127
URBAN DESIGN PORTFOLIO 01 AHMAD ZULKAMAL BIN MOHD ZIYADI

My work during degree and master

Embed Size (px)

DESCRIPTION

 

Citation preview

  • URBAN DESIGN PORTFOLIO 01AHMAD ZULKAMAL BIN MOHD ZIYADI

  • SENIMAN VILLAGEEXPLORING THE CULTIVATED CITY THROUGH URBAN FORMS OF JOGJAKARTA

    THE HARMONIC CONVERGENCE OF CULTURAL EVENT

  • PROJECT ABSTRACTKAMPUNG PAJEKSAN IS ONE FAMOUS VILLAGE WHICH IT HAVE A OWN CULTURE AND LIFESTYLE. IT LOCATED AT HEART OF MALIOBORO STREET WHICH IT IS ONE OF EARLIEST VILLAGE THAT FOUNDED DURING THE 18TH CENTURY . THE COMMUNITY WITHIN THE SITE AREA

    2

    MALIOBORO KG. PAJEKSAN

    13.45 252paxPER ARCRE

    700pax

    ARCRE

  • STRATEGIC PLACEMENT

    PAJEKSAN MALIOBORO

    500mm

    Local people of Pajeksan are alreadyinvolved in this famous culture events.Some parts of this village practiced gamelan,kethoprak and wayang kulit.

    The location of Kampung Pajeksan is very strategic It is situated just 300m from Malioboro Street where Malioboro Street is one of the most busy place in Jogjakarta.

    DILEMMA

    Even this village is situated near Malioboro Street that very famous all around the world,the village development are very poor.The village is like left abandoned by the government.The culture inside Pajeksan is hidden by the famous and well-known Malioboro Street

    THE LEFT VILLAGE

    TO EMPOWER THE ROOT OF MALIOBORO LOCAL IDENTITY BY MEANS OF VITALIZING HERITAGE ART THAT EMBODIED WITHIN THE VILLAGES A NEW CONCEPT OF ART LIVING VILLAGE WHERE LOCAL PEOPLE ABLE TO ENLIVEN COMMUNITY ART HERITAGE AND PEOPLE GLOBALLY EXPERIENCED AND LEARN OF THEIR CULTURE AS WELL.

    THE INSTITUITION OF HERITAGE ART IS THE BEST APPROACH PRACTICED WITHIN THE LOCAL COMMUNITY TO STREGHTEN THE LOCAL ESSENCE AS WELL AS ART PRACTICE. THIS METHOD ALSO TO INCUBATE THE

    PROJECTING THE VILLAGE AS URBAN HERITAGE STAGE, PEOPLE EXPERIENCED WHAT IS HERITAGE ART ACTIVISTS.FRONT AND BACKSTAGE PROCESS. THE DEEPER LEARNING IS GAIN THROUGH THE EXPERIENCE OF BOTH PROCESSES/PREPARATION/ESSANCE.

    MALIOBORO STREET

    KAMPUNG PAJEKSAN

    ECONOMY

    20232013

    CULTURE

    MALIOBORO STREET KAMPUNG PAJEKSAN

    20232013

    DILEMMA, POTENTIAL AND HYPOTHESIS

    HYPOTHESIS

  • THEORY

    KAMPUNG PAJEKSAN WILL BE THE HEART TO EDUCATE, EXPE-RIENCE AND CONSUME THE CULTURAL PRODUCTS BY THE COMMUNITY AND PUBLIC.

    arts are good for people, the arts being used historically as a tool for social organization and normalization Lash , 2006

    The bigger achievement is to try to create something so deeply rooted that it can stand firm against the global takeover by interest groups

    Hufford and Miller, 2006

    THE IDEA OF CULTURE CONSERVATION ISEMBEDDED IN THE AIM OF THIS DESIGN. THE COMMUNITY WILL STILL PRACTICING THEIR CULTURE EVEN THEY ARE LIVING IN THE HEART OF A CITY. THERE ARE POTENTIAL CULTURAL VALUES SPOTTED IN BETWEEN HOUSES AND THE POSSIBILITIES OF INJECTING URBAN CULTURAL VALUE INTO KAMPUNG PAJEKSAN IS VERY HIGH.

    THE HARMONIC CONVERGENCE IS FORM BASED ON THE INTERLOCKING OF THREE FILLED OUT STRATEGIES. FIRST STRATEGY IS TO INTRODUCE THE ART KNOWLEDGE TO THE LOCAL RESIDENTS AND TOURISTS. THERE WILL BE STUDIOS/WORKSHOPS (GAMELAN, KETHOPRAK, BATIK PROCESS-ING, WAYANG KULIT AND ETC).

    SECONDLY, THIS HARMONIC CONVERGENCE VILLAGE IS AIMED TO BE A BUSINESS HUB. THE LOCAL RESIDENTS WILL BE EXPOSED IN MARKETING KNOWLEDGE WHERE THEY WILL BE MARKETING THEIR OWN ART PRODUCTS. AS LOCAL COMMUNITY, THEY ARE GRANTED FOR HAVING THEIR OWN COMMERCIAL ZONE TO COMMERCIALISE THE ART PRODUCTS THAT HAVE BEEN DONE BY THEMSELVES. INDIRECTLY, THIS WILL BE GIVING THE INCOME OPPORTUNITY FOR LOCALS.

    THE LAST STRATEGY IS BY ORGANIZING LIVE PERFORMANCES IN THIS VILLAGE. THERE WILL BE VARIETIES OF CULTURE PERFORMANCES SUCH AS GAMELAN, KETHOPRAK, WAYANG KULIT.

    ALL THESE STRATEGIES ARE PROPOSED TO BE SETTING IN THE EXISTING STREETS.THE STREETS (MAIN ACCESS FOR PAJEKSAN VILLAGERS) WILL BE UTILIZED TO ACCOMMODATE ALL PROPOSED PROGRAMMES AND ALSO FUNC-TIONED AS INTERACTION DEVICE BETWEEN THE LOCAL RESIDENTS.

    the street is a room by agreementA community room the walls of which belong to the donors.The ceiling is the sky Louis I. Kahn

    ART EDUCATION

    THE STREET

    COMMUNITY COMMUNITYTHE

    STREET

  • TO EMPOWER THE ROOT OF MALIOBORO LOCAL IDENTITY BY MEANS OF VITALIZING HERITAGE ART THAT EMBODIED WITHIN THE VILLAGES A NEW CONCEPT OF ART LIVING VILLAGE WHERE LOCAL PEOPLE ABLE TO ENLIVEN COMMUNITY ART HERITAGE AND PEOPLE GLOBALLY EXPERIENCED AND LEARN OF THEIR CULTURE AS WELL.

    THE INSTITUITION OF HERITAGE ART IS THE BEST APPROACH PRACTICED WITHIN THE LOCAL COMMUNITY TO STREGHTEN THE LOCAL ESSENCE AS WELL AS ART PRACTICE. THIS METHOD ALSO TO INCUBATE THE

    PROJECTING THE VILLAGE AS URBAN HERITAGE STAGE, PEOPLE EXPERIENCED WHAT IS HERITAGE ART ACTIVISTS.FRONT AND BACKSTAGE PROCESS. THE DEEPER LEARNING IS GAIN THROUGH THE EXPERIENCE OF BOTH PROCESSES/PREPARATION/ESSANCE.

    JALAN DAGEN

    JALAN PAJEKSAN

    JALAN MALIOBORO

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    ZONING

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    SCHOOL SHOPLOT

    JALAN MALIOBORO

    JALAN DAGEN

    HOTEL/ HOMESTAY

    BUILT FORM

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    VOID

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    MOVEMENT

    JALAN MALIOBORO

    JALAN PAJEKSAN

    SURAU/COMMUNITY

    JALAN PAJEKSAN

    JALAN DAGEN

    POPULATION

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    PADESTRIAN/MOTORCYCLE/TRISHAW

    JALAN DAGEN

    SITE BOUNDARY

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    RESIDENTIAL

    13.45AQRE

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    ACCESSIBILITY

    JALAN MALIOBORO

    JALAN PAJEKSAN

    JALAN DAGEN

    HOSTEL/RENTED HOUSE

    DATA FINDING

  • 123

    2012MIGRATION OF PEOPLE ESTABLISHMENT OF HOTEL AND COMMERCIAL

    1970MIGRATION OF PEOPLEESTABLISHMENT OF COMMERCIAL

    PRIMARY ROAD ESTABLISHGOVERMENT CHINESE SCHOOLDALEM JONONEGERAN

    1925

    165HOUSING

    65%ACTIVE INCULTURE ART

    JALAN

    PAJEKS

    AN

    JALAN DAGE

    N

    JALAN MALIBOROACCOMODATION

    SCHOOL

    URBAN FABRIC MORPHOLOGY

  • HERITAGE EVENTTHE CITY OF MALIOBORO ARE RICH IN CULTURE AND HERITAGE VALUES. THE CITY ITSELF ARE WELL KNOWN FOR ITS HERITAGE EVENTS AND PERFORMANCES ART. THROUGHOUT THE YEARS, MALIOBORO ARE FLOODED WITH TOURIST ESPECIALLY COME FOR THE LOCAL EVENTS AND HERITAGE EXPERIENCES. NEVERTHELESS, THE LOCAL PEOPLE OF MALIOBORO ARE THE SUCCESSOR OF THE CULTURE HERITAGE. THE WAYANG, KETHOPRAK AND OTHER HERITAGE EVENT STILL BEEN PRACTICING AND CELEBRATE IN THE URBAN SETTING. THEY ALSO VERY ATTACH AND PARTICIPATE IN CULTURE EVENTS THAT VITALIZE THE MALIOBORO IDENTITY.

