Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
Supply 1
PROCUREMENT OF CHEMICAL BONDED
CASTABLE REFRACTORY FOR UNIT NO 2 AOH AT
KHAPERKHEDA TPS
4500058168 KAILASH TRADERS 1997257.50 No 5
Supply 2SUPPLY OF AIR PORT ASSEMBLY FOR XRP 883
COAL MILL OF UNIT NO 3 &4, KHAPERKHEDA TPS4500057858 AIA ENGINEERING LTD 1530000.00 No 3
Supply 3
SUPPLY OF THERMOCOUPLES & RTDS ALONG
WITH THERMOWELL FOR 210 MW KHAPERKHEDA
TPS
4500057881ELECTROPNEUMATIC
ENGINEERS300615.00 No 3
Supply 4
SUPPLY OF MATERIAL REQUIRED FOR WORK OF
INSTALLATION, COMMISSIONING AND TESTING OF
BUNKER COAL 3D LEVEL MEASUREMENT SYSTEM
AT BUNKERS OF UNIT 5 AT CHP-II, 500MW
KHAPERKHEDA T.P.S.
4500057904
BULK MATERIAL
HANDLING
TECHNOLOGIES
3905402.93manufacture &
supply2
Supply 5
PROCUREMENT OF 75KW VFD ALONG WITH
PANEL FOR F.O. PUMP MOTOR AT OIL HANDLING
PLANT, 500MW KPKD.
4500058399PUNJAB MACHINE
TOOLS536384.10 no 5
Supply 6
PROCUREMENT OF M. S. GRILLS FOR COAL
BUNKERS FOR CHP-II, 500 MW UNIT,
KHAPERKHEDA TPS.
4500058306 R.S.INDUSTRIES 332808.00manufacture &
supply6
Supply 7
SUPPLY OF SPARES FOR LIQUID RING VACUUM
PUMPS OF NASH CL-2001 MAKE PUMPS
INSTALLED IN AHP-II,500 MW KHAPERKHEDA TPS.
4500058446VS SALES
CORPORATION1212199.80 No 2
Supply 8
PROCUREMENT OF IMPACT IDLERS FOR 1800 MM
BELT CONVEYOR & FLAT RETURN ROLLERS FOR
1200 M CON. SYSTEM FOR CHP-II, 500 MW UNIT,
KHAPERKHEDA
4500058817UMASAN
ENTERPRISES403032.00
manufacture &
supply5
Supply 9
SUPPLY OF DOME PLATE & TUBE SHEET WITH
PURGE AIR SYSTEM FOR BUFFER HOPPER OF
VACUUM BASED ESP ASH EVACUATION SYSTEM
AHP,500 MW KHAPERKHEDA TPS.
4500059070KLEENAIR SYSTEMS
PRIVATE LIMITED955385.55 No 2
Supply 10SUPPLY OF A4 SIZE XEROX PAPERS ON AS AND
WHEN REQUIRED BASIS.4500059125
GLOBE TRADING
COMPANY612360.00
manufacture or
supply2
Supply 11
SUPPLY & WORK FOR COLD AIR VELOCITY TEST
CAVT AT APH OUTLET TO ESP INLET DUCT,
INSTALLATION OF DIVERTER PLATES AND FABRIC
EXPANSION JOINT IN UNIT NO 4
AOHKHAPERKHEDA TPS
4500059347
FAVOURITE
FABRICATORS
PVT.LTD.
4382119.20 No 2
Supply 12
PROCUREMENT OF CHEMICAL BONDED
CASTABLE REFRACTORY FOR UNIT NO 4 AOH AT
KHAPERKHEDA TPS
4500059428 CASTWEL INDUSTRIES 976395.00 No 4
Supply 13 SUPPLY OF MS FASTENERS. 4500059605 ORION INDUSTRIES 616770.00manufacture or
supply4
Page 1 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
Supply 14SUPPLY OF CAUSTIC SODA LYE 100 % BASIS AT
WTP-I KHAPERKHEDA TPS4500059569
SVS CHEMICAL
CORPORATION1049999.83
manufacture or
supply2
Supply 15
SUPPLY AND APPLICATION OF FIRE CREATE
REFRACTORY AND ALLIED WORKS OF BAH FOR
UNIT NO UNIT 4 AOH AT KHAPERKHEDA TPS
4500059592 M S ENTERPRISES 3481860.00 No 2
Supply 16
PROCUREMENT OF BOILER FEED GATE, APH
ACCESS DOOR & ELIPTICAL DOOR AT UNIT NO 3 &
4, TPS KHAPERKHEDA
4500059643 HI-TECH MACHINERY 1012914.00 No 2
Supply 17PROCUREMENT OF SS 304 BAH SEAL PLATES FOR
UNIT NO 1 TO 4, KHAPERKHEDA TPS4500059712 C B INDUSTRIES 496440.00 No 5
Supply 18
PROCUREMENT OF BAH SEAL TROUGH OF
CARBON STEEL MATERIAL FOR UNIT NO 4 AOH,
TPS KHAPERKHEDA
4500059758TUSHAR ENGINEERING
WORKS321930.00
manufacture &
supply6
Supply 19
SUPPLY OF SPARES FOR BOTTOM ASH HOPPER
REFRACTORY COOLING SYSTEM AT AHP-II,500
MW KHAPERKHEDA TPS.
4500059914VIDARBHA
ENGINEERING WORKS1218105.00 No 5
Supply 20
SUPPLY OF MOISTURE TESTING REAGENTS FOR
KITTIWAKE MAKES OIL ANALYZER TO WTP-500MW
KHAPERKHEDA TPS.
4500060380 PRAVEEN TRADERS 508296.60manufacture or
supply2
Supply 21
ANNUAL SUPPLY CUM WORKS CONTRACT FOR
CONVEYOR BELT JOINTING / PATCHING BY COLD /
HOT VULCANIZING PROCESS FOR CHP II,
KHAPERKHEDA TPS.
