SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Local Projects in Egypt

Page 2: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 1

1- Water Projects

Project # 1

Project Name Water Supply in Arish City – North Sinai Governorate

Project Location Arish City – North Sinai Governorate

Client NOPWASD

Contractor Arab Contractors “Osman Ahmed Osman”

Year 2010

Project Description The project includes the following tasks:

Prepare the hydraulic analysis using WaterCAD software for water

distribution network in Arish city for years 2010, 2030 and year

2050

Prepare the detail drawings of water distribution networks (plans

and profiles, thrust blocks, road crossings and valve chamber

details)

Prepare the technical specifications and bill of quantities

Prepare the electrical and mechanical details of water site, ground

reservoirs in New South Massed pumping station. Design of two

storage reservoirs each 10000 m3

Prepare the electrical and mechanical details of water site, ground

reservoirs in New Safa pumping station. Design of two storage

reservoirs each 20000 m3

Prepare the electrical and mechanical details of water site, ground

reservoirs in old South Massed pumping station. Design ofone

storage reservoir with 5000 m3 capacity

Page 3: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 2

Project Name Water Treatment Plant in Shatoura village – Tahta Markaz - Sohag

Governorate – capacity 1200 liter/second

Project Location Shatoura village – Tahta Markaz - Sohag Governorate

Client NOPWASD

Contractor Al Abd Company

Year 2008

Project Description The project includes the following tasks:

Prepare the hydraulic calculation and sizing of treatment units

Prepare the layout and hydraulic profile of the plant

Prepare the electrical, mechanical , structural and architectural

design and detail drawings of the following buildings: (intakes –

raw water pumping station – rapid mixing tank – calriflocculators –

rapid sand filters – ground reservoirs – high lift stations –

generators – transformers – chlorination building – chemical

building and other building in the plant

Prepare the structural calculation sheet

Prepare the pipe yard

Prepare the technical specifications of electromechanical and civil

works

Prepare the dewatering design and calculation sheets

Prepare the sheet pile design and calculation sheet

Solve problems at site

Page 4: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 3

Project Name Water Distribution Network in Shatoura village – Tahta Markaz - Sohag

Governorate

Project Location Shatoura village – Tahta Markaz - Sohag Governorate

Client NOPWASD

Contractor Mokhtar Ibrahim Company

Year 2008

Project Description The project includes the following tasks:

Prepare the hydraulic analysis using WaterCAD software for water

distribution network in Tahta Markaz

Prepare the detail drawings of water distribution networks (plans

and profiles, thrust blocks, road crossings and valve chamber

details) – Pipe diameter ranges from 1200mm to200mm with total

length of about 100km.

Prepare the technical specifications and bill of quantities

Prepare the design of 5 elevated storage tanks with capacities 1000,

2000 and 3000 m3

Prepare the dewatering design and calculation sheets

Prepare the sheet pile design and calculation sheet

Solve problems at site

Page 5: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 4

Project Name Water Distribution Network for 15 villages in Shatoura village – Tahta

Markaz - Sohag Governorate

Project Location Shatoura village – Tahta Markaz - Sohag Governorate

Client NOPWASD

Contractor Mokhtar Ibrahim Company

Year 2008

Project Description The project covers the following villages; Nag Mansour, Al Swama Gharb, El

Shiekh Zain El Din, Benga, Bani Harb, Nag Hamouda, Al Haredat, Nag

Hamad, El Shiekh Masoud, Arab Negwag and Al Kim Al Asfar.

The length of pipes about 150 km with diameters ranges from 100 to 400 mm

The project includes the following tasks:

Survey works

Prepare the hydraulic analysis using WaterCAD software for water

distribution network in Tahta Markaz

Prepare the detail drawings of water distribution networks (plans

and profiles, thrust blocks, road crossings and valve chamber

details) – Pipe diameter ranges from 1200mm to200mm with total

length of about 100km.

Prepare the technical specifications and bill of quantities

Prepare the dewatering design and calculation sheets

Prepare the sheet pile design and calculation sheet

Solve problems at site

Page 6: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 5

Project Name Water Treatment Plant in Bani Ahmed – Minia Governorate –

capacity 1200 liter/second

Project Location Bani Ahmed Minia Governorate

Client NOPWASD

Contractor Al Handasah & Tarkebat Al Mechanikiya Company – Sami Zakhary

Year 2008

Project Description The project includes the following tasks:

Prepare the hydraulic calculation and sizing of treatment

units

Prepare the layout and hydraulic profile of the plant

Prepare the electrical, mechanical , structural and

architectural design and detail drawings of the following

buildings: (intakes – raw water pumping station – rapid

mixing tank – calriflocculators – rapid sand filters –

ground reservoirs – high lift stations – generators –

transformers – chlorination building – chemical building

and other building in the plant

Prepare the structural calculation sheet

Prepare the pipe yard

Prepare the technical specifications of electromechanical

and civil works

Prepare the dewatering design and calculation sheets

Prepare the sheet pile design and calculation sheet

Solve problems at site

Page 7: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 6

Project Name Expansion of Al Bostan Water Treatment Plant – Damietta

Governorate – capacity 600 liter/second

Project Location Al Bostan Damietta Governorate

Client NOPWASD

Contractor Arab Contractors “Osman Ahmed Osman”

Year 2009

Project Description The project includes the following tasks:

Prepare the hydraulic calculation and sizing of treatment

units

Prepare the layout and hydraulic profile of the plant

Prepare the electrical and mechanical design and detail

drawings of the following buildings: (intakes – raw water

pumping station – rapid mixing tank – calriflocculators –

rapid sand filters – ground reservoirs – high lift stations –

generators – transformers – chlorination building –

chemical building and other building in the plant

Prepare the pipe yard

Prepare the technical specifications of electromechanical

works

Solve problems at site

Project # 7

Project Name Rehabilitation of Al Bostan Water Treatment Plant 2400 liter/sec

(14 filters and two sedimentation tanks)

Project Location Al Bostan Damietta Governorate

Client NOPWASD

Contractor Arab Contractors “Osman Ahmed Osman”

Year 2010

Project Description The project includes the following tasks:

Assessment and evaluation of existing structures (14

filters and two sedimentation tanks. The existing

structures have many cracks and rust of steel bars

Prepare the recommendations for rehabilitation

Prepare the core tests for existing structure

Prepare the structural drawings of rehabilitation works

Prepare the drawings of mechanical and electrical works

Prepare the specification of structural, architectural works

Prepare the specification of electrical and mechanical

works

Prepare bill of quantities

Page 8: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 1

Project # 8

Project Name Rehabilitation of Kafr Soliman Water Treatment Plant 120000 m3/d

Project Location Kafr Soliman -Damietta Governorate

Client NOPWASD

Contractor Arab Contractors “Osman Ahmed Osman”

