Namami Gange - Component wise Allocation
2
“Namami Gange – Integrated Ganga Conservation Mission”
approved by Cabinet on 13/05/2015
With an outlay of ₹ 20,000 Cr upto Dec 2020
Component A
Ongoing projects having remaining central liabilities of Rs.7,272 crore
This includes 33 sewerage Projects (630 MLD STP) and 24 Ghats &Crematoria projects.
Component B
New initiatives at an estimated cost of Rs.12,728 crore with 100% central assistance
This includes 102 sewerage Projects (3256 MLD STP) and 37 Ghats &Crematoria
projects.
Salient Features
3
NAMAMI GANGE
100% Centrally
funded programme
O&M cost for 15 years included for
new projects
Comprehensive
integrated programme
Non-lapsable
fund
5 year dedicated
Budget allocation
Hybrid Annuity
based PPP model
adopted
Namami Gange Projects Overview
4
Sl
NoProjects Undertaken No. of Projects
Sanction Cost
(Rs in Cr)
Pollution Abatement Projects
1Sewage Infrastructure (94 on Ganga, 8 on
tributaries)102 16984
2 Bioremediation 8 26.94
3 Modular STPs –Decentralised Treatment 20 410
4Upcoming Projects on Tributaries (7 states, 31
tributaries, 68 towns)68 Under estimation
Sub total 198 17420.94
5 Rural Sanitation (4465 villages along Ganga) 1 1018
Total 199 18438.94
Namami Gange Projects Overview
5
Sl No Projects Undertaken No. of ProjectsSanction Cost
(Rs in Cr)
River Front, Ghats & Crematoria Projects
1 Ghats & Crematoria (Old) 24 204.39
2 Ghats & Crematoria (New) 37 721.94
3 Ghats Cleaning 1 15.00
4 River Surface Cleaning 1 55.24
5 River Front Development 2 270.55
Sub-total 65 1267.12
Other Projects
6 Institutional Development 6 340.41
7Project Implementation Support / Research &
Study Projects2 9.96
8 Biodiversity 4 31.91
9 Afforestation 11 113.28
10 Composite Ecological Task Force 1 167
Sub-total 24 662.56
Grand Total 288 20368.62
Status of Sewerage Projects
6
S.
No.State
Status as on May 2014 Status as on May 2018
Projec
ts
Comple
ted
Work-
in-
Progre
ss
Under Tendering Process
Projects
STP
Capacity
(MLD)
Complet
ed
Work-in-
progress
Under
Tenderin
g
Tender
to be
floated
STP
Capacit
y
(MLD)
Tender
Receive
d &
Finaliza
tion in
process
Under
Tendering
Tender
to be
floated
Ganga Main stem
1 Uttarakhand 10 24 1 9 - - 31 156 13 18 0 0 0
2Uttar
Pradesh12 334 - 7 3 2 27 743.5 8 8 1 10 0
3 Bihar 4 55 - 4 19 529 - 10 3 0 6
4 Jharkhand 1 12 - 0 1 0 2 16 - 2 0 - -
5 West Bengal 4 60 - 3 1 15 483.5 2 4 - 4 5
Sub Total 31 485 1 (18) 23 5 2 94 1928 23 42 4 14 11
Tributaries
6 Haryana 2 145 - 2 2 145 1 1 - - -
7 Delhi - - - 2 1044 - 1 - 1 -
8 U.P - - - 3 130.5 - 1 2 - -
9 Bihar - - - 1 9 - - 1 - -
Sub Total 2 145 0 2 0 0 8 1328.5 1 3 3 1 -
Total 33 630 1 (18) 25 5 2 102 3256 24 45 7 15 11
7
Initiatives taken up by NMCG
“One City One Operator” - STPs in 7 towns (Kanpur, Allahabad, Mathura, Patna,
Kolkata, Howrah-Bally, Bhagalpur) are being integrated & tendered with Hybrid Annuity
based projects – 4 already tendered during this period (Kanpur, Allahabad, Mathura &
Kolkata)
Focus on 10 major towns contributing almost 64% of total sewage discharge.
Total STP capacity- 1109 MLD is being created at a cost of ₹ 9883 Cr in these
towns
Performance evaluation of existing STPs completed in Uttarakhand, Uttar Pradesh and
Bihar.
Project Engineers for Haridwar and Varanasi projects appointed by NMCG
Annual inspection of GPIs through technical institutions in a time bound manner.
