URBAN DESIGN PORTFOLIO 01AHMAD ZULKAMAL BIN MOHD ZIYADI
SENIMAN VILLAGEEXPLORING THE CULTIVATED CITY THROUGH URBAN FORMS OF JOGJAKARTA
THE HARMONIC CONVERGENCE OF CULTURAL EVENT
PROJECT ABSTRACTKAMPUNG PAJEKSAN IS ONE FAMOUS VILLAGE WHICH IT HAVE A OWN CULTURE AND LIFESTYLE. IT LOCATED AT HEART OF MALIOBORO STREET WHICH IT IS ONE OF EARLIEST VILLAGE THAT FOUNDED DURING THE 18TH CENTURY . THE COMMUNITY WITHIN THE SITE AREA
2
MALIOBORO KG. PAJEKSAN
13.45 252paxPER ARCRE
700pax
ARCRE
STRATEGIC PLACEMENT
PAJEKSAN MALIOBORO
500mm
Local people of Pajeksan are alreadyinvolved in this famous culture events.Some parts of this village practiced gamelan,kethoprak and wayang kulit.
The location of Kampung Pajeksan is very strategic It is situated just 300m from Malioboro Street where Malioboro Street is one of the most busy place in Jogjakarta.
DILEMMA
Even this village is situated near Malioboro Street that very famous all around the world,the village development are very poor.The village is like left abandoned by the government.The culture inside Pajeksan is hidden by the famous and well-known Malioboro Street
THE LEFT VILLAGE
TO EMPOWER THE ROOT OF MALIOBORO LOCAL IDENTITY BY MEANS OF VITALIZING HERITAGE ART THAT EMBODIED WITHIN THE VILLAGES A NEW CONCEPT OF ART LIVING VILLAGE WHERE LOCAL PEOPLE ABLE TO ENLIVEN COMMUNITY ART HERITAGE AND PEOPLE GLOBALLY EXPERIENCED AND LEARN OF THEIR CULTURE AS WELL.
THE INSTITUITION OF HERITAGE ART IS THE BEST APPROACH PRACTICED WITHIN THE LOCAL COMMUNITY TO STREGHTEN THE LOCAL ESSENCE AS WELL AS ART PRACTICE. THIS METHOD ALSO TO INCUBATE THE
PROJECTING THE VILLAGE AS URBAN HERITAGE STAGE, PEOPLE EXPERIENCED WHAT IS HERITAGE ART ACTIVISTS.FRONT AND BACKSTAGE PROCESS. THE DEEPER LEARNING IS GAIN THROUGH THE EXPERIENCE OF BOTH PROCESSES/PREPARATION/ESSANCE.
MALIOBORO STREET
KAMPUNG PAJEKSAN
ECONOMY
20232013
CULTURE
MALIOBORO STREET KAMPUNG PAJEKSAN
20232013
DILEMMA, POTENTIAL AND HYPOTHESIS
HYPOTHESIS
THEORY
KAMPUNG PAJEKSAN WILL BE THE HEART TO EDUCATE, EXPE-RIENCE AND CONSUME THE CULTURAL PRODUCTS BY THE COMMUNITY AND PUBLIC.
arts are good for people, the arts being used historically as a tool for social organization and normalization Lash , 2006
The bigger achievement is to try to create something so deeply rooted that it can stand firm against the global takeover by interest groups
Hufford and Miller, 2006
THE IDEA OF CULTURE CONSERVATION ISEMBEDDED IN THE AIM OF THIS DESIGN. THE COMMUNITY WILL STILL PRACTICING THEIR CULTURE EVEN THEY ARE LIVING IN THE HEART OF A CITY. THERE ARE POTENTIAL CULTURAL VALUES SPOTTED IN BETWEEN HOUSES AND THE POSSIBILITIES OF INJECTING URBAN CULTURAL VALUE INTO KAMPUNG PAJEKSAN IS VERY HIGH.
THE HARMONIC CONVERGENCE IS FORM BASED ON THE INTERLOCKING OF THREE FILLED OUT STRATEGIES. FIRST STRATEGY IS TO INTRODUCE THE ART KNOWLEDGE TO THE LOCAL RESIDENTS AND TOURISTS. THERE WILL BE STUDIOS/WORKSHOPS (GAMELAN, KETHOPRAK, BATIK PROCESS-ING, WAYANG KULIT AND ETC).
SECONDLY, THIS HARMONIC CONVERGENCE VILLAGE IS AIMED TO BE A BUSINESS HUB. THE LOCAL RESIDENTS WILL BE EXPOSED IN MARKETING KNOWLEDGE WHERE THEY WILL BE MARKETING THEIR OWN ART PRODUCTS. AS LOCAL COMMUNITY, THEY ARE GRANTED FOR HAVING THEIR OWN COMMERCIAL ZONE TO COMMERCIALISE THE ART PRODUCTS THAT HAVE BEEN DONE BY THEMSELVES. INDIRECTLY, THIS WILL BE GIVING THE INCOME OPPORTUNITY FOR LOCALS.
THE LAST STRATEGY IS BY ORGANIZING LIVE PERFORMANCES IN THIS VILLAGE. THERE WILL BE VARIETIES OF CULTURE PERFORMANCES SUCH AS GAMELAN, KETHOPRAK, WAYANG KULIT.
ALL THESE STRATEGIES ARE PROPOSED TO BE SETTING IN THE EXISTING STREETS.THE STREETS (MAIN ACCESS FOR PAJEKSAN VILLAGERS) WILL BE UTILIZED TO ACCOMMODATE ALL PROPOSED PROGRAMMES AND ALSO FUNC-TIONED AS INTERACTION DEVICE BETWEEN THE LOCAL RESIDENTS.
the street is a room by agreementA community room the walls of which belong to the donors.The ceiling is the sky Louis I. Kahn
ART EDUCATION
THE STREET
COMMUNITY COMMUNITYTHE
STREET
TO EMPOWER THE ROOT OF MALIOBORO LOCAL IDENTITY BY MEANS OF VITALIZING HERITAGE ART THAT EMBODIED WITHIN THE VILLAGES A NEW CONCEPT OF ART LIVING VILLAGE WHERE LOCAL PEOPLE ABLE TO ENLIVEN COMMUNITY ART HERITAGE AND PEOPLE GLOBALLY EXPERIENCED AND LEARN OF THEIR CULTURE AS WELL.
THE INSTITUITION OF HERITAGE ART IS THE BEST APPROACH PRACTICED WITHIN THE LOCAL COMMUNITY TO STREGHTEN THE LOCAL ESSENCE AS WELL AS ART PRACTICE. THIS METHOD ALSO TO INCUBATE THE
PROJECTING THE VILLAGE AS URBAN HERITAGE STAGE, PEOPLE EXPERIENCED WHAT IS HERITAGE ART ACTIVISTS.FRONT AND BACKSTAGE PROCESS. THE DEEPER LEARNING IS GAIN THROUGH THE EXPERIENCE OF BOTH PROCESSES/PREPARATION/ESSANCE.
JALAN DAGEN
JALAN PAJEKSAN
JALAN MALIOBORO
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
ZONING
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
SCHOOL SHOPLOT
JALAN MALIOBORO
JALAN DAGEN
HOTEL/ HOMESTAY
BUILT FORM
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
VOID
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
MOVEMENT
JALAN MALIOBORO
JALAN PAJEKSAN
SURAU/COMMUNITY
JALAN PAJEKSAN
JALAN DAGEN
POPULATION
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
PADESTRIAN/MOTORCYCLE/TRISHAW
JALAN DAGEN
SITE BOUNDARY
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
RESIDENTIAL
13.45AQRE
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
ACCESSIBILITY
JALAN MALIOBORO
JALAN PAJEKSAN
JALAN DAGEN
HOSTEL/RENTED HOUSE
DATA FINDING
123
2012MIGRATION OF PEOPLE ESTABLISHMENT OF HOTEL AND COMMERCIAL
1970MIGRATION OF PEOPLEESTABLISHMENT OF COMMERCIAL
PRIMARY ROAD ESTABLISHGOVERMENT CHINESE SCHOOLDALEM JONONEGERAN
1925
165HOUSING
65%ACTIVE INCULTURE ART
JALAN
PAJEKS
AN
JALAN DAGE
N
JALAN MALIBOROACCOMODATION
SCHOOL
URBAN FABRIC MORPHOLOGY
HERITAGE EVENTTHE CITY OF MALIOBORO ARE RICH IN CULTURE AND HERITAGE VALUES. THE CITY ITSELF ARE WELL KNOWN FOR ITS HERITAGE EVENTS AND PERFORMANCES ART. THROUGHOUT THE YEARS, MALIOBORO ARE FLOODED WITH TOURIST ESPECIALLY COME FOR THE LOCAL EVENTS AND HERITAGE EXPERIENCES. NEVERTHELESS, THE LOCAL PEOPLE OF MALIOBORO ARE THE SUCCESSOR OF THE CULTURE HERITAGE. THE WAYANG, KETHOPRAK AND OTHER HERITAGE EVENT STILL BEEN PRACTICING AND CELEBRATE IN THE URBAN SETTING. THEY ALSO VERY ATTACH AND PARTICIPATE IN CULTURE EVENTS THAT VITALIZE THE MALIOBORO IDENTITY.