Year 2009

Project Description The project includes the following tasks:

Assessment and evaluation of existing structures. The

existing structures have many cracks and rust of steel bars

Prepare the core tests for existing structure

Prepare the documents of removal of existing buildings

because these buildings in very bad conditions

Page 9: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 9

Project Name Abo Diab Water Treatment Plant (2160 m3/d) – Qena Governorate

Water Pipeline 300mm diameter and 7 km length

Project Location Qena Governorate

Client NOPWASD

Contractor Mokhtar Ibrahim Company

Year 2009

Project Description The project includes the following tasks:

Prepare the hydraulic calculation sheets for water

treatment plant 25 liter/sec

Prepare the hydraulic design and calculation sheet of

water transmission pipeline with diameter 300mm and 7

km length

Prepare the structural , mechanical and electrical detail

drawings for water treatment plant

Prepare the detail drawings for water transmission frce

main (plan and profile)

Prepare the technical specifications

Page 10: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 10

Project Name Review the Master Plan Works in the Holding Company of Water

and Wastewater

Project Location Holding Company of Water and Wastewater

Client HCWW

Year 2007

Project Description Professor Dr. Mohamed Shabaan Negm (President of Senior) work as

a member in the committee for reviewing the master plans documents

submitted from different consultants for whole governorates. The

following documents were reviewed:

Present and future population studies

Present and future water and wastewater flows

Planning of water/wastewater networks

Hydraulic analysis of water/wastewater networks

Master Plan works for water and wastewater

High priority projects

Investment plans

Page 11: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 11

Project Name Water Distribution Network for 13 villages in Bani Ahmed – Minai

Governorate

Project Location Bani Ahmed - Minia Governorate

Client NOPWASD

Contractor Al Bad Company

Year 2009

Project Description The project covers the following villages; Bani Ahmed, Tala, Dair Attia,

Demsha we Hashem, Ezbet Al Hakim, Reeda, Al Hwslia, Tahnash, Saft Al

Sharkya, Bihdal, Damsheer, Edmo and Maquossa

The length of pipes about 50 km with diameters ranges from 200 to 800 mm

The project includes the following tasks:

Prepare the hydraulic analysis using WaterCAD software for water

distribution network

Prepare the detail drawings of water distribution networks (plans

and profiles, thrust blocks, road crossings and valve chamber

details)

Prepare the detail drawings of crossing of 800mm pipe under

railway and Ibrahimia canal

Prepare the technical specifications and bill of quantities

Prepare the dewatering design and calculation sheets

Prepare the sheet pile design and calculation sheet

Solve problems at site

Page 12: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 12

Project Name Water Treatment Plant in Matai – Minia Governorate – capacity 1200

liter/second

Project Location Matai Minia Governorate

Client NOPWASD

Contractor Al Handasah & Tarkebat Al Mechanikiya Company – Sami Zakhary

Year 2008

Project Description The project includes the following tasks:

Prepare the hydraulic calculation and sizing of treatment

units

Prepare the layout and hydraulic profile of the plant

Prepare the electrical, mechanical , structural and

architectural design and detail drawings of the following

buildings: (intakes – raw water pumping station – rapid

mixing tank – calriflocculators – rapid sand filters –

ground reservoirs – high lift stations – generators –

transformers – chlorination building – chemical building

and other building in the plant

Prepare the structural calculation sheet

Prepare the pipe yard

Prepare the technical specifications of electromechanical

and civil works

Prepare the dewatering design and calculation sheets

Prepare the sheet pile design and calculation sheet

Solve problems at site

Page 13: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 13

Project Name Rehabilitation and Expansion of Water Treatment Plants and Water

Distribution Networks in Alexandria – High Priority Projects (EUM /

Alex HPP) - USAID GRANT No. 263-0270.02

Project Location Alexandria Governorate

Client AWGA - USAID

Main Consultant Montgomery Watson Harza

Year 2003- 2005

Project Description The project includes the following tasks:

Review Drawings and submittals of water treatment plants in

Alexandria Water Company. The work includes also the

Analysis of Variation Orders and Review the submittals from

Contractor.

The Project includes the analysis of variation orders and

negotiation of the contractor and issue the final VOR.

The work also includes reviewing of the submittals submitted

from Contractor for rehabilitation of water treatment plants.

The reviewed drawings, submittals, calculation sheets, O&M

manuals of water treatment plants are:

Manshia Water Treatment Plant with capacity 370,000 m3/d

Siouf Water Treatment Plant with capacity 860,000 m3/d

Rond Point Water Treatment plant with capacity 590,000 m3/d

Nozha Water Treatment Plant with capacity 170,000 m3/d

Borg Al Arab Water Treatment Plant with capacity 550,000

m3/d

Nobaria Water Treatment Plant with capacity 460,000 m3/d

Mamoura Water Treatment Plant with capacity 210,000 m3/d

Page 14: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project # 14

Project Name Rehabilitation and Expansion of Water Treatment Plants and Water

Distribution Networks in Alexandria – High Priority Projects (EUM /

Alex HPP) - USAID GRANT No. 263-0270.02

Project Location Alexandria Governorate

Client AWGA - USAID

Main Consultant Montgomery Watson Harza

Year 2003- 2005

Project Description The project includes the following tasks:

Review Drawings and submittals of carrier pipelines in

Alexandria Water Company. The work includes also the

Analysis of Variation Orders and Review the submittals from

Contractor.

The Project includes the analysis of variation orders and

negotiation of the contractor and issue the final VOR.

The work also includes reviewing of the submittals submitted

from Contractor for the following pipelines

Pipes with diameter 100mm and 38 Km length

Pipes with diameter 150mm and 11 Km length

Pipes with diameter 200mm and 14 Km length

Pipes with diameter 300mm and 16 Km length

Pipes with diameter 500mm and 10 Km length

Pipes with diameter 700mm and 12 Km length

Pipes with diameter 1000mm and 7.3 Km length

Page 15: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project Name Damietta Water Supply System

Project Location Water Supply System to feed 52 buildings and

recreational area in Damietta

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Prepare design and tender documents for water supply

system

Project Description The Project includes preparation of design and tender

documents of water supply system and Supervision of

construction activity

Page 16: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 1

Project Name Belbeis Industrial City (150 Feddans located at the road

connects between 10t h

Ramadan and Belebis ci ty)

Project Name Belbeis Industrial City (150 Feddans located at the road

connects between 10t h

Ramadan and Belebis ci ty)

Project Location Belbeis Industrial City (150 Feddans located at the road

connects between 10t h

Ramadan and Belebis ci ty)

Client Al Sharkia Water and Sanitary Company

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Prepare tender documents for water si te and water

distribution network

Project Description The Project includes preparation of tender documents of

water si tes which includes water wells, ground

reservoirs, high l if t pump station, chlorination building,

transformer and generator. The work includes the design

the water distribution network. The work includes the

preparation of technical specifications and bil ls of

quanti t ies.