    ART CRAFT EATING WAYANG KULIT COSTUME EXHIBITION ENTERTAINMENT

    BABAK KAMPUNG

    KETHOPRAK

    JALAN PAJEKSAN

    HOST

    JALAN MALIOBORO

  • TYPE OF EVENT

    PENCAK FESTIVAL

    PESTA RAKYAT JOGJA

    CHIN

    ESE C

    ULTU

    RE

    WEEK

    MALIOBORO

    ANNUALYEAR EVENTS

    112

    211

    10 3

    4

    5

    67

    8

    9

    MALIOB

    ORO

    FEST

    IVAL

    FEST

    IVAL

    KESE

    NIA

    NJO

    GJA

    FEST

    IVAL

    APE

    MAN

    JOGJA JAVA FESTIVAL

    MALANG DANCE FESTIVAL

    BABA

    D KA

    MPU

    NG

  • TYPOLOGYTYPOLOGY OF EVENTS

    GAMELAN (INSTRUMENTS, INDEPENDENCE PERFORMANCE )

    GAMELAN INSTRUMENTS

    PEDHALANG & SINDEN

    C1

    COMPLETE SET OF GAMELANPAX = 18 PERSON

    AREA = 40m

    B1

    A1

    C2

    B2

    A2

    TWO COMPLETE SET OF GAMELANPAX = 33 PERSON

    AREA = 80m

    THREE COMPLETE SET OF GAMELANPAX = 48 PERSON

    AREA = 120mC3

    B3

    A3

    WAYANG (KULIT, KARUCIL, GOLEK)

    WAYANG STAGE

    C1

    WAYANG STAGE AND GAMELANAREA = 18.96m

    B1

    A1

    C2

    B2

    A2

    C3

    B3

    A3

    WAYANG STAGE AND GAMELANAREA = 21.96m

    WAYANG STAGE AND GAMELANAREA = 32.96m

    WAYANG STAGE AND GAMELANAREA = 42.96m

    D1 D2 D3

  • TYPOLOGYPERFORMANCE STAGE (KETHOPRAK, RAMAYANA, BEKSAN, WAYANG WONG)

    PERFORMANCE STAGE PAX = 4 PERSONAREA = 32.00m

    A1 A2 A3 A4

    PERFORMANCE STAGE PAX = 6 PERSONAREA = 48.00m

    PERFORMANCE STAGE PAX = 8 PERSONAREA = 64.00m

    PERFORMANCE STAGE PAX = 10 PERSONAREA = 80.00m

    B1 B2 B3 B4

    B1 B2 B3 B4

    B1 B2 B3 B4

    PAX = 50 PERSONAREA = 16.875m

    PAX = 100 PERSONAREA = 33.75m

    PAX = 150 PERSONAREA = 50.625m

    A1 A2 A3

    B1 B2B4

    C1C2 C3 C4

    STAGGERED STAGE LINEAR STAGEAREA FOR 1 PERSON = 0.34m

    B3

    TYPOLOGY OF AUDIENCE

  • SINGLE VOL

    UME

    SINGLE VO

    LUME

    SINGLE VO

    LUME

    DOUBLE FL

    OOR

    DOUBLE FL

    OOR

    WITH BALC

    ONY

    SINGLE VOL

    UME

    SINGLE VO

    LUME

    WITH A SH

    OP

    SINGLE VO

    LUME

    WITH A SH

    OP

    SINGLE VO

    LUME

    WITH A SH

    OP

    TYPOLOGY

    LINEAR JUNCTION L-SHAPE SQUARE

    560 M2 580 M2 600 M2 1500 M

    TYPOLOGY OF EXISTING STREET

    TYPOLOGY OF EXISTING HOUSE

  • PROGRAM MECHANISM

  • DESIGN STRATEGY

  • DESIGN STRATEGY

  • EVENT TIMELINE PROPOSAL

    ART CRAFT,STREET ART GALLERY, EXISTING HOUSING

    ACCOMMODATION

    BUSINESSART CRAFT,COSTUME WALK, EXISTING HOUSING

    ACCOMMODATION

    EXISTING COMMERCIAL, EXISTING HOUSING

  • HYPOTHETICAL PROGRAMMES

    EXHIBITION, ENTERTAINMENT

    PERFORMANCE, RELAXING,

    EATING, BUSINESS EXISTING HOUSINGEXISTING HOUSING

    ACCOMMODATION

    BUSINESS

    DIAGRAMMATIC SECTION

  • DESIGN STRATEGY

  • DESIGN PRINCIPLE

    LIVING UNITS

    POCKECTS OF CAFETARIA

  • DESIGN MECHANISM

    LIVING UNITS

    POCKECTS OF CAFETARIA

    STREET ART GALLERYPERFORMANCE ART STAGE

  • DESIGN STRATEGY

  • PROGRAM MECHANISM

  • ROMANCING THE CULTIVATED CITY @ SENTUL (e)LYMPIOUS UNIVERSITI TEKNOLOGI MARA, MALAYSIA

    THERAPEUTIC CENTERTHE FUTURE ART OF HEALING

  • PROJECT ABSTRACT

    Healthcare buildings should be designed to suit the practice of medicine physically, emotionally and spiritually

    architects could create an environment that not only allow practice of medicine means of healing but allowing comfort, emotionally stable and spiritually at ease

    World Academy of Science, Engineering and Technology 29 2009

    ARE PATIENT GETTING SICK OR CURED IN HOSPITAL?

    THEY ARE ISOLATED FROM THE WORLD

    SOURCE :WWW.TED.COM

    ENVIROMENT

    ENVIROMENT

    EXPERIECING THROUGH HOLOGRAM TREATMENT

    AVERAGE TIME 1/2 YEARS SPENDIN HOSPITAL

    Mental hospitals 'treat patients like prisoners'

    By 2112 Future medical technology has given us brain-computer interfaces, nano-robots, gene manipulation, robotic surgery, synthetic organs, organ cloning, individualized drugs, bionic body parts and cryogenic sleep. This kind of tech-nology is happening in the here and now.

    The coming revolution in medicine will offer us the chance to engage in our own health in ways we have never done before. It will let us monitor and improve the health of others, and it will very much be televised. It will collapse time and space. Well carry our own medical records with us, access diagnosis and treatment suggestions, have the ability to be directly and immediately in touch with caregivers, which will help us achieve healthy outcomes Applications are being developed for the treatment of chronic diseases and for rehabilitation that will combine entertainment and medical care.

  • ISSUE & DILEMMAEventhough the medical technologies is improved around the world, the increasing of technology can cause a traumatic experience through a hardship life. As example, Japan the most advanced country in the world have an issue to be the most high sucide rate in the world. Europe, and America also have been listed with the most high citizen with a mental disorder.

    In this years, in Malaysia about 10% of Malaysian Citizen have been effect by mental illness problem. If this not been solve, by 2113 Malaysia through a technology geeks, Malaysia also can be effected and been list.

    100,000per yearSource: World Health Organization

    2011

    SUCIDE RATE

    7%average per year

    2113170,000

    CAUSE

    Genetic & Age

    LOVE FAMILY

    Psychological trauma

    Environmental stressors

    FIRED

    JOB

    10%FROM MALAYSIA POPULATION292,400

    SOURCE : NEW STRAITS TIME ,10 OCTOBER 2013Deputy director-general of Health (Public Health), Datuk Dr Lokman Hakim

    193 BILION USD per year spend for mental ilness

    MENTAL ILNESS

    SOURCE : WORLD HEALTH ORGRANIZATION ( WHO )

  • HYPOTHESISThe question is, are patient getting sick or cured in hospital? Especially for people who have long term sickness like mental illness. They are isolated from the world. The concept of Therapeutic urbanism is about create a healing space within the environment.

    The first level is to help individuals with persistent and serious mental illness to develop the emotional, social and intel-lectual skills needed to live, learn and work in the community with the least amount of professional support and a through the enviroment space. It will enabling persons with persistent and serious mental illness to live a normal life in the community it will shift away from an illness model towards a model of functional disability

    The second level is by using the environment and urban fabric surrouding, it has a community that will accept the individ-ual, and heal them within the environment. It wil heal base on the individual problem. The Physical Therapy, Recreational therapy, Spritual Therapy and Art therapy environment wil a play role as concept for the Therapeutic urbanism.