ART CRAFT EATING WAYANG KULIT COSTUME EXHIBITION ENTERTAINMENT
BABAK KAMPUNG
KETHOPRAK
JALAN PAJEKSAN
HOST
JALAN MALIOBORO
TYPE OF EVENT
PENCAK FESTIVAL
PESTA RAKYAT JOGJA
CHIN
ESE C
ULTU
RE
WEEK
MALIOBORO
ANNUALYEAR EVENTS
112
211
10 3
4
5
67
8
9
MALIOB
ORO
FEST
IVAL
FEST
IVAL
KESE
NIA
NJO
GJA
FEST
IVAL
APE
MAN
JOGJA JAVA FESTIVAL
MALANG DANCE FESTIVAL
BABA
D KA
MPU
NG
TYPOLOGYTYPOLOGY OF EVENTS
GAMELAN (INSTRUMENTS, INDEPENDENCE PERFORMANCE )
GAMELAN INSTRUMENTS
PEDHALANG & SINDEN
C1
COMPLETE SET OF GAMELANPAX = 18 PERSON
AREA = 40m
B1
A1
C2
B2
A2
TWO COMPLETE SET OF GAMELANPAX = 33 PERSON
AREA = 80m
THREE COMPLETE SET OF GAMELANPAX = 48 PERSON
AREA = 120mC3
B3
A3
WAYANG (KULIT, KARUCIL, GOLEK)
WAYANG STAGE
C1
WAYANG STAGE AND GAMELANAREA = 18.96m
B1
A1
C2
B2
A2
C3
B3
A3
WAYANG STAGE AND GAMELANAREA = 21.96m
WAYANG STAGE AND GAMELANAREA = 32.96m
WAYANG STAGE AND GAMELANAREA = 42.96m
D1 D2 D3
TYPOLOGYPERFORMANCE STAGE (KETHOPRAK, RAMAYANA, BEKSAN, WAYANG WONG)
PERFORMANCE STAGE PAX = 4 PERSONAREA = 32.00m
A1 A2 A3 A4
PERFORMANCE STAGE PAX = 6 PERSONAREA = 48.00m
PERFORMANCE STAGE PAX = 8 PERSONAREA = 64.00m
PERFORMANCE STAGE PAX = 10 PERSONAREA = 80.00m
B1 B2 B3 B4
B1 B2 B3 B4
B1 B2 B3 B4
PAX = 50 PERSONAREA = 16.875m
PAX = 100 PERSONAREA = 33.75m
PAX = 150 PERSONAREA = 50.625m
A1 A2 A3
B1 B2B4
C1C2 C3 C4
STAGGERED STAGE LINEAR STAGEAREA FOR 1 PERSON = 0.34m
B3
TYPOLOGY OF AUDIENCE
SINGLE VOL
UME
SINGLE VO
LUME
SINGLE VO
LUME
DOUBLE FL
OOR
DOUBLE FL
OOR
WITH BALC
ONY
SINGLE VOL
UME
SINGLE VO
LUME
WITH A SH
OP
SINGLE VO
LUME
WITH A SH
OP
SINGLE VO
LUME
WITH A SH
OP
TYPOLOGY
LINEAR JUNCTION L-SHAPE SQUARE
560 M2 580 M2 600 M2 1500 M
TYPOLOGY OF EXISTING STREET
TYPOLOGY OF EXISTING HOUSE
PROGRAM MECHANISM
DESIGN STRATEGY
DESIGN STRATEGY
EVENT TIMELINE PROPOSAL
ART CRAFT,STREET ART GALLERY, EXISTING HOUSING
ACCOMMODATION
BUSINESSART CRAFT,COSTUME WALK, EXISTING HOUSING
ACCOMMODATION
EXISTING COMMERCIAL, EXISTING HOUSING
HYPOTHETICAL PROGRAMMES
EXHIBITION, ENTERTAINMENT
PERFORMANCE, RELAXING,
EATING, BUSINESS EXISTING HOUSINGEXISTING HOUSING
ACCOMMODATION
BUSINESS
DIAGRAMMATIC SECTION
DESIGN STRATEGY
DESIGN PRINCIPLE
LIVING UNITS
POCKECTS OF CAFETARIA
DESIGN MECHANISM
LIVING UNITS
POCKECTS OF CAFETARIA
STREET ART GALLERYPERFORMANCE ART STAGE
DESIGN STRATEGY
PROGRAM MECHANISM
ROMANCING THE CULTIVATED CITY @ SENTUL (e)LYMPIOUS UNIVERSITI TEKNOLOGI MARA, MALAYSIA
THERAPEUTIC CENTERTHE FUTURE ART OF HEALING
PROJECT ABSTRACT
Healthcare buildings should be designed to suit the practice of medicine physically, emotionally and spiritually
architects could create an environment that not only allow practice of medicine means of healing but allowing comfort, emotionally stable and spiritually at ease
World Academy of Science, Engineering and Technology 29 2009
ARE PATIENT GETTING SICK OR CURED IN HOSPITAL?
THEY ARE ISOLATED FROM THE WORLD
SOURCE :WWW.TED.COM
ENVIROMENT
ENVIROMENT
EXPERIECING THROUGH HOLOGRAM TREATMENT
AVERAGE TIME 1/2 YEARS SPENDIN HOSPITAL
Mental hospitals 'treat patients like prisoners'
By 2112 Future medical technology has given us brain-computer interfaces, nano-robots, gene manipulation, robotic surgery, synthetic organs, organ cloning, individualized drugs, bionic body parts and cryogenic sleep. This kind of tech-nology is happening in the here and now.
The coming revolution in medicine will offer us the chance to engage in our own health in ways we have never done before. It will let us monitor and improve the health of others, and it will very much be televised. It will collapse time and space. Well carry our own medical records with us, access diagnosis and treatment suggestions, have the ability to be directly and immediately in touch with caregivers, which will help us achieve healthy outcomes Applications are being developed for the treatment of chronic diseases and for rehabilitation that will combine entertainment and medical care.
ISSUE & DILEMMAEventhough the medical technologies is improved around the world, the increasing of technology can cause a traumatic experience through a hardship life. As example, Japan the most advanced country in the world have an issue to be the most high sucide rate in the world. Europe, and America also have been listed with the most high citizen with a mental disorder.
In this years, in Malaysia about 10% of Malaysian Citizen have been effect by mental illness problem. If this not been solve, by 2113 Malaysia through a technology geeks, Malaysia also can be effected and been list.
100,000per yearSource: World Health Organization
2011
SUCIDE RATE
7%average per year
2113170,000
CAUSE
Genetic & Age
LOVE FAMILY
Psychological trauma
Environmental stressors
FIRED
JOB
10%FROM MALAYSIA POPULATION292,400
SOURCE : NEW STRAITS TIME ,10 OCTOBER 2013Deputy director-general of Health (Public Health), Datuk Dr Lokman Hakim
193 BILION USD per year spend for mental ilness
MENTAL ILNESS
SOURCE : WORLD HEALTH ORGRANIZATION ( WHO )
HYPOTHESISThe question is, are patient getting sick or cured in hospital? Especially for people who have long term sickness like mental illness. They are isolated from the world. The concept of Therapeutic urbanism is about create a healing space within the environment.
The first level is to help individuals with persistent and serious mental illness to develop the emotional, social and intel-lectual skills needed to live, learn and work in the community with the least amount of professional support and a through the enviroment space. It will enabling persons with persistent and serious mental illness to live a normal life in the community it will shift away from an illness model towards a model of functional disability
The second level is by using the environment and urban fabric surrouding, it has a community that will accept the individ-ual, and heal them within the environment. It wil heal base on the individual problem. The Physical Therapy, Recreational therapy, Spritual Therapy and Art therapy environment wil a play role as concept for the Therapeutic urbanism.