Project Name Belbeis Industrial City (150 Feddans located at the road

connects between 10t h

Ramadan and Belebis ci ty)

Page 17: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 2

Project Name New Cairo WTP 500,000 m3/day (PPP).

Project Location New Cairo WTP in New Cairo, Cairo, Egypt

Client European Commission, Ministry of Housing, Ministry of

Finance, Holding Company for water and wastewater

Contracted By (Parsons Brinckerhoff / MWH Consortium)

Project Duration 2008

Required Expertise Prepare the Private public Partnership (PPP) ender

documents for water si te and water distribution network

Project Description Prepare and help the HCWW and Ministry of Housing to

develop operate, buil t and transfer for new Cairo water

treatment plant 500,000 m3/day. The main tasks are

review the exist ing technical due dil igence report;

provide the technical input for the legal documentation;

and support the marketing of the project to potential

investors as well as answer technical questions raised by

potential bidders . Review the exist ing technical due

dil igence report;

Page 18: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 3

Project Name Potable Water Pipeline in El Marg 1600/1400 mm

Diameter

Project Location From El Marg Water Treatment Plant to El Salam

District

Client Arab Contractor – Osman Ahmed Osman

Contracted By Senior Consult ing Engineers

Project Duration 2007

Required Expertise Prepare shop drawing for pipeline 1600 / 1400 mm with

total length of about 3.6 km.

Project Description The Project includes preparation of work shop drawing

of potable water pipelines 1600 mm diameter with length

1.6 km and pipeline 1400mm diameter with length 2 km.

The work also includes the details of valve chambers

and thrust blocks.

Page 19: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 4

Project Name Raw Water Pipeline in El Marg 1800mm Diameter

Project Location From Ismailia Canal to El Marg East to Cairo

Client Arab Contractor – Osman Ahmed Osman

Contracted By Senior Consult ing Engineers

Project Duration 2006

Required Expertise Prepare shop drawing for two pipe l ine 1800 mm length

and each about 7 km length

Project Description The Project includes preparation of work shop drawing

of raw water pipelines each with diameter 1800 mm and

7 km length. The work also includes the details of valve

chambers, canal crossings and thrust blocks and

structural details.

Page 20: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 5

Project Name Water Treatment Plants for Iron and Manganese

Removal (25 l /s) – Menofiya Governorate

Project Location Menofiya Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2005

Required Expertise Review Civi l and Electromechanical drawings and

submittals for Five (5) water treatment plants for iron

and Manganese removal in Menofiya governorate.

Project Description Review Civil and Electromechanical drawings and

submittals for Five (5) water treatment plants for iron

and Manganese removal in Menofiya governorate The

water treatment plant capacity is 25 l /s. These plants are

located in the followings vil lages:

Toukh Tanbasha

Gaza

Allafy

Aldaw

Baraks

Page 21: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 6

Project Name Water Treatment Plants for Iron and Mangane se Removal

(50 l /s) – Menofiya and Sohag Governorate

Project Location Menofiya Kaliubyia and Sohag Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2005

Required Expertise Review Civil and Electromechanical drawings and

submittals for Twelve (12) water treatment plants for iron

and Manganese removal in Menofiya , Kaliubyia and Sohage

governorate.

Project Description Review Civil and Electromechanical drawings and

submittals for Twelve (12) water treatment plants for iron

and Manganese removal in Menofiya and Sohag governorate

The water treatment plant capacity is 50 l /s. These plants

are located in the followings vil lages:

Bahnay, Zaweit Bem, Saft Gzam, Meet Fares

Kamshoush

Bahada, Shoubra Shehab, Al Mounera, Kafr Ramada,

Al Monshaa Al Kobra, Kafr Mouis

Al Harga Kebly

Page 22: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 7

Project Name Water Treatment Plants for Iron and Manganese Removal

(50 l /s) – Menofiya and Sohag Governorate

Project Location Menofiya and Sohag Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2005

Required Expertise Review Civil and Electromechanical drawings and

submittals for six (6) water treatment plants for iron and

Manganese removal in Menofiya, Kaliubyia and Sohage

governorate.

Project Description Review Civil and Electromechanical drawings and

submittals for six (6) water treatment plants for iron and

Manganese removal in Menofiya and Sohag governorate The

water treatment plant capacity is 50 l /s. These plants are

located in the followings vil lages:

Bakhaty, Al raheb, Monshat Al Nour, Al Tolihat .

Al Eghata, Om Dos

Page 23: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 8

Project Name Water distribution networks and water treatment plant in

Belbeis ci ty, Sharqyia governorate

Project Location Sharqyia Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2005

Required Expertise Review Civil and Electromechanical drawings, submittals

and designs for water distribution works and water

treatment plant

Project Description Review Civil and Electromechanical drawings submittals

and design for water distribution networks and water

treatment plant in Belbeis ci ty

Page 24: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 9

Project Name Abu Swair Distribution Network and Water

Treatment Plant

Project Location Abu Swair city – Ismailia Governorate – Egypt

Client NOPWASD

Contracted By Arab Contractors – Consulting Engineering & Technical

Services Department – Environmental Engineering Division

Project Duration 1998 – 2002

Required Expertise Detailed Engineering Design for water distribution system and

water treatment plant

Project Description

The Project includes the design of water distribution network, elevated tank, dewatering system, intake,

water treatment plant.

The water distribution pipe diameters range from 100mm to 400mm with lengths about 29500 m (29.5

km). The elevated tank with capacity 500 m3. The water treatment plant with design capacity of 400 l/s.

the plant comprises of intake structure, intake conduit, raw pump station, flash mixing tank, alum

solution tanks, calri-flocculators, rapid sand filters, ground reservoirs, high lift pump, standby

generator, transformer, chlorine and chemical building.

The work includes the following tasks:

Preparation of preliminary report of water distribution network, water treatment plant and elevated

tank.

