3 MaterialThree grades of steel were used in the construction of the vessel’s hull:

Mild steel (Grade A) with a minimum yield stress• 12 of 235 N/mm2.High tensile steel (Grades AH/DH) with a minimum yield stress of 315 N/mm• 2.High tensile steel (Grades AH36/EH36) with a minimum yield stress •of 355 Nmm2.

Grades AH/DH were generally used in areas of higher stress although AH36/EH36 was used to a very limited extent in some areas such as the hatch coaming. Mild steel was used in all other areas.

1.6.4 Bureau Veritas rules and calculationsThe contract for the construction of CGM Normandie was signed on 12 December 1989, and her keel (hull No. 1082) was laid on 1 April 1991. The classification society used during the vessel’s construction was Bureau Veritas (BV). The role of a classification society during a vessel’s design and construction is to establish and apply the technical requirements detailed in the society’s published rules. This is achieved by scrutiny of the design specification and by regular site survey and inspection throughout the building of a vessel. Certificates of classification are issued on delivery following successful plan approval and survey. Part II of the society’s rules regarding hull structure applied during the vessel’s design and construction, included:

“3-14.11. Scantlings13 are given for the midship region and the end regions...In the intermediate regions, scantlings are to vary gradually from the midship region to the end regions.”

BV’s rules also specified the buckling criteria which was to be used to assess hull scantlings, but these criteria were only applicable to 0.2L14 either side of a vessel’s midships (frames 102 to 232 on MSC Napoli) (Figure 13). No buckling calculations were required to be undertaken in way of the engine room.

A report on the “3-D Stress Analysis of the Hold Structure” for CGM Normandie was produced by BV in 1990. The analysis covered the central cargo hold region (frames 156 to 202 in Nos. 4 and 5 holds); it did not consider the structure in way of the engine room. The scope of this analysis complied with the applicable BV rules at the time of build, which required direct calculation (i.e. Finite Element Analysis) of the primary members in the hold space. When the vessel’s classification was changed from BV to DNV in 2002, a reassessment of the hull scantlings was not undertaken. Both societies

12 The yield strength or yield point of a material is defined in engineering and materials science as the stress at which a material begins to deform plastically. Prior to the yield point the material will deform elastically and will return to its original shape when the applied stress is removed. Once the yield point is passed, some fraction of the deformation will be permanent and non-reversible.

13 Scantling refers to the collective dimensions of a vessel’s framing and structural supports. The word is most often used in the plural to describe how much structural strength in the form of girders, I-beams, etc. is in a given section.

14 0.2L is the fraction of a vessel’s length overall.

Page 27: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

19

are members of the International Association of Classification Societies (IACS)15 in which the rules of the member societies are mutually accepted. Therefore, DNV was not obliged to reassess MSC Napoli’s hull scantlings against its own rules.

HULL CONDITION1.7 1.7.1 Survey

The MAIB completed a number of internal and external surveys of MSC Napoli while she was beached at Branscombe Bay. Dive and on board surveys indicated that the hull fracture on the starboard side of the ship extended from the bottom hull plating at frame 82, upwards and forwards to frame 88 via the sea chest area (Figure 15).

15 Other classification societies which are members of IACS are: American Bureau of Shipping, China Class Society, Germanischer Lloyd, Lloyd’s Register, Nippon Kaiji, Registrano Italiano, Russian Register and the South Korean Register.

Figure 15

Path of fracture line established during dive surveys

Fracture line

Page 28: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

20

There was no indication of any damage to the bow area, or the forward-most containers. Once the forward section of the hull had been detached and taken to the Harland and Wolff dry dock (Figures 16-18), it was possible to perform a more detailed inspection of the fracture, which confirmed the earlier indications with respect to the path of the failure.

The inspections in Belfast were able to confirm that the vessel had been built in accordance with the ship’s drawings. It was established that not all longitudinal girders in the double bottom were continuous in the area of the failure. While the port side girders were continuous, the centreline and starboard side girders were intercostal between floors. In addition, it was noted that there were fractures through the throats of fillet welds at the sites of discontinuous longitudinal girders, while the continuous girders had generally failed mid frame.

1.7.2 Material testsEighteen samples of steel were removed from the fracture path by the MAIB. A further three samples were removed from immediately forward of the fracture path on behalf of the vessel’s charterers. All of the samples were sent to the Test House, Cambridge, for analysis. A summary report of this analysis is at Annex C. The Test House concluded:

“…the vessel’s failure was not attributable to any identifiable material or metallurgical deficiencies or issues and that steel work was thought to have been in good order, in terms of freedom from both corrosion wastage and significant cracking, at the time of the casualty.” [sic]

Figure 16

Forward section of hull in Belfast dock

Page 29: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

21

Figure 17

Localised plate buckling - port sea chest

Figure 18

Starboard side hull collapse near lower sea chests

Page 30: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

22

The main findings of the material tests on the 18 samples removed from the fracture path were:

Steel Grades•

The grades of steel used in the construction were generally as specified in the vessel’s drawings, or of higher grade (Figure 19). The only sample that did not meet the required properties was the centreline girder, where mild steel (Grade A) was used instead of high tensile steel (AH32).

Weld sizes•

A number of fillet welds were found to be marginally under the specified minimum size. However, the cross cruciform joint strength was found to be significantly stronger than expected from shipyard construction fillet welding and would have potentially negated any shortfalls in weld size.

Corrosion•

Thickness measurements taken on the steel samples using a calibrated digital vernier indicated minimal corrosion of structure in way of the failure (Table 1). The results support surveys conducted by BV and DNV during the service life of the vessel and visual observations during the hull inspection.

Figure 19

Comparison of tensile steel results with expected yield stress ranges

Sample Tensile Tests0.2% Proof Stress

Sample ID and Description

Upper Yield Stress

Mean Yield Stress

Lower Yield Stress

Stre

ss (M

Pa)

Upper Yield Stress

Mean Yield Stress

Lower Yield Stress

PTF

L3 -

Tank

Top

STT

9 - T

ank

Top

PTF

L3 -

Long

itudi

nal G

irder

Long

itudi

nal G

irder

PB

S8

- Bot

tom

She

ll

PS

S1

- Sid

e S

hell

SS

B12

- S

ide

She

ll

PB

S8

- Cen

trelin

e G

irder

0

50

100

150

200

250

300

350

400

450

Page 31: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

23

1.7.3 Post-build repairs to weldsThree of the steel samples showed evidence consistent with repairs or joint repositioning being completed when the ship was in service. One of these samples (STL11), which was taken from the connection between a transverse floor and longitudinal girder number 3 at 6050mm off the ship’s centre line inside the starboard sea chest at frame 84 (Figure 20), exhibited evidence that at least one of the four fillet welds forming the cruciform joint (Figures 21 and 22) had been repaired. With regard to this sample, the Test House report (Annex C) concluded “Piece STL11 exhibited a fatigue crack that had initiated from a region of weld metal exhibiting pre-existing centre bead segregation, or liquation type hot cracking. The lower fatigue portion of the crack, by contrast, contained an in situ corrosion product consistent with its formation in a marine environment. Collectively, the evidence suggests that a solidification defect had been present in the throat of the original construction weld. The crack had grown by a mechanism of fatigue and had been open to the elements, during which time the lower crack regions had suffered corrosion. The crack had then been partly excavated and a capping weld run applied over the previously open and corroded crack.”