4500060376THEJO ENGINEERING
LIMITED3805188.45
manufacture &
supply2
Supply 22SUPPLY OF THREE PHASE POWER QUALITY &
ENERGY ANALYZER.4500060509 K P INSTRUMENTS 441000.00
manufacture or
supply2
Supply 23
PROCUREMENT OF BELT TRACKING SYSTEM FOR
1200 MM WIDE CON. BELT FOR CHP-II, 500 MW
UNIT, KHAPERKHEDA TPS
4500060459GLOBAL CONVEYOR
SYSTEMS PVT LTD399097.44
manufacture &
supply2
Supply 24
SUPPLY OF SEAL PLATES FOR SEAL TROUGH OF
BOTTOM ASH HOPPER AHP-II, 500 MW UNIT 5
KHAPERKHEDA TPS
4500060714 C B INDUSTRIES 328440.00 No 8
Supply 25 SUPPLY OF MS FASTENERS. 4500060597 SAIF TRADERS 1709032.50manufacture or
supply2
Supply 26
SUPPLY OF SPARES FOR HIGH VELOCITY &
MEDIUM VELOCITY WATER SPRAY SYSTEM 210
MW.
4500061104 NOBLE ENGINEERINGS 481950.00manufacture or
supply2
Supply 27
PROCUREMENT OF SLOW SPEED GEAR
COUPLINGS FOR BELT CONVEYOR SYSTEM FOR
CHP-II
4500061251GOKAC
TRANSMISSIONS338150.40
manufacture &
supply2
Supply 28
RATE CONTRACT FOR SUPPLY OF UNHYDROUS
AMMONI GAS TO UNIT NO.III & IV AT WTP-I
KHAPERKHEDA TPS
4500061072ADITYA AIR PRODUCTS
PVT LTD5213446.88
manufacture or
supply2
Page 2 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
Supply 29PROCUREMENT OF MODIFIED RETURN ROLLERS
FOR APRON FEEDER CHAIN DRIVE IN CHP-II4500061252
BRAINER
INTERNATIONAL690375.00
manufacture &
supply3
Supply 30
RATE CONTRACT FOR DOSING OF UNHYDROUS
AMMONIA GAS TO UNIT III & UNIT IV AS PER MPCB
NORMS AT KHAPERKHEDA TPS.(210 DAYS)
4500061525 JUNIFAB FACTOTUM 1153055.74 No 2
Supply 31 SUPPLY OF VARIOUS CONSUMABLES. 4500061622T M ENGINEERING
COMPANY334231.56
manufacture or
supply2
Supply 32SUPPLY OF PRINTER TONER CARTRIDGES FOR
THE YEAR 2015-16 AT KHAPERKHEDA TPS.4500061964
UNIQUE TRADING
COMPANY884079.00
manufacture or
supply3
Supply 33
SUPPLY OF AERATION PAD & SEGMENT PLATES
FOR AIR LOCK VESSEL OF AHP II, U#5 ( 500 MW)
KHAPERKHEDA TPS.
4500061778
HINDUSTAN
ENGINEERING
CORPORATION
657909.00manufacture &
supply3
Supply 34 SUPPLY OF SWITCHGEAR SPARES FOR CHP-I. 4500061873VASHI ELECTRICALS
PVT LTD316127.70 No 4
Supply 35
SUPPLY OF SOLENOID VALVES FOR
MODIFICATION AT AHP FOR C&I-II 500 MW
KHAPERKHEDA TPS
4500062034PREET ENGINEERING
WORKS355168.80
manufacture &
supply5
Supply 36
SUPPLY OF PART MATERIAL, ERECTION,
COMMISSIONING & LOAD TESTING OF HOIST AT
FRF ROOM & CONDENSER VACUUM PUMPS
LOCATION AT THE RISK AND COST OF M/S. BHEL.
4500061996 R S INDUSTRIALS 967614.75 No 2
Supply 37
PROCUREMENT OF ASH INTAKE VALVE 200 NB
AND VENT VALVE 100 NB, 50 NB RUBBER SEAT,
BODY & FLAPS FOR AHP-I
4500062142INNOVATIVE
ENGINEERS329175.00
manufacture &
supply3
Supply 38
SUPPLY OF BAG FILTER, CAGES AND LOCKING
PLATE FOR BUFFER HOPPER OF VACUUM BASED
DRY FLY ASH EVACUATION SYSTEM OF AHP II,
U#5 ( 500 MW) KHAPERKHEDA TPS.
4500062183
HINDUSTAN
ENGINEERING
CORPORATION
1701000.00 No 3
Supply 39SUPPLY OF DRAG CHAIN LINKS FOR R-600 COAL
FEEDERS AT UNIT NO 1 & 2, TPS KHAPERKHEDA4500062702
RAJU ENGINEERING
WORKS PVT LTD945172.80
manufacture &
supply3
Supply 40
PROCUREMENT OF CENTRIFUGAL CLUTCH
COUPLING SUITABLE FOR AIR PRE HEATER 31.5
VIMT 2000( 72 DEGREE PA) AT UNIT#5,500MW TPS
KHAPERKHEDA.
4500062164ORIENTAL FOUNDRY
AND ELECT INDU304500.00 No 2
Supply 41SUPPLY OF CAUSTIC SODA LYE 100 % BASIS AT
WTP-I KHAPERKHEDA TPS4500062460 PARSHVA ASSOCIATES 979200.00 No 2
Supply 42SUPPLY OF 25 METER HIGH MAST TOWERS WITH
ALLIED MATERIAL FOR KHAPERKHEDA TPS.4500062832
AKELECT
ENGINEERING1239000.00 No 2
Page 3 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
Works 1
WORK OF OVERHAULING OF SUB ASSEMBLIES &
ITS COMPONENTS OF BULLDOZERS ON AS &
WHEN REQUIRED BASIS IN CHPVM-I, TPS
KHAPERKHEDA.