Tender documents which includes:

Detail drawings (Mechanical, electrical, structural, architectural)

Technical specifications

Bill of Quantities

Page 25: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 10

Project Name China Project in Free Zone in Suez Gulf

Project Location Suez Gulf – Egypt

Client Egyptian – China Company

Contracted By Arab Contractors – Consulting Engineering & Technical

Services Department – Environmental Engineering Division

Project Duration 2002

Required Expertise Detailed Engineering Design for ground water supply tanks and

high lift pumping station.

Project Description The Project includes the design of ground storage tanks and

high lift pumping station with capacity of 18,000 m3/d. The

work includes the preparation of the detail drawings of the

auxiliary facilities such as generators, transformers, fuel tanks,

etc.

The work includes the following tasks:

Prepare the tender documents for water and wastewater

works which includes general and special conditions,

technical specifications, preamble and bills of quantities

Evaluation of the bids of the contractors.

Page 26: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 11

Project Name Middle Egypt Project (USAID Project)

Project Location Minia Governorate – Egypt

Client Montgomery Watson Harza – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2001

Required Expertise Design of slow sand filter water treatment plant in Sultan

village

Project Description Prepare the conceptual design of water treatment plant in Sultan

village in Minia governorate. The plant consists of roughing

filter, water intake from river Nile, raw water pump station,

slow sand filter units, ground reservoirs, sludge lagoons,

auxiliary buildings, finished water pumping station. The work

includes the design of water carrier pipeline 300 mm diameter

and 3500 m length to the elevated tanks in Sawada village. The

work also includes the calculation sheet and basis of design

report.

Page 27: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 12

Project Name Middle Egypt Project (USAID Project)

Project Location Minia, Fayoum and Beni Suef governorates – Egypt

Client Montgomery Watson Harza – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2001

Required Expertise Assessment of water facilities

Project Description Participation in the assessment of water treatment plants in

Fayoum, Minia and Beni Suef Governorates. The assessment

study covers the hydraulic and organic loads, assessment of the

existing electromechanical equipment. Identify the problem in

each plant and the required additional work to upgrade the

plant

Page 28: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 13

Project Name Bulk Meters in Secondary Cities Project

Project Location Nuweiba, Luxor, Aswan, Mansoura, Sharm El Shiekh

Client Chemonics International – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2000

Required Expertise Prepare the tender documents

Project Description Prepare a report identifying the required water meter to

measure the amount of water at different places in Luxor,

Nuweiba, Mansoura, Aswan and Sharm El Shiekh Cities. The

work also include the preparation of the detailed drawings,

technical specification and bills of quantities.

Page 29: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 14

Project Name Raw Water Pipeline 1800 mm Dia from Berkash to

Shiekh Zayed WTP

Project Location Cairo – Egypt

Client Industrial and Engineering Projects Company

Contracted By Senior Consulting Engineers

Project Duration 2000

Required Expertise Prepare the workshop drawings

Project Description Prepare the workshop drawings for the two pipelines each 1800

mm diameter from GRP to transfer the raw water from Nile in

Berkash to Shiekh Zayed water treatment plant in 6th

October

city. The work also includes the preparation of workshop

drawings for crossing under Mansouria Canal and Alex – Cairo

desert road. The work also includes the mechanical and

structural workshop drawings of anti hammer devices and valve

chambers.

Page 30: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 15

Project Name Bayad Al Arab Distributon Network

Project Location Bayad Al Arab – Beni Suef Industrial City – Egypt

Client Ministry of Housing

Contracted By Faculty of Engineering – Ain Shams University

Project Duration 2002

Required Expertise Detailed Engineering Design for water distribution system and

elevated tank

Project Description The Project includes the design of water distribution network,

elevated tank.

The water distribution pipe diameters ranges from 100mm to

700mm with lengths about 30000 m. The elevated tank with

capacity of 1000 m3.

The work includes the following tasks:

Preparation of preliminary report of water distribution

network, water treatment plant and elevated tank.

Tender documents which includes:

Detail drawings (Mechanical, electrical, structural,

architectural)

Technical specifications

Bill of Quantities

Page 31: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 16

Project Name Marsa Alam Water Resources

Project Location Marsa Alam – Hurgada – Red Sea Governorate – Egypt

Client Red Sea Governorate

Contracted By Horse Company

Project Duration 1999

Required Expertise Assessment report for water resources in Marsa Alam in Red

Sea governorate.

Project Description A study report to assess the water resources and water demand

in Marsa Alam to provide the tourist villages by water supply.

Page 32: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 17

Project Name South Sinai Water Resources

Project Location South Sinai governorate – Egypt

Client South Sinai Governorate

Contracted By Horse Company

Project Duration 1999

Required Expertise Assessment report for water resources in South Sinai in Red

Sea governorate.

Project Description A study report to assess the water resources and water demand

in South Sinai to provide the tourist villages by water supply.

Project Name Fire Fighting Network in Hospital

Project Location Nasr City – Cairo - Egypt

Client Insurance Hospital – Nasr City – First District

Contracted By Senior Consulting Engineers

Project Duration 1998

Required Expertise Tender documents

Project Description Prepare the design and tender documents for fire fighting

network in Insurance hospital in Nasr City. The work also

includes the rehabilitation of the ground reservoir. The work

includes the supervision on the contractor and test of the pipes

in the field.

The work includes the quality control during the supervision

period. The work includes the auditing work for the ongoing

tests of construction materials such as sands, gravel, concrete

test, steel bar, pipe tests in the factory and in the field and issue

the certificate of completion.

Page 33: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 18

Project Name Desouk Water Treatment Plant

Project Location Desouk City – Egypt

Client National Organization of Potable Water and Sanitary Drainage

Contracted By Al Asoake Al Tugaria Company - Contractor

Project Duration 2002

Required Expertise Redesign of the Rapid Sand Filter Gallery

Project Description Redesign of the pipe gallery and rapid sand filters in Desouk

water treatment plant and prepare the hydraulic calculation

sheet.

Project Name Motobas Water Treatment Plant

Project Location Motobas City – Egypt

Client National Organization of Potable Water and Sanitary Drainage

Contracted By Al Asoake Al Tugaria Company - Contractor

Project Duration 2002

Required Expertise Redesign of the Rapid Sand Filter Gallery

Project Description Redesign of the pipe gallery and rapid sand filters in Motobas

water treatment plant and prepare the hydraulic calculation

sheet.