Table 1

Steel sample thickness measurements

Repo . C1 0 (Dra t) M e Tech L d © 2008

SampleID Item

MeasuredThickness

(mm)

SpecifiedThickness

(mm)Diminution

(mm)Diminution

(%)

PSS1 Lower Side Shell 17.6 18 0.4 2.2%Upper Side Shell 18.6 18 -0.6 -3.3%

PTF2 Transverse Floor 19.3 19 -0.3 -1.6%PTFL3 Tank Top 19.7 19 -0.7 -3.7%

Longitudinal Girder 20.0 19 -1 -5.3%Transverse Floor 19.4 19 -0.4 -2.1%

PTFL4 Transverse Floor 15.8 15 -0.8 -5.3%Longitudinal Girder 24.3 25 0.7 2.8%Tank Top 15.1 15 -0.1 -0.7%

CL5 Transverse Floor 14.1 15 0.9 6.0%Longitudinal Girder 15.0 15 0 0.0%

CLTT6 Tank Top 14.9 15 0.1 0.7%STL7 Transverse Floor 14.7 15 0.3 2.0%

Longitudinal Girder 24.7 25 0.3 1.2%PBS8 Bottom Shell 18.1 18 -0.1 -0.6%STT9 Tank Top Stbd Side 19.3 19 -0.3 -1.6%

Tank Top Port Side 15.0 15 0 0.0%SSB10 Bottom Shell 18.4 18 -0.4 -2.2%STL11 Transverse Floor 15.1 15 -0.1 -0.7%

Longitudinal Girder 19.2 19 -0.2 -1.1%SSB12 Side Shell 18.0 18 0 0.0%

P13 Tank Top 19.0 19 0 0.0%S14 Tank Top 19.1 19 -0.1 -0.5%

Average -0.1 -0.6%

Sample hic ness Measurements

Page 32: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

24

Figure 20

Transverse floor and longitudinal girder number 3 at 6050mm off centre line (including fillet weld connection) inside sea chest, frame number 84 starboard side prior to removal from the vessel

Figure 21

Macrophoto of specimen taken from sample removed from the sea chest showing weld repair

Page 33: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

25

It was not possible from the metallurgical evidence available to determine when the repairs were conducted, and no record could be found of any welding repairs to the ship’s main structural girders in way of her engine room.

1.7.4 Previous damageDuring a routine dry docking in January 2001, the vessel’s starboard side hull plating was indented following misalignment of the blocks. Permanent repairs were completed in March 2001. In April 2001 the vessel ran aground at full sea speed in the Malacca Straits (Figure 23). Material damage was caused to the bottom plating and internal structures from the bow to frame 210 (Figure 24). Cargo holds No. 1 to No. 4, the bulbous bow, the fore peak tank, No. 1 deep tank and the bow thrusters room were all flooded. The vessel was aground for 60 days while cargo was removed. She was then towed to Vietnam, where approximately 90m of the forward section of the vessel (bow to frame 212) from the keel to the summer load line (15m) was replaced. This required 3000 tonnes of steel.

The ship returned to service in October 2001 but landed heavily onto a berth in Jeddah in December 2001, which resulted in fractures and indents to the port side of her hull in way of No. 4 and No. 5 fuel oil tanks. Following hull survey and provisional repairs, the ship was able to continue in service.

The vessel grounded again in August 2002 in Jeddah, but damage was limited to scoring of the underside hull coating.

Figure 22

Macrograph of specimen taken from sample removed from the starboard sea chest showing detail of fatigue crack and repair

Page 34: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

26

CLASSIFICATION RULE DEVELOPMENTS1.8 Since MSC Napoli was built, IACS has updated its rules regarding structural requirements and the loads applied to a ship’s hull. For steel ships greater than 90m in unrestricted service, the hull girder strength requirements have been common to all IACS members since 1992 (Unified Requirement S1116 – Longitudinal Strength Standard). However, S11 only requires bending strength to be calculated for the 0.4L midships region; S11 specifies that bending strength outside this region may be determined at the discretion of the relevant classification society. S11 also specifies the requirements for the calculation of buckling strength of plate panels and longitudinals which are subject to hull girder bending and shear forces in the amidships region.

16 Subject to the ratification by the governing body of each member society, Unified Requirements are incorporated into the rules and practices of those societies. Unified Requirements are minimum require-ments; each member society remains free to set more stringent requirements.

Figure 23

MSC Napoli (formerly CMA CGM Normandie) aground in 2001

Figure 24

Extent of bottom damage

Page 35: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

27

As computing power has developed, the degree to which structural designs for new buildings is analysed has also increased, albeit each classification society has, to date, set its own requirement in this area. For example, it is now quite usual for global strength to be assessed using a mathematical model of the entire hull, rather than the central cargo holds within the 0.4L range defined by S11. Similarly, most classification societies now routinely check the ability of the bottom shell and inner bottom plating to resist buckling forces at areas outside of the 0.4L range.

LOAD AND STRENGTH ASSESSMENTS1.9 1.9.1 DNV

Following the loss of MSC Napoli, DNV conducted a load and strength assessment of the vessel’s hull structure (Annex D). The analysis comprised three main elements: hydrodynamic wave load analysis; global finite element (FE) analysis of the entire hull with a standard mesh model in the engine room region (frames 64 to 106), and; advanced non-linear stress and ultimate capacity analysis using a finer mesh between frames 79 and 92. The objective of the assessment was to provide a probable load range for the vertical bending moment and shear force in way of the forward engine room bulkhead (frame 88) and the corresponding structural hull capacity range.

To estimate the wave load range, two sets of environmental parameters (wave height, wave interval, vessel heading, vessel speed, water depth, wave spectra and wave spread) were used to give a ‘high’ and a ‘low’ case. Both cases were considered relevant to the conditions experienced. The resultant calculated load range was 3400MNm to 4300MNm.

The basis and main assumptions for the linear and non-linear FE models were: ‘as built’ dimensions of scantlings were used; no margins for corrosion were deducted; the model was constructed in accordance with the vessel’s drawings, and; normal fabrication tolerances were represented by geometrical imperfections. A capacity range was achieved by using the lower and upper yield strengths of the three steel grades used in the vessel’s construction. The resultant capacity range was 4200MNm to 4950MNm.

1.9.2 BVIn parallel, BV conducted a load and capacity assessment in way of MSC Napoli’s forward engine room bulkhead (frame 88) (Annex E). Two sets of environmental parameters were used which were considered to be relevant to the conditions experienced. The resultant calculated load range was 3650MNm to 4170MNm. The society also calculated the total bending moment at frame 88 in accordance with the requirements of the current UR S11 to be 4220MNm.

