MyFloridaMarketPlace CRB MeetingSeptember 28, 2006
Page - 2
Agenda
Opening Comments – Agenda Review
Office Depot Punch-out Design Change (SIR 422) We want your guidance to move forward
Office Depot Master Agreement
MFMP Upgrade Upgrade overview – phases to completion Benefits/Enhancements between current version (7.1a) and upgrade
version (8.2) Additional DMS objectives CRB Participation Customization review
Next Meeting Time / Location
Page - 3
Ariba Buyer 8.2.2 UpgradeBenefits/Enhancements
Catalog Enhancements: Select multiple catalog items and enter the desired ordered quantity before
adding to requisition Additional Keyword Search Options:
Use of ‘And’ or ‘Or’ operator Exact Phrase Exclude Words
Catalog Favorites: Add to Favorites from catalog search results screen Catalog items added to your Favorites display a ‘star’ icon Create Favorites groups
Enhanced Login Option Go-to menu options (e.g. Home, Status, Approve Requests, Catalog, etc)
Session Timeout Warning Allow users to extend their session or continue with session timeout
Leverage system to create reports in Excel Export system search results (max. 500 rows) Export requisition line items
Page - 4
Ariba Buyer 8.2.2 UpgradeBenefits/Enhancements
User interface consolidation resulting in fewer process steps
Transaction Type 7.1a
Process Steps
8.2.2
Process Steps
Create Requisition 7 3
Address Maintenance 5 3
Cancel Requisition 5 1
Contract Exemption 5 1
Delete Disbursement 5 1
FLAIR Login Information 5 1
Password Change 3 1
Payment Update 5 1
Release Encumbrance 5 1
Restore Contract Amount 5 1
User Maintenance 5 3
Page - 5
Ariba Buyer 8.2.2 UpgradeBenefits/Enhancements
Data Scoping Entity scoping will be added to the System Search functionality by using a
combination of roles and permissions which will provide different levels of access. The different levels are listed below:
Level 1 –scoped by the user’s assigned entity and will not return any results outside of that entity.
Level 2 –scoped by a user group (subset of the available entities within MFMP) and will not return any results for entities outside the assigned user group. An example of a user group could potential be DMS and all of its dotted line agencies.
Level 3 – will not be scoped by a user’s entity. The search result will return transactions across all entities that match the entered criteria. This will be accomplished by creating a new permission and a new role.
A new entity field will be added to each of the System Search pages. Level 2 and Level 3 users will have the ability to search across multiple agencies. This field will allow these users to return search results for one entity, multiple entities, or all entities allowed by their role. Level 1 users will only have access to their entity; the entity field on these pages will provide them with no additional entity options and will not allow them to choose an entity value of “No Value”.
Page - 6
Ariba Buyer 8.2.2 UpgradeBenefits/Enhancements
SIR 376: System generates Base ID error when a "Next Version" is aborted
Known defect for Buyer 7.1a Ariba has resolved this issue in the Buyer 8.2.2 version that will be
implented with the upgrade
Change Request 6: Hold Until - Need to allow the user to be able to have edit capabilities when a PR has a hold until date for the future and is sitting in the FLAIR approval queue
This CR will be implemented for Buyer 8.2.2
Page - 7
Ariba Buyer 8.2.2 UpgradeDMS Specific Initiatives
Standardize Role/Permissions
Standardize Workflows
Deliver effective Operational Reports
Deliver effective Training approach
Effectively communicate the upgrade through all phases of the upgrade
Page - 8
Ariba Buyer 8.2.2 Upgrade – Process OverviewTechnical Infrastructure
Plan Design Build Test Train Deploy
Technical Infrastructure – Establishment of physical environments. Physical Hardware Code Migration Data Conversion
Impact to CRB - No impact to the CRB during this stage of the upgrade
Technical Infrastructure
Page - 9
Ariba Buyer 8.2.2 Upgrade – Process Overview Plan Stage
Plan Design Build Test Train Deploy
Technical Infrastructure
Plan Stage - This involves the analysis of existing functionality and code to determine upgrade scope and effort Code enhancement analysis Evaluation of implemented change requests and SIRs
Impact to CRB – Evaluation of design change requests and SIRs for removal in Buyer 8.2.2
Page - 10
Ariba Buyer 8.2.2 Upgrade – Process Overview Design Stage
Plan Design Build Test Train Deploy
Technical Infrastructure
Design Stage – This stage involves design of new functionality being included in the upgrade effort Data Scoping Hold Until
Impact to CRB – Evaluation of design change requests for implementation in Buyer 8.2.2
Page - 11
Ariba Buyer 8.2.2 Upgrade – Process Overview Build Stage
Plan Design Build Test Train Deploy
Technical Infrastructure
Build Stage - This stage involves the development and assembly test of the application with MFMP customizations Build code line for Buyer 8.2.2 – this includes the migration of core code
from Buyer 7.1a to Buyer 8.2.2 Development of custom code to include previously implemented 7.1a
MFMP customizations
Impact to CRB – No impact to the CRB during this stage of the upgrade
Page - 12
Ariba Buyer 8.2.2 Upgrade – Process Overview Test Stage
Plan Design Build Test Train Deploy
Technical Infrastructure
Test Stage – This stage involves testing the components and validating the solution System Test (Pass 1 through Pass 3) Performance Testing User Acceptance Testing
Impact to CRB – Participation within User Acceptance Test activities
Page - 13
Ariba Buyer 8.2.2 Upgrade – Process Overview Training Stage
Plan Design Build Test Train Deploy
Technical Infrastructure
Train Stage – This involves development of training materials “What’s New” for Buyer 8.2.2 training Any additional training needs as identified through the upgrade
process
Impact to CRB Attend What’s New for Buyer 8.2.2 training Review and evaluate Buyer 8.2.2 training materials for distribution to
the user community
Page - 14
Ariba Buyer 8.2.2 Upgrade – Process Overview Deploy Stage
Plan Design Build Test Train Deploy
Technical Infrastructure
Deploy Stage – This stage involves the implementation of the Buyer 8.2.2 application, technical architecture, technical infrastructure, and training to the agencies Implementation – “Go-Live” of Buyer 8.2.2 Disaster Recovery Test Execution Production Support Tuning
Impact to CRB - No impact to the CRB during this stage of the upgrade