Close monitoring of milestones. Field visits increased.
Regular Follow-up with State Agencies
Upcoming projects on tributaries- 68 towns in 7 states on 31 tributaries
150
457
234
310
45
320
60
615
160
4163
456
270
102
589
82
15
72
310
35
200
30
26
150
6545 40
0
100
200
300
400
500
600
700
Haridwar Kanpur Allahabad Varanasi Farrukhabad Patna Bhagalpur Kolkata Howrah Bally
Sewage Generation (2035) Existing Treatment Capacity (Mld) Ongoing Projects Under Tendering Approved Projects
Focus on Large Cities of Ganga Main Stem
All figures are in Mld
10 towns with a total sewage generation of 1897 Mld contribute almost 64% of total
sewage (2953 Mld) discharge from the 97 towns to river Ganga
8
Awarded projects:
Status of Hybrid Annuity Sewerage Projects
9
Project Signing of Agreement Start of work
82 MLD STP at Haridwar 11/10/2017 01/02/2018
50 MLD STP at Varanasi 11/10/2017 01/02/2018
Progress of Works
Contract Signing
Status of other Hybrid Annuity Sewerage Projects
10
S.
No.
Name of the Package Capacity
in MLD
Present Status Award Date
(Tentative)
(i) Mathura 30 Bids Received (14-03-
2018); Evaluated
14/05/2018
(ii) Allahabad - Jhusi, Naini,
Phaphamau
72 NIT published (16/03/2018) 19/06/2018
(iii) Unnao, Shuklaganj and Kanpur 49 NIT published (08/03/2018) 02/06/2018
(iv) Farrukhabad 35 NIT published (12/04/2018) 02/07/2018
(v) Mirzapur and Gazipur 38 NIT published (14/04/2018) 02/07/2018
(vi) Digha & Kankarbagh in Patna* 150 Likely NIT date-14/05/2018 11/07/2018
(vii) Bhagalpur* 65 Likely NIT date-30/05/2018 16/07/2018
(viii) Kolkata (Tolly’s Nalla) 26 NIT published (27/04/2018) 12/07/2018
(ix) Howrah &Bally; Kamarhati &
Baranagar *
165 Likely NIT date-14/05/2018 12/07/2018
*- Projects under World Bank funding
12
Sewerage Projects in Haridwar
Sewage Generation- 74 MLD
Existing Capacity – 63 MLD
Work in Progress – 82 MLD STP, I&D works,
Arihant Vihar network
All 20 drains being tapped
Uttarakhand– Completed Projects
13
S. No. Project
1
STP at Devprayag
Cost - 3.66 Cr
STP capacity – 1.4 MLD
2
Sewerage Scheme in Devprayag
Cost – 4.50 Cr
3
I&D at Joshimath
Cost – 9.61 Cr
4
I&D at Gopeshwar
Cost – 10.18 Cr
5
Sewerage Scheme at Triveni
Ghat, Rishikesh
Cost – 7.23 Cr
Triveni Ghat
Uttarakhand – Completed Projects
14
S. No. Project
6
Sewerage system & STP for
Tapovan area, Rishikesh
Cost – 24.12 Cr
STP capacity – 3.5 MLD
7
Sewerage Scheme at Ahbab Nagar
Jwalapur Zone E-2 at Haridwar
Cost – 24.84 Cr
8
STP at Sarai, Haridwar
Cost – 24.91 Cr
STP capacity – 18 MLD
Tapovan STP
15
S. No. Project
9Sewerage Scheme in Gangotri
Cost – 0.45 Cr
10
Sewerage System and STP for
Gangotri Dham
Cost – 10.48 Cr
STP capacity – 1 MLD
11I&D at Devprayag
Cost – 7.27 Cr
12I&D at Badrinath
Cost – 7.26 Cr
13Sewerage Scheme in Uttarkashi
Cost – 4.84 Cr
Total (13 projects) Cost – ₹ 139.35 Cr
STP capacity – 23.9 MLD
Uttarakhand– Completed Projects
Gangotri
Gangotri
16
S.No. Project
1
STP at Jagjeetpur & Sarai
Cost – 273.37 Cr
STP capacity – 82 MLD
Physical progress – 13.05 %
Likely date of completion – Mar’19
2
Tertiary treatment of existing 27 MLD STP
at Jagjeetpur & u/g of existing 18 MLD STP
at Sarai
Cost – 32.65 Cr
Physical progress – 10 %
Likely date of completion – Nov’18
3
I&D at Sarai & JagjeetpurCost – 116.28 Cr
Physical progress – 48.86 %
Likely date of completion – Dec’18
4
Upgradation of STP at Tapovan
Cost – 2.19 Cr