The FE model developed by BV to determine the vessel’s ultimate capacity at frame 88 incorporated frames 79 to 92 from the ship’s bottom to the first deck of the accommodation on the port side only. Geometrical symmetry was assumed for the starboard side of the vessel. A capacity range was achieved by using the upper and lower yield strengths of two of the steel grades used in the vessel’s construction. The highest grade of steel was not used due to its limited use in the area of failure. In this model, global collapse occurred between 4600MNm to 4700MNm.

Page 36: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

28

1.10 SLAMMING AND HULL WHIPPINGSlamming occurs when a ship’s hull impacts heavily with the water surface. There are two types of bow slamming: bottom slamming, where the ship’s bottom emerges from the water and undergoes a severe impact on re-entry; and bow flare slamming, when the upper flared part of the bow is forced deeper into the wave. Stern slamming can also occur where there is large flare in the aft hull. Both bow and stern slamming give rise to a sudden vertical deceleration at the bow or stern, and lead to a flexural vibration of the hull girder, known as whipping.

A whipping event starts when a ship is in a sagged condition17 and slams into a wave. The hull girder whipping response does not decay quickly and therefore contributes to a subsequent hogging bending moment. Whipping response on container ships has been monitored on actual ships and model tests. The results indicate that the additional wave load is typically between 10% and 50%. A 2D analysis of whipping effect included in the BV load assessment (Annex E) concluded that the effect increased wave bending moments for MSC Napoli by 30%.

The University of Southampton also assessed the possible contribution of whipping to the wave loading experienced by MSC Napoli. The university performed 2D hydroelasticity calculations to determine the bending moments and shear forces arising due to the vessel’s movement into head seas. However, the university was only able to effectively model bottom slamming. The university’s summary of its study is at Annex F and included:

Within the limitations of the 2D investigation carried out, the bending moment, shear force and stresses due to whipping are not considered significant enough to influence the structural failure in way of frames 82 and 88. However, during the investigations it was observed, with or without the inclusion of slamming, that the keel stresses in the vicinity of the aft quarter, namely frames 82 and 88, can be as large as the keel stresses amidships. This is an issue of concern to us, irrespective of the effects of whipping.

Whipping was not included in the DNV analysis (Annex D) because it considered that the required software to analyse the effect has not yet been developed due to the complexity and unpredictable nature of the phenomenon.

In view of the highly technical and specialised requirements of this investigation, MAIB engaged the expertise of BMT SeaTech Ltd to provide an independent assessment of the various reports and analyses, and to assist with the analysis of the technical factors considered in Section 2 of this report.

1.11 CONTAINER AUDITThere is no requirement for containers to be weighed at a port in Europe prior to being loaded onto a vessel. The weight of each individual container is declared by the packer or shipper, and this declared weight is used until it reaches its final destination. All of MSC Napoli’s containers were weighed when they were removed from the vessel in Branscombe. Almost all the containers loaded below decks had been submerged below water due to internal flooding within the holds (Figure 25), and their weights therefore differed significantly from the declared weights listed on the cargo manifests

17 Sagging is the stress a ship’s hull or keel is placed under when a wave is the same length as the ship and the ship is in the trough of two waves. This causes the middle of the ship to bend down slightly.

Page 37: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

29

due to water absorption. About 660 containers stowed on deck, which had remained dry, were also weighed. The weights of 137 (20%) of these containers were more than 3 tonnes different from their declared weights. The largest single difference was 20 tonnes, and the total weight of the 137 containers was 312 tonnes heavier than on the cargo manifest.

During the removal of the containers, the positions of 700 containers on deck were compared with the positions recorded by the terminal operator (i.e. the positions entered into the loading computer to determine the stability condition). Of these units, 53 (7%) were in either the wrong position or declared as the wrong container. It is generally agreed within the container industry that up to 10% of containers loaded onto a vessel might not be in their planned positions.

1.12 CONTAINER SHIP INDUSTRY1.12.1 Growth

The first ship to carry containers plied between Port Newark and Houston in the USA in 1956. The first international voyage of a container ship was in 1966 between Port Elizabeth, USA and Rotterdam, Netherlands. By the late 1960’s, the container shipping industry had become established and grew exponentially throughout the 1970s and 1980s. By 1983 the world container industry transported the equivalent of 12 million

Figure 25

Waterlogged containers in hold

Page 38: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

30

TEUs and continued to expand. Over the last 5 years, the volume of loaded containers shipped has grown on average 10% each year. Today, most of the world’s manufactured goods are carried in containers, and the equivalent of about 141 million TEU was transported by sea in 2007.

1.12.2 AdvantagesThe growth of the container ship industry, and its pivotal role in the worldwide intermodal system of transportation, has been due to a number of advantages that containers and container ships have over more traditional methods of sea transportation. In particular, a modern container ship has a monthly capacity of between 3 and 6 times more than a conventional cargo ship. This is primarily due to transhipment times. On average it takes between 10 and 20 hours to unload 1000 TEUs compared to 70 and 100 hours for a similar quantity of bulk freight. As a consequence, typical port turnaround times have reduced significantly following the introduction of containerisation. In addition, container ships are on average 35% faster than conventional freight ships (19 knots versus 14 knots).

1.12.3 Container ship designHistorically, most vessel types such as general cargo ships and early tankers had engine rooms positioned amidships. However, as the length of vessels increased, the position of the engine room was moved to the aft end. This also required a corresponding increase in their longitudinal strength.

The design of container ships evolved in parallel with the growth of the container industry and liner services. The size of these ships also increased but, unlike many other ship types, they retained a slender hull form and were equipped with large engines to enable them to cover long distances at a fast speed. Due to the fine lines aft, the engine room on container ships was increasingly positioned further forward.

Towards the end of the 1980’s, orders for ships of post-Panamax size of around 4000 TEU were placed with a number of shipyards. Today, the largest container ships have a capacity of about 12000 TEU, are over 400m in length and are typically powered by engines with power in excess of 100,000hp. The increase in size has been due to the economies of scale the larger vessels provide. A 5000 TEU container ship generally has operating costs per container 50% lower than a 2500 TEU vessel and the increase from 4000 TEU to 12000 TEU reduces the operating costs per container by about 20%.

1.12.4 World fleetAs of October 2007, the global fully cellular container vessel fleet stood at 4,178 vessels with more than 1400 on order. The average age of the world fleet was 11 years, but more than 1000 vessels were greater than 20 years old. No container ships were scrapped in 2005, and only 17 ships were scrapped between 2006 and 2007. The typical lifespan of a container ship is approximately 26 years.

Details of the world container ship fleet by TEU, and classification society are shown in Table 2.