4500057717
NISHANT
AUTOMOVERS AND
ENGINEERING
2284969.60 No 2
Works 2
WORK OF ARRESTING FLUE GAS LEAKAGES IN
DOG HOUSE, PENT HOUSE & CAT HOUSE
OBSERVED DURING PRE PRESSURIZATION TEST
IN UNIT NO. 4 DURING AOH
4500058053 A G ZINGARE 536781.02 No 2
Works 3
FABRICATION & ERECTION OF STRUCTURAL
STEEL PEDESTALS FOR DIVERTING 1*500MW ASH
DISPOSAL PIPE LINE NEAR SHANTI BRICK
FACTORY,AT TPS KHAPERKHEDA
4500057796DAVID INDUSTRIAL
WORKS1034237.47 No 2
Works 4
MODIFICATION WORK OF FLUE GAS PATH &
PRIMARY AIR FLOW TRANSMITTER IMPULSE
LINES & DUST COLLECTORS IN UNIT NO. 1 & 2. (AS
& WHEN REQUIRED)
4500057896PRATIK INDUSTRIES,
KHAPERKHEDA367937.92 No 2
Works 5ARRESTING LEAKAGES IN SOFTEN WATER TANK
AT TPS KHAPERKHEDA4500058024
SHRIRAM
CONSTRUCTION3155951.00 No 2
Works 6
WORK OF STRENGTHENING OF TRAVEL TRACKS
FOUNDATION & SUPPORTING BEAMS FOR BOTH
SIDE ARM CHARGERS FOR CHPII 500 MW
KHAPERKHEDA TPS.
4500058257 S P KULKARNI 1754319.38 No 2
Works 7CLEANING & CLEARING OF PERENNIAL NALLAH
BY REMOVING ASH TPS,KHAPERKHEDA4500058239
B C BIYANI PROJECTS
P.LTD BHUSAWAL561617.53 No 3
Works 8
PROPOSED WORK OF EXTERNAL PAINTING TO
UNIT 2 & 4 BUILDING 210MW IN T.P.S
KHAPERKHEDA
4500058242 RAJU H. GABHANE 884863.99 No 2
Works 9
PROVIDING & REPAIRING CONCRETE BLOCK FOR
ENCASING BASE OF STEEL COLUMNS FOR TP
NO.102 TO 108 OF STRUCTURE 500MW TPS
KHAPERKHEDA
4500058273SHRI SAI
CONSTRUCTION1528800.32 No 2
works 10
ANNUAL RATE CONTRACT FOR SERVICING,
REPAIRING & MAINTENANCE OF AIR
CONDITIONERS AND WATER COOLERS FOR EM-II,
500MW, KHAPERKHEDA.
4500058358SAHIL FREEZING
WORKS441829.56 No 2
works 11
CLEANING OF PERIPHERAL TOE DRAIN BY
REMOVING ASH AT WAREGAON ASH
BUND,TPS,KHAPERKHEDA
4500058533 M F JAIN 896917.91 No 3
works 12
ARRESTING LEAKAGES THROUGH CONCRETE
SURFACE AT PTP AND WT PLANT AT TPS
KHAPERKHEDA
4500058362SHRIRAM
CONSTRUCTION379324.82 No 2
works 13MODIFICATION OF SPENT BACK WASH SUMP AT
WT PLANT AT TPS KHAPERKHEDA.4500058397
HARSH
CONSTRUCTION327657.90 No 4
Page 4 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
Works 14
PROVIDING AND FIXING PAVEMENT BLOCKS AT
ENTERRENCE OF 1*500MW UNIT AT TPS
KHAPERKHEDA
4500058557 S R ENTERPRISES 1205345.75 No 2
Works 15
PROVIDING OIL PAINTING TO STEEL COLUMNS OF
STRUCTURE FOR TP NO.102 TO 108 OF 500MW
TPS KHAPERKHEDA
4500058407 RAJU H. GABHANE 1383084.99 No 2
works 16WORK OF SERVICING / MAINTENANCE OF AIR
COOLERS IN CHP- I & CHP-II.4500058707 D R CONSTRUCTION 313170.45 No 2
works 17
WORK OF PRE-MANSOON CLEANING OF
DRAINS,SEWER LINES AND CLEANING ROOF
TERRACE OF ALL AUXILLARY BUILDINGS IN
500MW UNIT PREMISES TPS,KHAPERKHEDA
4500058540 SANJAY V WAGHMARE 396622.42 No 3
works 18
FABRICATION AND ERECTION OF PLATFORMS
WITH RAILING AND SUPPORT STRUCTURES FOR
REGULAR OPERATION AND MAINTENANCE OF
AHP SYSTEM AND AUXILIARIES OF UNIT # 5
(500MW) AT KHAPARKHEDA TPS.
4500058715 S R ERECTORS 364800.00 No 3
Works 19
EXTRACTION OF DEPOSITED ASH/COAL FROM
EXISTING NALLAH INSIDE POWER HOUSE AREA IN
TPS KHAPERKHEDA
4500058727 RAJU H. GABHANE 453279.37 No 2
Works 20
REPAIR TO FLOORING,ENCASING STRUCTURAL
STEEL COLUMNS & ALLIED WORKS AT BOTTOM
ASH HOPPER AT 500MW TPS KHAPERKHEDA
4500058828DAVID INDUSTRIAL
WORKS2648842.31 No 4
Works 21
RECTIFICATION OF DRIBBLE CONVEYORS FOR
APRON FEEDER WITH SUPPLY OF REQUIRED
MATERIAL FOR CHP-II, KHAPERKHEDA TPS.
4500058900
VAISHNAVI
ENGINEERING
COMPANY
5299732.80 No 2
Works 22
WORK FOR HOT PA FAN & ID FAN MAINTENANCE
FOR UNIT NO. 1 TO 4 ON AS & WHEN REQUIRED
BASIS.
4500058862SHRI GAJANAN
ENGINEERING WORKS666505.97 No 2
Works 23
REPAIR OF BOILER EXPANSION MEASUREMENT
PROBES INCLUDING SERVICING / REPAIR OF
GUIDES, REPLACEMENT OF GUIDE &
RECTIFICATION / REPAIR OF BASE PLATES FOR
UNIT NO. 4 AOH
4500059013SEC PROJECTS PVT
LTD327337.61 No 2
Works 24SERVICING OF PA FANS / ID FAN DURING UNIT NO.
4 AOH4500058911
SHRI GAJANAN
ENGINEERING WORKS337644.47 No 4
Works 25
WORK OF UTILIZATION OF EXPERT SERVICES
FOR INSITU INSPECTION OF BOILER TUBE USING
RFET (REMOTE FIELD ELECTROMAGNETIC
TECHNIQUE) AT UNIT NO. 4 DURING AOH.
4500058923MRP NAIR ENGINEERS
AND CONTRACTORS1572915.00 No 2
Page 5 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
Works 26
WORK CONTRACT FOR MAINTENANCE OF AIR
PRE-HEATERS INCLUDING BASKET CLEANING,
SEAL SETTING AND DRIVE UNIT REPAIR DURING
SHORT SHUT DOWN / FORCED BREAK DOWN
UNIT NO. 1 TO 4.
