22
1 Project Alluvion – City of West Des Moines Project Alluvion Municipal Streets Seminar November 18, 2015

Municipal Streets Seminar - Iowa State University

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Municipal Streets Seminar - Iowa State University

1

Project Alluvion – City of West Des Moines

Project Alluvion

Municipal Streets Seminar

November 18, 2015

Page 2: Municipal Streets Seminar - Iowa State University

2

Project Alluvion – City of West Des Moines

Project Alluvion

Introductions Andy Denker – CTI Jeremy Huntsman – HR Green

Page 3: Municipal Streets Seminar - Iowa State University

3

Project Alluvion – City of West Des Moines

Project AlluvionProject Background

Page 4: Municipal Streets Seminar - Iowa State University

4

Project Alluvion – City of West Des Moines

Project Alluvion

Project Challenges

Page 5: Municipal Streets Seminar - Iowa State University

5

Project Alluvion – City of West Des Moines

Project Alluvion

City of West Des Moines CTI Elder Corp J&K Construction Bolton & Menk McClure Engineering MSA Shive-Hattery HR Green Civil Design Advantage

Iowa State University Purdue University Oregon State University Louisiana Transportation Research Center CP Tech Center Iowa Concrete Paving Association Minnesota Dept. of Transportation Iowa Dept. of Transportation Logan Contracting

Project Participants / Consultants

Page 6: Municipal Streets Seminar - Iowa State University

6

Project Alluvion – City of West Des Moines

Project AlluvionTimelines Pine Avenue – S. 8th Street to Highway 28 Water main Connections White Crane Road Pine Avenue – West of S. 8th Street S. 8th Street – Pine Avenue to County Line Road S. 8th Street – Pine Avenue to Army Post Road Maffitt Lake Road – Veteran’s Parkway to S. 8th Street Fiber Optic Connections

Page 7: Municipal Streets Seminar - Iowa State University

7

Project Alluvion – City of West Des Moines

Project Alluvion

Page 8: Municipal Streets Seminar - Iowa State University

8

Project Alluvion – City of West Des Moines

Project AlluvionWhy This Project is a Test Section? Mix of new pavement and existing pavement Similar traffic volumes for all streets Large enough to get good dataset Need to start sometime

Page 9: Municipal Streets Seminar - Iowa State University

9

Project Alluvion – City of West Des Moines

Project Alluvion

Current Concrete Issues Saturation/Freezing and Thawing Chemical Attack Incremental Cracking Others

Page 10: Municipal Streets Seminar - Iowa State University

10

Project Alluvion – City of West Des Moines

Project Alluvion

What are We Going to Do Sealant Subdrain Subbase / Subgrade Concrete mix

Page 11: Municipal Streets Seminar - Iowa State University

11

Project Alluvion – City of West Des Moines

Project Alluvion

Sealant Pavix Existing Pine Avenue joints Joints for 500’ Entire slab for 500’ Right after paving machine

Page 12: Municipal Streets Seminar - Iowa State University

12

Project Alluvion – City of West Des Moines

Project Alluvion

Subdrain Subdrain installed on all projects

Page 13: Municipal Streets Seminar - Iowa State University

13

Project Alluvion – City of West Des Moines

Project Alluvion

Subbase / Subgrade 12” Subgrade Prep 12” Subgrade Prep and 6” Subbase

Page 14: Municipal Streets Seminar - Iowa State University

14

Project Alluvion – City of West Des Moines

Project AlluvionConcrete Mix Who is involved City of West Des Moines CP Tech Center ICPA HR Green Iowa State Purdue Oregon State Paving Contractors

Page 15: Municipal Streets Seminar - Iowa State University

15

Project Alluvion – City of West Des Moines

Project AlluvionConcrete Mix Concrete Mix Timeline Project was Ready to Go City of West Des Moines Requested a Solution Meeting with ICPA – John Cunningham ICPA Brought in Dr. Weiss, CP Tech Center, Dr. Rupnow Formulate the Specifications Meeting with Paving Contractors More Specification Changes Testing

Page 16: Municipal Streets Seminar - Iowa State University

16

Project Alluvion – City of West Des Moines

Project Alluvion

Concrete Mix Dr. Weiss – Calcium Oxychloride Increase Fly Ash to 33% Reduce Reaction of Salts with Calcium Hydroxide

Page 17: Municipal Streets Seminar - Iowa State University

17

Project Alluvion – City of West Des Moines

Project Alluvion

Page 18: Municipal Streets Seminar - Iowa State University

18

Project Alluvion – City of West Des Moines

Project AlluvionConcrete Mix Minnesota Spec and Modifications to Spec Air – Minimum of 6% Behind Paver W/C ratio – 0.40 Target, 0.42 Maximum 400 lbs Cement Minimum Testing – ISU Testing Results to Date Test Section

Page 19: Municipal Streets Seminar - Iowa State University

19

Project Alluvion – City of West Des Moines

Project Alluvion

Page 20: Municipal Streets Seminar - Iowa State University

20

Project Alluvion – City of West Des Moines

Project Alluvion

Construction Collaboration Issues before paving Aggregates Pricing Previous experience Test section Fly ash Availability

Page 21: Municipal Streets Seminar - Iowa State University

21

Project Alluvion – City of West Des Moines

Project Alluvion

Construction Adjustments made first day Actual workability Air loss Water W/C discussion Power settings Temperamental mix

Page 22: Municipal Streets Seminar - Iowa State University

22

Project Alluvion – City of West Des Moines

QUESTIONS FROM THE AUDIENCEAsk away…