Page 39: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

31

Tabl

e 2

Dis

tribu

tion

of th

e w

orld

con

tain

er fl

eet b

y ca

paci

ty a

nd c

lass

ifica

tion

soci

ety

<1000

1000 -

2000

2000 -

3000

3000 -

4000

4000 -

5000

5000 -

6000

6000 -

7000

7000 -

8000

8000 -

9000

9000 -

10000

10000

- 1100

01100

0 - 12

000120

00 - 1

30001

3000 -

14000

14200

(blank)

Grand

Total

Americ

an Bu

reau o

f Ship

ping

58160

7650

7659

740

298

4567

Biro K

lass In

donesi

a50

22

54Bu

lgarsk

i Kora

ben Re

gistar

33

Burea

u Verit

as62

8737

1818

278

134

15289

China

Class

Socie

ty104

4210

916

135

5204

China

Corp

Regis

ter11

171

710

349

Det N

orske

Verita

s20

3350

2061

181

2205

Germ

anisch

er Llo

yd555

749443

179164

10863

1678

401

316

81

2424

Hellen

ic Regi

ster

22

Indian

Regis

ter2

2Ko

rea Cl

ass So

ciety

21

3Llo

yds Re

gister

9385

9174

13722

557

2414

157

624Nip

pon Ka

iji116

18780

3856

3747

718

586Re

gistro

talian

o6

617

534

Rinave

Portu

gesa

11

Russi

an Re

gister

235

28So

uth Ko

rean R

egiste

r71

3612

2311

1110

174Tu

rk Loyd

u2

2Vie

tname

se Re

gister

33

(blank)

11846

2612

6111

2324

441

321

21420

Grand

Total

1302

1456

843412

622309

21463

19176

2018

6540

142

5674

Page 40: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

32

- ANALYSISSECTION 2 2.1 AIM

The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents occurring in the future.

2.2 SIMILAR ACCIDENTSThe only other recorded catastrophic failure of a container ship hull structure occurred in 1997. MSC Carla broke in half in the North Atlantic with 1600 containers on board. Although her forward section sank, her aft section was recovered. Inspection of the aft section indicated that the hull fracture had followed a welded seam joining a new section of hull which had been inserted after build to increase the vessel’s length.

2.3 STRUCTURAL ANALYSESThe load and strength assessment conducted by DNV (Annex D) investigated the ultimate structural hull capacity using non-linear finite element modelling. The level of modelling undertaken was considerably more advanced than that typically performed during the structural design process, and was necessary to accurately represent the collapse of the hull.

In view of the findings of the material tests (paragraph 1.7.2 and Annex C), the assessment’s use of as-built scantlings is considered to be valid. Its inclusion of small geometrical imperfections in the hull shell and tank top areas corresponding to normal fabrication and tolerance levels is also considered appropriate in order to accurately model the onset of collapse. Without these imperfections, the model would reflect an ideal structure with a capacity in excess of what would practically have been achievable.

The ultimate strength analysis undertaken by BV also used FE modelling, albeit on a smaller scale, but included some local detail not taken into account in the DNV model, which conversely included scattered geometrical imperfections not used in the BV model. Consequently, although the DNV and BV models simulated the path of the failure of the hull structure in way of frames 82 and 88 using similar, but not identical, wave loading parameters, the total load and capacity ranges of the two analyses differed to some extent (Figure 26).

The DNV model indicates there was no margin between the maximum vertical bending moments experienced at the time of the failure and the design capacity of the hull structure. The BV analysis indicates the margin between the two values was about 430MNm. However, this margin was removed when whipping effect was taken into account.

To determine the factors which contributed to the failure of the hull structure, it is necessary to examine and compare the loads experienced at the time, to the maximum loads allowed for in the vessel’s design and the ultimate capacity of the vessel.

Page 41: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

33

2.4 LOADING 2.4.1 General

The loads acting on the hull of MSC Napoli at the time of the failure can be classified according to how they vary with time: static, slowly varying and rapidly varying. The static (or essentially static) loads were the ‘still water’ loads due to the weight of the hull, cargo and consumables, and the buoyancy. Slow varying loads included wave pressure loads on the hull due to the combination of wave encounter and resulting ship motion. Rapid varying loads can occur as a result of slamming, where the hull impacts severely with the water’s surface.

2.4.2 Static loading conditionThe still water loading condition applicable at the time of the hull failure produced a hogging bending moment at the engine room bulkhead (frame 88) of 2243MNm. This was 98.9% of the vessel’s seagoing limit (Figure 12). Shear forces and torsional moments were also within acceptable limits.

Although the discrepancies in the weight and distribution of the containers (paragraph 1.11) would have adversely affected the vessel’s still water bending moment, particularly if the additional weight was concentrated towards the vessel’s bow and stern, there were insufficient dry containers to establish the likely deviation in still water bending moment with any confidence. However, the additional weight carried probably

Figure 26

Comparison of DNV and BV load and capacity assessments

2000 2500 3000 3500 4000 4500 5000 5500 6000

Load 3400 - 4300

Capacity 4200 - 4950

Load 3650 - 4170

Capacity 4600 - 4700

DN

VB

V

MNm

Page 42: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

34

equated to the vessel’s deadload, and the resulting deviation to the still water bending moment would have been extremely small in comparison to the potential variability of the wave loading. Therefore, the effect of the discrepancies alone would have been insufficient to cause hull failure. Nevertheless, they would have contributed to the reduction of the safety margin available.

2.4.3 Wave loadingAssessing the sea conditions at the time of the accident is subject to considerable uncertainty. As part of its load and strength assessment, DNV consulted a variety of sources to identify the range of possible sea conditions experienced by the vessel on 18 January 2007. The parameters used to model the wave loading such as the significant wave heights, wave spectra, wave lengths and water depth were selected to replicate the actual conditions experienced. These parameters have been reviewed separately by BMT SeaTech, which has concluded they are the most accurate possible in the absence of definitive information on the actual conditions.

A comparison of the “high” and “low” wave loading cases used by DNV, the load range calculated by BV, the wave bending moments at frame 88 calculated in accordance with the BV rules applicable at the time of build (10-8 probability level), and the current IACS UR S11 requirement is shown at Figure 27. Although this comparison is simplistic and the results cannot be considered in isolation, it does indicate that the ‘’high” DNV case and the upper end of the BV range were very close to the design bending moment required by the society’s rule and the current IACS requirement. However, although the vertical wave bending moment acting on the hull at the time of the accident was potentially very high, it was unlikely to have appreciably exceeded either of the design values. Therefore, the waves encountered were within the bounds of normal wave theory; they were not freak waves.

Figure 27

Comparison of wave bending moments

Case 2 “Low”

Case 1 “High”

Extreme value distribution

Vertical bending moment (MNm)

Pro

babi

lity

Den

sity

Fun

ctio

n

1000 2000 3000 4000 5000 600000

0.5

1.5

2.5

3.5

1

2

3

x 10-3

BV ‘87 RuleIACS UR S11 RuleBV Analysis

DNV 90% Confidence Interval

Page 43: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

35

2.4.4 Slamming and hull whippingIt is likely that the hull of MSC Napoli was subjected to additional load due to whipping. First, the vessel impacted with several large waves immediately before the failure of her hull. Second, she was built with moderately large bow and stern flare angles. Finally, empirical data indicates that whipping effect can typically increase wave bending moments on container ships from between 10% and 50%. Any increase in the wave bending moment above the normal design level would inevitably erode the margin between loading and hull strength.