4500058901BHARTHI
CONSTRUCTION1066576.14 No 2
Works 27
WORK CONTRACT FOR BUNKER CHOKE UP
REMOVAL IN RAINY SEASON AT BOILER
MAINTENANCE OF UNIT # 5, 500 MW,
KHAPARKHEDA TPS.
4500058998 A G ZINGARE 654376.10 No 2
Works 28
WORK OF PROVIDING ASSISTANCE FOR COAL
STACK MANAGEMENT & VARIOUS WORKS
DURING RAINY SEASON , ROUND THE CLOCK BY
DEPLOYING UNSKILLED MANPOWER IN CHP-I.
4500059149 M F JAIN 1381040.36 No 2
Works 29
MEDICAL CHECKUP OF THE EMPLOYEE WORKING
IN KHAPERKHEDA TPS,KHAPERKHEDA FOR THE
YEAR 2014-15
4500059210 DR D P DEOTALE 547653.60 No 2
Works 30
WORK CONTRACT FOR REPLACEMENT OF 3 NO.
BUFFER HOPPER DOME & BAG HOLDING PLATE
(TUBE SHEET) IN AHP-II 500 MW, KHAPERKHEDA
TPS.
4500059147KUNAL
CONSTRUCTION815362.20 No 3
Works 31OIL FILTRATION AND ALLIED WORKS OF HT
TRANSFORMERS UNIT # 4, TPS KHAPERKHEDA.4500059177 ELMECH 459287.76 No 2
Works 32
APPLICATION OF CHEMICAL BONDED
REFRACTORY IN APH OUTLET TO ESP INLET
DUCT DURING UNIT NO. 4 ANNUAL OVERHAULS
4500059146 A G ZINGARE 642891.60 No 3
Works 33
WORK OF CONTRACT FOR CARRYING OUT COLD
AIR VELOCITY TEST (CAVT) SUPPLY &
INSTALLATION OF EXPANDED METAL SCREEN IN
BOILER AT UNIT NO. 4 DURING AOH.
4500059163MECH-WELL
INDUSTRIES LIMITED4254862.50 No 2
works 34
WORK OF INSITU REPAIR OF CRITICAL VALVE,
INSITU RECONDITIONING OF MAIN STEAM STOP
VALVE & LEGA TEST OF SAFETY VALVE DURING
UNIT NO. 4 AOH
4500059214BROSCO VALVES PVT
LTD1350128.22 No 3
works 35HIRING OF DOZER (HEAVY EARTH MOVER ) FOR
DOZING THE COAL.4500059189 M F JAIN 7519580.64 No 2
works 36
WORK OF CONCRETE BREAKING AND
MODIFICATIONS AT ALL
LOCATIONS,HEIGHTS,DEPTHS & LEVELS ON AS
AND WHEN REQUIRED BASIS IN 500MW PLANT
PREMISES TPS KHAPERKHEDA
4500059342DAVID INDUSTRIAL
WORKS323995.99 No 5
Works 37
MAINTENANCE CONTRACT FOR VARIOUS
ELECTRICAL WORKS OF ESP DURING AOH OF U-
5(500MW) 2015-16.
4500059547 ADITYA ENTERPRISES 330008.51 No 2
Page 6 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
works 38WORK OF BUNKER NECK CHOKE UP REMOVAL &
ALLIED WORKS IN UNIT NO. 1 TO 4.4500059557 A G ZINGARE 928324.80 No 2
works 39
PROPOSED WORK OF PRE-MONSOON CLEANING
OF DRAINS & PROVIDING R.C.C CHAMBERS ON
EXISTING UNDERGROUND SURFACE WATER LINE
AND SEWAGE DISPOSAL LINE AT VARIOUS
LOCATIONS IN POWER HOUSE AREA, AND CHP-I
IN TPS, KHAPERKHEDA.
4500059564 P. R. Chandekar, 402760.60 No 3
works 40
TRANSFER CHUTE CHOKE UP REMOVAL & ALLIED
WORKS FOR AREA A AT WAGON TIPPLER TO
CRUSHER HOUSE AND FOR AREA B CRUSHER
HOUSE TO BUNKER IN CHP 500MW, TPS
KHAPERKHEDA.
4500059682
S R GAWANDE
CONTRACTER
KHAPERKHEDA
474611.18 No 3
works 41OVERHAULING OF HP / LP VALVES DURING
ANNUAL OVERHAUL OF UNIT NO. 4.4500059636 RAJESH ENTERPRISES 340062.57 No 3
works 42
STRENGTHENING OF BOTTOM ASH HOPPER
INCLUDING REPLACEMENT OF M.S. PLATES,
BEAMS AND CHANNELS IN UNIT NO. 4 DURING
AOH.
4500059603SUNIL HITECH
ENGINEERS LTD.1909573.21 No 2
works 43
WORK CONTRACT FOR REMOVAL & REFITTING OF
INSULATION OF FURNACE, DUCTS, PIPELINES,
VALVES OF UNIT NO. 5 (500 MW) AT
KHAPERKHEDA TPS. AS & WHEN REQUIRED
BASIS.
4500059604MRP NAIR ENGINEERS
AND CONTRACTORS827640.00 No 2
works 44
HIRING OF EXPERT SERVICES FOR MONITORING
& VERIFICATION (M&V) FOR PAT CYCLE AS PER
BEE AT KHAPERKHEDA TPS (4X210MW)
4500059609STEAG ENERGY
SERVICES (INDIA)436848.00 No 1
works 45
PREMANSOON WATER PROOFING TREATMENT
TO MULTISTORIED BUILDING & OVERHEAD
WATER TANKS IN TPS COLONY,KHAPERKHEDA
4500059614MANORAMA
CONSTRUCTION781071.03 No 3
works 46WORK OF FABRICATION OF COLD END BASKETS
SUPPORT GRATING FOR UNIT NO. 4 APH 'A' & 'B'4500059683 FRIENDS SKILLS 322897.80 No 2
works 47CLEANING OF NDCT POND / BASIN DURING
ANNUAL OVERHAUL OF UNIT NO.5(500 MW).4500059869 M T DAHAKE 306658.86 No 2
works 48
CONTRACT FOR REPLACEMENT COMPLETE SET
OF BEATER HEADS, ARMS & JIBS OF IMPACT
CRUSHERS FOR CHP-II, 1X500 MW UNIT,
KHAPERKHEDA TPS.
