15
1 Muon Physics Project X Workshop Fermilab 17 November 2007

Muon Physics

  • Upload
    magda

  • View
    26

  • Download
    0

Embed Size (px)

DESCRIPTION

Muon Physics. Project X Workshop Fermilab 17 November 2007. Questions. Is the physics compelling in the light of LHC, prospects for ILC, other opportunities? Are there experimental techniques that require or can make use of the very high intensity? - PowerPoint PPT Presentation

Citation preview

Page 1: Muon Physics

1

Muon Physics

Project X WorkshopFermilab

17 November 2007

Page 2: Muon Physics

2

Questions

•Is the physics compelling in the light of LHC, prospects for ILC, other opportunities?

•Are there experimental techniques that require or can make use of the very high intensity?

•Can it be done cheaper, faster, better elsewhere?

Page 3: Muon Physics

3

Potential Program

•Muon and electron number violation (-N→e-N, →e+)– Best match to accelerator properties (energy, time structure, intensity)

for -N→e-N– →e+→e+e+e-better done at PSI (DC beam, plenty of muons, no

clear upgrade path requiring higher intensity)

•Muon anomalous magnetic moment– 8 GeV is probably too low for efficient 3.5 GeV pion production

•Muon electric dipole momentum– Could be a candidate– No clear advantage with respect to PSI, JPARC, BNL

•Muon lifetime

Concentrate on charged lepton flavor violation in -N→e-N

Page 4: Muon Physics

4

Is the physics of muon conversion compelling?

Covered by Joe Lykken and Hitoshi Murayama in the context of having set the supersymmetry mass scale in the early LHC running

• Has no Standard Model background – signal is unambiguous evidence for new physics

• Addresses directly question of flavor mixing in a class of supersymmetry models – not easily addressed with LHC

• In the event that LHC sees nothing beyond SM Higgs, it is one of the few ways to see evidence for something new (particularly in accelerator based particle physics).

• Could be unique in its discovery potential in the context of other new physics not addressed at LHC

– Heavy Z' boson– Leptoquarks – Multiple Higgs

Page 5: Muon Physics

5

•Explore dependence of N→e-N rate on new physics in model independent way using following Lagrangian

•Contributions are magnetic-moment-type operator =0 ) and effective four fermion interaction ( →∞ ). interpolates between these limits in cases where both types of operators are present.

•Illustrates relative power of conversion and decay in model independent way.

Is the physics compelling?

Page 6: Muon Physics

6

Is the physics compelling?

Sindrum2 (Au)

mu2e/MECO

PRIME

COMET

Project X?

Page 7: Muon Physics

8

Is the physics compelling?

If CLFV is observed at any stage with sufficient rate We can map out CLFV physics by comparing rate for -N→e-N to that for →e and →eee. More information derives from rates with different targets.

If new states are discovered at the LHC CLFV provides complementary information from both positive and negative results. For example, presence of CLFV in MSUGRA-type world would reveal that seesaw scale is high, lack of CLFV would point to lower seesaw scale.CLFV offers a strong (perhaps unique) link between the new physics uncovered by neutrino experiments and the new physics uncovered at the LHC.

If no new states other than the SM Higgs boson is discovered at the LHCCLFV among the deepest probes of new physics beyond the LHC reach. CLFV still has potential to elucidate the physics uncovered by neutrinos.

Page 8: Muon Physics

9

Can it be done cheaper, faster, better elsewhere?•Fermilab phase 1

– 8 GeV synchrotron– Storage rings for time structure of beam (1.6 s pulse spacing)– 20 kW beam power with small impact on program

•Fermilab phase 2– 8 GeV linac– Storage rings for time structure of beam (1.6 s pulse spacing)– 200 kW beam power without impact on program

•JPARC phase 1– 8 GeV synchrotron (de-rated from 40 GeV)– 50 kW beam power, inconsistent with program– Time structure in accelerator (1.2 s pulse spacing)

•JPARC phase 2– 40 GeV synchrotron– >1 MW beam power, inconsistent with program– Time structure from FFAG muon storage ring, low repetition rate

•PSI – 600 MeV cyclotron– 1.2 MW beam power (but too low energy for efficient pion production)– Pulsing only by chopping beam – inconsistent with other users

•Brookhaven National Laboratory – 8 GeV synchrotron (de-rated from 27 GeV)– Time-sharing with use as RHIC injector– 25 kW beam power (radiation limited)– Time structure in accelerator (1.35 s pulse spacing)

Page 9: Muon Physics

10

Can it be done faster, better, cheaper elsewhere?

Sindrum2 (Au)

mu2e/MECO

PRIME

COMET

Project X?

Page 10: Muon Physics

11

Can it be done better, faster, cheaper elsewhere?Considerations of potential sources of fake backgrounds specify much of the design of the beam and experimental apparatus.

SINDRUM2 currently has thebest limit on this process:

Expected signal

Cosmic raybackground

Prompt background

Experimental signature is105 MeV e- originating in a thin stopping target.

Muon decay

Page 11: Muon Physics

12

Can it be done cheaper, faster, better elsewhere?

•Mu2e/MECO based on detailed performance simulation, design and cost analysis that has been extensively reviewed – beam and accelerator modifications for Fermilab implementation is in early stages, but no show stoppers. It could be built at existing complex with modest tax on protons for neutrino physics or at Project X with no tax (Jim Miller).

•COMET is based on similar muon beam design, with novel detector geometry that is designed to reduce detector rates. Running COMET and the JPARC neutrino program are incompatible (Yoshi Kuno).

•PRISM (beam) / PRIME (experiment) is based on very different muon beam driven by a fast extracted beam and an FFAG muon storage ring with phase rotation. It has very high instantaneous stopping rates and a experimental geometry designed to reduce detector rates (Yoshi Kuno). Schedule, cost, manpower are not given.

•-N → e-N at Project X not yet studied. It would have no negative impact on a neutrino program. Muon beam intensity could be >10x what could be done earlier at Fermilab. Muon beam advances based on new technology (e.g. for muon colliders) should be studied (Chuck Ankenbrandt). A phased approach starting with mu2e is being studied (Jim Miller).

Page 12: Muon Physics

13

Straw Tracker

Crystal Calorimeter

Muon Stopping Target

Muon Beam Stop

Superconducting Production Solenoid

(5.0 T – 2.5 T)

Superconducting Detector Solenoid

(2.0 T – 1.0 T)

Superconducting Transport Solenoid

(2.5 T – 2.1 T)

Collimators

Can it be done better, faster, cheaper elsewhere?

• Fermilab mu2e based on MECO design• Single event sensitivity ~2x10-17

Page 13: Muon Physics

14

Can it be done better, faster, cheaper elsewhere?

Page 14: Muon Physics

15

Can it be done better, faster, cheaper elsewhere?JPARC

Page 15: Muon Physics

16

Can we use the high intensity provided by Project X?

-N → e-N at Project X is not yet studied in detail.

•Project X would eliminate any negative impact on neutrino program from proton economics.

•Muon beam intensity could be >10x what could be done earlier at Fermilab, more if muon beam techniques that are being pursued in context of muon collider studies can be used.

•Detector would require upgrades to improve rate-handling capabilities, resolution in measuring electron momentum.

•A phased approach starting with mu2e based on MECO design with sensitivity < 10-16 starting before Project X and a goal of approaching sensitivity of 10-18 is being studied.

•PRISM/PRIME approach could be studied in Fermilab context.