Page 34: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 19

B – Wastewater Projects

Project Name Wastewater Collection System for 11 vil lages in Quesna

(Menofiya Governorate)

Project Location Quesna Markaz – Menofiya Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Design the wastewater collection system in 11 vil lages in

Quesna Markaz in Menofiya Governorate . These vil lages

are Taha Shoubra, Om Khnan, Agayza, Kafr El Arab, Kafr

Absheesh, Shoubra Qubala, Munshaat Om Khnan, Kafr Zein

El Deen, Oshleem, Kafr Oshlee m, Kafr Al Salamiya. Senior

Also supervising the construction activit ies of sewer

pipelines, Manholes, force mains and pump stations

Page 35: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 20

Project Name Wastewater Collection System for 9 vil lages in Assuit

Governorate

Project Location Assuit Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Design the wastewater collection system in 9 vil lages in

Assuit Governorate. These vil lages are Bani Ghaleb, Garf

Sarhan, Bani Magd, Al wasta, Magrees, Al Hamam, Al

Eqaal, Al Quasir . Senior Also supervising the construction

activit ies of sewer pipelines, Manholes, force mains , Pump

stations, and wastewater treatment plants

Page 36: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 21

Project Name Scada System for Aranaa 250000 m3/day in Makkah Al

Mukarramah, Kingdom of Saudi Arabia

Project Location Makkah Al Mukarramah, Saudi Arabia

Client Abdul Salam Ogab Al Thagafi , Engineering Bureau, Civil

Consultations

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Design the philosophy of Scada system in Aranaa

wastewater treatment plant in Makkah Al Mukaramah, KSA.

Page 37: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 22

Project Name Wastewater project in Warak El Hadar Village Giza, Egypt

Project Location Warak El Hadar Island, Giza Governorate, Egypt

Client CAPW

Contracted By Senior Consult ing Engineers

Project Duration 2007

Required Expertise Design the complete wastewater collection system, force

mains and pump station. Prepare the tender documents and

environmental impact assessment.

Project Description Prepare the preliminary report and complete calculation

sheets for sewerage network. Environmental impact

assessment studies and complete tender documents.

Including album of drawings, general conditions, special

conditions and technical specifications and bil ls of

quanti t ies.

Page 38: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 23

Project Name Gabal Al Asfar Wastewater Treatment Plant – Contract # 19

Project Location Cairo – Egypt

Client Degremont Company

Contracted By Senior Consult ing Engineers

Project Duration 2005

Required Expertise Auditing the construction and O&M Procedures

Project Description Study Contract Documents to learn of the contractual

requirements for quality control and audit of quality control.

Review all inspection reports, procurement reports, testing

reports, condition reports, non-conformance reports, and shop

drawing submittals to determine any deficiencies.

Recommend corrective action for these deficiencies.

Review punch lists of all features.

Review as-built drawings for completeness.

Review additional documentation for completeness such as O

& M Manuals and preventive maintenance programs.

Submit a Complete Audit Report without attaching copies of

the reviewed material.

Current status of the project versus stated goals as related to

schedule, construction costs.

Future status which shall cover the estimate total cost of

project, expected time of completion.

The scope of the audit would include all phases of operations

and maintenance, including procurement, training, use of

spare parts, preventative maintenance, safety, and operation

performance through laboratory testing.

Page 39: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 24

Project Name Wastewater project in Menofiya in vil lages; Heet, Seroheet ,

Kafr Fisha, Fisha Al Kobra, Kamshoush

Project Location Menofiya Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2004

Required Expertise Review Civil and Electromechanical drawings and

submittals for wastewater projects in Menofiya governorate

Project Description Review Civil and Electromechanical drawings and

submittals for wastewater projects in Men ofiya

governorate. The project includes sewerage system,

force mains, pump stations and wastewater treatment

plants.

Page 40: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 25

Project Name Sludge Management in Greater Cairo

Project Location Greater Cairo

Client General Organization for Sanitary Drainage in Gr eater

Cairo

Contracted By Senior Consulting Engineers

Project Duration 24 Months starts from June 2003

Required Expertise Sludge treatment facilities and master plan for sludge

treatment, disposal and reuse in greater Cairo

Project Description

Greater Cairo has 6 wastewater treatment facilities and it produces 300,000 tons

dry solids per year and it is expected to increase up to 500,000 tons per year in

year 2022. Cairo GOSD suffers from disposing this sludge in a way which is not

complying with environmental regulation in Egypt which causes a lot of

environmental problems.

The project includes the following tasks:

Evaluation of the exist ing sludge treatment facil i t ies.

Carry out the pilot study to monitor the proposed sludge treatment methods

suitable for Cairo

Prepare the master plan for the sludge treatment facil i t ies

Marketing study for produced sludge

Prepare the training programs for staff in Cairo GOSD

Carry out the insti tutional work and Establish a management department for sludge

handling issue

Prepare the tender documents for the sludge treatment facil i t ies for greater Cairo.

Prepare the public awareness programs for farmers whom are going to use the

treated sludge.

Page 41: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 26

Project Name Middle Egypt Project

Project Location Minia, Fayoum and Beni Suef Governorate

Client Earth- Tech (American Consultant Firm)

Contracted By Chemonics / Senior Consulting Engineers

Project Duration 6 months

Required Expertise Design the sewerage network and water pipelines and

force mains

Project Description This project includes the preparation of the final

design and workshop drawings for Beni Ibyed village,

water pipelines and force mains in Minia city.

The project includes the following tasks:

Calculation sheets by using Sewer CAD.

General and Special details

Plans and profiles of the force mains

Canal crossings

Page 42: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 27

Project Name Farshut Wastewater Works

Project Location Farshut city – Qena Governorate – Egypt

Client NOPWASD

Contracted By Arab Contractors – Consulting Engineering & Technical

Services Department – Environmental Engineering Division

Project Duration 1999 – 2002

Required Expertise Detailed Engineering Design for sewage collection system,

force mains, sewage pumping stations and wastewater

treatment plants

Project Description The Project includes the design of sewage collection works,

force mains and 3 sewage pump stations and wastewater

treatment plants.

The area of Farshut city is 900 feddans. The length of sewers is

40200 m with diameters range from 200mm to 1200 mm and

the manhole numbers are 2584. The force mains are four force

mains

Force main with diameter 300 mm and 320 m length

from pump station NO. 1 to the sewer system of main

pump station

Force main with diameter 350 mm and 500 m length

from pump station No. 2 to the sewer system of main

pump station.

Two force mains with diameter 800 mm and 12000 m

(12 km) length from main pump station to the

wastewater treatment plant.

