27
U.Gasparini CMS week, 11/06/02 1 Muon DT software U.Gasparini, CMS week, 11 June 2002 - Organization -Testbeam & cosmic run results This talk can be found on: http: //cms.pd.infn.it/software/talks/cmsweek0206/DTsof tware.ppt

Muon DT software

Embed Size (px)

DESCRIPTION

Muon DT software. U.Gasparini, CMS week, 11 June 2002. - Organization Testbeam & cosmic run results This talk can be found on: http: //cms.pd.infn.it/software/talks/cmsweek0206/DTsoftware.ppt. Muon DT software. At last muon week (3/4/2002), an overview of the general muon - PowerPoint PPT Presentation

Citation preview

Page 1: Muon  DT  software

U.Gasparini CMS week, 11/06/02 1

Muon DT software

U.Gasparini, CMS week, 11 June 2002

- Organization

-Testbeam & cosmic run results

This talk can be found on:

http: //cms.pd.infn.it/software/talks/cmsweek0206/DTsoftware.ppt

Page 2: Muon  DT  software

U.Gasparini CMS week, 11/06/02 2

Muon DT software

At last muon week (3/4/2002), an overview of the general muonsoftware status/ organization was presented, going through the different projects(ORCA,OSCAR) and subjects ( testbeam, PRS/HLT, DCS,database, calibration)

See:

http: //cms.pd.infn.it/software/talks/muweek_0204/

file : Agenda_Intro.ppt and talks referenced therein.

As far as the organization of DT software, the (current) organization is the following:

Page 3: Muon  DT  software

U.Gasparini CMS week, 11/06/02 3

Muon DT sw: organizationL1 trigger simulation in ORCA: D.Bonacorsi (package coordinator, TS code) S.Vanini (BTI, TRACO code)

DT muon reco in ORCA : S. Lacaprara (muon package coord., DT reco, interface ORCA testbeam data) P. Ronchese (digitization)

Testbeam software : S. Vanini (monitoring), P.Ronchese (offline analysis), A.Meneguzzo, U.G.

Cosmic run tests : A.Meneguzzo, F.Cavallo, U.G.

DT measurement database: M.Passaseo, P. Checchia

Construction database: M.Passaseo, ...(1st workshop: yesterday)Detector DescriptionDatabase : ..... (=> 1st DDD workshop: 4th July 2002)DCS : M.Bellato... Calibration : .....Alignment : F. Matorras, C. Martines

Page 4: Muon  DT  software

U.Gasparini CMS week, 11/06/02 4

Monday 10th June

Agenda :

- F. Cavallari Introduction 10'- R. Breedon Muon Endcap DB 10'- I. Vorobiev Muon Endcap DB 20'- D. Contardo Tracker DB 30'- M. Passaseo Muon Drift Tubes DB 20‘ -P. De Barbaro Hcal DB 20' - E. Auffray Ecal Construction and Assembly 15'- Z. Kovacs Ecal DB 30'- F. Van Lingen Outlook and General DB issues 30'- common discussion

CMS Detector Construction Database Workshop

Page 5: Muon  DT  software

U.Gasparini CMS week, 11/06/02 5

DT testbeam & cosmic run data analysis

Summary:

- Test beam data analysis:

- mainly x-check of known results (MB2, testbeam 2001) - test of algorithms in controlled conditions... - used in cosmic test on MB3 chambers built in Legnaro - used in current local pattern rec. for HLT studies - Cosmic test data analysis on MB3 chambers in Legnaro

A.Meneguzzo, F.Cavallo, S.Vanini, P.Ronchese, M.Zanetti, U.G.

Also special thanks to M.De Giorgi, F.Gonella

Page 6: Muon  DT  software

U.Gasparini CMS week, 11/06/02 6

Test beam data analysis

dN(t)/dt

N(t)

Time box, MB2, run 883 (= 0)

SL 1 SL 2“Effective” vdrift fit:

Tmax (TDC counts)

Res.rms

Residuals (cm)

TDC counts

N(t)

dN/dt

Page 7: Muon  DT  software

U.Gasparini CMS week, 11/06/02 7

Test beam data analysis

TDC counts

378 ns

vdrift = 55.6 m/ns

(with

= 0

= 15ovdrift = + 0.9 %

Tmax = (T1+T3)/2 + T2

Page 8: Muon  DT  software

U.Gasparini CMS week, 11/06/02 8

Test beam data analysis

x2 x1 23.55 cm

= 0

x2- x1 (cm)

m

slope

1.6 0.1 mrad

1.4 mm(dominated by extrap.error)