A therapeutic urbanism may heal on two levels: on the level of the individual, of the citizen/user, and on that of the urban fabric. Action is by the individual, moved by both practical need and resonant memory. SOURCE : AYSSAR ARIDA ,THERAPTIC URBANISM , QUANTUM CITY
INDIVIDUAL COMMUNITYSPACE
PHSYCHOBIOLOGICAL VULNERABILITY
SOCIO ENVIRONMENTAL STRESSORS
PROTECTIVE FACTORMedication
Skill BuildingSosial Support
Impartments Disabilities
HANDICAP
VULNERABILITY, STRESS AND PROTECTIVE MODEL OF PSYCHIATRIC REHABILITA-
TION (LIBERMAN 1995)
RELIGION
COM
PETI
TION
EDUCATION
ENVIROMENTElectroconvulsive therapyphysical therapy
Cognitive behavioral therapySystemic therapy Virtual reality
exposure therapysimulated real environments through digital mediaoffers a sense of realism in a safe environment
PHYSICAL THERAPY CENTRE
MEDICAL FACILITIES
SENTUL (e)LYMPIOUS KL, MALAYSIA
AREA 28.872km
THE PROPOSED MASTER PLAN SETTING IS LOCATED IN THE HEART OF KUALA LUMPUR, SPECIFICALLY IN THE NORTH-ERN BOUNDARY OF KUALA LUMPURS CITY CENTRE. THE SITE IS SITUATED INSIDE SENTUL-MANJELARA DISTRICT, ONE OF THE 6 DISTRICTS INCLUDED IN THE FEDERAL TERRITORY. IT IS ALSO ONE OF THE LARGEST DISTRICT WITH AN AREA OF 46.098 KM.WITH REFERENCE TO THE KL STRUCTURE PLAN 2020, SENTUL-MANJELARA IS THE 2ND MOST POPULATED DISTRICT IN KUALA LUMPUR WITH A TOTAL POPULATION OF 445, 025 PEOPLE AND THE RECORD-ED DENSITY OF 9,645 PERSON/SQM. THE ACTUAL SETTING IS LOCATED IN THE SOUTHERN REGION OF SENTUL-MAN-JELARA DISTRICT, DIRECTLY ON THE CITY CENTRE BOUNDARY WHICH POSSESS A DIRECT GATEWAY INTO THE CITY CENTRE. THE PROPOSED SETTING HAS BEEN IDENTIFIED AND IT POSESS A TOTAL AREA OF 8.872 KM AND A DENSI-TY RATE OF 35 PERSON/SQM.
MASTER PLAN SETTING
COMMERCIAL GREEN AND OPEN SPACE RIVER AND WATER ELEMENT
RESEARCH AND DEVELOPMENT
RESIDENTIAL GREEN AND OPEN SPACE INSTITUTIONAL
ECO - DEVELOPMENT
INTEGRATED TRANSPORT PEDESTRIAN AND BICYLE NETWORK BOATING AND WATER TAXI
PUBLIC TRANSPORT
SONGDO IBD PROJECTION
35 acre
38 acre
75 acre
14 acre
30 acre
188 acre
297 acre
27 acre
30 acre
961%
=4000 people
BY GENERATING BIOMIMETIC PRINCIPLES IT IS ASSURED THAT THE PRINCIPLES ARE ADJUSTED IN AN OPTIMUM WAY TO THE PROBLEMS STATED IN BIOMIMETICS AND REFLECT THE ISSUES TACKLED WITHIN. ALSO, BY APPLYING BIOMIMETIC PRINCIPLES THE IDENTIFIED SOLUTIONS HAVE A HIGH POTENTIAL OF BEING MORE SUITABLE FOR BIOMIMETIC TRANSFER.
TOTA
L PO
PULA
TION
DE
NSIT
Y
=75642 people
=4000 people
=5 people
PROJECT INFO:
_SONGDO IBD, INCHEON, KOREA
_SENTUL ELYMPIOUS, KL, MALAYSIA AREA: 6.8 km
VISION: SUSTAINABLE BUSINESS DISTRICT
LAND USE:
AREA: 8.872 km VISION: TOWARDS ECO-DIGITAL HUMANISM
LAND USE:
SMART CITY/UBIQUITOS CITY.
1996-2017/10-YEAR DEVELOPMENT PROJECT
INTERBATIONAL BUSSINESS, IT, BT and R&D hub.
40% OF ITS AREA RESERVED FOR GREEN SPACE 26KM OF BICYCLE LANES PROVIDE CHARGING STATION FOR ELECTRIC VEHICLES
PROVIDE WASTE COLLECTION SYSTEM THAT ELIMINATES TRASH TRUCK BASED ON 6 CORE DESIGN GOALS WHICH IS OPEN SPACE, TRANSPORTATION, WATER, ENERGY USE, RECYCLING, OPERATIONS
BY GENERATING BIOMIMETIC PRINCIPLES IT IS ASSURED THAT THE PRINCIPLES ARE AD-JUSTED IN AN OPTIMUM WAY TO THE PROBLEMS STATED IN BIOMIMETICS AND REFLECT THE ISSUES TACKLED WITHIN. ALSO, BY APPLYING BIOMIMETIC PRINCIPLES THE IDENTIFIED SOLUTIONS HAVE A HIGH POTENTIAL OF BEING MORE SUITABLE FOR BIOMIMETIC TRANS-FER.
A
E
BTECHNOLOGY PARK
SENTUL - MANJALARA FLAGSHIP2113
DOWNTOWN
DART AND CULTURE PARK
CENTRAL PARK C TRANSIT HUB
BEHAVIOUR MANAGEMENT
BASIC SKILL
RESTORATION
PREPARATION
COMMUNITY PROCESS
TREATMENT PROCESS
AGENCY
FUNCTION IN COMMUNITY LIVING
VALUES
DOMINANT FACTOR
PROCESS
SPACE AND ENVIROMENT
PERSON
DESIGN IDEA
THERAPHY STRATEGY PROCESS
SOURCE : AYSSAR ARIDA ,THERAPTIC URBANISM , QUANTUM CITY
INDIVIDUAL COMMUNITY
A therapeutic urbanism may heal on two levels: on the level of the individual, of the citizen/user, and on that of the urban fabric. Action is by the individual, moved by both practical need and resonant memory.
THERAPEUTIC URBANISM
SPACE
PYHSICAL SPACE
PSYCHOLOGICAL SPACE
VIRTUAL SPACE
BIOLOGICAL SPACE
SPACEFOR
THERAPHY
THE ENVIRONMENT THAT VARY IN NATURE OF INDIVIDUAL PREFERENCE, NEED, AND DECIPLINE
THE TREATMENT THAT VARY IN NATURE OF INDIVIDUAL PREFERENCE, NEED, AND DECIPLINE
THE CONNECTION BETWEEN INDIVIDUAL GROUPS NOT JUST LOCALLY BUT ALSO TO THE
WIDER COMMUNITY THROUGH TECHNOLOGY.
