MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Embed Size (px)

Citation preview

Page 1: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

MUNICIPAL STORMWATER PERMITUPDATE & TIMELINE

Presented by Nick del Valle County of San Diego Watershed Protection

Program

Page 2: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Agenda

Status on Permit Implementation Activities:

• WQIP

• Jurisdictional Runoff Management Plan

• BMP Design Manual

• Optional Watershed Area Management Analysis

• Timelines & Opportunities for Engagement

• WPO & ERP

• IGP

Page 3: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

New Requirements

WQIP

WMAA

BMP Manual

JRMP

• Water Quality Improvement Plan

• Jurisdictional Runoff Management Plan

• Best Management Plan Manual

• Watershed Management Area Analysis

Page 4: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Engaging Stakeholders: Water Quality Improvement Plans (WQIP)

Due June 2015

County Lead(8 total)

Page 5: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

WQIP Goals & Strategies

Example goal:

• Eliminate ‘x’ % of persistently flowing outfalls

Example Strategy:

• Develop a residential outreach program to help reduce or eliminate flows attributed to over-irrigation

Page 6: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Jurisdiction Runoff Management Plan

Programs & Strategies

Reduce the discharge of pollutants from storm drains

Examples:

• Street Sweeping

• Education & Outreach

• Municipal BMPs

• Residential Outreach

Page 7: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

BMP Design Manual

Requirements for standard projects & Priority Development Projects (PDPs) • Replaces SUSMP

• Joint Effort - San Diego Copermittees

Public Workshops

June 10, 11 2014

Draft BMP Design Manual

10/24/2014

Co-Permittee comments

due

11/18/2014

Draft Manual Public Review

February 2015

Final Manual

June 2015

Local Adoption

Dec 2015

Page 8: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Optional Alternative Compliance

Optional Watershed Management Area Analysis (WMAA)

Regional Mapping Effort

• Mapping (Soils, Channels, Slopes)

• HMP Exemptions

• Opportunities for Alternative Compliance Projects

• Developed Template for Watersheds

Page 9: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

To Use Offsite Alternative Compliance...

• Must have completed the WMAA

• Jurisdictional Alternative Compliance Program

• Determine greater water quality benefit

• Program(s) may allow implementation or funding via in-lieu fee

• Voluntary agreement between jurisdiction/developer

• Built within 4 years of first PDP occupancy

Section E.3.c.(1)(b)., (1)(a). and (3).

Page 10: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Special Studies: Wet & Dry weather

San Diego River Dry-Weather Bacteria Source Tracking:

• Determine Sources of Bacteria During dry weather

• Using Genetic Tracking Technology

Pilot Surfer Wet Weather Epidemiology:

• Links Between Levels of Bacteria & Illness in Surfers in Winter

Bacteria Reference Watershed:

• Determine Naturally-Occurring Levels of Bacteria in Undisturbed Watersheds & Beaches Year-Round

Page 11: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Deliverables Timeline

*Reopener pending determination of RB EO Gibson

                   

                   

   6/27/15 WQIPs due   

                   

   6/27/15 JRMP update due   

                   

  6/27/15 WP ordinance update due                          

 

                     

   12/27/15 BMP Design Manual due Implementation

                     

  Bacteria TMDL Reopener* 2016            

                                               Jan Apr Jul Oct Jan Apr Jul Oct Jan Apr Jul Oct Jan Apr Jul Oct Jan Apr Jul Oct Jan Apr Jul Oct

2013 2014 2015 2016 2017 2018

Page 12: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Permit Engagement Opportunities

Orange County

enrollment

Early 2015

Riverside County

enrollment

Early 2016

Bacteria TMDL

reopener

Late 2016

Page 13: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Watershed Protection Ordinance (WPO) Update Schedule• WPO Workgroup meetings (4/7/14; 11/6/14)• County Counsel is reviewing the WPO draft comments

with WPP management.• December 2014 - Commence Stakeholder outreach.• January 2015 – Revise WPO per stakeholder comments.• February/March 2015 – File Public Notice with the Clerk

of the Board for the Board Letter.

Page 14: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Watershed Protection Ordinance (WPO) Update Schedule• April 2015 – First reading of the ordinance at the Board of

Supervisors.• May 2015 – Second reading and adoption of the WPO at

the Board of Supervisors.• June 2015 – WPO becomes effective.

Page 15: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Enforcement Response Plan (ERP)• Required components from the NPDES permit:

• Illicit Discharge Detection and Elimination Enforcement• Development Planning Enforcement• Construction Management Enforcement• Existing Development Enforcement

Page 16: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

County Unincorporated Areas

Industrial Concentrations Bordering areas

• Fallbrook• Vista• Ramona• Lakeside• Alpine• Rancho San Diego• Spring Valley

• San Marcos• Escondido• El Cajon

Page 17: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

Industrial Inventory

• Total: ~180 Facilities• Filers (NOI on file): 55%

(Notice of Intent)• Non-filers: 12%• NoNAs: 33%

(Notice of Non-Applicability)

Page 18: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

County Strategy• Comply with MS4 Permit• Ensure industrial operators are in compliance with MS4

Permit• Assist operators, as feasible, to prepare for the

implementation of the re-issued Industrial General Permit (July 2015)

• Provide resource contact information to operators

Page 19: MUNICIPAL STORMWATER PERMIT UPDATE & TIMELINE Presented by Nick del Valle County of San Diego Watershed Protection Program

County of San DiegoWatershed Protection [email protected]