Physical progress – 98 %
Likely date of completion – May’18
Uttarakhand – Work in Progress
KassawanSPS (I&D Sarai)
STP Sarai
17
S.No. Project
5
STP at Kirtinagar
Cost – 4.23 Cr
STP capacity – 0.06 MLD
Physical progress – 70 %
Likely date of completion – May’18
6
I&D and STP at Rudraprayag
Cost – 13.14 Cr
STP capacity – 0.525 MLD
Physical progress – 5 %
Likely date of completion – Dec’18
7
I&D and STP at Karnaprayag
Cost – 12.09 Cr
STP capacity – 0.35 MLD
Physical progress – 12 %
Likely date of completion – Dec’18
Uttarakhand – Work in Progress
Kirtinagar STP
18
S. No. Project
8
I&D with STP at Badrinath
Cost – 18.23 Cr
STP capacity – 1.01 MLD
Physical progress – 3 %
Likely date of completion – Dec’18
9
I&D and STP at Nandaprayag
Cost – 6.46 Cr
STP capacity – 0.15 MLD
Physical progress – 14 %
Likely date of completion – Dec’18
10
I&D and STP, at Chamoli
Cost – 61.83 Cr
STP capacity – 4.38 MLD
Physical progress – 11 %
Likely date of completion – Dec’18
Uttarakhand – Work in Progress
Nandprayag
Badrinath
19
S. No. Project
11
Upgradation of STP at Srinagar
Cost – 15.40 Cr
Physical progress – 5 %
Likely date of completion – Nov’18
12
I&D and STP at Srinagar
Cost – 22.51 Cr
STP capacity – 1 MLD
Physical progress – 8 %
Likely date of completion – Nov’18
13
I&D with STP at Joshimath
Cost – 48.42 Cr
STP capacity – 3.78 MLD
Physical progress – 10 %
Likely date of completion – Nov’18
14
Upgradation of STP (Gyansu)
Cost – 10.03 Cr
Physical progress – 20 %
Likely date of completion – Jun’18
Uttarakhand – Work in Progress
Srinagar STP Excavation
Upgradation at Uttarkashi STP
20
S. No. Project
15
Upgradation of STP at Swargashram,(Rishikesh)
Cost – 5.20 Cr
Physical progress – 15 %
Likely date of completion – Jun’18
16
Rising main and STP at Muni Ki Reti
Cost – 80.45 Cr
STP capacity – 12.5 MLD
Physical progress – 12 %
Likely date of completion – Mar’19
17
I&D at Arihant Vihar and New Vishnu Garden,
Haridwar
Cost – 4.68 Cr
Physical progress – 11 %
Likely date of completion – Oct’18
18
I&D with STP at Rishikesh
Cost – 158 Cr
STP capacity – 26 MLD
Physical progress – 8 %
Likely date of completion – Dec’19
Total (18 projects) Cost – ₹ 885.16 Cr
STP capacity – 131.76 MLD
Uttarakhand – Work in Progress
Muni ki Reti SPS
Cost: Rs. 6538.62 Cr
Sewage Generation- 234 MLD
Existing Capacity – 272MLD
Under Tendering- 72 MLD
All 20 drains being tapped
Uttar Pradesh- Completed projects
23
S. No. Project
1
Sewerage & Non sewerage
Schemes at District 'B' & 'E' of
Allahabad
Cost – 199.26 Cr
STP capacity – 85 MLD
2Sewerage work in District ‘E’
Cost – 142 Cr
3
Sewerage & Non sewerage
Schemes at District 'A' of
Alahabad
Cost – 106.08 Cr
STP capacity – 20 MLD
4
STP at Salori
Cost – 42.4 Cr
STP capacity – 14 MLD
Kodra STP-25 MLD
Salori STP-14 MLD
24
S. No. Project
5
Sewerage System & STP works
(Phase II) at Kannauj (Kali)
Cost – 43.66 Cr
STP capacity – 1 MLD
6
Sewerage Scheme at Narora,
Bulandshahar
Cost – 34.87 Cr
STP capacity – 4 MLD
Uttar Pradesh- Completed projects
Narora STP-4MLD
KannaujSTP- 13MLD
25
S. No. Project
7
Sewerage System & STP works at
Garhmuhteshwar
Cost – 46.51 Cr
STP capacity – 9 MLD
8
Sewerage works in
Anupshahar, Bulandshahar
Cost – 75.79 Cr
STP capacity – 2.5 MLD
Total (8 projects) Cost – ₹ 690.57 Cr
STP capacity – 135.5 MLD
Uttar Pradesh- Completed projects
26
S.No. Project
1
Sewerage System in District 'C' &