    A therapeutic urbanism may heal on two levels: on the level of the individual, of the citizen/user, and on that of the urban fabric. Action is by the individual, moved by both practical need and resonant memory. SOURCE : AYSSAR ARIDA ,THERAPTIC URBANISM , QUANTUM CITY

    INDIVIDUAL COMMUNITYSPACE

    PHSYCHOBIOLOGICAL VULNERABILITY

    SOCIO ENVIRONMENTAL STRESSORS

    PROTECTIVE FACTORMedication

    Skill BuildingSosial Support

    Impartments Disabilities

    HANDICAP

    VULNERABILITY, STRESS AND PROTECTIVE MODEL OF PSYCHIATRIC REHABILITA-

    TION (LIBERMAN 1995)

    RELIGION

    COM

    PETI

    TION

    EDUCATION

    ENVIROMENTElectroconvulsive therapyphysical therapy

    Cognitive behavioral therapySystemic therapy Virtual reality

    exposure therapysimulated real environments through digital mediaoffers a sense of realism in a safe environment

  • PHYSICAL THERAPY CENTRE

    MEDICAL FACILITIES

  • SENTUL (e)LYMPIOUS KL, MALAYSIA

    AREA 28.872km

    THE PROPOSED MASTER PLAN SETTING IS LOCATED IN THE HEART OF KUALA LUMPUR, SPECIFICALLY IN THE NORTH-ERN BOUNDARY OF KUALA LUMPURS CITY CENTRE. THE SITE IS SITUATED INSIDE SENTUL-MANJELARA DISTRICT, ONE OF THE 6 DISTRICTS INCLUDED IN THE FEDERAL TERRITORY. IT IS ALSO ONE OF THE LARGEST DISTRICT WITH AN AREA OF 46.098 KM.WITH REFERENCE TO THE KL STRUCTURE PLAN 2020, SENTUL-MANJELARA IS THE 2ND MOST POPULATED DISTRICT IN KUALA LUMPUR WITH A TOTAL POPULATION OF 445, 025 PEOPLE AND THE RECORD-ED DENSITY OF 9,645 PERSON/SQM. THE ACTUAL SETTING IS LOCATED IN THE SOUTHERN REGION OF SENTUL-MAN-JELARA DISTRICT, DIRECTLY ON THE CITY CENTRE BOUNDARY WHICH POSSESS A DIRECT GATEWAY INTO THE CITY CENTRE. THE PROPOSED SETTING HAS BEEN IDENTIFIED AND IT POSESS A TOTAL AREA OF 8.872 KM AND A DENSI-TY RATE OF 35 PERSON/SQM.

    MASTER PLAN SETTING

  • COMMERCIAL GREEN AND OPEN SPACE RIVER AND WATER ELEMENT

    RESEARCH AND DEVELOPMENT

    RESIDENTIAL GREEN AND OPEN SPACE INSTITUTIONAL

    ECO - DEVELOPMENT

    INTEGRATED TRANSPORT PEDESTRIAN AND BICYLE NETWORK BOATING AND WATER TAXI

    PUBLIC TRANSPORT

  • SONGDO IBD PROJECTION

    35 acre

    38 acre

    75 acre

    14 acre

    30 acre

    188 acre

    297 acre

    27 acre

    30 acre

    961%

    =4000 people

    BY GENERATING BIOMIMETIC PRINCIPLES IT IS ASSURED THAT THE PRINCIPLES ARE ADJUSTED IN AN OPTIMUM WAY TO THE PROBLEMS STATED IN BIOMIMETICS AND REFLECT THE ISSUES TACKLED WITHIN. ALSO, BY APPLYING BIOMIMETIC PRINCIPLES THE IDENTIFIED SOLUTIONS HAVE A HIGH POTENTIAL OF BEING MORE SUITABLE FOR BIOMIMETIC TRANSFER.

    TOTA

    L PO

    PULA

    TION

    DE

    NSIT

    Y

    =75642 people

    =4000 people

    =5 people

    PROJECT INFO:

    _SONGDO IBD, INCHEON, KOREA

    _SENTUL ELYMPIOUS, KL, MALAYSIA AREA: 6.8 km

    VISION: SUSTAINABLE BUSINESS DISTRICT

    LAND USE:

    AREA: 8.872 km VISION: TOWARDS ECO-DIGITAL HUMANISM

    LAND USE:

    SMART CITY/UBIQUITOS CITY.

    1996-2017/10-YEAR DEVELOPMENT PROJECT

    INTERBATIONAL BUSSINESS, IT, BT and R&D hub.

    40% OF ITS AREA RESERVED FOR GREEN SPACE 26KM OF BICYCLE LANES PROVIDE CHARGING STATION FOR ELECTRIC VEHICLES

    PROVIDE WASTE COLLECTION SYSTEM THAT ELIMINATES TRASH TRUCK BASED ON 6 CORE DESIGN GOALS WHICH IS OPEN SPACE, TRANSPORTATION, WATER, ENERGY USE, RECYCLING, OPERATIONS

  • BY GENERATING BIOMIMETIC PRINCIPLES IT IS ASSURED THAT THE PRINCIPLES ARE AD-JUSTED IN AN OPTIMUM WAY TO THE PROBLEMS STATED IN BIOMIMETICS AND REFLECT THE ISSUES TACKLED WITHIN. ALSO, BY APPLYING BIOMIMETIC PRINCIPLES THE IDENTIFIED SOLUTIONS HAVE A HIGH POTENTIAL OF BEING MORE SUITABLE FOR BIOMIMETIC TRANS-FER.

    A

    E

    BTECHNOLOGY PARK

    SENTUL - MANJALARA FLAGSHIP2113

    DOWNTOWN

    DART AND CULTURE PARK

    CENTRAL PARK C TRANSIT HUB

  • BEHAVIOUR MANAGEMENT

    BASIC SKILL

    RESTORATION

    PREPARATION

    COMMUNITY PROCESS

    TREATMENT PROCESS

    AGENCY

    FUNCTION IN COMMUNITY LIVING

    VALUES

    DOMINANT FACTOR

    PROCESS

    SPACE AND ENVIROMENT

    PERSON

    DESIGN IDEA

    THERAPHY STRATEGY PROCESS

    SOURCE : AYSSAR ARIDA ,THERAPTIC URBANISM , QUANTUM CITY

    INDIVIDUAL COMMUNITY

    A therapeutic urbanism may heal on two levels: on the level of the individual, of the citizen/user, and on that of the urban fabric. Action is by the individual, moved by both practical need and resonant memory.

    THERAPEUTIC URBANISM

    SPACE

    PYHSICAL SPACE

    PSYCHOLOGICAL SPACE

    VIRTUAL SPACE

    BIOLOGICAL SPACE

    SPACEFOR

    THERAPHY

    THE ENVIRONMENT THAT VARY IN NATURE OF INDIVIDUAL PREFERENCE, NEED, AND DECIPLINE

    THE TREATMENT THAT VARY IN NATURE OF INDIVIDUAL PREFERENCE, NEED, AND DECIPLINE

    THE CONNECTION BETWEEN INDIVIDUAL GROUPS NOT JUST LOCALLY BUT ALSO TO THE

    WIDER COMMUNITY THROUGH TECHNOLOGY.