4500060159 ORION INDUSTRIES 523501.68 No 2
works 49
WORK OF REJECT BELT JOINTING & CONVEYOR
PULLEY LAGGING OF COAL MILL REJECT
HANDLING SYSTEM FOR UNIT NO. 1 TO 4.
4500060204THEJO ENGINEERING
LIMITED789840.97 No 2
Page 7 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
works 50
WORK OF COAL NOZZLE ASSY. REPLACEMENT
DURING AOH OR SHORT SHUTDOWN AS & WHEN
REQUIRED BASIS.
4500060288BHARTHI
CONSTRUCTION1457339.52 No 2
Works 51
PROVIDING BUFFER WALL FOR ARRESTING
ASH/COAL SLURRY FROM EXISTING NALLAH
INSIDE POWER HOUSE AREA IN TPS
KHAPERKHEDA
4500060322 RAJU H. GABHANE 304242.47 No 5
Works 52
WORK CONTRACT FOR ERECTION & REMOVAL OF
CUP LOCK SCAFFOLDING INSIDE THE BOILER AND
FURNACE CLEANING BY HYDRO JETTING
MACHINE DURING AOH OF U#5, 500 MW, TPS
KHAPERKHEDA
4500061219MRP NAIR ENGINEERS
AND CONTRACTORS2987547.84 No 5
Works 53
WORK CONTRACT FOR ONLINE FILTRATION FOR
LUBRICATION OIL OF COAL MILL (SP320) & ID, FD,
PA (SP68) AT UNIT#5, 500 MW, TPS,
KHAPERKHEDA.
4500060465SUNITI ENTERPRISES
NAGPUR411768.00 No 3
Works 54WORK CONTRACT FOR STACK YARD COAL
MANAGEMENT IN CHP-II TPS KHAPERKHEDA4500060732
S R GAWANDE
CONTRACTER
KHAPERKHEDA
1444301.57 No 2
works 55
SHIFTING AND RE-LAYING OF 3 NOS. ASH SLURRY
LINES OF 500 MW UNIT 5 FROM OVERLAPPING
ZONE OF LINES BELOW CULVERT NEAR SHANTI
BRICK FACTORY ON PEDESTAL OF AHP-II (500MW)
KHAPARKHEDA TPS.
4500060750K M ADHAU
CONTRACTORS345762.00 No 2
Works 56
WORK CONTRACT FOR PATROLLING &
MAINTENANCE OF ASH SLURRY DISPOSAL (ASP
SERIES DISCHARGE) & HCSD (GEHO PUMP
DISCHARGE) PIPE LINES FROM PUMP HOUSE TO
WAREGAON ASH BUND FOR ASH HANDLING
PLANT UNIT # 5, 500 MW KHAPARKHEDA TPS.
4500060915K M ADHAU
CONTRACTORS6027574.09 No 2
Works 57
WORK CONTRACT FOR DEPLOYMENT OF
RETIRED RAILWAY LOCO OPERATORS /
EXPERIENCED LOCO OPERATORS FOR SHUNTING
OF COAL / OIL RAKES AT CHP I & II, TPS
KHAPERKHEDA.
4500060866TECHNOHIGH
ENTERPRISES1374429.60 No 2
works 58
REPAIR AND RECONDITIONING OF WORN OUT PA
FAN NDV 18 TIEFSTACK IMPELLER SHAFT
ASSEMBLY OF UNIT NO. 1 & 2.
4500061054 HI-TECH MACHINERY 570069.54 No 3
works 59
CONTRACT FOR RESTORATION OF DAMAGED ESP
FIELDS AND SERVICING OF ESP FIELDS IN AHP
500 MW, KHAPERKHEDA TPS
4500061187SUNIL HITECH
ENGINEERS LTD.9714170.19 No 2
Page 8 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
works 60
WORK CONTRACT FOR LIFTING &
TRANSPORTATION OF STONES, SHALE &
METTALIC PARTICLES FOR CHP-II, 500 MW
KHAPERKHEDA TPS.
4500061315 M F JAIN 347757.00 No 2
works 61
WORK OF SERVICING, STRENGTHENING AND
OTHER ALLIED WORKS OF R-600 COAL FEEDERS
OF UNIT NO. 1 & 2 ON AS AND WHEN REQUIRED
BASIS.
4500061464SWAPNIL
ENTERPRISES663069.87 No 3
works 62
WORK CONTRACT FOR VARIOUS MAINT. WORKS
OF ID, FD, PA ON AS AND WHEN REQUIRED BASIS
AT BOILER MAINT-II (500MW).
4500061580BHARTHI
CONSTRUCTION974948.52 No 2
works 63
REPLACEMENT OF WORN OUT PLATES OF
TRANSFER CHUTES FOR CONVEYOR SYSTEM
FOR CHP-II, KHAPERKHEDA TPS
4500061487 S R ERECTORS 443667.71 No 3
works 64HIGH PRESSURE WELDING AT TURBINE
MAINTENANCE - I.4500061568
MINU ENGINEERS AND
ERECTORS764275.04 No 2
works 65
THE WORK OF REPLACEMENT OF PANS, DECK
ROLLERS AND RETURN ROLLERS OF APRON
FEEDERS IN CHP-II.
4500061572 ORION INDUSTRIES 466847.10 No 2
works 66WORK CONTRACT FOR OVERHAULING OF
WOBBLER FEEDER INSTALLED AT CHP2 500 MW4500061870
VAISHNAVI
ENGINEERING
COMPANY
2109000.00 No 2
works 67WORK OF OVERHAULING OF TIME ENGINEERS -
MAKE WOBBLER FEEDER IN CHP-I.4500062189 THE TIME ENGINEERS 912000.00 No 2
works 68
WORK CONTRACT FOR HIRING THE HEAVY
VEHICLE FOR COAL LOADING IN COAL HANDLING
PLANT 500 MW KHAPERKHEDA. [ON AS AND
WHEN REQUIRED BASIS ]
4500062143 M F JAIN 3870054.90 No 2
works 69
WORK OF RUBBER LAGGING OF CONVEYOR
PULLEY BY COLD VULCANIZING PROCESS ( ON AS
& WHEN REQUIRED BASIS ) IN CHP-I, TPS
KHAPERKHEDA.