Allahapur, Allahabad
Cost – 146.87 Cr
Physical progress –84%
Likely date of completion – May’18
2
Sewerage works in Sewerage
District 'A' of Allahabad
Cost – 288.94 Cr
Physical progress – 65 %
Likely date of completion – Oct’18
3
Sewerage System with Sewer
network in District 'B' of Allahabad
Cost – 265.86 Cr
Physical progress – 63 %
Likely date of completion – Dec’18
Uttar Pradesh- Work in progress projects
VivekanandPark SPS
Chilla SPS
Sewer Works in Dist-B
Sewage Generation- 310 MLD
Existing Capacity – 102 MLD
Work in Progress – 310 MLD STP
All 37 drains being tapped
28
S.No. Project
4
Sewer network in District E of
Allahabad - Part 2
Cost – 52.78 Cr
Physical progress –88%
Likely date of completion –
May’18
5
JICA assisted Ganga Action
Plan Phase II project at
Varanasi
Cost – 641.19 Cr
STP capacity – 140 MLD
Physical progress –82%
Likely date of completion – Jul’18
Uttar Pradesh- Work in progress projects
Trenchless Sewerline
Dinapur STP
•District I network •Sisamau nala I&D works
•District IV Sewer network
Sisamau Nala•District III Sewer network
Sewage Generation- 457 MLD
Existing Capacity – 457MLD
Work in Progress – 15 MLD
Under Tendering- 30 MLD
All 21 drains being tapped
30
S.No. Project
6
Sewerage System & STP works
(Phase I) at Moradabad
Cost – 279.91 Cr
STP capacity – 58 MLD
Physical progress – 87%
Likely date of completion –
Jun’18
7
I&D of Sisamau Nala of Kanpur
city
Cost – 63.8 Cr
Physical progress – 20 %
Likely date of completion –
Oct’18
8
Sewerage works in District I of
Kanpur
Cost – 370.4 Cr
Physical progress – 10 %
Likely date of completion – Jul’20
Uttar Pradesh- Work in progress projects
Moradabad STP-58MLD
Guptar Ghat SPS
31
S.No. Project
9
STP for Assi-BHU District at
Ramana
Cost – 161.31 Cr
STP capacity – 50 MLD
Likely date of completion –
Dec’19
TOTAL (9 projects) Cost – ₹ 2271.06 Cr
STP capacity – 248 MLD
Uttar Pradesh- Work in progress projects
32
Uttar Pradesh – Tender received and under finalization
Sl
No.Name of the project
Date of
Sanction
Sanctioned
Cost (₹ in
Cr.)
STP
Capacity
(MLD)
Sewer
Network
(Km)
Likely Date
of Award
1Interception, Diversion & Treatment
works in Chunar, Dist. Mirzapur02.08.2017 27.98 2 1.16 May-18
2
Rehabilitation of Sewage Infrastructure &
Augmentation/ up gradation of Existing
STP at Vrindavan
24.03.2017 33.82 5 - May-18
3 Mathura Sewerage Scheme (HAM) 17.10.2017 204.97 67.5 - May-18
Total 266.8 74.5 1.16
33
Uttar Pradesh – Under Tendering
Sl
No.Name of Project
Sanctioned
Cost (₹ in
Cr.)
STP
Capacity
(MLD)
Sewer
Network
(Km)
Likely Date
of Award
1 Sewerage Scheme & STP at Bithoor, Kanpur Nagar 13.4 2 - June-18
2Interception, Diversion of drains & Sewage
Treatment works at Ramnagar71.26 10 0.44 July-18
3Interception, Diversion of drains & Sewage
Treatment works at Unnao (HAM)102.2 13 3.3 July-18
4
Interception, Diversion of drains & Sewage
Treatment works at Shuklaganj, Dist. Unnao
(HAM)
65.18 6 0.15 July-18
5STP at Pankha, Kanpur and integration with
existing STPs967.23 30 16.5
July-18
6
Interception, Diversion & Treatment works for
Naini (District G), Phaphamau (District F) & Jhusi
area District in Allahabad (HAM)
767.59 72 13.21 July-18
7Integrated project for development of STPs in
Allahabad alongwith existing Assets904.00 - - July-18
Uttar Pradesh State Project Overview
34
Sl
No.Name of Project
Sanctioned
Cost (₹ in
Cr.)