    THE INDIVIDUALS PHYSICAL AND MENTAL ABILITY TO ENGAGE WITH A WIDE RANGE OF

    PHYSICAL DISABBILITIES

    DESIGN IDEA

  • HEALTH COMMUNITY

    THERAPHY

    MEDICATION ECONOMY

    DESIGN BY NATURE

    CENTRAL NETWORK

    VIRTUAL TOWER

    FORM

    ACTIVITY

    IMAGE

    THERAPTIC URBANISM

    MEDICAL SPACE PLANNING

    LANDSCAPE INTERGRATED BUIDLINGS

    PEDESTRIANIZATION

    CIRCLE CENTER-GRID SYSTEM

    INTERCONNECTION ENVIROMENT AND THERAPY

    CENTRALIZE LANDMARK

    URBAN RESTORATION

    VIRTUAL THERAPTIC REALM

    TREATMENT

    DESIGN PRINCIPLETHERAPEUTIC URBANISM

    EQUAL RELATION TO LANSCAPE MORPOHOLOGY EQUIVALENCE BETWEEN MASS, VOID AND ORGANISM

    INJECTION OF PROGRAMS BY NEED CENTRE OF GRAVITY IN THE URBAN

    RESTORATION OF EXISTING DAMAGE FABRIC RESERVATION OF PHYSICAL FABRIC OF SPACE, VOID BECOME SOLID -Rachel Whiteread

  • PROCESS

    SPACE AND ENVIROMENT

    PERSON

  • FRAMEWORKST

    AGE

    2 :C

    OMM

    UNIT

    YTH

    E TR

    EATM

    ENT

    PROC

    ESS

  • SPIRITUAL THERAPY

    PHYSICAL THERAPY

    OCCUPATIONAL THERAPY

    ART THERAPY

    EMOTIONAL THERAPY

    RECRETIONAL THERAPY

    LABORATORY

    RESIDENTIAL

    DOCTOR RESIDENTIAL

    MOSQUE

    GREEN PARK THERAPY

    SCHOOL

    HOTEL

    MEDICAL CENTRAL

    PATIENT SHOP

    SPORT CENTRE

    GALLERY

    STUDIO

    SPRITUAL THERAPY

    OCCUPATIONAL THERAPY

    ART THERAPY

    RECRETIONAL THERAPY

    LABOROTARY

    DOCTOR RESIDENTIAL

    SCHOOL

    SPORT CENTRE

    SKILL

    SKILL

    AGENCY

    VALUE

    SKILL

    BEHAVIOUR

    SKILL

    BEHAVIOUR

    AGENCY

    ENVIROMENT

    VALUE

    VALUE

    VALUE

    VALUE

    SKILL

  • BUILDING MASSING

    RESIDENTIAL COMMERCIAL PUBLIC FACILITIES

    EXISTIING ROAD NETWORK EXISTING GREENARY EXISTING WATER ELEMENT

    PUBLIC PARK

    OUTDOOR VOID

    CENTRALISE BOUNDARY

    PARCEL 3LOVE

    PARCEL 4ART

    PARCEL 9SPRITUAL

    PARCEL 1WATER

    PARCEL 2ISLAMIC

    PARCEL 6BIONIC

    SITE POTENTIAL

  • ZONING MORPHOLOGY

  • MASSING AND PLANNING PRINCIPLE

    VOLUMETRIC PROJECTION

  • VOLUMETRIC PROJECTION

  • 1OO POPULATIONPROJECTION 2013 2113

    75642 18064252174

    YEARS

    acreAVERAGE GROWTHPER YEARS

    PROPOSED SITE

    60 acre

    4.2%313 X 87

    18700POPULATION

    VOLUMETRIC PROJECTION

    GALLERY

    ART CLASS

    PHYSICAL THERAPYCENTRE

    RECREATIONAL THERAPY

    SPRITUAL THERAPY

    PRESENTATION

    VIRTUAL REALITY THERAPY

    HOTEL

    RND

    MALL

    RESIDENTIALSPIDER TRAINSTATION

    MEDICAL ACADEMY

    PUBLIC TRANSPORT

    PROGRAMME

    DIAGRAMMATC CEXPLODED

  • TYPOLOGY

    THE FOUR TOWER ART THERAPY CENTRE MEDICAL FACILITIES SPRITUAL CENTRE RESIDENTIAL

    BUILDING

    MEDICAL ACADEMY

    SHOP DISTRICTRETAIL SHOP RND FACILITIESHOTEL MEGAMALL PHYSICAL THERAPY CENTRE

  • PUBLIC REALM

    LINKAGE DISTRICT

    DISTRICT

    RECREATIONALWATER FRONT RECREATIONAL

    WATER FRONT

  • ARK 754INTEGRATEDBUILDING SERVICES

    ROMANCING THE CULTIVATED CITY @ SENTUL (e)LYMPIOUS UNIVERSITI TEKNOLOGI MARA, MALAYSIA

    SAMSUNG TECHNOLOGY TOWER THE FUTURE INNOVATIONSTUDENT: AHMAD ZULKAMAL BIN MOHD ZIYADI . NO MATRIX: 2013200026

    Check by : Assoc. Prof Josmin Yayha

  • CONTEXT

    1.0 INTRODUCTION2.0 PROJECT BACKGROUND 2.1 THE PROJECT 2.2 CLIENT PROFILE3.0 THE CONCEPT 3.1 SITE ANALYSIS 3.2 FORM MORPHOLOGY 3.4 PROGRAMME DISTRIBUTION4.0 FLOOR PLANS5.0 CORE DESIGN6.0 FIRE APPLIANCES CONCEPT 6.1 FIRE APPLIANCES CONCEPT 6.2 REQUIRED FIRE HYDRANT 6.3 REQUIREMENT 6.4 FIRE APPLIANCES ACCESS 6.5 HOSE REEL PROVISION7.0 CONCEPT OF SERVICES8.0 VENTILATION SYSTEM9.0 SERVICES CALCULATION9.1 STAIRCASE AND 9.2 LIFT CALCULATION9.3 PARKING SCHEDULE10.0 SCHEDULE OF ACCOMODATION11.0 BUILDING ELEVATION12.0 BUILDING SECTION13.0 SECTIONAL PERSPECTIVE14.0 CUT-OUT SECTION

    1

  • 1.0 INTRODUCTION

    This report aim to explain overall services and re requirement concept for the HIGH RISE PROJECT for ADVANCE DESIGN PROJECT 2- Master of Architecture as given the lot from the Urban Design at Sentul, Kuala Lumpur.

    This project is part of masterplan two, site at sentul near the YTL development. This project is proposing a new Samsung Tower oce which target the international bisness and local people. The size is 2.5 acres.

    The main objective of the report is to :

    1. Deliver the explationation of the services and re requirements part of the project 2. Propose the sucient re requirements for the project.3. To understand the services and re requirement in designing a building.

    2

  • UU

    MASTER PLANSCALE 1:250

    MEDIA PRIMA

    FELDA

    MSC

    SAMSUNG

    BOULEVARD

    2.0 PROJECT BACKGROUND

    2.1 THE PROJECT

    2.2 CLIENT PROFILESamsung Electronics is part of one of the largest multi-billion dollar corporations in the world. In 2007 it exceeded the $100bn mark in annual sales for the first time in its history. This makes it one of the world's top three companies in the electronics industry where only two other companies, Siemens and Hewlett-Packard, have posted larger revenues. The name Samsung literally means three stars or tristar in Korean, reflecting the Samsung Groups dominance in two further sectors: Samsung Heavy Industries and Samsung Engineering and Construction. If you are talking innovation in Samsung walks the walk and is now the established leader in consumer electronics, providing a range of leading-edge premi-um products and, in their own words, leading the digital convergence revolution. In so doing Samsung has made a remark-able transformation from copy-cat manu-facturer to become Asia's most valuable technology company.

    The proposed master plan setting is locat-ed in the heart of Kuala Lumpur, specifical-ly in the northen boundary of Kuala Lum-purs city centre. The site is situated inside Sentul-Manjalara district, one of the 6 district included in the federal territory. It is also one of the largest district with an area of 46.098km. With reference to the KL Structure Plan 2020, Sentul Manjalara is the 2nd most populated district in Kuala Lumpr with a total population of 445,025 people and the recorded density of 9,645 person/sqm. The actual setting is located in the southern region of Sentul Manjalara district, directly on the city centre boundary which possess a direct gateway into the city centre. The proposed setting has been identified and it posess a total area of 8.872km and a density rate of 35 person/sqm.

    3

  • DIRECT EXTRUSIONOF MASS ACCORDING

    TO THE UBRAN DESIGNGUIDELINE

    SUN PATH INCISIONS AND PROVIDE SHADING

    ADDING GREEN POCKET

    3.0 DESIGN APPROACH

    3.1 SITE ANALYSIS

    3.2 FORM MORPHOLOGY

    4

  • 3.3 PROGRAMME DISTRIBUTION

    5

  • 4.0 FLOOR PLANS

    GROUND FLOORNOT IN SCALE

    6

  • FIRST FLOORNOT IN SCALE

    7

  • 2nd FLOORNOT IN SCALE

    3rd FLOORNOT IN SCALE

    8

  • 4th FLOORNOT IN SCALE

    5th FLOORNOT IN SCALE

    6th FLOORNOT IN SCALE

    9

  • 7,8,13,14,19,20,25,26,30 FLOOR OPEN PLAN OFFICE

    9,15,21 &26 FLOOR OPEN PLAN OFFICE

    16 FLOOR SERVICES FLOOR

    17 FLOOR SERVICES FLOOR

    12,18,24&29 FLOOR OPEN PLAN OFFICE10,11,16,17,22,23,27 &28 FLOOR OPEN PLAN OFFICE

    10

  • BASEMENTNOT IN SCALE

    11

  • BASEMENT 1-3NOT IN SCALE

    12

  • FIRE PROTECTIONPROTECTED BY FIRE LOBBYFIRE STAIRCASEPROTECTED FIRE ESCAPE ROUTEHOSE REEL AND WET RISERFIRE RATED DOORBOMBA FIRE LIFT

    1

    2

    3

    4

    5

    6

    1

    1

    2

    2

    3

    3

    4

    4

    5

    5

    5

    6

    SERVICESAHUSTORAGESERVICE DUCTELECTRICAL SERVICESRUBBISH COLLECTION

    1

    1

    2

    3

    3

    4

    4

    2

    5

    5

    GROUND - 29th FLOOR OPEN PLAN OFFICE

    BASEMENTOPEN PLAN OFFICE

    5.0 CORE DESIGN

    THE CORE DESIGN

    The samsung tower consist of 1 centre corewith consist :

    1) Services part- Serving for samsung tower maintanance workers and reman, not for the main worker.

    2) Lift core ( main )- Serving for the podium and oce tower till top .

    CENTRAL CORE CONFIGURATIONBy providing a central core conguration with one service core at the side, the oor for oce can easily divided to the units while in the same time maximizing the building eciency and also maximizing the view for the hotel room

    13

  • 1.FIRE APPLIANCE ACCESSIsland site for building volume above 112.000m

    6.0 FIRE APPLIANCES CONCEPT

    2- REQUIRED : FIRE HYDRANTFire hydrant should be located.

    - Away from obstruction as such furnitures- Not less then 2 metres from adjacent build-ing and overhang- Between 0.61 and 2.4 meter from re appliances access away from risks of vehicu-lar damage.- Must not be more then 91.6 metres apart from each other.

    2- REQUIREMENT FOR ISLAND SITEIsland site for building volume above 112.000m

    14

  • 4. FIRE APPLIANCE ACCESS

    OFFICE TOWER

    NET AREA [ LARGEST FLOOR AREA] 1600MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA/OL 160 PAXNO. OF EXIT STAIRCASE 2.67 STAIRS[PPF/ 60 PERSON]

    EXIT WIDTH REQUIRED 2.67X0.5 =1.46EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 1.46/1.00 1 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 2 NOS

    PODIUM NET AREA [ LARGEST FLOOR AREA] 4500MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 450 PAXNO. OF EXIT STAIRCASE 7.5 STAIRS[PPF/ 60 PERSON]

    EXIT WIDTH REQUIRED 7.5X0.55=4.1EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 4.1/1.00 4 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 5 NOS

    BASEMENT

    NET AREA [ LARGEST FLOOR AREA] 7700MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 770 PAXNO. OF EXIT STAIRCASE 3 STAIRS[PPF/ 60 PERSON]

    EXIT WIDTH REQUIRED 13X0.55 =7.15EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 7.15/1.00 7 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 8 NOS

    15

  • 4. FIRE APPLIANCE ACCESS

    From podium = 8 PAXFrom Basement = 8 PAXFrom oce unit = 2 PAXMaximum travel distance = 45 metresDead end limit =

    9,15,21 &26 FLOOR SCALE 1:250OPEN PLAN OFFICE

    16

  • The building is designed with the appliance of remen requirements and accordingly tothe clauses from the Uniform Building By-Law 1984 which include the clauses, 134, 196,197, 200, 201, and 202. The compartmentation has been designed accordingly to the 5thSchedule, dierent purpose of group. The Dead-end and Maximum Travel Distance hasbeen applied accordingly to the 7th Schedule of the UBBL.