4500062239THEJO ENGINEERING
LIMITED1304327.14 No 3
works 70
WORK OF TREE PLANTATION AND MAINTENANCE
OF PLANT,ORNAMENTAL PLANTS AND GARDEN
LAWN AT VARIOUS LOCATIONS IN 500MW PLANT
PREMISES AT TPS KHAPERKHEDA
4500062448HOSSAIN
CONSTRUCTION398182.38 No 3
works 71
REPAIRING & LAYING OF RCC PIPE & DRAIN NEAR
SOFT WATER TANK,AT 500MW TPS
KHAPERKHEDA
4500062464SHRI SAI
CONSTRUCTION408808.21 No 3
works 72PROVISION OF LIGHTING SYSTEM AT INTAKE
PUMP HOUSE TO NANDA ROAD.4500062561 D R CONSTRUCTION 555679.50 No 2
works 73ERECTION ,COMMISSIONING OF 25 METER HIGH
MAST TOWER AT TPS KHAPERKHEDA.4500062956
AKELECT
ENGINEERING570672.71 No 4
Page 9 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
works 74
PROVIDING RCC PRECAST DRAIN COVERS OVER
SURFACE DRAINS AND CHAMBERS AT ALL
LEVELS AT VARIOUS LOCATIONS AT 500 MW
PLANT PREMISES TPS KHAPERKHEDA
4500063006SHRI SAI
CONSTRUCTION458775.01 No 6
works 75
WORK CONTRACT FOR CARRYING OUT CAVT IN
BOILER AT U#5 ,500 MW ,TPS, KHAPERKHEDA
DURING AOH.
4500063319MECH-WELL
INDUSTRIES LIMITED627000.00 No 2
works 76
AWORK OF HOT P.A. FAN & I.D. FAN
MAINTENANCE FOR UNIT NO. 1 TO 4 ON AS &
WHEN REQUIRED BASIS AT TPS KHAPARKHEDA
4500063503SHRI GAJANAN
ENGINEERING WORKS527463.75 No 2
AMC 1
ANNUAL WORKS CONTRACT FOR MECHANICAL
MAINTENANCE OF COAL MILLS, COAL FEEDERS,
SEAL AIR FAN AND COAL DUST LEAKAGES
ATTENDING WORK AT U#5, 500 MW, TPS,
KHAPERKHEDA.
4500059022MRP NAIR ENGINEERS
AND CONTRACTORS6994619.13 No 2
AMC 2
ANNUAL WORK CONTRACT FOR MAINTENANCE
OF VARIOUS AUXILIARIES IN AHP STAGE-I, ETP2 &
WAREGAON WATER RECOVERY PUMP HOUSE
(AHP-I).
4500059085ADORECONTRACTORS
PRIVATELIMITED3702510.47 No 2
AMC 3WORK OF CLEANING ON ANNUAL BAISI AT
MAJORE STORES,KHAPERKHEDA4500058496 LUCKY ENTERPRISES 1263635.12 No 2
AMC 4
ANNUAL WORK CONTRACT FOR OPERATION &
MINOR MAINTENANCE OF VARIOUS DE SYSTEM &
OPERATION OF AIR COMPRESSOR FOR BOBR
EVACUATION, HPDS SYSTEM FOR WAGON
TIPPLER NO. 1 & 2 AND ALLIED WORKS IN CHP-I.
4500058792 D R CONSTRUCTION 5051374.14 No 2
AMC 5
ARC FOR MAINTENANCE OF MAIN PLANT
LIGHTING, STREET LIGHTING, LT MOTOR
MAINTENANCE & ALLIED WORKS & CABLE LAYING
WORK OF MAIN PLANT & ODP FOR EM-II.
4500059079 D R CONSTRUCTION 2919723.83 No 2
AMC 6
ANNUAL CONTRACT FOR THE WORK OF
OPERATION & MINOR MAINTENANCE OF STONE
GRAPPLE UNIT AT WAGON TIPPLER NO. I & II IN
CHP-I.
4500058885
VAISHNAVI
ENGINEERING
COMPANY
2446189.56 No 2
AMC 7AWC FOR VARIOUS WORK IN ESP INTERNAL
DURING ANNUAL OVERHOUL OF UNIT NO. 1 TO 44500059560 DEWAJI N KUBDE 2359255.54 No 2
AMC 8
ANNUAL CONTRACT FOR MAINTENANCE &
SERVICING OF FLAME SCANNERS, IGNITORS AND
HPBP SERVO VALVE AS AND WHEN REQUIRED
FOR C&I-II, 500MW KHAPERKHEDA TPS.
4500058931PRATIK INDUSTRIES,
KHAPERKHEDA685620.72 No 2
Page 10 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
AMC 9
ANNUAL CONTRACT FOR ASSISTANCE TO C&I
STAFF FOR MAINTENANCE OF C&I SYSTEM OF
500MW UNIT KPKD TPS.
4500059110 D R CONSTRUCTION 4477960.01 No 2
AMC 10
AWC FOR VARIOUS WORKS IN ESP, BOTTOM ASH
CLINKER GRINDER DISCHARGE LINE DURING
SHORT SHUTDOWN AND RUNNING MAINTENANCE
OF UNIT NO. 1 TO 4
4500059759 DEWAJI N KUBDE 2303062.54 No 2
AMC 11
ANNUAL MAINTENANCE WORK CONTRACT FOR
VARIOUS WORKS OF BFPS AND OTHER
AUXILIARIES (AS AND WHEN REQUIRED BASIS) AT
TURBINE MAINTENANCE-II (500MW) YR.2014-15.
4500059232 S K CONSTRUCTION 1494275.08 No 2
AMC 12
WORK CONTRACT FOR THE WORK OF MANUAL
PICKING UP & DISCHARGING AWAY OF STONES,
IRON PIECES, OVERSIZE COAL LUMP, WOODEN
LOGS ETC. FROM INDIGENOUS COAL FROM THE
CONVEYOR BELTS OF CHP-II, 500 MW, AT T.P.S.