STP
Capacity
(MLD)
Sewer
Network
(Km)
Likely Date
of Award
8Farrukhabad I&D and STP works (HAM)
213.62 35 - Jul-18
9 I&D works and STP, Mirzapur (HAM) 114.93 17 - Jul-18
10 I&D works and STP, Gazipur (HAM) 90.81 21 - Jul-18
Total 3310.22 206 33.6
Uttar Pradesh – Under Tendering
35
Namami Gange Projects (20 Towns) in Bihar
Projects – 20
Work in Progress – 10
Tender under evaluation-4
Under tendering- 6
Cost: Rs. 4629.12 Cr
Sewerage Projects in Patna
Sewage Generation- 286 MLD
Existing Capacity – 109 MLD
Work in Progress – 200 MLD
Tender to be Floated- 150 MLD
All 33 drains being tapped
37
PM Laying Foundation Stone for Patna Sewerage Schemes (at Mokama)
38
S. No. Project
1
Sewer Networks, SPS and STP at Buxar
Cost – 74.95 Cr
STP capacity – 16 MLD
Physical progress – 39 %
Likely date of completion – Feb’19
2
Sewage Treatment Plant - Beur for Patna,
Bihar
Cost – 68.16 Cr
STP capacity – 43 MLD
Physical progress – 23 %
Likely date of completion – Dec’19
3
Sewerage system with Sewer network,
Patna Beur
Cost – 225.77Cr
Physical progress – 22%
Likely date of completion – Mar’20
Bihar– Ongoing projects
Beur STP, Patna
Beur Network, Patna
Bihar State Project Overview
39
S. No. Project
4
Sewage Treatment Plant - Karmalichak for
Patna, Bihar
Cost – 77.04 Cr
STP capacity – 37 MLD
Physical progress – 24 %
Likely date of completion – Dec ‘ 19
5
Saidpur STP and adjoining Network for Patna,
Bihar
Cost – 184.93 Cr
STP capacity – 60 MLD
Physical progress – 22%
Likely date of completion – Dec’19
6
Saidpur Sewer Network, Patna, Bihar
Cost –Cr
STP capacity –6 MLD
Physical progress –%
Likely date of completion –
7
Sewerage scheme at Pahari Zone V, Patna, Bihar
Cost – 356.37Cr
(Agreement signed on 25-4-2018)
Likely date of completion – Apr’21
Bihar– Ongoing projects
Saidpur STP, Patna
Bihar State Project Overview
40
S.No. Project
8
Sewerage scheme at Pahari (Zone IVA (S)), Patna, Bihar
Cost – 184.86 Cr
(Recently Awarded)
Likely date of completion – Apr’21
9
Sewerage Treatment Plant at Pahari - Patna, Bihar
Cost – 191.62 Cr
STP capacity – 60 MLD
(Agreement signed on 9-5-2018)
Likely date of completion – April’21
10
Sewerage system with Sewer network ,Patna
Karmalichak
Cost – 277.42 Cr
(Recently Awarded)
Likely date of completion – Aug’20
Total
Cost (10 projects) – ₹1909.75 Cr
STP capacity – 216 MLD
Bihar– Ongoing projects
Karmalichak STP, Patna
Abstract - Under Tendering Process projects
Projects CostTender Under
EvaluationTender to be floated
10 2719.12 4 6
41
Sl
No.Name of Project
Sanctioned
Cost (₹ in
Cr.)
STP Capacity
(MLD)
Sewer
Network
(Km)
Likely Date of
Award
1 Sultanganj I&D and STP works 60.22 10 - May-18
2 Mokama I&D and STP works 53.81 8 - May-18
3 I&D and STP for Barh town 58 11 - May-18
4 I&D and STP works for Naugachia 60.79 9 - May-18
Total 232.82 38
Bihar– Tender Received and Finalisation in Process:
42
Sr.
No
Project Name Approved
Project Cost
(₹ in Cr.)
