15
Optix RTN 900 Radio Transmission System Optix RTN 900 Radio Transmission System Microwave ATP Functionality Test Microwave Scope of Work: New Link Swap Link Upgrade Link Capacity by Change Frequency Upgrade Link Capacity by Software Upgrade Link Capacity by Software and Hardware

MW ATP Functional Acceptance Test Record_MBS Project v1.1

Embed Size (px)

DESCRIPTION

MW ATP Functional Acceptance Test Record_MBS Project v1.1

Citation preview

Page 1: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

Optix RTN 900 Radio Transmission System

Microwave ATP Functionality Test

Microwave Scope of Work:

Customer / Project Name : INDOSAT/ PDH MW MBS Makassar

Near End Site ID – Name :

Far End Site ID – Name :

Transmission Configuration : RTN900/7G/1+1/1.2SD/157M

New Link

Swap Link

Upgrade Link Capacity by Change Frequency

Upgrade Link Capacity by Software

Upgrade Link Capacity by Software and Hardware

Page 2: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

On this date _____________________, we the undersigned hereby certify that the Optix RTN 900 Radio Transmission System equipment at the above location is installed, tested and accepted according to the attached Technical Test Protocol.

On behalf of PT. HUAWEI TECH INVESTMENT:

Signed:

Name: Position:

On behalf of PT. INDOSAT:

Signed:

Name: Position:

C O N T E N T:

Customer / Project Name : INDOSAT/ PDH MW MBS Makassar

Near End Site ID – Name :

Far End Site ID – Name :

Transmission Configuration : RTN900/7G/1+1/1.2SD/157M

Page 3: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

1. Configuration Check

2. Receive Power Level Result

3. SDH Service Configuration

4. Ethernet Interface

5. Ethernet Service Configuration

6. Browse Alarm Check

7. NE Visibility on NMS System

8. Document Attachment

Page 4: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

REVISION HISTORY

Date Revision Description Authors

2014/ Apr/10 V1.0 Toni Riyanto

2014/ Apr/15 V1.1 Toni Riyanto

Page 5: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

1) Configuration Check

Near-End Site Set-Up Channel 1 Channel 2 (*) Channel 3 (*) Channel 4 (*)

Frequency Plan (MHz)        

Transmitted frequency (MHz)

Received frequency (MHz)

ODU Sub Band

Tx power requested (dBm)

Modulation

E1 Capacity

Ethernet Capacity (Mbps)

(*) if Applicable

Far-End Site Set-Up Channel 1 Channel 2 (*) Channel 3 (*) Channel 4 (*)

Frequency Plan (MHz)        

Transmitted frequency (MHz)

Received frequency (MHz)

ODU Sub Band

Tx power requested (dBm)

Modulation

E1 Capacity

Ethernet Capacity (Mbps)

(*) if Applicable

2) Receive Power Level Result

Item

Near-End Site Far-End Site

ODU 1 ODU 2

(*)

ODU 3

(*)

ODU 4

(*)

ODU 1 ODU 2

(*)

ODU 3

(*)

ODU 4

(*)

Rx level in link budget (dBm)                

Rx Level (dBm)                

Tx Power (dBm)                

(*) if Applicable

3) SDH Service Configuration

Item Near-End Site Far-End Site

E1 Capacity

Page 6: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

4) Ethernet Interface

Port

Near-End Site Far-End Site

Enable Disable Enable Disable

Port 1        

Port 2

Port 3

Port 4

Port 5

Port 6

5) Ethernet Service Configuration

VLAN Configuration Near-End Site Far-End Site

2G VLAN data

3G VLAN data

2G/3G VLAN OAM

MW OAM

6) Browse Alarm Check

Check Item Near-End Site Far-End Site

Current Alarm □ OK □ NOK □ OK □ NOK

History Alarm within 24hours □ OK □ NOK □ OK □ NOK

Normally the related NE should be no alarm, the alarm is affected from activity or not, case by case, please

FM escalate to MS BO for more query.

7) NE Visibility on NMS System

Site NE Visibility on NMS System

Near-End Site □ OK □ NOK (*)

Far-End Site □ OK □ NOK (*)

(*) Screenshot from NMS system should available as attachment

Page 7: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

8) Document Attachment

Configuration Check

Bonto_Kamase

Receive Power Level Result

Bonto_Kamase

Page 8: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

Interference Check

Bonto_Kamase

Browse Alarm Check

Bonto_Kamase

Page 9: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

NE Visibility on NMS System

Bonto_Kamase

Configuration Check

Sunggumnasa

Page 10: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

Receive Power Level Result

Sunggumnasa

Interference Check

Sunggumnasa

Page 11: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

Browse Alarm Check

Sungguminasa

NE Visibility on NMS System

Sungguminasa

Page 12: MW ATP Functional Acceptance Test Record_MBS Project v1.1

Optix RTN 900 Radio Transmission System

Punch list RTN 900 ATP

Link ID -

Link Name -

Item

No

.

Description

Severity

Date to

be

cleared

Responsible

Group*

Date

Cleared**Supervisor

Maj

or

Min

or

Co

smet

ic

PT. Huawei Tech Investment PT. Indosat

Representative Representative

Name: ------------------------ --------------------------- Date: -------------------- ---------------------------