KHAPERKHEDA
4500059024PRINCE THERMAL
INDIA PVT LTD22373685.00 No 3
AMC 13
ANNUAL WORK CONTRACT FOR ASSISTANCE TO
EM-I STAFF TPS, KHAPERKHEDA FOR THE YEAR
2015-16.
4500059143 DEWAJI N KUBDE 5275946.05 No 2
AMC 14
ANNUAL CONTRACT FOR MECHANICAL
MAINTENANCE OF VARIOUS AUXILIARIES FOR
CHP II, T.P.S. KHAPERKHEDA
4500059693LONARE BROTHRES
CONTRACTORS5593315.95 No 2
AMC 15AMC FOR COLONY LIGHTING MAINTENANCE FOR
THE YEAR 2015-16.4500059743 JOY CONSTRUCTION 899477.67 No 1
AMC 16
ANNUAL CONTRACT FOR MISC CIVIL WORKS IN
POWER HOUSE AREA & OTHER ANCILLARY
BUILDINGS AT ALL LEVEL & LOCATION AT
TPS,KHAPERKHEDA
4500059958 RAJU H. GABHANE 436864.81 No 2
AMC 17
ANNUAL CONTRACT FOR MISCELLANEOUS CIVIL
WORKS AT ALL LEVELS & LOCATIONS FOR
MODIFICATION & MAINTENANCE OF VARIOUS
STRUCTURES & BUILDINGS ON AS & WHEN
REQUIRED BASIS AT TPS KHAPERKHEDA
4500060068 P. R. Chandekar, 601435.87 No 2
AMC 18
ANNUAL CONTRACT FOR SEALING HOLES OF
MASONARY WALL, REPAIRING OF SECURITY
GATES AT VARIOUS LOCATIONS & ALLIED WORKS
IN TPS KHAPERKHEDA (AS & WHEN REQUIRED
BASIS)
4500060032 RAJU H. GABHANE 488532.65 No 2
AMC 19
WORK CONTRACT FOR ROUTINE MAINTENANCE
WORKS AT TURBINE & TURBINE AUX INCLUDING
ODP PLANTS FOR UNIT 500MW KHAPERKHEDA
T.P.S
4500062041 S K CONSTRUCTION 4063118.85 No 2
Page 11 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
AMC 20
CONTRACT FOR HOUSEKEEPING & ALLIED
WORKS FOR ASH HANDLING PLANT UNIT #5, 500
MW AT KHAPARKHEDA TPS
4500060476DEEPAK
CONSTRUCTION2297597.04 No 2
AMC 21
ANNUAL WORK CONTRACT FOR THE REGULAR
WORK OF B.G WAGONS UNLOADING AT WAGON
TIPPLERS AND OCCASIONAL WORK OF
UNLOADING OF BTPN OIL WAGONS (OIL
TANKERS) AND ASSOCIATED WORK AT CHP II ,
TPS KHAPERKHEDA.
4500062153 THE TIME ENGINEERS 432496.51 No 2
AMC 22
ANNUAL CONTRACT FOR WORK OF
REPLACEMENT OF WORN OUT MOTHER PLATES
OF TRANSFER CHUTES OF CONVEYORS
SYSTEMS IN CHP-I.
4500060361 ORION INDUSTRIES 433200.00 No 2
AMC 23
ANNUAL WORK CONTRACT FOR HOUSEKEEPING
& ALLIED WORKS FOR AREA I & II FOR CHP II TPS
KHAPERKHEDA
4500060359
S R GAWANDE
CONTRACTER
KHAPERKHEDA
10300255.32 No 2
AMC 24
AMC FOR PROVIDING GENERAL SERVICES OF
MAN POWER IN OPERATION & MISC. WORK IN
AHP-I
4500061401 DEWAJI N KUBDE 3951062.70 No 2
AMC 25
ANNUAL WORK CONTRACT FOR LIFTING,
LOADING & TRANSPORTATION OF COAL MILL
REJECT & COAL OF UNIT NO. 1 TO 4,
KHAPERKHEDA TPS.
4500060580PUNYA COAL
ROADLINES2944620.00 No 2
AMC 26
ANNUAL WORK CONTRACT FOR DOZING THE
STACKED COAL PROPERLY IN COAL PILES
ROUND THE CLOCK & OTHER RELATED
MISCELLANEOUS EMERGENCY WORKS IN CHP-
I,CHP-II & PLANT TPS KHAPERKHEDA.
4500060448 M F JAIN 2250743.04 No 2
AMC 27
ANNUAL WORK CONTRACT FOR OPERATION,
SERVICING, CO-ORDINATION & MINOR
MAINTENANCE OF BEETLE CHARGER FOR CHP-I.
4500060810 ORION INDUSTRIES 4295766.24 No 2
AMC 28
ANNUAL WORK CONTRACT FOR L. P. WELDING OF
TURBINE MAINTENANCE ON AS & WHEN
REQUIRED BASIS FOR UNIT NO. 5 (500 MW) - YEAR
2015-16.
4500061038PRATIK INDUSTRIES,
KHAPERKHEDA663082.82 No 3
AMC 29
ANNUAL CONTRACT FOR THE WORK OF
COLLECTING AND DISPOSING OFF
GARBAGE/KITCHEN WASTE FROM DOOR TO
DOOR & OPERATING SOLID WASTE DISPOSAL
SCHEME IN ENTIRE COLONY AT TPS
KHAPERKHEDA
4500061561 P. R. Chandekar, 1198902.32 No 3
Page 12 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
AMC 30ANNUAL WORK CONTRACT FOR MECHANICAL
MAINTENANCE IN CHP-I, AT TPS, KHAPERKHEDA4500060914 ORION INDUSTRIES 6512682.57 No 2
AMC 31
ANNUAL WORK CONTRACT FOR CARRYING OUT
DAY TO DAY GLASS FIXING TO STEEL WINDOWS
OF QUARTERS IN TEMPORARY COLONY AND
A,B,C,D,E & F TYPE PERMANENT COLONY TPS
KHAPERKHEDA
4500060912 P. R. Chandekar, 490465.54 No 2
AMC 32ANNUAL MAINTENANCE CONTRACT FOR AC
PLANT TM-I KHAPERKHEDA T.P.S4500061406
PRATIK INDUSTRIES,
KHAPERKHEDA1084333.80 No 2
AMC 33
ANNUAL MAINTENANCE CONTRACT FOR AIR
COMPRESSORS ( ST-II UNITS/ WTP) AND
INSTRUMENT AIR DRYERS.