THE INDIVIDUALS PHYSICAL AND MENTAL ABILITY TO ENGAGE WITH A WIDE RANGE OF
PHYSICAL DISABBILITIES
DESIGN IDEA
HEALTH COMMUNITY
THERAPHY
MEDICATION ECONOMY
DESIGN BY NATURE
CENTRAL NETWORK
VIRTUAL TOWER
FORM
ACTIVITY
IMAGE
THERAPTIC URBANISM
MEDICAL SPACE PLANNING
LANDSCAPE INTERGRATED BUIDLINGS
PEDESTRIANIZATION
CIRCLE CENTER-GRID SYSTEM
INTERCONNECTION ENVIROMENT AND THERAPY
CENTRALIZE LANDMARK
URBAN RESTORATION
VIRTUAL THERAPTIC REALM
TREATMENT
DESIGN PRINCIPLETHERAPEUTIC URBANISM
EQUAL RELATION TO LANSCAPE MORPOHOLOGY EQUIVALENCE BETWEEN MASS, VOID AND ORGANISM
INJECTION OF PROGRAMS BY NEED CENTRE OF GRAVITY IN THE URBAN
RESTORATION OF EXISTING DAMAGE FABRIC RESERVATION OF PHYSICAL FABRIC OF SPACE, VOID BECOME SOLID -Rachel Whiteread
PROCESS
SPACE AND ENVIROMENT
PERSON
FRAMEWORKST
AGE
2 :C
OMM
UNIT
YTH
E TR
EATM
ENT
PROC
ESS
SPIRITUAL THERAPY
PHYSICAL THERAPY
OCCUPATIONAL THERAPY
ART THERAPY
EMOTIONAL THERAPY
RECRETIONAL THERAPY
LABORATORY
RESIDENTIAL
DOCTOR RESIDENTIAL
MOSQUE
GREEN PARK THERAPY
SCHOOL
HOTEL
MEDICAL CENTRAL
PATIENT SHOP
SPORT CENTRE
GALLERY
STUDIO
SPRITUAL THERAPY
OCCUPATIONAL THERAPY
ART THERAPY
RECRETIONAL THERAPY
LABOROTARY
DOCTOR RESIDENTIAL
SCHOOL
SPORT CENTRE
SKILL
SKILL
AGENCY
VALUE
SKILL
BEHAVIOUR
SKILL
BEHAVIOUR
AGENCY
ENVIROMENT
VALUE
VALUE
VALUE
VALUE
SKILL
BUILDING MASSING
RESIDENTIAL COMMERCIAL PUBLIC FACILITIES
EXISTIING ROAD NETWORK EXISTING GREENARY EXISTING WATER ELEMENT
PUBLIC PARK
OUTDOOR VOID
CENTRALISE BOUNDARY
PARCEL 3LOVE
PARCEL 4ART
PARCEL 9SPRITUAL
PARCEL 1WATER
PARCEL 2ISLAMIC
PARCEL 6BIONIC
SITE POTENTIAL
ZONING MORPHOLOGY
MASSING AND PLANNING PRINCIPLE
VOLUMETRIC PROJECTION
VOLUMETRIC PROJECTION
1OO POPULATIONPROJECTION 2013 2113
75642 18064252174
YEARS
acreAVERAGE GROWTHPER YEARS
PROPOSED SITE
60 acre
4.2%313 X 87
18700POPULATION
VOLUMETRIC PROJECTION
GALLERY
ART CLASS
PHYSICAL THERAPYCENTRE
RECREATIONAL THERAPY
SPRITUAL THERAPY
PRESENTATION
VIRTUAL REALITY THERAPY
HOTEL
RND
MALL
RESIDENTIALSPIDER TRAINSTATION
MEDICAL ACADEMY
PUBLIC TRANSPORT
PROGRAMME
DIAGRAMMATC CEXPLODED
TYPOLOGY
THE FOUR TOWER ART THERAPY CENTRE MEDICAL FACILITIES SPRITUAL CENTRE RESIDENTIAL
BUILDING
MEDICAL ACADEMY
SHOP DISTRICTRETAIL SHOP RND FACILITIESHOTEL MEGAMALL PHYSICAL THERAPY CENTRE
PUBLIC REALM
LINKAGE DISTRICT
DISTRICT
RECREATIONALWATER FRONT RECREATIONAL
WATER FRONT
ARK 754INTEGRATEDBUILDING SERVICES
ROMANCING THE CULTIVATED CITY @ SENTUL (e)LYMPIOUS UNIVERSITI TEKNOLOGI MARA, MALAYSIA
SAMSUNG TECHNOLOGY TOWER THE FUTURE INNOVATIONSTUDENT: AHMAD ZULKAMAL BIN MOHD ZIYADI . NO MATRIX: 2013200026
Check by : Assoc. Prof Josmin Yayha
CONTEXT
1.0 INTRODUCTION2.0 PROJECT BACKGROUND 2.1 THE PROJECT 2.2 CLIENT PROFILE3.0 THE CONCEPT 3.1 SITE ANALYSIS 3.2 FORM MORPHOLOGY 3.4 PROGRAMME DISTRIBUTION4.0 FLOOR PLANS5.0 CORE DESIGN6.0 FIRE APPLIANCES CONCEPT 6.1 FIRE APPLIANCES CONCEPT 6.2 REQUIRED FIRE HYDRANT 6.3 REQUIREMENT 6.4 FIRE APPLIANCES ACCESS 6.5 HOSE REEL PROVISION7.0 CONCEPT OF SERVICES8.0 VENTILATION SYSTEM9.0 SERVICES CALCULATION9.1 STAIRCASE AND 9.2 LIFT CALCULATION9.3 PARKING SCHEDULE10.0 SCHEDULE OF ACCOMODATION11.0 BUILDING ELEVATION12.0 BUILDING SECTION13.0 SECTIONAL PERSPECTIVE14.0 CUT-OUT SECTION
1
1.0 INTRODUCTION
This report aim to explain overall services and re requirement concept for the HIGH RISE PROJECT for ADVANCE DESIGN PROJECT 2- Master of Architecture as given the lot from the Urban Design at Sentul, Kuala Lumpur.
This project is part of masterplan two, site at sentul near the YTL development. This project is proposing a new Samsung Tower oce which target the international bisness and local people. The size is 2.5 acres.
The main objective of the report is to :
1. Deliver the explationation of the services and re requirements part of the project 2. Propose the sucient re requirements for the project.3. To understand the services and re requirement in designing a building.
2
UU
MASTER PLANSCALE 1:250
MEDIA PRIMA
FELDA
MSC
SAMSUNG
BOULEVARD
2.0 PROJECT BACKGROUND
2.1 THE PROJECT
2.2 CLIENT PROFILESamsung Electronics is part of one of the largest multi-billion dollar corporations in the world. In 2007 it exceeded the $100bn mark in annual sales for the first time in its history. This makes it one of the world's top three companies in the electronics industry where only two other companies, Siemens and Hewlett-Packard, have posted larger revenues. The name Samsung literally means three stars or tristar in Korean, reflecting the Samsung Groups dominance in two further sectors: Samsung Heavy Industries and Samsung Engineering and Construction. If you are talking innovation in Samsung walks the walk and is now the established leader in consumer electronics, providing a range of leading-edge premi-um products and, in their own words, leading the digital convergence revolution. In so doing Samsung has made a remark-able transformation from copy-cat manu-facturer to become Asia's most valuable technology company.
The proposed master plan setting is locat-ed in the heart of Kuala Lumpur, specifical-ly in the northen boundary of Kuala Lum-purs city centre. The site is situated inside Sentul-Manjalara district, one of the 6 district included in the federal territory. It is also one of the largest district with an area of 46.098km. With reference to the KL Structure Plan 2020, Sentul Manjalara is the 2nd most populated district in Kuala Lumpr with a total population of 445,025 people and the recorded density of 9,645 person/sqm. The actual setting is located in the southern region of Sentul Manjalara district, directly on the city centre boundary which possess a direct gateway into the city centre. The proposed setting has been identified and it posess a total area of 8.872km and a density rate of 35 person/sqm.
3
DIRECT EXTRUSIONOF MASS ACCORDING
TO THE UBRAN DESIGNGUIDELINE
SUN PATH INCISIONS AND PROVIDE SHADING
ADDING GREEN POCKET
3.0 DESIGN APPROACH
3.1 SITE ANALYSIS
3.2 FORM MORPHOLOGY
4
3.3 PROGRAMME DISTRIBUTION
5
4.0 FLOOR PLANS
GROUND FLOORNOT IN SCALE
6
FIRST FLOORNOT IN SCALE
7
2nd FLOORNOT IN SCALE
3rd FLOORNOT IN SCALE
8
4th FLOORNOT IN SCALE
5th FLOORNOT IN SCALE
6th FLOORNOT IN SCALE
9
7,8,13,14,19,20,25,26,30 FLOOR OPEN PLAN OFFICE
9,15,21 &26 FLOOR OPEN PLAN OFFICE
16 FLOOR SERVICES FLOOR
17 FLOOR SERVICES FLOOR
12,18,24&29 FLOOR OPEN PLAN OFFICE10,11,16,17,22,23,27 &28 FLOOR OPEN PLAN OFFICE
10
BASEMENTNOT IN SCALE
11
BASEMENT 1-3NOT IN SCALE
12
FIRE PROTECTIONPROTECTED BY FIRE LOBBYFIRE STAIRCASEPROTECTED FIRE ESCAPE ROUTEHOSE REEL AND WET RISERFIRE RATED DOORBOMBA FIRE LIFT
1
2
3
4
5
6
1
1
2
2
3
3
4
4
5
5
5
6
SERVICESAHUSTORAGESERVICE DUCTELECTRICAL SERVICESRUBBISH COLLECTION
1
1
2
3
3
4
4
2
5
5
GROUND - 29th FLOOR OPEN PLAN OFFICE
BASEMENTOPEN PLAN OFFICE
5.0 CORE DESIGN
THE CORE DESIGN
The samsung tower consist of 1 centre corewith consist :
1) Services part- Serving for samsung tower maintanance workers and reman, not for the main worker.
2) Lift core ( main )- Serving for the podium and oce tower till top .
CENTRAL CORE CONFIGURATIONBy providing a central core conguration with one service core at the side, the oor for oce can easily divided to the units while in the same time maximizing the building eciency and also maximizing the view for the hotel room
13
1.FIRE APPLIANCE ACCESSIsland site for building volume above 112.000m
6.0 FIRE APPLIANCES CONCEPT
2- REQUIRED : FIRE HYDRANTFire hydrant should be located.
- Away from obstruction as such furnitures- Not less then 2 metres from adjacent build-ing and overhang- Between 0.61 and 2.4 meter from re appliances access away from risks of vehicu-lar damage.- Must not be more then 91.6 metres apart from each other.
