1
HOR PC N39.898417 W75.435534 HOR PT N39.898091 W75.435261 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 33+79 SE PENNSYLVANIA RR N39.897314 W75.434545 GEOTECH SB-03 PROPOSED 20" PIPELINE PROPOSED 16" PIPELINE GLEN RIDDLE ROAD N39.895884 W75.433229 GEOTECH SB-04 HDD ENTRY/EXIT N39.893518 W75.431051 -100 0 100 200 300 -100 0 100 200 300 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 10° UTILITY TV UG 20+01 EXISTING SUNOCO PIPELINE 25+43 EXISTING SEWERLINE 26+62 UNDERGROUND ELECTRICAL 27+07 EXISTING SUNOCO PIPELINE 28+62 1315' 45' 87' 61' STA. 30+15 EL. 30' STA. 32+93 EL. 54' APPROXIMATE BEDROCK GRADE HDD ENTRY/EXIT 33+79 EL.69' GEOTECH SB-03 18+84, 15' RT GEOTECH SB-04 29+90, 92' RT R=1600' L=278' S=280' UNDERGROUND ELECTRICAL 23+79 EXISTING WATERLINE 23+37 EXISTING SEWERLINE 23+29 GLEN RIDDLE ROAD 23+22 OVERHEAD ELECTRIC 23+02 EXISTING WATERLINE 26+52 APPROXIMATE BEDROCK GLEN RIDDLE ROAD 23+21 UTILITY TV UG 21+00 DRIVEWAY 19+61 CL STREAM S-14 32+69 16' UTILITY FIBEROPTICS 30+47 EXISTING GAS LINE 22+97 EXISTING WATERLINE 21+96 OVERHEAD POWERLINE 23+03 EDGE OF WETLAND I1 EDGE OF WETLAND I1 EXISTING WATERLINE 30+40 0 FEET 100 100 200 STA 17+00 PULLBACK ALONG ROW EXISTING SUNOCO PIPELINES PA-DE-0103.0001 GLEN RIDDLE RD SEE PA-DE-0100.0000-RRa-16 NOTE: REFER TO TEST BORING LOG S3-0620 FOR COMPLETE SOIL MATERIAL DESCRIPTION -NG EL. 127' GEOTECH SB-03 -TOPSOIL (0' - 0.5') -COMPLETION DEPTH EL. 86' -GROUNDWATER (28.0') -SM (0.5' - 31.0') -WEATHERED GNEISS (28.0' - 41.0') -SC (0.1' - 4.0') -NG EL. 72' GEOTECH SB-04 -TOPSOIL (0' - 0.1') -CL (4.0' - 6.5') -COMPLETION DEPTH EL. 60' -WEATHERED GNEISS (12.0' - 12.3') -GROUNDWATER (4.0') -SM (6.5' - 12.0') SUNOCO EASEMENT LIMITS - NOT LOD LEGEND PERMANENT ROW TEMPORARY CONSTRUCTION ROW TEMPORARY WORKSPACE TEMPORARY ACCESS ROAD PERMANENT ACCESS ROAD SPOIL SPACE ONLY PROPOSED HDD PROPOSED 20" PIPELINE PROPOSED 16" PIPELINE HDD ENTRY-EXIT PEM WETLANDS PSS WETLANDS PFO WETLANDS -INCH HORIZONTAL DIRECTIONAL DRILL REF. DRAWING EROSION & SEDIMENT PLAN AERIAL SITE PLAN PLAN VIEW PROFILE VIEW NO. DESCRIPTION DATE BY CHK DATE REVISIONS DATE APP NOTES Sunoco Logistics Partners L.P. SUNOCO PIPELINE, L.P. 1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83 2. STATIONING IS BASED ON HORIZONTAL DISTANCES. 3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING. 5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440. PENNSYLVANIA PIPELINE PROJECT DESIGN AND CONSTRUCTION: 1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. 2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED PIPELINE. 3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4 4. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95) 5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50). 6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD). 7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND STREAM CROSSINGS. 8. CARRIER PIPE NOT ENCASED. 9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. 10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG. 11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT. 12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN WILL BE IMPLEMENTED AT ALL TIMES. 13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL TIMES. TO TO DWG NO DWG NO DESCRIPTION 16 SHEET 13 SHEET 12 ES-6.18 ES-6.20 GLEN RIDDLE RD, SOUTHEASTERN PENNSYLVANIA RR 1"=200' PA-DE-0100.0000-RRb-16 DELAWARE COUNTY, PENNSYLVANIA - UPPER CHICHESTER TOWNSHIP S3-0620B-16 A ISSUED FOR REVIEW MRS RMB AAW 08/14/15 08/14/15 08/14/15 EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 MRS RMB AAW 10/07/16 10/07/16 10/07/16 EP1 REVISED PER PADEP COMMENTS MRS RMB AAW 05/10/16 05/10/16 05/10/16 EP MRS RMB AAW 02/26/16 02/26/16 02/26/16 B ISSUED FOR BID MRS RMB AAW 08/31/15 08/31/15 08/31/15 3379' 3416'

N39.897314 N39.898417 W75.434545 N39.898091 W75.435534 … · 2016. 10. 7. · 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: N39.897314 N39.898417 W75.434545 N39.898091 W75.435534 … · 2016. 10. 7. · 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00