The project includes the design of three pump stations with

design flow of 100 l/s, 115 l/s and 960 l/s. The pump station

site includes the design of transformer, standby generator,

electrical equipment,…..etc.

The wastewater treatment plant is oxidation pond system with

capacity of 45000 m3/d.

The work includes the following tasks:

Preparation of preliminary report of sewage collection system,

pump stations, force mains and wastewater treatment plants.

Tender documents which includes:

Detail drawings (Mechanical, electrical, structural,

architectural)

Technical specifications

Bill of Quantities

Page 43: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 28

Project Name China Project in Free Zone in Suez Gulf

Project Location Suez Gulf – Egypt

Client Egyptian – China Company

Contracted By Arab Contractors – Consulting Engineering & Technical

Services Department – Environmental Engineering Division

Project Duration 2002

Required Expertise Detailed Engineering Design for sewage pumping station and

wastewater treatment plant

Project Description The Project includes the design of raw wastewater pumping

station, force main and wastewater treatment facilities with

capacity of 14000 m3/day. The wastewater treatment system is

activated sludge process (extended aeration system). The work

includes the preparation of the detail drawings of the auxiliary

facilities such as generators, transformers, fuel tanks, etc.

The work includes the following tasks:

Prepare the tender documents for water and wastewater

works which includes general and special conditions,

technical specifications, preamble and bills of quantities

Evaluation of the bids of the contractors.

Page 44: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 29

Project Name Rayssa and El Obour Districts

Project Location Al Arish City- North Sinai – Egypt

Client Ministry of Housing

Contracted By Arab Contractors – Consulting Engineering & Technical

Services Department – Environmental Engineering Division

Project Duration 2002

Required Expertise Detailed Engineering Design for 4 sewage pumping stations

with different capacities.

Project Description The Project includes the design of four sewage pumping

stations with different capacities ranging from 25 liter/sec to 80

liter/sec. The work includes the preparation of mechanical,

electrical, architectural and structural detail drawings. The

works includes preparation of the details of auxiliary facilities

such as generators, transformers, fuel tanks, etc.

The work includes to prepare the tender documents for sewage

pumping stations which includes mechanical, electrical,

architectural and structural detail drawings. The work also

includes general and special conditions, technical

specifications, preamble and bills of quantities

Page 45: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 30

Project Name Middle Egypt Project (USAID Project)

Project Location Minia, Fayoum and Beni Suef governorates – Egypt

Client Montgomery Watson Harza – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2001

Required Expertise Conceptual Engineering Design for wastewater collection

system, force mains and two sewage pumping stations in Beni

Ibyed village, Abu Qurqas, Minia governorates

Project Description The Project includes the conceptual design of wastewater

collection system, force mains and two wastewater pumping

stations

The work includes the following tasks:

Prepare the conceptual design of wastewater collection

system. The design flow is 80 liter/sec and the total sewer

pipe length is about 20 km with diameters ranges from

200mm to 400 mm.

Prepare the conceptual design of two force mains. The

first force main is 100 m length and 160 mm diameter.

The second force main is 4500 m length and 300 mm

diameter.

Prepare the conceptual design of wastewater pumping

stations; in-system pump station and main pump station.

The capacity of in-system pump station is 25 liter/sec and

the design flow of main pump station is 80 liter/sec. The

design includes the auxiliary facilities such as generators,

transformers, fuel tanks and control panels

Prepare the basis of design report

Page 46: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 31

Project Name Middle Egypt Project (USAID Project)

Project Location Minia, Fayoum and Beni Suef governorates – Egypt

Client Montgomery Watson Harza – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2001

Required Expertise Conceptual Engineering Design for wastewater pumping

stations and force mains in Minia city.

Project Description The Project includes the conceptual design of wastewater

pumping stations (PS#1, PS#2 and PS#4). The design capacity

of pump station #1 is 100 l/s, PS#2 320 l/s and PS#4 900 l/s.

The work includes the following tasks:

Prepare the conceptual design of wastewater pumping

stations and single line diagrams

Prepare the conceptual design of force mains between

pump stations and to the wastewater treatment plant.

Force main from PS#1 to PS#3 is 300 mm diameter

with 1200m length. Force main from PS#2 to PS#4 is

500 mm diameter with 3500 m length. Force main from

PS # 4 to WWTP is 800 mm diameter and 4800 m

length.

Prepare the basis of design report

Page 47: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 32

Project Name Middle Egypt Project (USAID Project)

Project Location Minia, Fayoum and Beni Suef governorates – Egypt

Client Montgomery Watson Harza – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2001

Required Expertise Conceptual Engineering Design for wastewater treatment in

Beni Suef city

Project Description The Project includes the conceptual design of wastewater

treatment plant in Beni Suef city with capacity of 50000 m3/d.

The treatment process is activated sludge process (extended

aeration system). The conceptual design includes the return

sludge pumps and excess sludge pumps. The sludge treatment

includes gravity thickeners and sludge drying beds.

The work includes the following tasks:

Prepare the conceptual design of wastewater treatment

process with capacity of 50000 m3/d. prepare the single

line diagrams.

Prepare the basis of design report

Page 48: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 33

Project Name Middle Egypt Project (USAID Project)

Project Location Minia, Fayoum and Beni Suef governorates – Egypt

Client Montgomery Watson Harza – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2001

Required Expertise Master Plan for water and wastewater facilities

Project Description Participation in the master plan studies. The work includes the

Preparation of the design criteria of water and wastewater

works. Conceptual design of water treatment plants with

different capacities, the ground water wells and elevated tanks.

Page 49: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 34

Project Name Middle Egypt Project (USAID Project)

Project Location Minia, Fayoum and Beni Suef governorates – Egypt

Client Montgomery Watson Harza – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2001

Required Expertise Assessment of wastewater facilities

Project Description Participation in the assessment of wastewater treatment plants

in Fayoum, Minia and Beni Suef Governorates. The assessment

study covers the hydraulic and organic loads, assessment of the

existing electromechanical equipment. Identify the problem in

each plant and the required additional work to upgrade the

plant.

Page 50: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 35

Project Name Force Main Crossing Under Bahr Youssef Canal

Project Location Fayoum governorates – Egypt

Client General Economic Authority for Water and Sanitation

Contracted By Senior Consulting Engineers

Project Duration 2003

Required Expertise Design of Force Mains Crossings

Project Description The consulting work includes the preparation of tender

documents of two sleeves concrete pipes with 2000 mm

diameter and 30 m length for each sleeve pipe. The work

includes design of the two force mains 1000 mm diameter each.