STP capacity
(MLD)
Sewer
Network
(Km)
NIT Publication
Date
1Sewerage System and STP for Digha
zone, Patna (HAM)824.00 100 288 May-18
2Sewerage System and STP for
Kankarbagh zone, Patna (HAM)578.89 50 150 May-18
3I&D and STP works for Bhagalpur
(HAM)254.13 65 - Jun-18
4Sewer Networks, SPS and STP,
Munger294.02 30 174.75 May-18
5Sewer Network, SPS and STP,
Begusarai230.07 17 114 May-18
6Sewer Networks, SPS and STP,
Hajipur305.19 22 189.3 May-18
Total 2486.3 284 916
Bihar– Tender to be floated
43
Namami Gange Projects (2 Towns) in Jharkhand
Sahibganj- 12 MLD STP, 55 km Sewer, ₹ 99.36 Cr,32% progress; likely
completion- December 2018
Rajmahal- 3.5 MLD STP, 34 km Sewer, ₹ 50.23 Cr, recently awarded;
likely completion by June 2019
Projects – 2
Work in Progress – 2
Cost: Rs. 149.59 Cr
44
Sahibganj STP
45
Namami Gange Projects in West Bengal
Projects – 15
Completed –2
Work in Progress – 4
Under Tendering -4
Tender to be floated-5
Cost: Rs. 2606.58 Cr
West Bengal State Project Overview
46
Sl No. Project
1
Sewerage Scheme & STP
works at Gayeshpur
Cost – 168.67 Cr
STP capacity – 8.23 MLD
2
Sewerage Scheme & STP
works at Kalyani
Cost – 57.87 Cr
STP capacity – 4+17 MLD
Total
Cost – 226.54 Cr
STP capacity – 29.23 MLD
West Bengal – Completed projects
West Bengal State Project Overview
47
S.No. Project
1
Sewerage Scheme & STP
works at Bhatpara
Cost – 228.52 Cr
STP capacity – 31 MLD
Physical progress – 91%
Likely date of completion
– Jun’18
2
Sewerage System & STP
works at Halishahr
Cost – 274.76 Cr
STP capacity – 16 MLD
Physical progress – 28 %
Likely date of completion
– Dec’18
West Bengal –Ongoing Projects
West Bengal State Project Overview
48
S.No. Project
3
Sewerage System & STP
works at Budge-Budge
Cost – 145.98 Cr
STP capacity – 9.3 MLD
Physical progress –35 %
Likely date of
completion – Oct’19
4
Sewerage System with
sewer network at
Barrackpore
Cost – 272.32 Cr
STP capacity – 24 MLD
Physical progress – 24 %
Likely date of
completion – Dec’19
TOTAL (4 projects) - Cost ₹ 921.58 Cr
STP capacity – 80.3 MLD
West Bengal – Ongoing Projects
49
Sl
No.Name of Project
Sanctioned
Cost (₹ in
Cr.)
STP
Capacity
(MLD)
Sewer
Network
(Km)
Likely Date
of Award
1Interception, Diversion & treatment works at
Behrampore51.20 3.5 5.25 Jun-18
2Interception, Diversion & treatment works at
Nabadwip54.30 20 4 Jun-18
3Interception, Diversion & treatment Works at
Tolly's Nullah (Adi Ganga) (HAM)307.12 26.10 114 Jul-18
4Integration of STPs with rehabilitation and O&M of
existing Assets165.16 - - Jul-18
Total 577.78 49.6 123.25
West Bengal – Under Tendering projects
West Bengal State Project Overview
50
Tender to be floated:
Sl
No.Name of Project
Date of
AA&ES
Sanctione
d Cost (₹
in Cr.)
