    North Williams Trac Operations Safety Project

    WELCOME

    The Portland Bureau o Transportation

    is exploring options that will

    make travelling on North Williams

    Avenue between Weidler Street and

    Killingsworth Street saer and morecomortable or all users.

    With the advice o a Stakeholder

    Advisory Committee ormed or this

    project, City sta have prepared alternative designs or your consideration.

    These designs include potential transportation changes to reduce conicts and

    improve operation o the bike lane, auto lanes, bus stops, and crosswalks.

    Heres how you can provide your input:

    Talk with staPlace comments on the map provided

    Answer questions at stations labelled Input Required

    Provide written comment

    Submit comments on project website:

    www.portlandonline.com/transportation/williams

    For more inormation, please visit the website or contact the Project Manager:

    Ellen Vanderslice

    503-823-4638

    [email protected]

    Notice o Non-Discrimination to the Public: The Portland Bureau o Transportation ully complies with Title VI o the Civil Rights Act o 1964 and related statutes and regulations in all programs and activi-ties. Contact the Title VI Coo rdinator at Room 1204, 1120 SW 5th Ave, Portland, OR 97204, or by telephone, (503) 823-2559, City TDD (503) 823-6868. To help ensure equal access to programs, se rvices and

    activities o the City o Portland, the City will provide auxiliary aids and services to persons with disabilities; please call 503-823-5185 or TDD 503-823-6868.

    PHOTOByjONATHANMAuS

    4 Comfort

    NE 7th Avenue

    trafc, with no

    Plus, it ends ju

    Street.

    5 Continui

    Side streets eaAvenue dont g

    6 Destinat

    North Williams

    place, and man

    biking on the s

    shop, or visit o

    7 The Num

    More than 3,00

    up North Willia

    day in the war

    evening, the st

    400 bikes and

    per hour in the

    Russell Street.

    3 Connections:O all the possible northbound

    bikeways or this area, North

    Williams Avenue is the only one

    with direct connections to the

    Broadway and Steel Bridge bike

    paths.

    2 NE MLK Boulevard:MLK is designated a major city

    trafc street or cars and is not a

    designated bikeway. Some people

    thereore use North Williams

    Avenue to bike to destinations on

    or near MLK Boulevard.

    1 Crossings and Continuity: The side streets west o Williams

    dont go through, and the major

    east-west streets are hard to cross

    because they carry heavy auto

    trafc rom I-5.

    Why Williams?The City o Portland designated North Williams Avenue a "major city bikew

    Portland Bicycle Plan last year. This means North Williams Avenue will beco

    the best and busiest bike routes in the bike network, the same way "major

    streets" (like NE MLK Blvd.) are designed to be the best and busiest car routWhy was North Williams Avenue designated a "major city bikeway"? And w

    many people already biking on North Williams Avenue?

    1

    1

    2

    3

    45

    5

    6

    7

  • 8/7/2019 N Williams April 16 Open House Displays

    2/13

    North Williams Trac Operations Safety Project

    FOUR MAJOR PROBLEMS

    Failure to yield to pedestrians

    crosswalks is a common comp

    We have heard concerns about speeding on every

    segment o N Williams. Between Broadway and Russell,

    52% o cars exceed the 30 mph speed limit. Multiple

    Auto Speeds

    People are concerned about the ease and saety o

    walking across N Williams. With two auto lanes and one

    bike lane to cross, and ast-moving car trac, usingeven a well-marked crosswalk can be unnerving. North

    Williams is a place where many children and people with

    disabilities walk and use transit, so crosswalks need to

    be sae and easy to use.

    Crosswalk Safety

    These are the concerns that we have heard most oten rom the residents,

    businesses and visitors o N Williams Avenue.

  • 8/7/2019 N Williams April 16 Open House Displays

    3/13

    North Williams Trac Operations Safety Project

    CROSSWALK SAFETY STRATEGIES

    Providing sae and comortable travel orpedestrians using North Williams Avenue is

    one o the highest priorities or this project. The

    potential strategies or improving the pedestrian

    environment includes:

    Reducing the number o auto lanes in certain

    locations to slow trac and allow drivers to

    better see pedestrians

    Provide high-visibility or signalized crosswalks

    at strategic locations

    Provide curb extensions to allow pedestriansand drivers to see one another

    Manage conficts with bicyclists

    Curb extensions decrease crossing distances and

    improves the visibility o pedestrians

  • 8/7/2019 N Williams April 16 Open House Displays

    4/13

    North Williams Trac Operations Safety Project

    SPEED REDUCTION STRATEGIES

    REDUCE TO ONETRAVEL LANE

    Providing a single travel lanegenerally reduces vehicle speeds

    as vehicles travel behind other

    slower-moving vehicles, e.g. North

    Vancouver Avenue.

    USE SIGNAL TIMING TO

  • 8/7/2019 N Williams April 16 Open House Displays

    5/13

    North Williams Trac Operations Safety Project

    BUS/BIKE CONFLICT STRATEGIES

    CYCLE TRACKDivert bicyclists behind

    bus stops so they do not

    have to interact with

    buses. This treatment

    requires managing

    conficts between bus

    passengers and the cycle

    track.