The work also includes the design of two chambers (inlet

chamber and outlet chambers). The tender documents includes

the general and special conditions, technical specifications, bills

of quantities, detailed drawings.

The work includes the quality control and Supervision during

construction period. The work includes the auditing work for

the ongoing tests of construction materials such as sands,

gravel, concrete test, and steel bar, pipe tests in the factory and

in the field.

Page 51: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 36

Project Name Three Force Mains in Fayoum City

Project Location Fayoum governorates – Egypt

Client General Economic Authority for Water and Sanitation

Contracted By Senior Consulting Engineers

Project Duration 2003

Required Expertise Design of Three Force Mains each with diameter 600 mm

diameter

Project Description The consulting work includes the preparation of tender

documents for three force mains each has diameter of 600 mm

and the total length is 3500 m. The tender documents includes

the general and special conditions, technical specifications, bills

of quantities and detailed drawings

Page 52: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 37

C – Reuse Projects

Project Name Feasibility Study of Reuse of Treated Wastewater

and Sludge in Jeddah Ci ty

Project Location Jeddah City – Saudi Arabia

Client Water and Sanitary Drainage Authority (WSDA) in Makkah Al

Mukarama Region

Contracted By Zohair Fayez and Partners (Saudi Consulting Firm)

Project Duration 2001

Required Expertise Technical and economical study

Project Description The consulting work includes the followings:

Identify the present and future amount of generated

wastewater and sludge in Jeddah city.

Identify the present wastewater and sludge reuse and

disposal.

Identify the existing environmental regulations in Saudi

Arabia.

Identify the quality of wastewater and sludge and the

deficiency in wastewater treatment plants to produce

effluent can e reused safely.

Carry out the proposed reuse projects and prepare the

economical analysis which identify the optimistic

solution.

Page 53: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 38

Project Name Reuse Project in Nuweiba City

Project Location Nuweiba City – South Sinai -Egypt

Client Chemonics International – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2002

Required Expertise Tender Documents

Project Description The consulting work includes the followings:

Prepare the conceptual design of the proposed project

Outline specifications

Bill of quantities

Page 54: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 39

Project Name Reuse Project in Nasr City

Project Location Naser City – Aswan Governorate – Egypt

Client Chemonics International – American Consulting Firm

Contracted By Senior Consulting Engineers

Project Duration 2002

Required Expertise Tender Documents

Project Description The consulting work includes the followings:

Prepare the conceptual design of the proposed prject

Outline specifications

Bill of quantities

Page 55: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 40

E – Industrial Wastewater Treatment Projects

Project Name SM Company, Mehala El Kobra City, Egypt

Project Location Mehala El Kobra City, Egypt

Client Egypt Environmental Initiatives Fund (EEIF)-

The Environmental Management & Technology Fund (EM&T)

Contracted By Consultants for Development and Environment (CDE) – El-

Kholei and Associates

Project Duration 2003

Required Expertise Design the industrial wastewater treatment plant and

prepare the tender documents (Compact Units).

Project Description The work includes the design of industrial wastewater

treatment plant and prepare the tender documents. The tender

documents includes technical specification and bill of

quantities.

Project Name Dolci Factory in 6t h

October City, Egypt

Project Location Dolci Factory in 6t h

October City, Egypt

Client Dolci Factory in 6t h

October City, Egypt

Contracted By Howeidy Consulting Office

Project Duration 1998

Required Expertise Design the industrial wastewater treatment plant and

prepare the tender documents (Compact Unit).

Project Description The work includes the design of industrial wastewater

treatment plant and prepare the tender documents. The tender

documents includes technical specification and bill of

quantities.

Page 56: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 41

Project Name Kimo Factory, Egypt

Project Location Kimo Factory, Egypt

Client Kimo Factory, Egypt

Contracted By Howeidy Consulting Office

Project Duration 1998

Required Expertise Design the industrial wastewater treatment plant and

prepare the tender documents (Compact Unit).

Project Description The work includes the design of industrial wastewater

treatment plant and prepare the tender documents. The tender

documents includes technical specification and bill of

quantities.

Project Name Lilly Factory, Egypt

Project Location Lilly Factory, Egypt

Client Lilly Factory, Egypt

Contracted By Howeidy Consulting Office

Project Duration 1998

Required Expertise Design the industrial wastewater treatment plant and

prepare the tender documents (Compact Unit)

Project Description The work includes the design of industrial wastewater

treatment plant and prepare the tender documents. The tender

documents includes technical specification and bill of

quantities.

Page 57: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 42

F – Environmental Studies

Project Name

ENVIRONMENTAL IMPACT ASSESSMENT AND

ENVIRONMENTAL MANAGEMENT PLAN STUDY IN

EAST DELTA AGRICULTURAL SERVICES PROJECT

Project Location Egypt

Client East Delta Agricultural Project – Ministry of Agriculture and

World Bank

Project Duration 2004

Required Expertise Carry out Environmental Impact Assessment for Current

Activities in East Delta Region .

Project Description East Delta Agricultural Services Project [EDASP] is one of the

major land development schemes of Egypt which started

physically in May 1999. EDASP area is located south of Lake

Manzala alongside El Salam canal to the west and east of the

Suez Canal. This proposed project is designed to assist some

29,000 new settlers on an area of about 130,000 feddans under

the government sponsored reclamation schemes through

provision of credit and extension (IDA Credit 3002 EGT and

IFAD Loan 440 EG). The baseline costs are estimated at US$

40 million over an implementation period of five years.

The main purpose of this Environmental Impact Assessment

(EIA) and Environmental Management Plan (EMP) study is to

cover the main environmental hotspots in the EDASP project

area. The Environmental problems which reported in the TOR

are:

Using the polluted wastewater in Bahr Al Bakar in

irrigation and reclamation activities because the irrigation

water in El Salam canal is not used.

Disposal of untreated domestic and industrial wastewater at

water courses and open areas due to absence of wastewater

treatment facilities.

Scarcity of clean potable water.

Raising the livestock very close to the human

accommodation places.

The accumulation of domestic and agricultural solid waste

management

The environmental management plan of agricultural

chemicals (pesticides and fertilizers).

