MyFloridaMarketPlace CRB MeetingNovember 28, 2006

Page 2: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 2

Agenda Review

CR 27 - Negative receiving (editing receipts > 24 hrs) Negative receiving has been voted into the upgrade

CR 28 - Regeneration of Workflow Clarify the intent and design

Review of CR Design Team Roles/responsibilities

Review of Groups/Roles & discussion

General upgrade status System Test Pass (STP) 1 results to-date Upcoming significant events (STP 2, UAT prep, Training prep)

Closing comments & What’s next

Page 3: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 3

CR 27 – Negative Receiving in the Upgrade!

Subsequent to discussions with MFMP and DMS Management, opportunity identified to postpone data scoping in exchange for including Negative receiving as presented 11/9/06 to CRB

Email to CRB Distributed 11/17/2006 to vote 6 agencies responded in favor of negative receiving 2 agencies responded in favor of data scoping 4 agencies did not respond

Design review summary

Assignment of Design Approval Team

Data Scoping will be re-addressed with full CRB involvement 1st quarter of next FY

Page 4: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 4

Regeneration of Workflow during Approvals

CR 28 - Regeneration of Workflow Subsequent to 11/9 CRB, some discussion or confusion on the intent of the CR What is the intent?

The intent is to minimize the number of times an approver sees a requisition During the approval process (either initial or change order), if a requisition is

edited and a change is made to the PR meeting any of the 4 conditions (business rules below), the PR will not be sent back through the approval flow

4 business rules to bypass regeneration• Adding a line item not requiring specific approver or less than 10% total PR

dollar value• Deleting a line item• Changing the total dollar value by less than 10%• Changing commodity code not requiring special approver

This design does not remove the approval flow for a Change Order on a Purchase Order unless:

Person making the change has the role of “CO No Workflow” Changes to the PO are limited to the 53 prescribed changes

Page 5: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 5

CR Design Approval Team Roles/Responsibilities

For each CR, Design Approval Team selected

Generally, Design Approval Team selected from CRB members

Design Approval Team involved in design review, testing and post implementation survey. Specifically, the team will: Review, provide input to, and approve designs Conduct user acceptance testing after development is complete Complete a system enhancement survey after the acceptance of

the CR

Page 6: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 6

8.2.2 Group and Role Structure

Groups Group is a collection of permissions Assign one group v. many roles Designed groups:

Analysis, Contract Manager, Purchasing, Requester, Approver, Reporting, Receiving and Invoicing

Roles Roles allow additional functionality Reduce the number of roles

For example: Requester-No eQuote, Requester eQuote, Requester-No eQuote-No

Accounting Edit and Requester-eQuote-No

Accounting Edit

Page 7: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 7

8.2.2 Group and Role Structure

Requester Group•Change•Create

eQuote Role

•Edit•Search

Accounting Edit Role

Central Receiver Role

Page 8: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 8

Ariba Buyer 8.2.2 Upgrade – Plan Stage Status

Plan Train DeployDesign

Accomplishments In progress Upcoming Development of 7.1 customized

components Review of 8.2 test conditions System Test Pass 1 Finalization of workflow analysis Change Request evaluation Review final upgrade scope

System Testing – 3 passes beginning (11/3 – 2/9/07)

Design of new key groups/roles/permissions

Data center relocation negotiations

Enterprise reporting assessment CR Designs

Go/No go decision for April 07 (1/19)

Implementation planning Ariba Sourcing upgrade planning UAT Script preparation Training preparation

* Bold indicates CRB participation may be requested

Test Build

Technical Infrastructure

Page 9: MyFloridaMarketPlace CRB Meeting November 28, 2006

Page 9

What’s Next?

December 19, 2006, Kirkman Building (HSMV); 2900 Apalachee Parkway, Room A427

Any closing discussion