However, from the different results obtained from the 2D analyses conducted by BV, which calculated a 30% increase in wave loading, and by Southampton University, which concluded that the increase in wave loading was not significant, it is apparent that whipping effect is currently very difficult to reliably calculate or model. Classification societies are therefore unable to predict its magnitude or effect on a ship’s structure, with any confidence, and as a consequence they are not generally calculated during the structural design process.

In view of the potential increase in wave loading due to whipping effect, further research is required by classification societies to ensure that the effect is adequately accounted for in ship design and structural analyses, and that sufficient allowance is made for the effect when determining design margins.

2.5 VESSEL CAPACITY (STRENGTH)2.5.1 Keel section modulus18 distribution

As detailed in paragraph 1.6.2 the structural framing of MSC Napoli changed significantly between the cargo hold section and the engine room. This, and other factors such as the reduction in depth of the hatch coaming and the discontinuation of the wing tanks, combined to reduce the strength of the hull in this region. This reduction in strength is demonstrated by the longitudinal distribution of the keel section modulus in Figure 28. It is recognised that this figure is simplistic in that it does not accurately represent the continuity of the longitudinal structural members along the vessel’s entire length. However, it is considered to be accurate within the region between the area of failure and amidships.

2.5.2 Buckling strength requirementAt the time MSC Napoli was built, her fine lines and resulting low block coefficient required her engine room to be further forward than most of the other ships being built at that time. However, because it was outside of the 0.4L amidships area, the applicable classification society rules did not require the buckling strength of the hull in this area to be checked. As a result, no calculations were made by either the ship builder or BV.

18 Section modulus is a measure of the relative strength (and resistance to bending) of a structural element, dependent on its cross sectional shape, thickness and orientation). In simple terms, it indicates the bending strength of a ship’s hull.

Page 44: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

36

For a ship structure that maintains the same structural configuration over the majority of its length, the requirement to vary scantlings gradually from the amidships region to the end regions will give a gradual reduction in buckling strength outside the amidships region. This reduction in strength complements the usual reduction in global bending loads outside the amidships region. However, this assumption was not valid on MSC Napoli where there was a change in structural configuration from longitudinal framing amidships to transverse framing in the engine room where the hull stresses were almost as great as at her amidships region. The transverse framing in the engine room of MSC Napoli was an inherently weak structure under compressive loading.

2.5.3 Buckling strength assessmentThe DNV assessment identified the mode of failure on the hull structure of MSC Napoli as a localised plate buckling. The failure mechanism started as elastic buckling of the hull shell plating in the bilge area in way of frames 82 to 88, which progressed into the bottom, double bottom and up into the ship’s side. This path is consistent with the damage observed during inspection of the vessel’s forward section in Belfast (Figure 16).

Figure 28

Keel section modulus

Sec

tion

Mod

ulus

(m3 )

x/L

Page 45: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

37

To assess the buckling strength of the hull in the engine room, BMT SeaTech used the formulas specified in the 1987 BV rules (Part II, Chapter 3, Section 3-7), and also the current IACS Unified Requirement S11 (rev.5). It is acknowledged that the BV buckling criteria applied only to the amidships region and were intended for regular flat panels and not for complex box and curved structure, which are inherently more resistant to buckling, such as between frames 80 and 85. The UR S11 requirements for the assessment of buckling strength apply only to plate panels and longitudinals subject to hull girder stresses in the 0.4L amidships region. UR S11 was not applicable at the time of the MSC Napoli’s design and construction.

The buckling strength calculations undertaken by BMT SeaTech (Annex G) are summarised in Table 3. The results are presented in terms of ‘utilisation’, which indicates how much of the panels’ buckling capacity has been used To meet the buckling criteria, the utilisation should be less than 1.

Similar results were obtained for the two sets of rules. A number of panels in the tank top, bottom and lower side structure in the region of frame 82 were found to be deficient (Figure 29). Other panels, although passing the buckling checks, were close to the buckling criteria. Consequently, it is likely that when the vessel’s hull girder strength was reduced due to the buckling of the weaker panels, the remaining structure had insufficient margin to withstand the increased load. This failure mechanism is consistent with the failure mechanism identified in the FE analyses.

Summary of buckling strength checks conducted by BMT SeaTech

MS N po i Struct al F r I v s i

Utilisation

Item BV Rules(1987)

IACS

URS11

Bottom Shell – between CL girder and girder 1210 off CL 1.1 1.0

Bottom Shell – between girders 1210 and 2605 off CL 0.8 0.8

Bottom Shell – between girders 2605 and 6050 off CL 1.4 1.2

Bottom Shell – between girder 6050 off CL and tank top 1.5 1.3

Side Shell – between tank top and bhd 11270 off CL 1.2 1.0

Tank Top – between CL girder and girder 1210 off CL 1.3 1.1

Tank Top – between girders 1210 and 2605 off CL 0.9 0.9

Tank Top – between girders 2605 and 6050 off CL 1.7 1.5

Tank Top – between girders 6050 off CL and side shell 1.1 1.0

Table 3

Page 46: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

38

2.5.4 Hull construction and condition2.5.4.1 Materials

The strength of the hull of MSC Napoli at the time of its failure would have been dependent on whether the hull was constructed in accordance with the design drawings and any deterioration over the lifetime of the ship. The material tests conducted on the 18 samples removed from the fracture path identified a number of minor deficiencies, which are not considered to have adversely affected the strength of the hull.

In particular, the centreline girder was made of mild steel (A) rather than high tensile steel (AH32) and its yield strength was therefore inadequate. However, as its ultimate tensile strength met the requirements of AH32, it is considered that its use would not lead to a significant reduction in the ultimate collapse moment of the hull girder.

A number of weld sizes were also marginally under size and a number of fractures through fillet welds were evident. However, structural analysis of the hull indicates that the longitudinal girders had a higher buckling strength relative to the tank top and shell plates. Therefore, it is highly probable that the girders failed as a result of being placed under additional load following the initial buckling of bottom and tank top plating, irrespective of their continuity and weld sizes. Consequently, the presence of fractures through the fillet welds at sites of discontinuous longitudinal girders is not surprising.

2.5.4.2 Weld repairsIn its conclusions, the Test House stated “The apparent widespread evidence of local repair welding, some of which was clearly and demonstrably post build, would suggest that there had been earlier local structural integrity problems and issues in respect of fillet weld integrity in particular.” [sic]

Figure 29

Frame 82

Page 47: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

39

Fatigue cracking and welding repairs are not unusual in a vessel of MSC Napoli’s age, and the repair of fatigue cracks and welds by on board fitters or riding gangs is a common practice. However, given the location of the sample removed from the starboard sea chest, this repair could only have been undertaken with the provision of an external cofferdam or when the vessel was in a dry dock. No record exists to indicate when these repairs were undertaken, and they were not reported to either of the vessel’s classification societies.