HOR PC

N39.898417

W75.435534

HOR PT

N39.898091

W75.435261

10+

00

11+

00

12+

00

13+

00

14+

00

15+

00

16+

00

17+

00

18+

00

19+

00

20+

00

21+

00

22+

00

23+

00

24+

00

25+

00

26+

00

27+

00

28+

00

29+

00

30+

00

31+

00

32+

00

33+

00

33+

79

SE PENNSYLVANIA RR

N39.897314

W75.434545

GEOTECH SB-03

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

GLEN RIDDLE ROAD

N39.895884

W75.433229

GEOTECH SB-04

HDD ENTRY/EXIT

N39.893518

W75.431051

-100

0

100

200

300

-100

0

100

200

300

17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00

10°

UT

IL

IT

Y T

V U

G

20

+0

1

EX

IS

TIN

G S

UN

OC

O P

IP

EL

IN

E

25

+4

3

EX

IS

TIN

G S

EW

ER

LIN

E

26

+6

2

UN

DE

RG

RO

UN

D E

LE

CT

RIC

AL

27

+0

7

EX

IS

TIN

G S

UN

OC

O P

IP

EL

IN

E

28

+6

2

1315'

45'

87'

61'

STA. 30+15

EL. 30'

STA. 32+93

EL. 54'

APPROXIMATE

BEDROCK

GRADE

HD

D E

NT

RY

/E

XIT

33

+7

9

EL

.6

9'

GE

OT

EC

H S

B-0

3

18

+8

4, 1

5' R

T

GE

OT

EC

H S

B-0

4

29

+9

0, 9

2' R

T

R=1600'

L=278'

S=280'

UN

DE

RG

RO

UN

D E

LE

CT

RIC

AL

23

+7

9

EX

IS

TIN

G W

AT

ER

LIN

E

23

+3

7

EX

IS

TIN

G S

EW

ER

LIN

E

23

+2

9

GL

EN

R

ID

DL

E R

OA

D

23

+2

2

OV

ER

HE

AD

E

LE

CT

RIC

23

+0

2

EX

IS

TIN

G W

AT

ER

LIN

E

26

+5

2

APPROXIMATE

BEDROCK

GL

EN

R

ID

DL

E R

OA

D

23

+2

1

UT

IL

IT

Y T

V U

G

21

+0

0

DR

IV

EW

AY

19

+6

1

CL

S

TR

EA

M S

-1

4

32

+6

9

16'

UT

IL

IT

Y F

IB

ER

OP

TIC

S

30

+4

7

EX

IS

TIN

G G

AS

L

IN

E

22

+9

7

EX

IS

TIN

G W

AT

ER

LIN

E

21

+9

6

OV

ER

HE

AD

P

OW

ER

LIN

E

23

+0

3

ED

GE

O

F W

ET

LA

ND

I1

ED

GE

O

F W

ET

LA

ND

I1

EX

IS

TIN

G W

AT

ER

LIN

E

30

+4

0

0

FEET

100 100 200

STA 17+00

PU

LLB

AC

K A

LO

NG

RO

W

EXISTING SUNOCO PIPELINES

PA-DE-0103.0001

GLE

N R

ID

DLE

R

D

SEE

PA-DE-0100.0000-RRa-16

NOTE: REFER TO TEST BORING LOG S3-0620

FOR COMPLETE SOIL MATERIAL DESCRIPTION

-NG EL. 127'

GEOTECH SB-03

-TOPSOIL (0' - 0.5')

-COMPLETION

DEPTH EL. 86'

-GROUNDWATER (28.0')

-SM (0.5' - 31.0')

-WEATHERED GNEISS

(28.0' - 41.0')

-SC (0.1' - 4.0')

-NG EL. 72'

GEOTECH SB-04

-TOPSOIL (0' - 0.1')

-CL (4.0' - 6.5')

-COMPLETION

DEPTH EL. 60'

-WEATHERED GNEISS

(12.0' - 12.3')

-GROUNDWATER (4.0')

-SM (6.5' - 12.0')

SUNOCO EASEMENT

LIMITS - NOT LOD

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

PROPOSED 16" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN

WILL BE IMPLEMENTED AT ALL TIMES.

13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL

TIMES.

TO

TO

DWG NO DWG NO DESCRIPTION

16

SHEET 13SHEET 12

ES-6.18 ES-6.20

GLEN RIDDLE RD, SOUTHEASTERN PENNSYLVANIA RR

1"=200'

PA-DE-0100.0000-RRb-16

DELAWARE COUNTY, PENNSYLVANIA - UPPER CHICHESTER TOWNSHIP

S3-0620B-16

A ISSUED FOR REVIEWMRS RMB AAW 08/14/1508/14/15 08/14/15

EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16MRS RMB AAW10/07/16 10/07/1610/07/16

EP1 REVISED PER PADEP COMMENTSMRS RMB AAW05/10/16 05/10/1605/10/16

EP MRS RMB AAW02/26/1602/26/16 02/26/16

B ISSUED FOR BIDMRS RMB AAW08/31/1508/31/15 08/31/15

3379'

3416'