4500061129BALAJI
CONSTRUCTION1170318.02 No 2
AMC 34
ANNUAL WORK CONTRACT FOR BUNKER
SCRAPPING OF UNIT 1TO 4 ( AS & WHEN
REQUIRED BASIS ) IN CHP-I
4500062280 M F JAIN 702545.98 No 2
AMC 35
ANNUAL CONTRACT FOR PREVENTIVE
MAINTENANCE AND MINOR MECHANICAL
MAINTENANCE OF HYDRAULIC SYSTEMS FOR
WAGON TIPPLERS, S.A.C, S/R, AND APRON
FEEDER
4500061226 ORION INDUSTRIES 1163289.06 No 3
AMC 36AMC FOR STRAINERS AT NAVEGAON / KORADI
AND C.T. NOZZLES.4500061246
KORADI BEROJGAR
BOHUUDESHIYA SEVA736657.85 No 2
AMC 37
AMC FOR COMPUTER, PRINTER, SCANNER AND
NETWORKING COMPONENT 2015-16, AT TPS,
KHAPERKHEDA.
4500061225 KEY COMPUTERS 910801.27 No 2
AMC 38ANNUAL WORK CONTRACT FOR CHP-I
HOUSEKEEPING AND ALLIED WORKS AT AREA - I.4500061424
S R GAWANDE
CONTRACTER
KHAPERKHEDA
22150234.82 No 2
AMC 39ANNUAL WORK CONTRACT FOR CHP-I
HOUSEKEEPING AND ALLIED WORKS AT AREA - II.4500061407 M F JAIN 17185751.94 No 2
AMC 40
ANNUAL WORK CONTRACT FOR MAINTENANCE,
STAMPING & VERIFICATION OF WEIGH BRIDGES
AND BELT WEIGHERS IN CHP-I.
4500061397 WEIGHTECH 2045474.50 No 1
AMC 41
ANNUAL WORK CONTRACT FOR HOUSEKEEPING
OF CONVEYOR 102 A/B WITH MINOR MECHANICAL
MAINTENANCE WORK AT CHP-II 500MW TPS.
4500061725 ORION INDUSTRIES 3635264.11 No 2
AMC 42
ANNUAL CONTRACT FOR PREVENTIVE
MAINTENANCE OF CLINKER GRINDER AT U 1 TO U
4
4500062018KUNAL
CONSTRUCTION1012829.76 No 3
Page 13 of 14
Name of TPS-Khaperkheda TPSList of PO proceesed in SETs from Aril 2015 to October 2015
Contract Sr. No. Description of Contracts Order No Name of Agency Value of Order QR Deviation if
any
No. of Qualifying
Bidders
AMC 43
ANNUAL WORK CONTRACT FOR MECHANICAL
MAINTENANCE OF COAL MILLS, COAL FEEDER &
SEAL AIR FANS AT UNIT NO. 1 & 2
4500062797BHAVANA ENERGY
INFRA PVT LTD10487249.22 No 2
AMC 44
ANNUAL WORK CONTRACT FOR LIFTING,
LOADING & TRANSPORTATION OF FLY ASH
COLLECTED AT THE FLOOR AREA OF BOILER TO
AHP U-1 & 4 DISPOSAL OF SAME TO WAREGAON
ASH BUND
4500062866 M F JAIN 435981.60 No 2
AMC 45AMC FOR HT MOTOR OVERHAUL U#1 TO 4 AS AND
WHEN REQUIRED BASIS.4500062345
JAI BHAWANI AIR
CONDIT & MECH WORK329228.35 No 2
AMC 46
ARC FOR MAINTENANCE OF MAIN PLANT
LIGHTING , MAINTENANCE OF MAIN PLANT &
COLONY STREET LIGTTING , HT/LT CABLE LAYING
WORK IN PLANT & COLONY AT KHAPERKHEDA
TPS.
4500063022 D. R. Constructions., 5154112.37 No 2
AMC 47
ANNUAL WORK CONTRACT FOR FABRICATION &
ERECTION OF PLATFORM, LOW PRESSURE
WATER LINES & L.P. WELDING WORKS AT BM-2
AS AND WHEN REQUIRED
4500062566LAXMI ENGINEERING
WORKSHOP308750.19 No 4
AMC 48
PROVIDING SERVICES OF OFFICE ASSISTANTS
AND OFFICE ATTENDANTS IN MPD SECTION,
FQAD SECTION, MAJOR STORE, WELFARE
OFFICE, ACCOUNTS SECTION & SECURITY AT
KHAPERKEHDA TPS
4500062707BALAJI
CONSTRUCTION987306.67 No 2
AMC 49
ANNUAL WORK CONTRACT FOR MAINTENANCE
OF BOTTOM ASH, COARSE ASH, TUBE SETTLER,
WATER & ASH SLURRY PUMPS OF AHP II, UNIT
NO. 5 (500 MW) KHAPARKHEDA TPS.
4500062690G Y LONARE
CONTRACTORS4523360.69 No 3
AMC 50
ANNUAL MAINTENANCE CONTRACT FOR PLC
BASED PRESSURISED AIR CLOSE COAL MILLS
REJECT HANDLING & CONVEYING SYSTEM AT
U#5, 500 MW, TPS, KHAPERKHEDA.
4500062661 A B U CONSTRUCTION 1981464.04 No 2
AMC 51
ANNUAL CONTRACT FOR MECHANICAL
MAINTENANCE WORK OF COAL MILL REJECT
BELT BC1 TO BC4 AT UNIT NO. 1 TO 4.
4500062653 RAJESH ENTERPRISES 2751657.46 No 2
AMC 52
ANNUAL CONTRACT FOR OPERATION OF PLC
BASED PRESSURISED AIR CLOSE COAL MILLS
REJECT HANDLING & CONVEYING SYSTEM AT
U#5, 500 MW, TPS, KHAPERKHEDA.
4500062820 A B U CONSTRUCTION 5882642.88 No 2
AMC 53ANNUAL WORK CONTRACT FOR OPERATION OF
'D' - POINT AT TPS KHAPERKHEDA.4500063151 M F JAIN 2003180.30 No 3