Although it is a requirement to report structural damage including fatigue cracks to classification societies, it is possible that this requirement is not fully understood. It is also possible that, due to the incidence of fatigue cracking, and hence the need for weld repairs on board container ships, it is occasionally overlooked. Such reporting affords the opportunity for underlying problems to be investigated, and for permanent remedial action to be taken. In this instance, the fatigue cracking and weld re-positioning identified after the vessel entered service was possibly indicative of a local design issue but did not contribute to the vessel’s structural failure. However, a failure to report structural damage could result in an opportunity missed for a design problem to be investigated and permanently rectified.

2.5.4.3 Previous accidentsThere is no evidence to indicate that the strength of the hull structure in way of the engine room had been reduced as a result of the damage sustained by MSC Napoli in previous accidents, particularly the vessel’s grounding in 2001 (paragraph 1.7.4).

2.6 IACS – UNIFIED REqUIREMENTSIt has been identified that the hull structure of MSC Napoli failed due to a lack of buckling strength in the engine room region. At the time of build, no buckling checks were required by the applicable rules, and none were made. However, as the current requirements specified in UR S11 leaves buckling checks outside the 0.4L amidships region to the discretion of individual classification societies, there is a possibility that even if MSC Napoli had been built after 1992, the lack of buckling strength in way of her engine room would still not have been identified. Importantly, it is highly probable that there are a number of other container ships of a similar design to MSC Napoli which are also vulnerable to localised buckling in severe conditions. It is essential that such designs are quickly identified and remedial action is taken where necessary.

It is apparent that UR S11 has lagged behind the development of container ship design and operation and requires immediate revision. The failure to the hull of MSC Napoli highlights that buckling strength checks must be based on global hull stresses along the entire length of the hull, and not limited to the 0.4L amidships, or left to the discretion of individual societies. The use of common methodologies in this respect would also provide greater assurance that the strength of all new build container ships is being adequately addressed.

The load and capacity assessments conducted by DNV and BV (Figure 26) show that, in the case of MSC Napoli, the design margin of safety was either insufficient when whipping is taken into account (BV), or non-existent (DNV). The analyses are supported by the fact that the vessel broke her back when within her seagoing limitations and, although the conditions were severe and had a low probability of occurrence, they were nevertheless equivalent to the current UR S11 design value.

Page 48: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

40

Although it is implicit in UR S11 that the design of a ship ensures that her ultimate strength is in excess of the maximum loads expected, the scope of the excess or safety margin is not defined. In practice, it is generally based upon a classification society’s experience, and does not explicitly take into account factors which increase bending moments such as whipping, or other variables such as inaccuracies in container weights and distribution. Given the importance of the design safety margin in ensuring an acceptable level of safety, a more methodical and objective approach is warranted.

2.7 IMMEDIATE ACTION TAKEN TO IDENTIFY SHIPS VULNERABLE TO LOCALISED BUCKLINGFollowing its structural analysis of the hull failure of MSC Napoli, DNV, at the request of the MAIB and in co-operation with LR developed a two-stage methodology to identify other container ships which were potentially vulnerable to localised buckling in severe conditions.

As soon as a methodology had been determined, the Chief Inspector of Marine Accidents wrote to the Chief Executives of the IACS member societies and the China Corporation Register to inform them of the circumstances of the hull failure of MSC Napoli, and his concern that other container ships might also be vulnerable to localised buckling in severe conditions. Societies were advised of the methodology developed by DNV and LR to identify such vessels, and were requested that each society use the methodology (or similar) to screen its vessels, focussing on vessels of 2500 TEU and greater, with two or more cargo bays aft of their accommodation/engine room.

As a result of the screening process, which involved over 1500 container ships, at the time of the publication of this report: 12 vessels were identified as potentially having insufficient buckling strength in severe conditions and requiring remedial action; a further 10 vessels were identified as being borderline and require more detailed investigation; and the screening of 8 container ships was still in progress.

2.8 VESSEL OPERATION2.8.1 Speed and heading in heavy weather

Despite the progressively worsening weather conditions during the morning of 18 January, with the ship ‘pounding heavily’ into the sea, the vessel’s course and speed were considered at the time to be appropriate and in keeping with the ship manager’s instructions. Engine speed had been reduced overnight from 82rpm to 71rpm, but this had been prompted by difficulty in controlling the main engine, rather than the risk of damage to the forward part of the vessel or her containers. The DNV load and strength assessment of MSC Napoli found that variations in the speed of the vessel in the modelled sea conditions significantly changed the vertical wave bending moment experienced. Its analysis determined that a variation of 5kts on the vessel’s average speed changed the wave load by approximately 10% (lower speeds giving lower bending moments). Similarly, variations in the ship’s speed would have had a significant effect on the occurrence and magnitude of slamming and whipping, with higher loads at higher speeds. Therefore, it is almost certain that a reduction of speed would have significantly reduced the risk of hull failure.

As MSC Napoli was making good 11kts over the ground when the structural failure of her hull occurred, there was ample scope to reduce speed further and still maintain steerage.

Page 49: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

41

The DNV study indicated that changes to the ship’s heading relative to the waves between 0º and 15º had negligible effect on the vertical bending moment. While in larger alterations away from the sea, torsional effects might become more pronounced, adjustment of course is nevertheless an important tool in reducing stresses in heavy weather.

A number of accidents to large tankers and bulk carriers some years ago, resulted from structural failure. These prompted the use of hull stress monitoring equipment on such vessels to determine the hull stresses experienced and to assist the masters of these vessel types to identify when such stresses reached a given threshold. Such monitoring also ultimately led to significant changes to the design of bulk carriers and tankers.

The container industry has utilised guidance systems to reduce the prevalence of bow damage and container loss due to heavy weather. However, given the importance of speed with regard to wave loading and whipping effect and the failure of the hull of MSC Napoli, it is evident that the absence of damage to a vessel’s bow or containers is not always an accurate indicator of the appropriateness of a vessel’s speed. Consequently, research into the potential benefits of hull stress monitoring and/or vessel motion sensing should be considered.

2.8.2 Operation of the main engine without a governorAn electronic main engine governor facilitates the direct control of an engine from the bridge or the engine control room. It also prevents a main engine from over-speeding and tripping when the propeller emerges from the sea in heavy weather. Both of these functions are important factors in a vessel’s safe operation and, given the weather and sea conditions forecast in the English Channel, the decision to sail from Antwerp without an operational governor was questionable.

The chief engineer and technical superintendent were aware that control of the engine was only possible from the engine’s side. The control of the engine from this position is an emergency mode; the expectation that watch officers would maintain this mode of operation continuously, standing next to the main engine for the entire passage to Sines, in the expected sea conditions was unrealistic.

The ship manager was obliged to inform the vessel’s classification society, DNV, of failures to critical machinery on board its vessel. In this case, it is debatable whether or not the main engine governor was critical to the safe operation of the vessel. However, had the ship manager erred on the side of caution, and at least discussed the status of the defect with the classification society, this might have allowed a more informed consideration of its consequences when deciding if the vessel was in a fit material state to sail from Antwerp.

Given the potentially adverse effect on the vessel’s manoeuvrability in restricted waters, the pilot should have been informed of the governor situation.