STP
Capacity
(MLD)
Sewer
Networ
k (Km)
NIT
Publicatio
n
1Interception, Diversion & treatment works at
Howrah (HAM)02.08.2017 185.22 65 May-18
2Interception & Diversion with STP at Bally
(HAM)10.10.2017 164.93 40 May-18
3Interception, Diversion & treatment works at
Baranagar & Kamarahati (HAM)17.01.2018 172.10 60 9 May-18
4Interception & Diversion with STP at Hugli-
Chinsurah- 160 29.3 20 Jun-18
5 Interception & Diversion with STP at Maheshtala - 198.43 28.1 Jun-18
TOTAL 880.68 222.4 29
West Bengal – Tender to be floated
Status of Existing Sewerage Infrastructure & Interventions
97 towns on Ganga Main Stem
Sewage Generation : 2953 MLD (Yr. 2016), 3603 MLD (Yr 2035)
Available Treatment Capacity (01/11/2017) : 84 STPs – 1584 MLD in 46 Towns
Status of Existing 84 STPs
51
Recently commissioned,
working fine alongwith long term O&M (733 MLD) - 39 STPs
Operational and non
compliant & under utilized (581 mld) - 14
STPs
Defunct (270 mld) - 31 STPs
46%
17%
37%
39 STPs- Working satisfactorily
12 STPs (91 MLD)- Up-gradation & O&M Sanctioned
8 STPs (530 MLD)- Integrated under One City One Operator
23 STPs – Tender for upgradation
2 STPs discarded;
Present Status of Existing STPs
52
State Working fine –
Necessary
Interventions
taken
Nos. (MLD)
Up-gradation &
O&M
Sanctioned
Nos. (MLD)
Integrated under
One City One
Operator
Nos. (MLD)
Up-
gradation
through
Atkins
Nos.
(MLD)
Discarded
Nos. (MLD)
Total
Nos. (MLD)
Uttarakhand 9 (91.9) 2 (9.5)
Lakkar Ghat
Srinagar
11(101.4)
Uttar
Pradesh
17 (437.31) 4 (343)
Jajmau 130
Bingawan 210
Shantipuram
Trivenipuram
1 (27)
Jajmau
CETP
2 (7.5)
Kalindipuram
Jajmau 5
24(814.81)
Bihar 3 (84) 3 (38)
Pahari, Buxar
Bhagalpur (BP)
1 (2)
Chhapra
7(124)
West Bengal 10 (119.42) 7 (43.25)
Bhatpara– 4nos.
Budge-Budge
Barrackpore
Maheshtala (BP)
4 (187)
Anupara (BP)
Gardenreach
Keorapukur
Kamarhati (BP)
21 (194.27) 42(543.94)
Total 39 (732.63) 12 (90.75) 8 (530) 23 (223.27) 2 (7.5) 84 (1584.15)
Implementati
on Status
Operating Execution- 10
(75.27)
Bid prep – 2 (15)
Bidding- 6 (445)
Bid prep- 2 (85)
Bid prep-
23(223.27)
Execution- 10 (75.27)
Bidding – 6 (445)
Bid prep – 27 (323.27)
Sr. No.
StateNo. of
TributariesNo. of Towns
1 Uttarakhand 1 1
2 Uttar Pradesh 10 33
3 Bihar 7 15
4 Jharkhand 2 2
5 West Bengal 1 3
6 Rajasthan 3 4
7 Madhya Pradesh 7 10
TOTAL 31 68
Upcoming Projects on Tributaries
Decentralised Treatment of 20 drains in 15 cities through Modular Treatment System
• 20 drains which are not covered in sewerage projects have been identified
• Pollution flowing in 20 drains in 15 cities (about 60 MLD) to be contained & treated using modular STPs,
• First of its kind offered on services contract model and include removal of trash, solid waste and pollution load.
• Bhudana, Muzaffar nagar, Gajraula, Moradabad, Hapur, Gulaothi, Kasganj, Unnao, Bhadohi, Kunda in UP and Titagarh, Jangipur, Champdani, Chandannagar and Belur in West Bengal.
• Tenders on services model are under process • Award of work by May’2018 end.• Modular STPs are ready to install tailored systems and will be
operational in six months time.• After successful response to the tenders, the model will be
replicated in other untapped drains.
Ministry of Drinking Water and Sanitation has taken up construction of IHHLs, liquid
waste management for all 1662 Gram Panchayats.