    9,15,21 &26 FLOOR OPEN PLAN OFFICE

    5. HOSE REEL PROVISIONHose reel for every 30m radi

    17

  • FIRE STAIRCASE (ESCAPE ROUTE)1

    2

    BASEMENT-EXTERNAL STAIRCASE BASEMENT-EXTERNAL-PODIUM STAIRCASE

    3 PODIUM-TOWER STAIRCASE

    1

    2

    2

    2 2

    3

    ELEVATOR1 2BASEMENT-EXTERNAL LIFT CAR LIFT 3 BASEMENT-PODIUM LIFT 45

    FIRE/SERVICE LIFTHIGH ZONE LIFT 6 LOW ZONE LIFT 3

    4

    6

    1

    2

    5

    WATER SUPPLY1 2KITCHEN DIRECT SUPPLY PUMP 3 SUCTION TANK4 COOL WATER RISER 5 TOILET6 GRAVITY TANK

    1

    23

    4

    5

    5

    6

    7.0 CONCEPT OF SERVICES.

    STAIRCASE & FIRE STAIRCASE.Staicases are provided according to the required Dead end Limit and Maximum Travel Distance, as stated in the Uniform Building By Law 1984

    LIFT CORE- Central core.- One side at service core.

    WATER SUPPLY SYSTEM

    This building uses an PUMPED UPFEED AND DOWNFEED SYSTEM due it has water tank in service oor located at 16th oor. All water is pump to suction tank and will be pump to the water tank at 16th oor and will be distributed for domestic uses.

    18

  • FIRE FIGHTING1 2HOSE REEL AND RISER SPRINKLER 3 SPRINKLER TANK4 FIRE FIGHTING TANK 5 WET RISER 6 SPRINKLER7 SPRINKLER RISER

    3

    5

    7

    6

    3

    4

    4

    3

    WET RISER AND SPRINKLER SYSTEM

    ELECTRICAL1 2ELEC &COM TRUNK GENSET ROOM 3 DATA ROOM4 6MDF ROOM 5 PABX TRANS ROOM 1 7 TRANS ROOM 28 TNB 10 CALL CENTER

    11 ELECTRIC RISER 12 COMMUNICATION RISER 13 BAS RISER9 LV MAIN SWITCH ROOM

    1

    2

    3

    46

    5

    7

    8

    10

    1112

    9

    13

    ELECTRICAL SERVICES.

    MAINTAINANCE1 2GARDEN CORRIDOR COUNTER WEIGHT GONDOLA 3 GONDOLA RAIL 4 GONDOLA HOUSE

    1

    2

    3

    4

    WINDOW CLEANING

    19

  • 20

    8.0 VENTILATION SYSTEMThe building uses mechanical and natural ventilationMechanical Ventilation system : Centralized chiller, Local Ahu

    CHILLER PLANT ROOM

    Equipment roomThe heart of the central air conditioning is the chiller. Chiller make use of the refrigeration principles to work mechanical rooms typically house the following equipment:- Air handlers- Boiler- Chiller and pumps- Heat exchangers- Water heaters and tanks- Water pumps ( for domestic, heating/cooling, and firefighting water)-Main distribution piping and valves.- Sprinkler distribution piping and pump

    16 FLOOR SERVICES FLOOR

    COOLING TOWER

    BASEMENT

    AHU

    Air Handling UnitAir handling unit are often called AHU. The air handling unit is box-like equipment with a fan and a cooling coil inside. Some units also contaiin air filters. The whole fan and motor assembly, comprising shaft, bearings, pulley, belting is usually put inside the AHU

    The basic function of the AHU is to suck air from the rooms, let it pass through chilled water cooling coils and then discharging the cooled air back to the room

  • 9.0 SERVICES CALCULATION

    GROSS FLOOR AREAGROUND : 101302.28 SQFLEVEL 1 : 124188.55 SQFLEVEL 2 : 33042.41 SQFLEVEL 3 : 30480.82 SQFLEVEL 4 : 33408.35 SQFLEVEL 5 : 33408.35 SQFLEVEL 6 : 33408.35 SQFLEVEL 7 : 33408.35 SQFLEVEL 8 - 15 : 184344.0 SQF-------------------------------------------------TOTAL AREA : 73986.29 SQM

    BUILDING VOLUMEHEIGHT : 61.50 MWIDTH : 108.00 MLONG : 96.6 M--------------------------------------VOLUME : 641617.2 M3*FIRE APPLIANCE ACCESS112000 AND ABOVE = ISLAND SITEPLOT RATIO 1 : 6GROUND : 101302.28 SQFLEVEL 1 : 124188.55 SQFLEVEL 2 : 33042.41 SQFLEVEL 3 : 30480.82 SQFLEVEL 4 : 33408.35 SQFLEVEL 5 : 33408.35 SQFLEVEL 6 : 33408.35 SQFLEVEL 7 : 33408.35 SQFLEVEL 8 - 15 : 184344.0 SQF----------------------------------------------------601635 SQF / 186427.65 SQF = 3.54

    UBBL REQUIREMENTS :*SEVENTH SCHEDULEHOTEL :DEAD END 10M | UNSPRINKLERED 30M | SPRINKLERED 45MCOMMERCIAL :DEAD END 15M | UNSPRINKLERED 30M | SPRINKLERED 45M*TENTH SCHEDULEHOTEL :EXTINGUISHING SYSTEM | AUTO SPRINKLER & HOSEREEL |FIRE ALARM SYSTEM | MANUAL ELECTRICAL FIRE ALARMSYSTEM | EMERGENCY LIGHTING | GENERATORSCOMMERCIAL : #REFER TO THE HIGHEST RISK PURPOSEGROUP

    HOSEREEL SYSTEM :REQUIRED HOSE REEL :TOTAL HOSE REEL PER FLOOR (30M RADIUS/HOSE REEL)NOS OF HOSEREEL PER FLOOR : FLOOR AREA/100

    GROUND FLOOR : 1146/1000 1.146 = 1 HOSE REEL1ST FLOOR : 3416/1000 3.416 = 3 HOSE REEL2ND FLOOR : 6623/1000 6.623 = 7 HOSE REEL3,4,5,6TH FLOOR : 2139/1000 2.139 = 2 HOSE REEL7TH FLOOR : 2324/1000 2.324 = 2 HOSE REEL8-15TH FLOOR : 1671/1000 1.671 = 2 HOSE REELTOTAL HOSE REEL = 38 HOSE REELS

    21

  • 9.1 STAIRCASE CALCULATIONOFFICE TOWER

    NET AREA [ LARGEST FLOOR AREA] 1600MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA/OL 160 PAXNO. OF EXIT STAIRCASE 2.67 STAIRS[PPF/ 60 PERSON]

    EXIT WIDTH REQUIRED 2.67X0.5 =1.46EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 1.46/1.00 1 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 2 NOS

    PODIUM NET AREA [ LARGEST FLOOR AREA] 4500MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 450 PAXNO. OF EXIT STAIRCASE 7.5 STAIRS[PPF/ 60 PERSON]

    EXIT WIDTH REQUIRED 7.5X0.55=4.1EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 4.1/1.00 4 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 5 NOS

    BASEMENT

    NET AREA [ LARGEST FLOOR AREA] 7700MOCCUPANCY LOAD [71 SCHEDULE ] 10 M/PERSON NO. OF PERSON/FLOOR NA+OL 770 PAXNO. OF EXIT STAIRCASE 3 STAIRS[PPF/ 60 PERSON]

    EXIT WIDTH REQUIRED 13X0.55 =7.15EXIT WIDTH PROVIDED 1.00MSTAIRCASE REQUIRED 7.15/1.00 7 NOSADDITIONAL STAIRCASE REQUIRED 1 NOSTOTAL STAIRCASE REQUIRED 8 NOS

    22

  • 9.2 LIFT CALCULATIONOFFICE TOWER

    INTERVAL + AVERAGE TIME (SEC)INTERVAL 60SECAVERAGE LOBBY WAIT TIME 30 SEC

    HANDLING CAPACITYPAX CAPACITY (MAX) 12-28 20 PAXNORMAL LOAD / TRIP (P) 10-22 12 PAX

    PERCENTAGE HANDLING CAPACITY PHCBUILDING POPULATION = 3500 PAXMIN % BUILDING POPULATION IS 5 MIN = 525 PAX

    TRAVEL TIME (LOBBY WAIT + TRAVEL TIME )CALCULATION NO OF PAX PER TRIPP= POP X HCP/ (300/1) 52.5 PAX/ TRIP

    NO OF LIFT = 6 UNITS PASSANGER LIFTS

    9.3PARKING SCHEDULE

    CAR PARKING CALCULATION

    GFA : 60,639.60 sq.mGFA-30% SERVICES : 60,639.60 - 18191.88TOTAL : 42,447.72 sq.m (456,903 sq/ft)1car park = 500 sq.ft = 456,903/500 = 9131081 + 10%(visitor) = 1004+1% (OKU)1014 - 50% (discaunt) =507 car parking