2.8.3 Departure and arrival hull loading conditionsIn Antwerp, MSC Napoli’s trim was adjusted to allow the vessel to sail from her berth at any state of the tide. To achieve this, the vessel was ballasted to produce a maximum draught aft of 13 metres. However, this meant that, in her departure condition, the

Page 50: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

42

vessel’s seagoing maximum bending moments were exceeded. The draught of the vessel had been similarly adjusted at Felixstowe, again resulting in her exceeding her seagoing maxima for bending moments. On both occasions, MSC Napoli was within the maxima for harbour bending moments and, after clearing the locks at Antwerp, the vessel was reballasted during the transit of the River Schelde to bring her bending moments to within the maximum seagoing limit.

It is recognised that the harbour bending moment maxima is often applied in sheltered or enclosed waters. However, the practice of routinely sailing from berths on stresses in excess of the seagoing maxima was potentially detrimental to the safety of the vessel. First, altering the draught of MSC Napoli when navigating in restricted waters, was inherently dangerous, particularly as the pilot was not kept informed. Second, conducting ballasting operations during periods of standby could have been distracting, and slack ballast tanks could have adversely affected vessel stability. Finally, the overstressed condition of the vessel could have made the consequences of an accident, particularly grounding, considerably worse.

Data from the ship’s onboard loading computer, experience from other investigations to container ships, and anecdotal evidence from other ships’ crews indicate that the practice of arriving and departing from berths with ship stresses in excess of permissible seagoing maxima is commonplace within the container ship industry. It is known that some vessels remain above the maximum seagoing limit when in open water, particularly when the distance between terminals is short.

2.9 WEIGHT OF CONTAINERSThe audit of the containers removed from MSC Napoli and the deadload calculated on departure, indicate that the declared weights of many of the containers carried by the vessel were inaccurate. This discrepancy is widespread within the container ship industry and is due to many packers and shippers not having the facilities to weigh containers on their premises. It is also due to shippers deliberately under-declaring containers’ weights in order to: minimise import taxes calculated on cargo weight; allow the over-loading of containers; and to keep the declared weight within limits imposed by road or rail transportation.

In view of the fact that container ships invariably sail very close to the permissible seagoing maximum bending moments, the additional undeclared weight has the potential to cause vessels to exceed these maxima. Container shipping is the only sector of the industry in which the weight of a cargo is not known. If the stresses acting on container ships are to be accurately controlled, it is essential that containers are weighed before embarkation.

2.10 CONTAINER SHIP INDUSTRY 2.10.1 Environment and culture

Container ships are a key link within the worldwide transportation system, and their numbers and size have increased rapidly over the last 40 years. Without the ability to quickly ship large quantities of containers across the oceans, containerisation would generally be constrained within the continents. However, the commercial advantages of containerisation and intermodalism such as speed and quick turnarounds appear

Page 51: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

43

to have become the focus of the industry at the expense of the safe operation of its vessels. The industry is very schedule driven, and operators inevitably have an eye on the timetable when making key decisions.

In this case, the decisions to: sail without an operational governor; sail in excess of the maximum permissible seagoing bending moments in order to allow greater flexibility for the time of departure; to operate at near maximum bending moments when underway; and to keep the ship’s speed as fast as possible when pounding into heavy seas, were symptomatic of the industry’s ethos to carry as much as possible as quickly as possible. However, although these decisions were undoubtedly made in the belief that the ship was operating within acceptable limits, this investigation has shown that unknown variables such as whipping effect and container weights are able to erode or eliminate the safety margins in place.

No ship is unbreakable. Classification societies apply structural strength limitations which are contingent on the application of good seamanship and prudent operational practice. It has been apparent during the course of this investigation that these caveats are not widely recognised by many in the container ship industry. Unlike other large vessels such as bulk carriers, which can frequently disregard the effect of the sea, due to their lines and limited engine power, container ships cannot. It is essential that companies recognise this difference and put in place controls and procedures to ensure that container ships operate within safe limits at all times.

2.10.2 Industry code of best practiceIn its report on the investigation of the collapse of cargo containers on Annabella, which was published in September 2007, the MAIB noted:

Unlike in other sectors of the international shipping industry, there is currently no dedicated trade organisation which routinely provides guidance on best practice for the container industry. Working practices relating to the planning, loading, transportation and discharge of containers are largely unregulated and have been understandably focussed on the need to maximise efficiency and speed of operation. While key industry players will attest that safety is of paramount concern, evidence obtained during this and other MAIB investigations into container shipping accidents suggests that in reality, the safety of ships, crews and the environment is being compromised by the overriding desire to maintain established schedules or optimise port turn round times.

The report identified that there was a clear need for an Industry Code of best practice. As a result, the following recommendation was made to the International Chamber of Shipping (ICS):Work with industry to develop, then promote adherence to, a best practice safety code to ensure that (inter alia):

Effective communications and procedures exist between all parties involved in the • planning and delivery of containers to ensure ship’s staff have the resources and the opportunity to safely oversee the loading and securing of cargo.Cargo securing manuals are comprehensive and in a format which provides ready • and easy access to all relevant cargo loading and securing information.

Page 52: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

44

Loading computer programmes incorporate the full requirements of a vessel’s cargo • securing manual. Such computers should be properly approved to ensure that officers can place full reliance on the information provided.The availability or otherwise of a reliable, approved, loading computer programme is • a factor to be included in determining an appropriate level of manning for vessels on intensive schedules. The resultant increase in acceleration forces and consequent reduction in allowable • stack weights when a vessel’s GM is increased above the value quoted in the cargo securing manual is clearly understood by vessels’ officers. The consequential effect on container stack weight, height and lashing arrangement for changes in the vessel’s GM should be readily available and clearly displayed to ships’ staff.Those involved in container operations are aware that containers with allowable • stack weights below the ISO standard are in regular use and must be clearly identified at both the planning and loading stages to avoid the possibility of such containers being crushed.With respect to cargo planning operations:• - cargo planners have appropriate marine experience or undergo training to

ensure ship safety considerations are fully recognised,- cargo planning software provided is able to recognise and alert planners to the

consequences of variable data e.g. GM, non standard container specifications,- lessons learned from problems identified during container planning operations

are formally reviewed and appropriate corrective measures put in place,- ships’ staff are provided with sufficient time to verify/approve proposed cargo

plans.

2.11 ABANDONMENTThe abandonment of a vessel in any conditions is problematic. Therefore, the abandonment and successful recovery of the 26 crew from MSC Napoli, in the severe conditions experienced, is praiseworthy. By the time the master arrived at the lifeboat embarkation position, the crew were on board and wearing immersion suits and lifejackets, the engine was running, extra water had been stowed on board, and VHF radios, SARTs and the EPIRB were ready for use. Despite the vessel rolling heavily, the enclosed lifeboat was lowered without incident and then manoeuvred clear of the stricken vessel. Although there were a number of practical issues that should be noted, this successful abandonment clearly demonstrates the importance and value of regular maintenance and drills.

