Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
DNUP
UP
DN
BENCHESLOCKERS
1.
2.3. 4. 5.
6.
8.
9.10.
10. 11.
7.
13.
14.
15.
16.
17.
18.
19.
15.
20.
15.
21.
11.
22.
4.
4.
9.
9.
9.
7.
11.11.
12.
Feet
Meters
01 10 20 50
0 1 5 8 10 20
51. NSTAR VAULT2. MAIN ELECTRIC ROOM3. MECHANICAL4. STAIRWAY5. MAIN DISTRIBUTION FRAME ROOM6. UTILITY/TIE INS7. RESTROOM8. ELEVATOR LOBBY
17. ISO 218. ISO 1.119. ISO 1.220. STUDIO 121. CONTROL ROOM 122. PERCUSSION STORAGE23. CLOSET
LEVEL B1 - FLOOR PLAN
Berklee School of Music160 Massachusetts AvenueBoston, Massachusetts
Walters-Storyk Design GroupHighland, NY
9. ELEVATOR10. ELECTRICAL CLOSET11. EQUIPMENT CLOSET12. CORRIDOR13. GENERAL STORAGE14. STUDIO 215. SOUND LOCK16. CONTROL ROOM 2
23.
UP
Feet
Meters
01 10 20 50
0 1 5 8 10 20
5LEVEL B2 - FLOOR PLAN
Berklee School of Music160 Massachusetts AvenueBoston, Massachusetts
Walters-Storyk Design GroupHighland, NY
1. FUTURE MUSIC TECH/GENERAL STORAGE2. GEN TANK3. MECHANICAL4. STAIRWAY5. MECHANICAL CLOSET6. FIRE PUMP7. RESTROOM
22. DUB STAGE23. CLOSET24. DUB - ISO 125. PRODUCTION LOUNGE26. PRODUCTION CONTROL27. PRODUCTION ISO
15. SOUND LOCK16. STUDIO 317. ISO 318. MASTERING AND CRITICAL LISTENING LAB19. TECH LAB20. OVERDUB BOOTH21. DUB - ISO 2
1.2.
3.
7.4.
8.
9.10.
11.
15.
14.
16.
4.
5.
6.12.
18.7.
23.
19.
23.20.
29.
21.
22.
24.
15.11.
4.
12.
25.
26.
13.
27. 27.
8. ELEVATOR LOBBY9. ELEVATOR10. ELECTRICAL CLOSET11. EQUIPMENT CLOSET12. CORRIDOR13. GENERAL STORAGE14. CONTROL 3
27.
9.
9.
9.
5. 15.
17.
15.
26. 26. 26.