    MOTORCYCLE PARKING

    GFA : 60,639.60 sq.mGFA-30% SERVICES : 60,639.60 - 18191.88TOTAL : 42,447.72 sq.m (456,903 sq/ft)1car park = 1500 sq.ft = 456,903/1500 = 3041081 + 10%(visitor) = 334+1% (OKU)337 - 50% (discaunt) =169 car parking

    23

  • 24

    10.0 SCHEDULE OF ACCOMODATION .

    NET AREA SERVICES & CIRCULATION TOTAL AREA ( GROSS )BASEMENT

    GROUND FLOOR COMMERCIAL 1269 543 3627PARKING AND CIRCULATION 5237 201 5438

    6506 744 9065 71.77054606

    LEVEL 1 (PODIUM ) COMMERCIAL 2369 481 2850CIRCULATION 1036 160 1196

    3405 641 4046 84.15719229

    LEVEL 2 (PODIUM) COMMERCIAL 3931 481 4412

    3931 481 4412 89.09791478

    LEVEL 3 ( PODIUM) COMMERCIAL 3931 481 4412

    3931 481 4412 89.09791478

    LEVEL 4 OFFICE 1174 481 1655

    1174 481 1655 70.93655589

    LEVEL 5 OFFICE 1312 481 1793

    1312 481 1793 73.17345231

    LEVEL 6 OFFICE 1200 481 1681

    1200 481 1681 71.38607971

    LEVEL 7-8,10-11,13-14,16-17,19-20,22-23,25-26,28-29 OFFICE 16200 7696 23896

    16200 7696 23896 67.79377302

    LEVEL 9,12,15,18,21,24,27, OFFICE 7400 3376 10776

    7400 3376 10776 68.67112101

    TOTAL 45059 14862 59921 75.19734317

    75%

    TABULATIONLEVEL EFFICIENCYDESCRIPTION

    TOTAL BUILDING EFFICIENCY=

    CLIENT SAMSUNG SDB BHD.LOCATION SENTULTYPE OF LAND COMMERCIALLOT NO

    PURPOSE GROUP PERCENTAGE

    OFFICE 42.0 %COMMERICIAL 25.0 %SHOWCASE GALLERY 10 % SERVICES 15 %FACILITIES 8 %TOTAL 100 % 60,639.60M

    PLOT RATION CALCULATION PLOT AREA (PA) 2.5 ACRES 10,106.60MPLOT RATIO (PR) 1 : 6 MAX GROSS FLOOR AREA ( GFA ) 60,639.60 MMAX PLINTH AREA MPA 60%X PA 6063.96MSERVICE/ CALCULATION 30%X GFA 18191.8M

  • ROOF LEVEL

    LEVEL 28

    LEVEL 27

    LEVEL 26

    LEVEL 25

    LEVEL 24

    LEVEL 23

    LEVEL 22

    LEVEL 21

    LEVEL 20

    LEVEL 19

    LEVEL 18

    LEVEL 17

    LEVEL 16

    LEVEL 15

    LEVEL 14

    LEVEL 13

    LEVEL 12

    LEVEL 11

    LEVEL 10

    LEVEL 9

    LEVEL 8

    LEVEL 7

    LEVEL 6

    LEVEL 5

    LEVEL 4

    LEVEL 3

    LEVEL 2

    LEVEL 1

    GROUND LEVEL

    LOWER GROUND

    NORTH BOUND ELEVATION WEST BOUND ELEVATION

    11.0 BUILDING ELEVATION

    25

  • AUDITORIUMBANQUET HALL

    LIFT

    CO

    RELI

    FT C

    ORE

    LIFT

    CO

    RELI

    FT C

    ORE

    FIRE

    STA

    IRCA

    SE

    FIRE

    STA

    IRCA

    SE

    FIRE

    STA

    IRCA

    SE

    FIRE

    STA

    IRCA

    SEFI

    RE S

    TAIR

    CASE

    FIRE

    STA

    IRCA

    SE

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    SERVICESSERVICES

    SERVICES SERVICES

    SERVICE

    BOARD ROOM

    LEVEL 27

    LEVEL 26

    LEVEL 25

    LEVEL 24

    LEVEL 23

    LEVEL 22

    LEVEL 21

    LEVEL 20

    LEVEL 19

    LEVEL 18

    MUSOLLA

    SERVICES FLOOR

    LEVEL 15

    LEVEL 14

    LEVEL 13

    LEVEL 12

    LEVEL 11

    LEVEL 10

    LEVEL 9

    LEVEL 8

    LEVEL 7

    LEVEL 6

    LEVEL 5

    LEVEL 4

    LEVEL 3

    LEVEL 2

    LEVEL 1

    GROUND LEVEL

    LOWER GROUND

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    OFFICE AREA

    BOARDROOM

    SURAU SURAU

    SECTION

    12.0 BULDING SECTION

    26

  • LIFT CO

    RE

    GBI-EE

    ENERGY STAIR APPLIANCESLow power consumption appliances and low heat emmited

    GBI-SM4

    LANDSCAPING

    GBI-SM3

    CONNECTION TO COMMUNITY SERVICESThe bus station and LRT line is located directly infront of the building

    GBI-SM4

    VIEW CAPTURING NOZZLESThe surrounding sites premiem vieware captured by the orientation design of this building

    GBI-EE

    LIGHTNING ZONINGPartitioned light zone that save energywhen the space is not in use

    GBI-EE

    Efficient lightingLighting fitting using 15 bulbs and led lighting

    GBI-EE4

    GOOD CONSTRUCTION QUALITYDry construction and manufacturingconstruction quality meet the standard

    GBI-EQ5

    LOW VOC PAINTApply low volatile organiccompound paint.

    GBI-MR3

    RECYCLE GLASSRecycled glass used to minimizedembed energy in glass production

    GBI-IN1

    INNOVATIVE SURAU LAYOUTThe mihrab is pointing toward the kiblatthus the integration of nozzle has beenpuctured to attain this feature

    SURAU

    GBI-EQ4

    INDOOR AIR POLLUTANTSCeiling and carpet to belower emitting containedmaterial suc as gypsum fibrous board and adhesive

    GBI-EQ

    NATURAL LIGHTINGHigh level natural light allowance(offset 10m oe less from core)

    SECTIONAL PERSPECTIVE

    13.0 SECTIONAL PERSPECTIVE

    27

  • 12

    2

    3

    3

    5

    5

    67

    8

    89

    BB

    B

    F

    G

    H

    K

    D

    A

    2

    3

    6

    7

    8

    8

    8

    4

    1

    1

    B

    C

    E

    F

    H

    I

    K

    M

    PA

    I

    GBI-SM4

    LANDSCAPING

    GBI-EE

    LIGHTNING ZONINGPartitioned light zone that save energywhen the space is not in use

    GBI-EQ5

    LOW VOC PAINTApply low volatile organiccompound paint.

    GBI-MR3

    RECYCLE GLASSRecycled glass used to minimizedembed energy in glass production

    GBI-EQ

    NATURAL LIGHTINGHigh level natural light allowance(offset 10m oe less from core)

    GBI-EQ4

    INDOOR AIR POLLUTANTSCeiling and carpet to belower emitting containedmaterial suc as gypsum fibrous board and adhesive

    12

    3

    56789

    10

    4

    FIRE PREVENTION SYSTEMSPRINKLER SYSTEM

    HOSE REEL RISER

    FIRE HOSE REEL

    PRESSURIZE SHAFT

    FIRE STAIRCASE

    SPRINKLER RISER

    WET RISER

    FIRE RATED DOOR

    FIRE LIFT

    FIRE STOP

    B

    C

    EFGH

    I

    D

    STRUCTURAL COMPONENTSCORE SHEAR WALL

    METAL DECKING

    RAISE FLOOR SYSTEM

    COMPOSITE FLOOR SLAB

    CASTELLATED BEAM

    SUSPENDED CEILING

    HOLLOW STEEL STRUCTURE

    RC COLUMN

    LOW-E GLAZING

    A

    2

    3

    5678

    4

    TOWER SPACESMOKE LOBBY

    MALE TOILET

    MALE OKU TOILET

    AIR LOCK

    LIFT LOBBY

    FEMALE TOILET

    FEMALE OKU TOILET

    OFFICE AREA

    1B

    C

    EFGH

    IJK

    D

    SERVICES COMPONENTSSERVICES DUCTING

    WIRE DISTRIBUTION FORK

    SERVICE LIFT

    SOIL WASTE RISER

    HIGH ZONE LIFT

    LOW ZONE LIFT

    FIRE ALARM RISER

    TELEPHONE RISER

    EXTRA LOW VOLTAGE RISER

    BUILDING AUTOMATION SYSTEM

    ELECTRIC RISER

    L COOL WATER RISER

    M AHU ROOM

    N CHILLER WATER SLAB RISER

    O CHILLER WATER RISER

    P AIR COND DUCTING

    A

    14.0 CUT-OUT SECTION

    28

  • BS.C 04Anthropo & Ergonomics studiesStudents CapsuleRetreat House

  • BS.C 05Painting Gallery

  • BS.C 06Children resource centre Petaling Jaya

  • OBSTACLE CONCEPT ZIG ZAG

    VERNACULAR ARCHITECTURE SUN ORIENTATION RECYCLE MATERIAL CHILDREN OBSTACLE WIND ORIENTATION NATURAL

    USING VER NACULAR AS BASIC CONCEPT - LOUVER WALL, LARGE OPENING,RISE ON STILT

    LON

    G D

    ISTA

    NC

    E

    LEVELING

    1 CHILDRENS RESOURCE CENTREZIG ZAG

    Recalled the old days, children like to walk around the village to enjoy the beauty of nature, they were running, climbing trees, playing beside the river while breathing fresh air as if they were their own world. They were free to do anythingthey want.