    SEPARATE BUSES ANDCYCLISTS IN TIMESeparate signal phases can be used to

    separate buses and bikes e g buses could

  • 8/7/2019 N Williams April 16 Open House Displays

    6/13

    North Williams Trac Operations Safety Project

    BIKEWAY CAPACITY STRATEGIES

    The North Williams corridor is one o the most popular bikeways in Portland. This can lead tocrowded conditions where aster cyclists try to pass slower cyclists. Providing more space, so

    bicyclists do not encroach into trac lanes when passing, will create a more comortable cycling

    environment and be able to carry even more cyclists in the uture. Some potential bikeway

    enhancements are described below.

    WIDE BIKE LANE BUFFERED BIKE LANE

    BENEFITS: BENEFITS:

  • 8/7/2019 N Williams April 16 Open House Displays

    7/13

    North Williams Trac Operations Safety Project

    NORTH WILLIAMS SEGMENTS 5 -

    5 SKIDMORE TO KILLINGSWORTApproximately 700 to 850 motor vehicles during peak h

    Light bus stop activity; some conficts (Alberta)

    No bicycle count data available

    Neighbors concerned about speeding (no speed dataavailable)

    Crosswalks are used by vulnerable pedestrians

    OPPORTUNITY:

    Remove a travel lane

    on the west side o th

    street and shit lanesto create space or an

    enhanced bikeway

    Moderate parking demand

  • 8/7/2019 N Williams April 16 Open House Displays

    8/13

    North Williams Trac Operations Safety Project

    NORTH WILLIAMS SEGMENTS 2 -

    2 I-5 ON-RAMP TO RUSSELLApproximately 700 motor vehicles during peak hour

    Moderate bus stop activity bus/bike leaprogging

    Approximately 300 bicyclists during peak hour

    52% o vehicles exceed the speed limit, many neighbor

    complaints

    Tillamook and Page used by vulnerable pedestrians

    Light to moderate parking demand

    OPPORTUNITY:Convert an auto trave

    lane into an enhanced

    bikeway

  • 8/7/2019 N Williams April 16 Open House Displays

    9/13

    North Williams Trac Operations Safety Project

    SIGNAL PROGRESSION

    Ever notice that i you go the right speed along

    Grand Avenue (30 mph) or Broadway in Downtown

    (12 mph) you get all green lights? Trac engineers

    adjust the timing o these signals so that the trac

    progresses at these speeds. The same technique

    can be used on North Williams Avenue to better

    manage vehicle speeds.

    However, providing a green wave requires a

    close and regular spacing o signals that does

    not currently exist on North Williams Avenue. It

    is proposed that speeds be better managed in

    the commercial district between Cook Street and

    Shaver Street by adding signals at:

    Failing Street

    Beech Street

  • 8/7/2019 N Williams April 16 Open House Displays

    10/13

    North Williams Trac Operations Safety Project

    LANE CONFIGURATION

    One Lane or Two?A single motor vehicle lane on North

    Williams Avenue can carry approximately

    850 vehicles per hour. Two lanes can carry

    approximately 1,700 vehicles per hour.

    Peak hour trac does not exceed the one

    lane capacity in a number o segments and

    existing trac may be accommodated with a

    single lane.

    In segments 2 and 5, it is proposed that

    one o the motor vehicle travel lanes be

    converted to provide space or an enhancedbikeway and bus operating space. The

    benets o a single travel lane arrangement

    include:

    ONE-LANE

    CAPACITY

    ourTrafc(vehic

    lesperhour)

    TWO-LANE

    CAPACITY

    1,700

    850

    t1

    t2

    t3

    t4

    t5

    1,550

    700800

    1,100

    850

    Weekday PM Peak Hour Motor Veh

    Trafc Volumes on North Williams Av

  • 8/7/2019 N Williams April 16 Open House Displays

    11/13

    North Williams Trac Operations Safety Project

    EXISTING CONDITIONS

    For more inormation see the North Williams Existing ConditionsReport at www.portlandonline.com/transportation/williams

  • 8/7/2019 N Williams April 16 Open House Displays

    12/13

    North Williams Trac Operations Safety Project

    EXISTING CONDITIONS

    For more inormation see the North Williams Existing ConditionsReport at www.portlandonline.com/transportation/williams

    NORTH WILLIAMS POTENTIAL BIKEWAY ENHANCEMENT

  • 8/7/2019 N Williams April 16 Open House Displays

    13/13

    N

    Ap

    CYCLE TRACK ENHANCED BIKE LAN

    PROPOSED ALIGNMENT OPTIONSEXISTING CONDITIONS

    5

    4

    3

    2

    1

    5

    4

    3

    2

    1

    NORTH WILLIAMS POTENTIAL BIKEWAY ENHANCEMENT

    (No Cycle Track Option)TMETN