2- REQUIREMENT FOR ISLAND SITEIsland site for building volume above 112.000m
14
4. FIRE APPLIANCE ACCESS
OFFICE TOWER
NET AREA [ LARGEST FLOOR AREA] 1600MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA/OL 160 PAXNO. OF EXIT STAIRCASE 2.67 STAIRS[PPF/ 60 PERSON]
EXIT WIDTH REQUIRED 2.67X0.5 =1.46EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 1.46/1.00 1 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 2 NOS
PODIUM NET AREA [ LARGEST FLOOR AREA] 4500MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 450 PAXNO. OF EXIT STAIRCASE 7.5 STAIRS[PPF/ 60 PERSON]
EXIT WIDTH REQUIRED 7.5X0.55=4.1EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 4.1/1.00 4 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 5 NOS
BASEMENT
NET AREA [ LARGEST FLOOR AREA] 7700MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 770 PAXNO. OF EXIT STAIRCASE 3 STAIRS[PPF/ 60 PERSON]
EXIT WIDTH REQUIRED 13X0.55 =7.15EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 7.15/1.00 7 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 8 NOS
15
4. FIRE APPLIANCE ACCESS
From podium = 8 PAXFrom Basement = 8 PAXFrom oce unit = 2 PAXMaximum travel distance = 45 metresDead end limit =
9,15,21 &26 FLOOR SCALE 1:250OPEN PLAN OFFICE
16
The building is designed with the appliance of remen requirements and accordingly tothe clauses from the Uniform Building By-Law 1984 which include the clauses, 134, 196,197, 200, 201, and 202. The compartmentation has been designed accordingly to the 5thSchedule, dierent purpose of group. The Dead-end and Maximum Travel Distance hasbeen applied accordingly to the 7th Schedule of the UBBL.
9,15,21 &26 FLOOR OPEN PLAN OFFICE
5. HOSE REEL PROVISIONHose reel for every 30m radi
17
FIRE STAIRCASE (ESCAPE ROUTE)1
2
BASEMENT-EXTERNAL STAIRCASE BASEMENT-EXTERNAL-PODIUM STAIRCASE
3 PODIUM-TOWER STAIRCASE
1
2
2
2 2
3
ELEVATOR1 2BASEMENT-EXTERNAL LIFT CAR LIFT 3 BASEMENT-PODIUM LIFT 45
FIRE/SERVICE LIFTHIGH ZONE LIFT 6 LOW ZONE LIFT 3
4
6
1
2
5
WATER SUPPLY1 2KITCHEN DIRECT SUPPLY PUMP 3 SUCTION TANK4 COOL WATER RISER 5 TOILET6 GRAVITY TANK
1
23
4
5
5
6
7.0 CONCEPT OF SERVICES.
STAIRCASE & FIRE STAIRCASE.Staicases are provided according to the required Dead end Limit and Maximum Travel Distance, as stated in the Uniform Building By Law 1984
LIFT CORE- Central core.- One side at service core.
WATER SUPPLY SYSTEM
This building uses an PUMPED UPFEED AND DOWNFEED SYSTEM due it has water tank in service oor located at 16th oor. All water is pump to suction tank and will be pump to the water tank at 16th oor and will be distributed for domestic uses.
18
FIRE FIGHTING1 2HOSE REEL AND RISER SPRINKLER 3 SPRINKLER TANK4 FIRE FIGHTING TANK 5 WET RISER 6 SPRINKLER7 SPRINKLER RISER
3
5
7
6
3
4
4
3
WET RISER AND SPRINKLER SYSTEM
ELECTRICAL1 2ELEC &COM TRUNK GENSET ROOM 3 DATA ROOM4 6MDF ROOM 5 PABX TRANS ROOM 1 7 TRANS ROOM 28 TNB 10 CALL CENTER
11 ELECTRIC RISER 12 COMMUNICATION RISER 13 BAS RISER9 LV MAIN SWITCH ROOM
1
2
3
46
5
7
8
10
1112
9
13
ELECTRICAL SERVICES.
MAINTAINANCE1 2GARDEN CORRIDOR COUNTER WEIGHT GONDOLA 3 GONDOLA RAIL 4 GONDOLA HOUSE
1
2
3
4
WINDOW CLEANING
19
20
8.0 VENTILATION SYSTEMThe building uses mechanical and natural ventilationMechanical Ventilation system : Centralized chiller, Local Ahu
CHILLER PLANT ROOM
Equipment roomThe heart of the central air conditioning is the chiller. Chiller make use of the refrigeration principles to work mechanical rooms typically house the following equipment:- Air handlers- Boiler- Chiller and pumps- Heat exchangers- Water heaters and tanks- Water pumps ( for domestic, heating/cooling, and firefighting water)-Main distribution piping and valves.- Sprinkler distribution piping and pump
16 FLOOR SERVICES FLOOR
COOLING TOWER
BASEMENT
AHU
Air Handling UnitAir handling unit are often called AHU. The air handling unit is box-like equipment with a fan and a cooling coil inside. Some units also contaiin air filters. The whole fan and motor assembly, comprising shaft, bearings, pulley, belting is usually put inside the AHU
The basic function of the AHU is to suck air from the rooms, let it pass through chilled water cooling coils and then discharging the cooled air back to the room
9.0 SERVICES CALCULATION
GROSS FLOOR AREAGROUND : 101302.28 SQFLEVEL 1 : 124188.55 SQFLEVEL 2 : 33042.41 SQFLEVEL 3 : 30480.82 SQFLEVEL 4 : 33408.35 SQFLEVEL 5 : 33408.35 SQFLEVEL 6 : 33408.35 SQFLEVEL 7 : 33408.35 SQFLEVEL 8 - 15 : 184344.0 SQF-------------------------------------------------TOTAL AREA : 73986.29 SQM
BUILDING VOLUMEHEIGHT : 61.50 MWIDTH : 108.00 MLONG : 96.6 M--------------------------------------VOLUME : 641617.2 M3*FIRE APPLIANCE ACCESS112000 AND ABOVE = ISLAND SITEPLOT RATIO 1 : 6GROUND : 101302.28 SQFLEVEL 1 : 124188.55 SQFLEVEL 2 : 33042.41 SQFLEVEL 3 : 30480.82 SQFLEVEL 4 : 33408.35 SQFLEVEL 5 : 33408.35 SQFLEVEL 6 : 33408.35 SQFLEVEL 7 : 33408.35 SQFLEVEL 8 - 15 : 184344.0 SQF----------------------------------------------------601635 SQF / 186427.65 SQF = 3.54
UBBL REQUIREMENTS :*SEVENTH SCHEDULEHOTEL :DEAD END 10M | UNSPRINKLERED 30M | SPRINKLERED 45MCOMMERCIAL :DEAD END 15M | UNSPRINKLERED 30M | SPRINKLERED 45M*TENTH SCHEDULEHOTEL :EXTINGUISHING SYSTEM | AUTO SPRINKLER & HOSEREEL |FIRE ALARM SYSTEM | MANUAL ELECTRICAL FIRE ALARMSYSTEM | EMERGENCY LIGHTING | GENERATORSCOMMERCIAL : #REFER TO THE HIGHEST RISK PURPOSEGROUP
HOSEREEL SYSTEM :REQUIRED HOSE REEL :TOTAL HOSE REEL PER FLOOR (30M RADIUS/HOSE REEL)NOS OF HOSEREEL PER FLOOR : FLOOR AREA/100
GROUND FLOOR : 1146/1000 1.146 = 1 HOSE REEL1ST FLOOR : 3416/1000 3.416 = 3 HOSE REEL2ND FLOOR : 6623/1000 6.623 = 7 HOSE REEL3,4,5,6TH FLOOR : 2139/1000 2.139 = 2 HOSE REEL7TH FLOOR : 2324/1000 2.324 = 2 HOSE REEL8-15TH FLOOR : 1671/1000 1.671 = 2 HOSE REELTOTAL HOSE REEL = 38 HOSE REELS
21
9.1 STAIRCASE CALCULATIONOFFICE TOWER
NET AREA [ LARGEST FLOOR AREA] 1600MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA/OL 160 PAXNO. OF EXIT STAIRCASE 2.67 STAIRS[PPF/ 60 PERSON]
EXIT WIDTH REQUIRED 2.67X0.5 =1.46EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 1.46/1.00 1 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 2 NOS
PODIUM NET AREA [ LARGEST FLOOR AREA] 4500MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 450 PAXNO. OF EXIT STAIRCASE 7.5 STAIRS[PPF/ 60 PERSON]
EXIT WIDTH REQUIRED 7.5X0.55=4.1EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 4.1/1.00 4 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 5 NOS
BASEMENT
NET AREA [ LARGEST FLOOR AREA] 7700MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 770 PAXNO. OF EXIT STAIRCASE 3 STAIRS[PPF/ 60 PERSON]
EXIT WIDTH REQUIRED 13X0.55 =7.15EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 7.15/1.00 7 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 8 NOS
22
9.2 LIFT CALCULATIONOFFICE TOWER
INTERVAL + AVERAGE TIME (SEC)INTERVAL 60SECAVERAGE LOBBY WAIT TIME 30 SEC
HANDLING CAPACITYPAX CAPACITY (MAX) 12-28 20 PAXNORMAL LOAD / TRIP (P) 10-22 12 PAX
PERCENTAGE HANDLING CAPACITY PHCBUILDING POPULATION = 3500 PAXMIN % BUILDING POPULATION IS 5 MIN = 525 PAX
TRAVEL TIME (LOBBY WAIT + TRAVEL TIME )CALCULATION NO OF PAX PER TRIPP= POP X HCP/ (300/1) 52.5 PAX/ TRIP
NO OF LIFT = 6 UNITS PASSANGER LIFTS
9.3PARKING SCHEDULE
CAR PARKING CALCULATION
GFA : 60,639.60 sq.mGFA-30% SERVICES : 60,639.60 - 18191.88TOTAL : 42,447.72 sq.m (456,903 sq/ft)1car park = 500 sq.ft = 456,903/500 = 9131081 + 10%(visitor) = 1004+1% (OKU)1014 - 50% (discaunt) =507 car parking
MOTORCYCLE PARKING
GFA : 60,639.60 sq.mGFA-30% SERVICES : 60,639.60 - 18191.88TOTAL : 42,447.72 sq.m (456,903 sq/ft)1car park = 1500 sq.ft = 456,903/1500 = 3041081 + 10%(visitor) = 334+1% (OKU)337 - 50% (discaunt) =169 car parking
