17

NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration
Page 2: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

NamPower

The national power utility of Namibia:

It’s core business is generation,transmission & energy trading

Is at the centre of socio-economicdevelopment of Namibia

Main objectives are to ensure availability,affordability and accessibility of electricity

Page 3: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

SAP Fiori

New SAPuser experience

Page 4: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Why SAP Fiori

Improve time taken to:

Release purchase requisitions

Approve travel expenses

Approve travel request

Approve timesheets

Approve leave request

Page 5: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

SAP Fiori Project overview

Week project

SAP RDSfor Fiori

Page 6: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

SAP Fiori Project overview

Apps configured

SAP RDSfor Fiori

Page 7: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

SAP Fiori Project overview

Tier configuration

SAP RDSfor Fiori

Page 8: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

SAP Fiori RDS

Benefits:

Low cost of implementation

Fastest and most predictableway to get started

Pre-packaged, instant-value apps

Choice to deploy one or manySAP Fiori apps

Page 9: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Project duration

48Hours

To install enhancement pack

Page 10: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Project duration

2Hours

Integration & configuration

Page 11: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Technical specifications

SAP NetWeaver Gateway System

SAP NetWeaver 7.3Enhancement Pack 1

Support PackageLevel 9

OracleDatabase

16GBRAM

Windows Server2008 R2 64Blt

Page 12: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Technical specifications continue

SAP ECC (ERP Backend System)

SAP NetWeaver 7.2Enhancement Pack 5

Support PackageLevel 9

Oracle Database HP-UX 11.31

Page 13: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Technical specifications continue

Installed software components

SAP GWGW CORE 2.0

IWBEP 2.0UI2

SAPUI5

Create SAP roles

SAP ERPIWBEP 2.0

GBHCM003 (Leave)SRA008 (Travel Exp)GBAPP (Requisition)

SRA009 (Travel Req App)SRA10(Timesheet App)

Trusted RFC

Page 14: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Project success

Why did this project take so little time and the successthereof?• NamPower SAP implementations are mostly standard

and according to best practices• Where there was a need for change, we have reverted

our business back to suit the standard• NamPower keeps its SAP implementation in line with the

latest SAP releases

Page 15: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Interviews

Mr. O’Brien Hekandjo- Chief Officer, Technical Services“SAP Fiori is a great innovation from SAP, it allows me to do my releases and approvalsfrom anywhere using my iPad, thus improving productivity and business processes.”

Mr. Nico Hough- Chief System Administrator, IT“I move around a lot, and to approve things like leave and trips was always a hassle as itrequired me to logon to my notebook, Now with SAP Fiori I can do my approvals fromanywhere, very quickly, and it is user friendly.”

Page 16: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Interviews

Mr. Reiner - Jagau Chief Officer, Power Systems Development“Better use of available time by being able to release/approve workflows whenever sparetime is available i.e. before and after meetings; It is no longer required to access thecomputer when in office to release/approve workflows – so available time can be betterspent on other pending work; Process to execute work has been greatly enhanced andpeople implementing projects, S&T approvals and/or awaiting any other approvals are nolonger frustrated due to non-availability of senior personnel.”

Mr. David Magongo – Senior Manager, Transmission“It has always been a challenge to execute some tasks while away in the field as corporatenetwork is required. I still remember those days when I used to drive to the office just toapprove leave or do releases. With SAP Fiori, I can do the approvals and releases evenwhen I am out of office as long as my iPhone is with me. Most of the Engineering Servicessupervisors have also shared their sentiments about SAP Fiori - that it really lightened theirburdens.”

Page 17: NamPower The national power utility of Namibia · NamPower The national power utility of Namibia: It’s core business is generation, ... To install enhancement pack. Project duration

Questions