Page 9: Muon  DT  software

U.Gasparini CMS week, 11/06/02 9

Test beam data analysis

= 0 Slope measurement in single SuperLayers

SL1

SL2

Slope

FullChamber

2.4 mrad

7.8 mrad

7.9 mrad

Page 10: Muon  DT  software

U.Gasparini CMS week, 11/06/02 10

Test beam data analysis

= 0 Slope measurement in r-phi plane:

2.4 mrad

(dominated by beam divergency)

Slopes in different regions

Page 11: Muon  DT  software

U.Gasparini CMS week, 11/06/02 11

Test beam data analysis

= 0 Residuals in Phi SL (8 points local segment):

160 mLayer 4

Layer 3

Layer 2

Layer 1

cm

Page 12: Muon  DT  software

U.Gasparini CMS week, 11/06/02 12

Test beam data analysis

= 15o

Page 13: Muon  DT  software

U.Gasparini CMS week, 11/06/02 13

Test beam data analysis

slope

x

SL2

SL1

x

Effect of wrong (~1%) vdrift (at fixed muon direction)

= 15o

Page 14: Muon  DT  software

U.Gasparini CMS week, 11/06/02 14

Test beam data analysis

After correction for “effective” vdrift:

slope

= 15oSL1

SL2

Fullchamber

Page 15: Muon  DT  software

U.Gasparini CMS week, 11/06/02 15

Test beam data analysisslope

x(cm)

Slopes in different regions

= 15o

Page 16: Muon  DT  software

U.Gasparini CMS week, 11/06/02 16

Test beam data analysis

= 15o

220 m

Page 17: Muon  DT  software

U.Gasparini CMS week, 11/06/02 17

Cosmic run data in Legnaro

- 4 chambers (MB3_01, MB3_02, MB3_03, MB3_04 ) have been assembled and tested under cosmic run in Legnaro

-each single SL has HV tests, pressure tests, noise/rate test, dead-channel test… with scalers before chamber assembling => not speak about it here…

Assembled chambers are the then put on a cosmic station test(1/2 chamber per time is tested) and a full DAQ => local rec. chain (ORCA, running on Obj.database; all data stored/archived there)

Results (noise,cell efficiency, MT measured in cosmic runs) stored in ‘database’on Web (M.Passaseo, P. Checchia):

http: //www.pd.infn.it/dbcms

(also: wire position measurements in SL,…)

Page 18: Muon  DT  software

U.Gasparini CMS week, 11/06/02 18

Cosmic run data

Full MB3 chamber in Legnaro:

cosmic angle (rad)

x (cm)

½ chamber instrumented in this run

Page 19: Muon  DT  software

U.Gasparini CMS week, 11/06/02 19

Cosmic run data

MB3_03

28116 m

0.20.15 mrad

Page 20: Muon  DT  software

U.Gasparini CMS week, 11/06/02 20

Cosmic run data

270 m

(all angles)

Lay1

Lay2

Lay3

Lay4

MB3_03/ SL1

Page 21: Muon  DT  software

U.Gasparini CMS week, 11/06/02 21

Cosmic run data

MB3_0276523 m

2.9 0.2 mrad

Page 22: Muon  DT  software

U.Gasparini CMS week, 11/06/02 22

Cosmic run data

-41423 m

-43930 m

-45034 m

-28536 m

L4

L1

L2

L3

Page 23: Muon  DT  software

U.Gasparini CMS week, 11/06/02 23

Cosmic run data

114538 m

111733 m

108531 m

104728 m

Page 24: Muon  DT  software

U.Gasparini CMS week, 11/06/02 24

Cosmic run data

MB3_02, after correction(shift by 140 m L1 in SL1)

-0.7 0.2 mrad

- 34423 m

Page 25: Muon  DT  software

U.Gasparini CMS week, 11/06/02 25

Cosmic run data

Summary:

Chamber Phi1-Phi2 slope Resolution ( m) misalignment ( m) (rad) (8 point fit residuals)

MB3_01

MB3_02 345 2.9 0.2 280

MB3_03 280 0.20 0.15 260

MB3_04 610 0.80 0.20 240

Page 26: Muon  DT  software

U.Gasparini CMS week, 11/06/02 26

Cosmic run data

SL1 SL2Tmax fits:

= 0-5o

= 15-20o

= 10-15o

= 5-10o

MB3_03

Page 27: Muon  DT  software

U.Gasparini CMS week, 11/06/02 27

Cosmic run data

Tmax vs

SL1

SL2

Theta (deg)

MB3_03