23
24
10.0 SCHEDULE OF ACCOMODATION .
NET AREA SERVICES & CIRCULATION TOTAL AREA ( GROSS )BASEMENT
GROUND FLOOR COMMERCIAL 1269 543 3627PARKING AND CIRCULATION 5237 201 5438
6506 744 9065 71.77054606
LEVEL 1 (PODIUM ) COMMERCIAL 2369 481 2850CIRCULATION 1036 160 1196
3405 641 4046 84.15719229
LEVEL 2 (PODIUM) COMMERCIAL 3931 481 4412
3931 481 4412 89.09791478
LEVEL 3 ( PODIUM) COMMERCIAL 3931 481 4412
3931 481 4412 89.09791478
LEVEL 4 OFFICE 1174 481 1655
1174 481 1655 70.93655589
LEVEL 5 OFFICE 1312 481 1793
1312 481 1793 73.17345231
LEVEL 6 OFFICE 1200 481 1681
1200 481 1681 71.38607971
LEVEL 7-8,10-11,13-14,16-17,19-20,22-23,25-26,28-29 OFFICE 16200 7696 23896
16200 7696 23896 67.79377302
LEVEL 9,12,15,18,21,24,27, OFFICE 7400 3376 10776
7400 3376 10776 68.67112101
TOTAL 45059 14862 59921 75.19734317
75%
TABULATIONLEVEL EFFICIENCYDESCRIPTION
TOTAL BUILDING EFFICIENCY=
CLIENT SAMSUNG SDB BHD.LOCATION SENTULTYPE OF LAND COMMERCIALLOT NO
PURPOSE GROUP PERCENTAGE
OFFICE 42.0 %COMMERICIAL 25.0 %SHOWCASE GALLERY 10 % SERVICES 15 %FACILITIES 8 %TOTAL 100 % 60,639.60M
PLOT RATION CALCULATION PLOT AREA (PA) 2.5 ACRES 10,106.60MPLOT RATIO (PR) 1 : 6 MAX GROSS FLOOR AREA ( GFA ) 60,639.60 MMAX PLINTH AREA MPA 60%X PA 6063.96MSERVICE/ CALCULATION 30%X GFA 18191.8M
ROOF LEVEL
LEVEL 28
LEVEL 27
LEVEL 26
LEVEL 25
LEVEL 24
LEVEL 23
LEVEL 22
LEVEL 21
LEVEL 20
LEVEL 19
LEVEL 18
LEVEL 17
LEVEL 16
LEVEL 15
LEVEL 14
LEVEL 13
LEVEL 12
LEVEL 11
LEVEL 10
LEVEL 9
LEVEL 8
LEVEL 7
LEVEL 6
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
GROUND LEVEL
LOWER GROUND
NORTH BOUND ELEVATION WEST BOUND ELEVATION
11.0 BUILDING ELEVATION
25
AUDITORIUMBANQUET HALL
LIFT
CO
RELI
FT C
ORE
LIFT
CO
RELI
FT C
ORE
FIRE
STA
IRCA
SE
FIRE
STA
IRCA
SE
FIRE
STA
IRCA
SE
FIRE
STA
IRCA
SEFI
RE S
TAIR
CASE
FIRE
STA
IRCA
SE
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
SERVICESSERVICES
SERVICES SERVICES
SERVICE
BOARD ROOM
LEVEL 27
LEVEL 26
LEVEL 25
LEVEL 24
LEVEL 23
LEVEL 22
LEVEL 21
LEVEL 20
LEVEL 19
LEVEL 18
MUSOLLA
SERVICES FLOOR
LEVEL 15
LEVEL 14
LEVEL 13
LEVEL 12
LEVEL 11
LEVEL 10
LEVEL 9
LEVEL 8
LEVEL 7
LEVEL 6
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
GROUND LEVEL
LOWER GROUND
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
OFFICE AREA
BOARDROOM
SURAU SURAU
SECTION
12.0 BULDING SECTION
26
LIFT CO
RE
GBI-EE
ENERGY STAIR APPLIANCESLow power consumption appliances and low heat emmited
GBI-SM4
LANDSCAPING
GBI-SM3
CONNECTION TO COMMUNITY SERVICESThe bus station and LRT line is located directly infront of the building
GBI-SM4
VIEW CAPTURING NOZZLESThe surrounding sites premiem vieware captured by the orientation design of this building
GBI-EE
LIGHTNING ZONINGPartitioned light zone that save energywhen the space is not in use
GBI-EE
Efficient lightingLighting fitting using 15 bulbs and led lighting
GBI-EE4
GOOD CONSTRUCTION QUALITYDry construction and manufacturingconstruction quality meet the standard
GBI-EQ5
LOW VOC PAINTApply low volatile organiccompound paint.
GBI-MR3
RECYCLE GLASSRecycled glass used to minimizedembed energy in glass production
GBI-IN1
INNOVATIVE SURAU LAYOUTThe mihrab is pointing toward the kiblatthus the integration of nozzle has beenpuctured to attain this feature
SURAU
GBI-EQ4
INDOOR AIR POLLUTANTSCeiling and carpet to belower emitting containedmaterial suc as gypsum fibrous board and adhesive
GBI-EQ
NATURAL LIGHTINGHigh level natural light allowance(offset 10m oe less from core)
SECTIONAL PERSPECTIVE
13.0 SECTIONAL PERSPECTIVE
27
12
2
3
3
5
5
67
8
89
BB
B
F
G
H
K
D
A
2
3
6
7
8
8
8
4
1
1
B
C
E
F
H
I
K
M
PA
I
GBI-SM4
LANDSCAPING
GBI-EE
LIGHTNING ZONINGPartitioned light zone that save energywhen the space is not in use
GBI-EQ5
LOW VOC PAINTApply low volatile organiccompound paint.
GBI-MR3
RECYCLE GLASSRecycled glass used to minimizedembed energy in glass production
GBI-EQ
NATURAL LIGHTINGHigh level natural light allowance(offset 10m oe less from core)
GBI-EQ4
INDOOR AIR POLLUTANTSCeiling and carpet to belower emitting containedmaterial suc as gypsum fibrous board and adhesive
12
3
56789
10
4
FIRE PREVENTION SYSTEMSPRINKLER SYSTEM
HOSE REEL RISER
FIRE HOSE REEL
PRESSURIZE SHAFT
FIRE STAIRCASE
SPRINKLER RISER
WET RISER
FIRE RATED DOOR
FIRE LIFT
FIRE STOP
B
C
EFGH
I
D
STRUCTURAL COMPONENTSCORE SHEAR WALL
METAL DECKING
RAISE FLOOR SYSTEM
COMPOSITE FLOOR SLAB
CASTELLATED BEAM
SUSPENDED CEILING
HOLLOW STEEL STRUCTURE
RC COLUMN
LOW-E GLAZING
A
2
3
5678
4
TOWER SPACESMOKE LOBBY
MALE TOILET
MALE OKU TOILET
AIR LOCK
LIFT LOBBY
FEMALE TOILET
FEMALE OKU TOILET
OFFICE AREA
1B
C
EFGH
IJK
D
SERVICES COMPONENTSSERVICES DUCTING
WIRE DISTRIBUTION FORK
SERVICE LIFT
SOIL WASTE RISER
HIGH ZONE LIFT
LOW ZONE LIFT
FIRE ALARM RISER
TELEPHONE RISER
EXTRA LOW VOLTAGE RISER
BUILDING AUTOMATION SYSTEM
ELECTRIC RISER
L COOL WATER RISER
M AHU ROOM
N CHILLER WATER SLAB RISER
O CHILLER WATER RISER
P AIR COND DUCTING
A
14.0 CUT-OUT SECTION
28
BS.C 04Anthropo & Ergonomics studiesStudents CapsuleRetreat House
BS.C 05Painting Gallery
BS.C 06Children resource centre Petaling Jaya
OBSTACLE CONCEPT ZIG ZAG
VERNACULAR ARCHITECTURE SUN ORIENTATION RECYCLE MATERIAL CHILDREN OBSTACLE WIND ORIENTATION NATURAL
USING VER NACULAR AS BASIC CONCEPT - LOUVER WALL, LARGE OPENING,RISE ON STILT
LON
G D
ISTA
NC
E
LEVELING
1 CHILDRENS RESOURCE CENTREZIG ZAG
Recalled the old days, children like to walk around the village to enjoy the beauty of nature, they were running, climbing trees, playing beside the river while breathing fresh air as if they were their own world. They were free to do anythingthey want.