Rural Sanitation
55
S. No. State Completed IHHLVillages (Near Ganga)
Declared as ODF
1 Bihar 321324 468
2 Jharkhand 2497766
3 U.P388340 1604
4 Uttarakhand9540 222
5 W.B339507 2105
Total 1083688 4465
Total Cost – Rs. 841.3 Crores
Ghats and Crematoria
No. of
Projects
No. OfCost
(₹ in Cr)
Status
Ghats
(G)
Crematoria
(C)
Total
(T)
Completed Under Progress Under Tendering
G C G C G C
37 151 54 205 721.94 32 6 104 22 15 26
ProposedPresent
56
Original site
Present ProposedOriginal site
GHATS
CREMATORIA
Rudraprayag AlaknandaRiver Bathing Ghat - 1
Srinagar Nathaini Cremation ghat
57
No. of
Projects
No. OfCost
(₹ in Cr)
Status
Ghats
(G)
Crematoria
(C)
Total
(T)
Completed Under Progress Under Tendering
G C G C G C
9 22 22 44 175.08 8 6 13 16 1 0
Ghats and Crematoria - Uttarakhand
RAMKUND GHAT DEVPRAYAG
RHS RUDRAPRAYAG
Chandi Ghat RFD
58
Development of Chandi Ghat(Adjacent to Chandi Ghat Bridge, Haridwar)
Project cost- 50.36 CrPhysical progress- 55%Expenditure- 26.17 CrLikely Date of Completion- Dec-18
Main Component of Chandi Ghat Project-•Bathing Ghat- 630 m long•Cremation Ghat- 140 m long•STP- 25 KLD•Water & Sewer Network- 1.5 km•Overhead Water Tank- 70 KLD
PRE - PROJECT SCENARIO PRESENT SCENARIO
59
No. of
Projects
No. OfCost
(₹ in Cr)
Status
Ghats
(G)
Crematoria
(C)
Total
(T)
Completed Under Progress Under Tendering
G C G C G C
11 87 25 112 397.70 23 0 61 1 3 24
Ghats and Crematoria – Uttar Pradesh
Bhairav, Kaushalya, Bharat & Pandav Ghats Bithoor
Sarsaiya ghat, Kanpur
Ravani katiriGhat, Balawalito Anupshahr
60
No. of Projects
No. Of
Cost (₹ in
Cr)
Status
Ghats (G)Crematoria
(C)Total (T)
Completed Under Progress
G C G C
5 14 1 15 40.86 0 0 14 1
Ghats and Crematoria - Bihar
Pul Ghat, Sonepur
Gola ghat, Buxar
Konhara Crematoria, Hajipur
61
Patna RFD
Patna RFD
Cost: ₹ 243.27 Crore Expenditure: ₹ 167 Crore
No. of Ghats: 20 Complete: 16
Promenade: 6.6 km Complete: 4.7 km
Crematoria : 1 Civil Work complete
overall 85% complete
62
No. of
Projects
No. OfCost
(₹ in Cr)
Status
Ghats
(G)
Crematoria
(C)
Total
(T)
Completed Under Progress Under Tendering
G C G C G C
4 12 2 14 62.07 1 0 7 1 4 1
Ghats and Crematoria - Jharkhand
Sarkanda Ghat Sahibganj to Rajmahal
Maskaliaya Crematorium
63
No. of
Projects
No. OfCost
(₹ in Cr)
Status
Ghats
(G)
Crematoria
(C)
Total
(T)
Completed Under Progress Under Tendering
G C G C G C
7 15 4 19 44.24 0 0 9 3 6 1
Ghats and Crematoria – West Bengal
Bhatpara Crematorium
Babughat, Garulia
Girish ghat, Garulia
• Trash skimmers are deployed in 11 cities.
• Delhi, Haridwar, Garhmukteshwar, Kanpur, Allahabad,
Varanasi, Patna, Sahibganj, Howrah, Mathura-
Vrindavan, and Nabadwip.
River and Ghat Cleaning
64
Trash Skimmers
IL&FS Environmental Infrastructure and Service Ltd. (IEISL) to clean 84 Ghats in
Varanasi for 3 years at the cost of Rs.5.0 Crores per year under tripartite agreement
between NMCG, Varanasi Nagar Nigam & IEISL.
Man Mandir Ghat
• Similar Ghat Cleaning activities are
being taken up for other major towns
such as Haridwar, Kanpur- Bithoor,
Allahabad ,Mathura-Vrindavan
Ghat Cleaning
Afforestation
FRI, Dehradun has prepared afforestation plan of 1,34,106 hectare areas at an estimated cost of
INR 2294 crores.
65
2016-2018
STATE Area in ha. Rs crore
Uttarakhand 5369 35.497
Uttar Pradesh 831 18.652
Bihar 600.5 24.924
Jharkhand 396 13.428
West Bengal 3588 19.64
Total 10785 112.141
66
Biodiversity
• Biodiversity conservation to study restoration & rehabilitation of the aquatic environment of
River Ganga
• Assessment of Fish & fisheries in Ganga river system for developing sustainable
conservation & restoration plan
Thank You