    But now, they are trapped between the natural and the modern world. Internet becoming their games, virtual games to be crazed by them. This unhealty lifestyle causes obesity among them.

    ZIG ZAG is designed not as an odinary children resourcecentre. Through interaction, the children are able to experience the concept of vernacular architecture from the malay kampung house and it surrounding - the nature playground, an ecological picnic and friendly to the enviroment. ,making ZIG ZAG comfortable for teaching the children through nature and educate themto have good healty life

    The ZIG ZAG is built using natural materials like timber, steel and concrete. The wall is designed as a louver to allow good ventilation keeping the building in a suitable comfort level.

    CONCECPTUAL

    ISSUES OBESITY PROBLEM

    TRADITIONAL MALAY HOUSE

    EXTERIOR PLANNING

    SITE ANALYSIS

  • PRAYER ROOM

    CAFE

    KITCHEN

    LIBRARY

    VOID

    VOID

    GROUND FLOOR PLANSCALE 1 :100

    U

    A

    A

    BB

    FIRST FLOOR PLAN

    AV ROOM

    DANCING ROOM

    EXHIBITION AREA

    MULTIPURPOSE AREA

    SMALL GARDEN

    STORE

    VOID

    VOID

    LOBBY

    ENTRANCE

    ADMIN

    SCALE 1 :100

    UP

    U

    A

    A

    BB

    SECTION B-BNOT IN SCALE

    SECTION A-ANOT IN SCALE

    ADAPT TO NATURELOUVERS WALL

    EXHIBITION AND MULTI PURPOSE AREALARGE OPENINGLOUVERS WALLSTACK EFFECT

    PUBLIC PATHCOURTYARD CONCEPTEXPOSED SUNLIGHTART WALL

    LIBRARYCAPSULE CHAIR

    CHILDRENS RESOURCE CENTRE2 ZIG ZAG

    2

    3

    1

    1

    3

    2

    1

    1

    2

    2

    3

    3

    ELEVATION VIEW

  • BS.C 07Urban renewal of Rie Range, PenangAlternative Housing In Putrajaya

  • RATIO CAR TO RESIDENTIAL 1 : 3.3

    The idea of proposing urban development in the area is to build a sustainable city where there isenvironmentally and socially sustainable . It is to promote a green mindset and raise public awareness about health.Centralizing the park between the blocks will be the main focal point of the development. It takes consideration of suitable sidewalks, gather spaces, views etc. Rearrange the blocks and site planning and provides more green spaces to encourage them exercise. The New Rifle Range will present the quality of better l ife to make the place feel safe and healthier l iving.

    Rifle Range Flat built in 1969 was Penang first low cost project used the precast concrete elements to construct mass houses.The name Rifle Range was given because of the site was used for target practices. The site is located in Georgetown,Penang at the junction of Jalan Padang Tembak with Jalan Boundary(Jalan Sempadan) next to it is Batu Gantong Chinese Cemetery. Rifle Range flats consist of 9 blockseach blocks is 17 to 18 storey with 24 units at each level with a total of 3,699 units and more than15,000residents. There are one market complex , which has public library and a community hall. On the right of the wet market is the longest hawker complex in Penang.

    SETTING

    ISSUESChinese Cemetery is a recreation centre for Rifle Range community. It shows that there are lack of basic amenities such as halls, playground , or even car parking.Basically ,they need more facilities, or just parks with trees to climb, fresh air to breathe, grass to run and play in.

    HYPOTHESIS

    1 unit = 5 people3660 units x 5

    LIMITED SPACE FOR RECREATIONAL ACTIVITIES

    URBAN RENEWAL RIFLE RANGE PULANG PINANGHANGING SQUARE

    = 18300 people

    1 Bedroom Unit1 Bedroom Units are intermediate units of 36 s.m. There are 3072 units.

    2 Bedroom Unit2 Bedroom Units are end units with an area of 38.7 s.m. There are a total of 588 units.

    Floor Plan Layoutds.m and 51 intermediate units of 36 s.m.

    Z School D Factory KW^

    DESIGN PROPOSAL

    m

    MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA

  • higher level recreational area

    wet market

    market area on ground level

    new residential block

    community hall

    Old folks

    Hawkers

    Residents/Family

    Teenagers

    Income/trading

    privacy

    Community

    Healthy/comfort

    Facilities

    Active lifestyle

    Entertaintment

    commercial/services

    recreational park/sports

    public centre

    landscaping

    car park

    residential

    GROUP NEED PROGRAM

    C

    PHASE 1PHASE 3

    PHASE 2

    URBAN RENEWAL RIFLE RANGE PULANG PINANGHANGING SQUARE

    4 STOREY LIMIT

    PROPOSED INTERVENSION

    THERE IS ABUNDAT EVIDENCE TO SHOW PEOPLE THAT LIVEIN BUILDING MORE THEN 4 STOREY CAN ACTUALLY DAMAGE THEIR MIND AND FEELING

    - D.M FANNING - 18 NOV 1967 FAMILY IN FLATS BRITISH MEDICAL JOURNAL

    HIGH RISE LIVING TAKE PEOPLE AWAY FROM THE GROUND, AWAY FROM THE CASUAL,EVERYDAY SOCIETY THAT OCCURS ON THESIDEWALK AND STREETS AND ON THE GARDEN

    PROVIDE GREEN COMMUNITY SPACE

    PHASE 1Residential

    PHASE 3landscape recreational sport

    NEW BUILDING

    x 17

    FACADE TREATMENT

    commercial public centre PHASE 2

    car park

    Higher level recreational area

    Hawkers/market area

    sub-basement carpark

    MAIN FEATURES

    DESIGN STRATEGIES

    SITE PLAN

    MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA

    PHASE 1

    PHASE 2

    PHASE 3

  • MOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA

    3. GARBAGE DISPOSALImplementation of garbage grinder at all kitchen sinks. Convenience for dwelersin disposing food waste, at the same time recycling food waste into composite soilfor farming and landscaping used

    A strategy to collect rainwater at rooftop and stormwater from surfacerun-o. A collection of rainwater will be used for irrigation at vertical gardens and the hanging garden

    Nutrien from wastedisposal

    rainwater pipe

    soil

    Vertical plant

    Vertical Garden Section

    4. RECYCLABILITYa. energy saving ttingb.Green productc.Recycle material

    5. GREEN MATERIAL a.local building materialb.used for lesser processing and transportation cost

    GREEN FEATURE

    a. Open courtyard and open spaceb. allow ventilation at the centre of the community

    2. RAINWATER COLLECTOR

    URBAN RENEWAL RIFLE RANGE PULANG PINANG

    1. GREEN HANGING GARDEN

    HANGING SQUAREMOHD FIKRI | AHMAD ZULKAMAL | AHMAD MUSTAFA KAMAL | DZUL IZZAT | NUR SALINA

    vertical plant

    rainwater pipe

    louvers

    soil

    disposal pipe

  • Large opening to allow wind to enter the residential

    an active area is provide with large opening

    large opening at the north side to avoid direct sun heat

    inactive area like bedroom ,toilet is at south side

    Green element at the roof provide good quality of air for the residential

    N

    LIVING ROOMMASTER BEDROOM

    KITCHEN

    FAMILY AREA

    BEDROOM 1 BEDROOM 2

    TOILET 1

    TOILET 2

    TOILET 3

    SEMI PUBLIC AND PUBLIC PRIVATE

    Void also is provide near the corridor to give privacy to bedroom

    toilet ,and bath installed with small opening to provide more privacy

    the residential design also is design to provide two zoning space, semi public and private area . The family will gain more privacy

    MINIMIZE FOOTPRINTThis housing is design with pilotis, allow it to minimal he ground use. It also to express the appreaciate the nature.

    70% OF GREEN AREAThe entire place is plant with tree as natural element. It has garden roof to reserve for the planting and act as cool element.

    ARCHITECTURAL SCIENCE ARK 554

    SUSTAINABILITY

    SITE MANAGEMENT

    OPEN AREAAct as courtyard at the centre of building, to allow ventilation and provide shading for the activities

    MINIMIZE GROUND COVERonly a certain part are cover with unnatural material ,The rest, is covered with natural green element such as grass.