But now, they are trapped between the natural and the modern world. Internet becoming their games, virtual games to be crazed by them. This unhealty lifestyle causes obesity among them.
ZIG ZAG is designed not as an odinary children resourcecentre. Through interaction, the children are able to experience the concept of vernacular architecture from the malay kampung house and it surrounding - the nature playground, an ecological picnic and friendly to the enviroment. ,making ZIG ZAG comfortable for teaching the children through nature and educate themto have good healty life
The ZIG ZAG is built using natural materials like timber, steel and concrete. The wall is designed as a louver to allow good ventilation keeping the building in a suitable comfort level.
CONCECPTUAL
ISSUES OBESITY PROBLEM
TRADITIONAL MALAY HOUSE
EXTERIOR PLANNING
SITE ANALYSIS
PRAYER ROOM
CAFE
KITCHEN
LIBRARY
VOID
VOID
GROUND FLOOR PLANSCALE 1 :100
U
A
A
BB
FIRST FLOOR PLAN
AV ROOM
DANCING ROOM
EXHIBITION AREA
MULTIPURPOSE AREA
SMALL GARDEN
STORE
VOID
VOID
LOBBY
ENTRANCE
ADMIN
SCALE 1 :100
UP
U
A
A
BB
SECTION B-BNOT IN SCALE
SECTION A-ANOT IN SCALE
ADAPT TO NATURELOUVERS WALL
EXHIBITION AND MULTI PURPOSE AREALARGE OPENINGLOUVERS WALLSTACK EFFECT
PUBLIC PATHCOURTYARD CONCEPTEXPOSED SUNLIGHTART WALL
LIBRARYCAPSULE CHAIR
CHILDRENS RESOURCE CENTRE2 ZIG ZAG
2
3
1
1
3
2
1
1
2
2
3
3
ELEVATION VIEW
BS.C 07Urban renewal of Rie Range, PenangAlternative Housing In Putrajaya
RATIO CAR TO RESIDENTIAL 1 : 3.3
The idea of proposing urban development in the area is to build a sustainable city where there isenvironmentally and socially sustainable . It is to promote a green mindset and raise public awareness about health.Centralizing the park between the blocks will be the main focal point of the development. It takes consideration of suitable sidewalks, gather spaces, views etc. Rearrange the blocks and site planning and provides more green spaces to encourage them exercise. The New Rifle Range will present the quality of better l ife to make the place feel safe and healthier l iving.
Rifle Range Flat built in 1969 was Penang first low cost project used the precast concrete elements to construct mass houses.The name Rifle Range was given because of the site was used for target practices. The site is located in Georgetown,Penang at the junction of Jalan Padang Tembak with Jalan Boundary(Jalan Sempadan) next to it is Batu Gantong Chinese Cemetery. Rifle Range flats consist of 9 blockseach blocks is 17 to 18 storey with 24 units at each level with a total of 3,699 units and more than15,000residents. There are one market complex , which has public library and a community hall. On the right of the wet market is the longest hawker complex in Penang.
SETTING
ISSUESChinese Cemetery is a recreation centre for Rifle Range community. It shows that there are lack of basic amenities such as halls, playground , or even car parking.Basically ,they need more facilities, or just parks with trees to climb, fresh air to breathe, grass to run and play in.
HYPOTHESIS
1 unit = 5 people3660 units x 5
LIMITED SPACE FOR RECREATIONAL ACTIVITIES
URBAN RENEWAL RIFLE RANGE PULANG PINANGHANGING SQUARE
= 18300 people
1 Bedroom Unit1 Bedroom Units are intermediate units of 36 s.m. There are 3072 units.
2 Bedroom Unit2 Bedroom Units are end units with an area of 38.7 s.m. There are a total of 588 units.
Floor Plan Layoutds.m and 51 intermediate units of 36 s.m.
Z School D Factory KW^
DESIGN PROPOSAL
m
MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA
higher level recreational area
wet market
market area on ground level
new residential block
community hall
Old folks
Hawkers
Residents/Family
Teenagers
Income/trading
privacy
Community
Healthy/comfort
Facilities
Active lifestyle
Entertaintment
commercial/services
recreational park/sports
public centre
landscaping
car park
residential
GROUP NEED PROGRAM
C
PHASE 1PHASE 3
PHASE 2
URBAN RENEWAL RIFLE RANGE PULANG PINANGHANGING SQUARE
4 STOREY LIMIT
PROPOSED INTERVENSION
THERE IS ABUNDAT EVIDENCE TO SHOW PEOPLE THAT LIVEIN BUILDING MORE THEN 4 STOREY CAN ACTUALLY DAMAGE THEIR MIND AND FEELING
- D.M FANNING - 18 NOV 1967 FAMILY IN FLATS BRITISH MEDICAL JOURNAL
HIGH RISE LIVING TAKE PEOPLE AWAY FROM THE GROUND, AWAY FROM THE CASUAL,EVERYDAY SOCIETY THAT OCCURS ON THESIDEWALK AND STREETS AND ON THE GARDEN
PROVIDE GREEN COMMUNITY SPACE
PHASE 1Residential
PHASE 3landscape recreational sport
NEW BUILDING
x 17
FACADE TREATMENT
commercial public centre PHASE 2
car park
Higher level recreational area
Hawkers/market area
sub-basement carpark
MAIN FEATURES
DESIGN STRATEGIES
SITE PLAN
MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA
PHASE 1
PHASE 2
PHASE 3
MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA
3. GARBAGE DISPOSALImplementation of garbage grinder at all kitchen sinks. Convenience for dwelersin disposing food waste, at the same time recycling food waste into composite soilfor farming and landscaping used
A strategy to collect rainwater at rooftop and stormwater from surfacerun-o. A collection of rainwater will be used for irrigation at vertical gardens and the hanging garden
Nutrien from wastedisposal
rainwater pipe
soil
Vertical plant
Vertical Garden Section
4. RECYCLABILITYa. energy saving ttingb.Green productc.Recycle material
5. GREEN MATERIAL a.local building materialb.used for lesser processing and transportation cost
GREEN FEATURE
a. Open courtyard and open spaceb. allow ventilation at the centre of the community
2. RAINWATER COLLECTOR
URBAN RENEWAL RIFLE RANGE PULANG PINANG
1. GREEN HANGING GARDEN
HANGING SQUAREMOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA
vertical plant
rainwater pipe
louvers
soil
disposal pipe
Large opening to allow wind to enter the residential
an active area is provide with large opening
large opening at the north side to avoid direct sun heat
inactive area like bedroom ,toilet is at south side
Green element at the roof provide good quality of air for the residential
N
LIVING ROOMMASTER BEDROOM
KITCHEN
FAMILY AREA
BEDROOM 1 BEDROOM 2
TOILET 1
TOILET 2
TOILET 3
SEMI PUBLIC AND PUBLIC PRIVATE
Void also is provide near the corridor to give privacy to bedroom
toilet ,and bath installed with small opening to provide more privacy
the residential design also is design to provide two zoning space, semi public and private area . The family will gain more privacy
MINIMIZE FOOTPRINTThis housing is design with pilotis, allow it to minimal he ground use. It also to express the appreaciate the nature.
70% OF GREEN AREAThe entire place is plant with tree as natural element. It has garden roof to reserve for the planting and act as cool element.
ARCHITECTURAL SCIENCE ARK 554
SUSTAINABILITY
SITE MANAGEMENT
OPEN AREAAct as courtyard at the centre of building, to allow ventilation and provide shading for the activities
MINIMIZE GROUND COVERonly a certain part are cover with unnatural material ,The rest, is covered with natural green element such as grass.