Page 53: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

45

– CONCLUSIONS SECTION 3

3.1 SAFETY ISSUES CONTRIBUTING TO THE ACCIDENT WHICH HAVE RESULTED IN RECOMMENDATIONS

The effect of the discrepancies in the declared weights of the containers would 1. not have been sufficient to cause hull failure, but it would have contributed to the reduction of the safety margin between the total bending moment experienced and the strength of the hull. [2.4.2]

Although it is likely that the wave loading experienced by 2. MSC Napoli was increased by whipping effect, classification societies are unable to predict its magnitude or effect on a ship’s structure with any confidence. [2.4.4]

In view of the potential increase in wave loading due to whipping effect, further 3. research is required within the industry to ensure that the effect is adequately covered by ship design and structural analyses, and that sufficient allowance is made for the effect when determining a design margin. [2.4.4]

As the area of the hull which failed was outside of the 0.4L amidships area, the 4. applicable classification society rules did not require the buckling strength of the hull in this area to be checked. Therefore the buckling strength of the hull in way of the engine room was not calculated by either the ship builder or BV. [2.5.2]

The transverse framing in the engine room of 5. MSC Napoli was an inherently weak structure when under compressive loading. [2.5.3]

It is apparent that UR S11 has lagged behind the development of container ship 6. design and operation, and requires immediate revision. Buckling checks must be based on global hull stresses along the entire length of the hull and not left to the discretion of individual societies. The use of common methodologies in this respect would provide greater assurance that the strength of all new build container ships is being adequately addressed. [2.6]

In view of the importance of the design safety margin in ensuring an acceptable 7. level of safety, a more objective approach is warranted. [2.6]

Given the importance of speed with regard to wave loading and whipping 8. effect, research into the provision of hull stress monitoring and/or vessel motion sensing on container ships should be considered. [2.8.1]

Although the vessel’s speed was considered to be appropriate in the conditions 9. experienced, it is almost certain that a reduction of speed would have significantly reduced the risk of hull failure. [2.8.1]

The stresses acting upon a container ships hull cannot be accurately controlled 10. unless containers are weighed before embarkation. [2.9]

Page 54: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

46

3.2 OTHER SAFETY ISSUES IDENTIFIED DURING THE INVESTIGATION ALSO LEADING TO RECOMMENDATIONS

It is possible that the requirement to report structural damage, including fatigue 11. cracking and weld repairs on main structural members, to classification societies is either not fully understood or is occasionally overlooked. [2.5.4.2]

Although it is debatable whether or not the defect to the main engine governor 12. was critical to the safe operation of the vessel, had the ship manager discussed the status of the defect with the classification society, this might have allowed a more informed consideration of its consequences when deciding if the vessel was in a fit material state to sail from Antwerp. [2.8.2]

Despite the potentially adverse effect on the manoeuvrability of the vessel in 13. restricted waters, the pilot was not informed of the defect to the main engine governor. [2.8.2]

The practice of arriving and departing from berths, in a loaded condition that was 14. in excess of permissible seagoing maxima, was potentially detrimental to safety but is commonplace within the container ship industry. [2.8.3]

3.3 SAFETY ISSUES IDENTIFIED DURING THE INVESTIGATION WHICH HAVE NOT RESULTED IN RECOMMENDATIONS BUT HAVE BEEN ADDRESSED

As a result of the screening of over 1500 container ships by their respective 15. classification societies, 12 vessels were identified as being potentially vulnerable to localised buckling in severe conditions and requiring remedial action. [2.7]

The commercial advantages of containerisation and intermodalism such as 16. speed and quick turnarounds appear to have become the focus of the industry at the expense of the safe operation of its vessel. [2.10]

Page 55: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

47

- ACTION TAKENSECTION 4 4.1 CLASSIFICATION SOCIETIES

The classification societies of the 12 container ships identified as being potentially vulnerable to localised buckling and requiring remedial action are, in consultation with the vessels’ owners, in the process of determining permanent technical solutions. Further investigation of the 10 ships requiring more detailed examination and the screening of the remaining 8 ships is ongoing. Where necessary the immediate safety of the ships identified as being at risk or requiring more detailed investigation will be ensured by the imposition of operational limitations until technical solutions can be undertaken. The Chief Inspector has written to the Chief Executive of one classification society which has not yet completed its screening process strongly advising that similar action be considered should any of its vessels be found to require permanent remedial action.

4.2 INTERNATIONAL CHAMBER OF SHIPPINGFollowing the MAIB recommendation 2007/176 made in its report on the investigation of the collapse of the cargo containers on Annabella (Report No 21/2007), the Chamber has convened a group of container ship industry experts and, with the assistance of the World Shipping Council, has started work to develop and publish a code of best practice for the industry. The code is expected to be completed by the end of 2008, after which it will be presented to IMO for adoption.

4.3 MARITIME AND COASTGUARD AGENCYIn May 2007, the MCA tabled a paper at the Paris MOU Port State Control Committee on the subject of operational checks and the human factor in loading of ships and whether adequate checks were being carried out prior to sailing. The paper highlighted the loading of tankers and compliance with damage stability criteria. Also, as a late addition because of the structural failure to MSC Napoli, and anticipating concerns regarding container ships, the paper also mentioned carrying out container weight and ship longitudinal strength checks on such vessels. The UK will lead a task force to consider these checks for a concentrated inspection campaign planned for 2010, taking into account the findings of this report.

Page 56: Napoli Report No 9/2008 - Maritime Safety Innovation Lab

48

– RECOMMENDATIONSSECTION 5 The International Association of Classification Societies is recommended to:2008/128 Review the contents of UR S11 (Longitudinal Strength Standard) to ensure:

Hull girder strength and buckling checks are carried out on all critical •sections along the entire length of the hull.An evaluation of the suitability of current UR S11 design wave bending •moment criteria for vessels with low block coefficient is undertaken.Member societies use common methodologies when complying with the •requirements of this rule.

2008/129 Consolidate the results of current research undertaken by its member societies into the effect of whipping on hull structures and to incorporate these results into future revisions of its unified requirements.

2008/130 Research and review the technological aids available which would assist masters to measure hull stresses in port and at sea.

The International Chamber of Shipping is recommended to:2008/131 When developing a Code of Best Practice for the container industry (MAIB

recommendation 2007/176 refers):Engage with IACS on the incorporation of issues within the Code which are •of mutual interest, e.g. the need to adhere to operational limits on hull stress as set by the relevant classification society and the need for the objective assessment and reporting of fatigue cracking.Ensure the Code addresses the following:•

- the need to establish the actual weight of containers before being loaded onto a vessel.

- the importance of safe speed and prudent seamanship when navigating in conditions of heavy weather.

Zodiac Maritime Agencies Ltd is recommended to:2008/132 Review its safety management system and auditing procedures to ensure:

Guidance and instructions to masters regarding speed in heavy weather take •into account the lessons learned from this accident.Its shore management consults with the relevant classification societies •when there is any doubt regarding the criticality of machinery items on board its vessels, which are defective or unserviceable.Its masters are fully aware of the requirement to inform embarked pilots of all •factors affecting manoeuvrability and stability.

Marine Accident Investigation BranchApril 2008

Safety recommendations shall in no case create a presumption of blame or liability