    INDOOR ENVINROMENTAL QUALITY

    NATURAL LIGHTING

    Maximize opening on north and south side. Note that the glass area height up to the ceilling to have more penetration sunlight inside thus saving the energy for lighting. The lighting can be used

    White color are choosed to maximize the reection of light inside thus make the interior more bright and lively

    COLOR

    While white color for exterior building reect the heat of sunlight thus minimize the energy usage for thermal cooling

    notice the skylight between the split level, it allow sunlight penetrate inside the centre area. No need for energy lighting in daylight as most interior area receive the sunlight

    SKYLIGHT

    Interior opening up to the ceiling Interior

    skylight

    an active area is provide with large opening

    large opening at the north side to avoid direct sun heat

    Cross ventilation

    Both opening on north and south side allow cross ventilation

    RAINWATER COLLECTINGwide and shallow pond surrounded area for water collecting. Thus become facade treatment and as water cooling purpose

    WATER EFFICIENCY

    NEAR TO LAKEThe lake act as natural water cooling ,where it place at south east of the housing, allow natural cooling when wind blow.

    ENERGY EFFICIENCY

    N

    ORIENTATION

    VORTEX EFFECTThe height of the building is block the wind at the centre of site to give a pleasure wind to the site

    All windows for housing is design to facing north and south to avoid direct sun light

    Green element in the toilet give good quality of air

    Master bedroom located near balcony with large tinted glass opening give,comfortable and privacy environment

    DESIGN BY :AHMAD ZULKAMAL BIN MOHD ZIYADI | 2007106123 TUTOR : MDM ONG

    CROSS VENTILATION

    OPENING FACING NORTH

  • ahmad zulkamal bin mohd ziyadi | 2007106123

    front elevation

    roof level

    4th floor

    3rd floor

    2nd floor

    1st floor

    ground floor

    rear elevation

    left elevation

    roof level

    4th floor

    3rd floor

    2nd floor

    1st floor

    ground floor

    roof level

    4th floor

    3rd floor

    2nd floor

    1st floor

    ground floor

    section a-a

    section B-B

    roof level

    4th floor

    3rd floor

    2nd floor

    1st floor

    ground floor

    right elevation

    roof level

    4th floor

    3rd floor

    2nd floor

    1st floor

    ground floor

    roof level

    4th floor

    3rd floor

    2nd floor

    1st floor

    ground floor

    green serpent

    phase 1

  • typical section

    gymnasium

    nursery

    3rd FLOOR

    1st FLOOR

    green serpent

    1

    2

    3

    2

    2

    2 3

    1

    1

    3

    1

    1

    ground FLOOR

    2nd FLOOR

    a

    a

    b

    b

    cafe

    multifunctionhall

    green serpent

    1

    1

    3

    1

    1st Floor

    basement

    1

    1

    3

    1

    N

    4th FLOOR

    1

    2

    3

    2

    2

    2 3

    3rd FLOOR

    1

    2

    3

    2

    2

    2 3

    1

    ROOF GARDEN

    4th FLOOR

    2nd FLOOR

    1

    2

    3

    2

    2

    2 3

    1

    1

    1

    3

    ROOF GARDEN

    ROOF

    ROOF

    ROOF

    ROOF

    ROOF GARDEN

    1

    4

    6

    5

    3

    2

    7

    8

    9

    3

    1

    4

    6

    5

    3

    2

    7

    8

    9 11

    2

    7

    4

    5

    1

    8

    3

    2

    9

    7

    4

    5

    1

    8

    3

    2

    9

    family unit 11.kitchen 2.toilet13.toilet 24.toilet 3 5.living room6.bedroom 1&27.master bedroom8.balcony9.family area10.laundry 11.circulationtotal

    25m3.56m5m60m12m23m45m29m9m55m273m

    1

    studio unit1.kitchen 2.toilet13.toilet 24.living room5.study room6.master bedroom7.balcony8.circulation

    total

    10m32.5m48m9m21m27m45m

    165m

    3

    family unit 223m3.56m5m60m12.5m23m44m29m9m55m270m

    1.kitchen 2.toilet13.toilet 24.toilet 3 5.living room6.bedroom 1&27.master bedroom8.balcony9.family area10.laundry11.circulationtotal

    2

    1

    4

    6

    7

    2

    5

    3

    1

    4

    6

    7

    2

    5

    3

    1

    4

    6

    7

    2

    5

    3

    FLOOR PLAN

    TYPICAL UNIT PLAN

    SCALE 1:200

    SCALE 1:100

    SCALE 1:50

    ahmad zulkamal bin mohd ziyadi | 2007106123green serpent

    phase 1

    roof plan

  • BS.C 08Visitor Centre ,Precint 5 ,Putrajaya

  • ACCESSIBILITYNATURAL ELEMENT

    A

    BC

    ANAYLSISGOOD VIEW, FACING LAKE

    POTENTIALRESTAURANT WITH GOOD VIEWENVIROMENT

    ANAYLSISCENTER POINT ,CONNECTED WITH THE CENTRE CITY

    POTENTIALLINKAGE TO OTHER SITE,

    ANAYLSISFIRST VIEW FOR VISITOR AS MAIN ENTRANCE

    POTENTIALMAIN ENTRANCE, A PUBLIC ENTRANCE

    DROP OFF

    ENTRANCE

    LOBBY

    HISTORY GALLERY

    AV ROOM

    CONTROL ROOM

    A/C / RISER

    PUMP ROOM

    MEETING ROOM

    MANAGER OFFICE

    STORAGE

    TEMP DISPOSALSERVICES

    LIFTOFFICE

    CLIENT HISTORY

    Sushi King first opened our doors in 1995, pioneering a new era of Japanese cuisine in Malaysia with our unique Kaiten Sushi or Revolving Sushi with quick service res-taurant concept. Offering a wide variety of sushi along with an expansive menu of other Japanese food at af-fordable prices in a friendly, cosy environment, we quickly gained popularity to become a favourite amongst locals and foreigners alike.

    ENTRANCE POINT

    BOLUVARD POINT

    LAKE POINT

    3 MAIN POINT USING CIRCLE AS ONE OF HARMONY ELEMENT

    ENTRANCE POINT

    BOLUVARD POINT

    LAKE POINT

    CENTRALISE POINTTO CREATE CONNECTION

    ENTRANCE POINT

    BOLUVARD POINT

    LAKE POINT

    LINGKAGETO SITE A

    LINGKAGETO SITE D

    LINGKAGETO SITE C

    CREATE A LINGKAGE

    ENTRANCE POINT

    BOLUVARD POINT

    LAKE POINT

    SERVICES

    SOA

    ENTRANCE POINT

    BOLUVARD POINT

    LAKE POINT

    ORIENTATION

    SERVICES

    MORPHOLOGY AND CONCEPT

    KEY PLAN

    LOCATION PLAN MASTER PLAN1:1000 SITE PLAN

    1:500

    TO CREATE CONNECTIONCREATE A LINGKAGE ORIENTATION

    SOA STUDYROOF STUDY STRUCTURE STUDY

    SUSHI

    TO SITE A

    TO SITE A

    FACING BOULEVARD

    FRESH CULTURE

    FAST FOODSMOOTH

    WATER ELEMENTCALMNESS

    SITE PLAN 1:500

    SUSHIFRESH

    FAST FOODSMOOTH

    CALMNESS

    SUSHICULTURE

    WATER ELEMENT

    SUSHICULTURE

    HYPOTHETICAL PROGRAMMES

    PUBLIC CAFE FOR VISITOR AND NON VISITOR

    CREATE NEW RECIPIES, TV SHOW PROGRAMMES

    HISTORY AND SUSHI GAL-LERY ,VISUAL

    EDUCATION PROGRAMMESCOOKING CLASS

    BOULEVARD CONTINUATION AS A PUBLIC GATHERING AREA

    LIVE FISH AQUARIUM

    GREEN BELT WILL FUNCTION AS BOTH OUTDOOR ACTIVITIES

    AHMAD ZULKAMAL BIN MOHD ZIYADI 2007106123

    FALL

    PUMP ROOM

    TANK

    GREEN FEATURES - RAIN WATER COLLECTION

    DISTRIBUTION WATER FOR GARDEN ANDAQUARIUM

    SAVE 45%

    SUSHI KING

  • DROP OFF

    ENTRANCE

    LOBBY

    HISTORY GALLERY

    AV ROOM

    CONTROL ROOM

    A/C / RISER

    PUMP ROOM

    MEETING ROOM

    MANAGER OFFICE

    STORAGE

    TEMP DISPOSALSERVICES

    LIFTOFFICE

    GATE ENTRANCE

    GALLERY 2

    SOUVENIER SHOP

    PRAYER ROOM (M)

    PRAYER ROOM (F)

    JANITORROOM

    A/C / RISER

    GARDEN

    OPEN COOKING SHOWROOM

    RESTAURANT

    west elevation

    GALLERY 1

    GARDEN

    ENTRANCE

    AV AREAGALLERY 2

    KITCHENRESTAURANT

    OFFICE

    EAST ELEVATION

    SECTION A-A

    GROUND FLOOR

    MAIN COLUMN AND MAIN STRUCTURE

    PRIMETER AND SECONDRY BEAMPRIMARY BEAM

    2ND FLOOR COLUMN & BEAM

    PURLIN AND TURBULAR ROOM STRUCTURE

    FIRST FLOOR

    A

    A

    SECTION B-B

    B

    B

    ROOF AND FINISHES

  • BLOW UP DETAILSCALE 1:50 BLOW UP DETAIL

    SCALE 1:10

    master part 1 portfolio compressCOVER PAGE 1PORTFOLIO JOGJAPAKSI KETELUSANPORTFOLIO THERAPEUTICBOARD 1BOARD 2COVER PAGE 2

    SERVICE REPORTdegree portfoliopart4part5part6part7part8