INDOOR ENVINROMENTAL QUALITY
NATURAL LIGHTING
Maximize opening on north and south side. Note that the glass area height up to the ceilling to have more penetration sunlight inside thus saving the energy for lighting. The lighting can be used
White color are choosed to maximize the reection of light inside thus make the interior more bright and lively
COLOR
While white color for exterior building reect the heat of sunlight thus minimize the energy usage for thermal cooling
notice the skylight between the split level, it allow sunlight penetrate inside the centre area. No need for energy lighting in daylight as most interior area receive the sunlight
SKYLIGHT
Interior opening up to the ceiling Interior
skylight
an active area is provide with large opening
large opening at the north side to avoid direct sun heat
Cross ventilation
Both opening on north and south side allow cross ventilation
RAINWATER COLLECTINGwide and shallow pond surrounded area for water collecting. Thus become facade treatment and as water cooling purpose
WATER EFFICIENCY
NEAR TO LAKEThe lake act as natural water cooling ,where it place at south east of the housing, allow natural cooling when wind blow.
ENERGY EFFICIENCY
N
ORIENTATION
VORTEX EFFECTThe height of the building is block the wind at the centre of site to give a pleasure wind to the site
All windows for housing is design to facing north and south to avoid direct sun light
Green element in the toilet give good quality of air
Master bedroom located near balcony with large tinted glass opening give,comfortable and privacy environment
DESIGN BY :AHMAD ZULKAMAL BIN MOHD ZIYADI | 2007106123 TUTOR : MDM ONG
CROSS VENTILATION
OPENING FACING NORTH
ahmad zulkamal bin mohd ziyadi | 2007106123
front elevation
roof level
4th floor
3rd floor
2nd floor
1st floor
ground floor
rear elevation
left elevation
roof level
4th floor
3rd floor
2nd floor
1st floor
ground floor
roof level
4th floor
3rd floor
2nd floor
1st floor
ground floor
section a-a
section B-B
roof level
4th floor
3rd floor
2nd floor
1st floor
ground floor
right elevation
roof level
4th floor
3rd floor
2nd floor
1st floor
ground floor
roof level
4th floor
3rd floor
2nd floor
1st floor
ground floor
green serpent
phase 1
typical section
gymnasium
nursery
3rd FLOOR
1st FLOOR
green serpent
1
2
3
2
2
2 3
1
1
3
1
1
ground FLOOR
2nd FLOOR
a
a
b
b
cafe
multifunctionhall
green serpent
1
1
3
1
1st Floor
basement
1
1
3
1
N
4th FLOOR
1
2
3
2
2
2 3
3rd FLOOR
1
2
3
2
2
2 3
1
ROOF GARDEN
4th FLOOR
2nd FLOOR
1
2
3
2
2
2 3
1
1
1
3
ROOF GARDEN
ROOF
ROOF
ROOF
ROOF
ROOF GARDEN
1
4
6
5
3
2
7
8
9
3
1
4
6
5
3
2
7
8
9 11
2
7
4
5
1
8
3
2
9
7
4
5
1
8
3
2
9
family unit 11.kitchen 2.toilet13.toilet 24.toilet 3 5.living room6.bedroom 1&27.master bedroom8.balcony9.family area10.laundry 11.circulationtotal
25m3.56m5m60m12m23m45m29m9m55m273m
1
studio unit1.kitchen 2.toilet13.toilet 24.living room5.study room6.master bedroom7.balcony8.circulation
total
10m32.5m48m9m21m27m45m
165m
3
family unit 223m3.56m5m60m12.5m23m44m29m9m55m270m
1.kitchen 2.toilet13.toilet 24.toilet 3 5.living room6.bedroom 1&27.master bedroom8.balcony9.family area10.laundry11.circulationtotal
2
1
4
6
7
2
5
3
1
4
6
7
2
5
3
1
4
6
7
2
5
3
FLOOR PLAN
TYPICAL UNIT PLAN
SCALE 1:200
SCALE 1:100
SCALE 1:50
ahmad zulkamal bin mohd ziyadi | 2007106123green serpent
phase 1
roof plan
BS.C 08Visitor Centre ,Precint 5 ,Putrajaya
ACCESSIBILITYNATURAL ELEMENT
A
BC
ANAYLSISGOOD VIEW, FACING LAKE
POTENTIALRESTAURANT WITH GOOD VIEWENVIROMENT
ANAYLSISCENTER POINT ,CONNECTED WITH THE CENTRE CITY
POTENTIALLINKAGE TO OTHER SITE,
ANAYLSISFIRST VIEW FOR VISITOR AS MAIN ENTRANCE
POTENTIALMAIN ENTRANCE, A PUBLIC ENTRANCE
DROP OFF
ENTRANCE
LOBBY
HISTORY GALLERY
AV ROOM
CONTROL ROOM
A/C / RISER
PUMP ROOM
MEETING ROOM
MANAGER OFFICE
STORAGE
TEMP DISPOSALSERVICES
LIFTOFFICE
CLIENT HISTORY
Sushi King first opened our doors in 1995, pioneering a new era of Japanese cuisine in Malaysia with our unique Kaiten Sushi or Revolving Sushi with quick service res-taurant concept. Offering a wide variety of sushi along with an expansive menu of other Japanese food at af-fordable prices in a friendly, cosy environment, we quickly gained popularity to become a favourite amongst locals and foreigners alike.
ENTRANCE POINT
BOLUVARD POINT
LAKE POINT
3 MAIN POINT USING CIRCLE AS ONE OF HARMONY ELEMENT
ENTRANCE POINT
BOLUVARD POINT
LAKE POINT
CENTRALISE POINTTO CREATE CONNECTION
ENTRANCE POINT
BOLUVARD POINT
LAKE POINT
LINGKAGETO SITE A
LINGKAGETO SITE D
LINGKAGETO SITE C
CREATE A LINGKAGE
ENTRANCE POINT
BOLUVARD POINT
LAKE POINT
SERVICES
SOA
ENTRANCE POINT
BOLUVARD POINT
LAKE POINT
ORIENTATION
SERVICES
MORPHOLOGY AND CONCEPT
KEY PLAN
LOCATION PLAN MASTER PLAN1:1000 SITE PLAN
1:500
TO CREATE CONNECTIONCREATE A LINGKAGE ORIENTATION
SOA STUDYROOF STUDY STRUCTURE STUDY
SUSHI
TO SITE A
TO SITE A
FACING BOULEVARD
FRESH CULTURE
FAST FOODSMOOTH
WATER ELEMENTCALMNESS
SITE PLAN 1:500
SUSHIFRESH
FAST FOODSMOOTH
CALMNESS
SUSHICULTURE
WATER ELEMENT
SUSHICULTURE
HYPOTHETICAL PROGRAMMES
PUBLIC CAFE FOR VISITOR AND NON VISITOR
CREATE NEW RECIPIES, TV SHOW PROGRAMMES
HISTORY AND SUSHI GAL-LERY ,VISUAL
EDUCATION PROGRAMMESCOOKING CLASS
BOULEVARD CONTINUATION AS A PUBLIC GATHERING AREA
LIVE FISH AQUARIUM
GREEN BELT WILL FUNCTION AS BOTH OUTDOOR ACTIVITIES
AHMAD ZULKAMAL BIN MOHD ZIYADI 2007106123
FALL
PUMP ROOM
TANK
GREEN FEATURES - RAIN WATER COLLECTION
DISTRIBUTION WATER FOR GARDEN ANDAQUARIUM
SAVE 45%
SUSHI KING
DROP OFF
ENTRANCE
LOBBY
HISTORY GALLERY
AV ROOM
CONTROL ROOM
A/C / RISER
PUMP ROOM
MEETING ROOM
MANAGER OFFICE
STORAGE
TEMP DISPOSALSERVICES
LIFTOFFICE
GATE ENTRANCE
GALLERY 2
SOUVENIER SHOP
PRAYER ROOM (M)
PRAYER ROOM (F)
JANITORROOM
A/C / RISER
GARDEN
OPEN COOKING SHOWROOM
RESTAURANT
west elevation
GALLERY 1
GARDEN
ENTRANCE
AV AREAGALLERY 2
KITCHENRESTAURANT
OFFICE
EAST ELEVATION
SECTION A-A
GROUND FLOOR
MAIN COLUMN AND MAIN STRUCTURE
PRIMETER AND SECONDRY BEAMPRIMARY BEAM
2ND FLOOR COLUMN & BEAM
PURLIN AND TURBULAR ROOM STRUCTURE
FIRST FLOOR
A
A
SECTION B-B
B
B
ROOF AND FINISHES
BLOW UP DETAILSCALE 1:50 BLOW UP DETAIL
SCALE 1:10
master part 1 portfolio compressCOVER PAGE 1PORTFOLIO JOGJAPAKSI KETELUSANPORTFOLIO THERAPEUTICBOARD 1BOARD 2COVER PAGE 2