Page 58: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 43

Project Name ENVIRONMENTAL, HEALTH AND SAFETY

COUNTRY PROFILE FOR EGYPT

Project Location Egypt

Client Environmental Policy Centre Europe (EPCE) – Member of the

LAWGIBB Group

Contracted By Senior Consulting Engineers

Project Duration 1999

Required Expertise Country Profile and Occupational Health & Safety

Project Description Develop a report describing the regulatory requirements

concerning occupational health & safety and partially

environmental currently in force or under development in

Egypt. The scope of work includes: (1) general E, H &S

principles; permits requirements; and administrations. (2)

Waste management (including hazardous waste). (3) General

H&S duty of care requirements (4) Emergency planning and

response. (5) Electrical safety, (6) first aid (7) accident

reporting and investigation. (8) Control of contractors.

Page 59: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 44

Project Name Environmental Impact Assessment for Port Fouad

wastewater treatment plant

Project Location Port Fouad - Egypt

Client EEAA

Contracted By Arab Contractors – Osman Ahmed Osman

Project Duration 1998

Required Expertise Environmental Impact Assessment

Project Description Prepare an Environmental Impact Assessment report for Port

Fouad wastewater treatment plant and sewerage system in Port

Fouad city in Egypt.

Page 60: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 45

Project Name Environmental Assessment – First Stage Investment Projects

Governorate of Beni Suef, EGYPT

Project Location Governorate of Beni Suef, EGYPT

Client Harza

Project Duration 2001

Required Expertise Environmental Impact Assessment

Project Description Participate in the Environmental Impact Assessment report for

water and wastewater projects in Beni Suef governorates in

year 2001. The project was funded by USAID. Project Number:

263-0270. The proposed projects includes

Expansion of water treatment of Beni Suef with design

capacity 300 l/s

New wastewater treatment plant with capacity 50000

m3/day

Page 61: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project Name Environmental Assessment – First Stage Investment Projects

Governorate of Minia, EGYPT

Project Location Governorate of Minia, EGYPT

Client Harza

Project Duration 2001

Required Expertise Environmental Impact Assessment

Project Description Participate in the Environmental Impact Assessment report for

water and wastewater projects in Minia governorates in year

2001. The project was funded by USAID. Project Number:

263-0270. The proposed projects includes

Expansion of water treatment of Minia with design

capacity 300 l/s

New water treatment plant 100 liter/second (slow sand

filter)

Sewerage system in beni Ibayed village – Abu Qurqas

Rehabilitation of some force mains and pump stations

and water mains in Minia

Page 62: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project Name Environmental Assessment – First Stage Investment Projects

Governorate of Fayoum, EGYPT

Project Location Governorate of Fayoum, EGYPT

Client Harza

Project Duration 2001

Required Expertise Environmental Impact Assessment

Project Description Participate in the Environmental Impact Assessment report for

water and wastewater projects in Fayum governorates in year

2001. The project was funded by USAID. Project Number:

263-0270. The proposed projects includes

New wastewater treatment plant in Kohafa 60000

m3/day

Sludge composting site

Sludge force mains 2 pipelines each 250mm

Sewage force mains 2 pipelines each 1000mm

Page 63: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project Name Environmental Assessment Study for the Tourist Places in KSA

Project Location Riyadh, KSA

Client SUPREME COMMISSION FOR TOURISM

Main Consultant Law GIBB – British Consultant

Project Duration 2001

Required

Expertise

Sustainable Tourism Programme – Overall Survey of

Environment related information and protection regulations and

Criteria.

Project

Description

The project included the following tasks:

- The structure plan in phase 1.4 will cover the required infra-

structure such as water supply, wastewater treatment, power

supply and solid waste disposal facilities.

- For each of the proposed scenario, infrastructures will be

taken into consideration if it is relevant to the potential

proposals.

- Establish of Environmental Condition Baseline. This will

include the review of all information regarding air and

water quality. This information will reflect current

environmental quality, and identify key trends and

pressures likely to influence the environment over the plan

period and beyond.

- Determination of the sustainable development indicators

that can be used define the environmental baseline. Use the

international recognised standards and approaches for

identifying significant effects using methods compliant with

World Bank, United Nations Environmental Program

(UNEP), United nations Educational Scientific & Cultural

Organization (UNESCO), World Conservation Union

(IUCN), World Wildlife Fund (WWF), Organisation for

Economic Cooperation and Development (OECD) and

European Commission (EC) guidelines.

- Applicable regulations and standards, national and

international

- Focus on identifying potential environmental constraints to

tourism and associated infrastructure development – and on

areas of opportunity and potential enhancement of

environmental quality either as mitigation for impacts or as

an integral part of increasing value.

- An iterative approach to the overall assessment during the

development of the structure plan so that the environmental

impact assessment contributes directly to shaping the

structure plan and provides positive input – identifying the

extent to which potential constraints could be overcome,

impacts mitigated and enhancement opportunities realized.

Page 64: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 1

- Identify the potential sensitive sites and resources that may

be at risk from pressures exerted by tourism i.e. discharge

to the environment and the disposal of wastes, as well as

physical pressure and disturbance. Water resource

availability will be a key aspect.

- Use of the experience gained elsewhere in the

environmental assessment and management of tourism plan.

- Quantify environmental demands and inputs associated

with the three scenarios for tourism growth and will include

water resources requirements and wastes.

- Predict and quantify environmental impacts for each

scenario to cover water quality and resources.

- Advice on mitigation measures, residual effects and

comparison of options.

- Sustainable methods for minimizing physical risks to

tourists and operators.

- Sustainable Environmental Management Strategies

(developing the guidelines.

Page 65: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project Name Environmental Assessment Study for Warak Al Hadar Village

– Giza Governorate

Project Location Gezert Warak Al Hadar, Giza Governorate, EGYPT

Client CAPW

Project Duration 2007

Required Expertise Environmental Impact Assessment Study

Project Description Prepare the EIA study and report for sewerage system, pump

station and force main for Gezeret Warak Al Hadar in Giza

governorate. The total cost of the proposed project is 90 million

LE

Page 66: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

L – Supervision Works (أعمال اإلشراف على التنفيذ)

Project Name Damietta Water Supply System

Project Location Water Supply System to feed 52 buildings and

recreational area in Damietta

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Prepare design and tender documents for water supply

system

Project Description The Project includes preparation of design and tender

documents of water supply system and sewerage system

and Supervision of construction activit ies of water and

wastewater works

Page 67: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 1

Project Name Wastewater Collection System for 11 vil lages in Quesna

(Menofiya Governorate)

Project Location Quesna Markaz – Menofiya Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Design the wastewater collection system in 11 vil lages in

Quesna Markaz in Menofiya Governorate. These vil lages

are Taha Shoubra, Om Khnan, Agayza, Kafr El Arab, Kafr

Absheesh, Shoubra Qubala, Munshaat Om Khnan, Kafr Zein

El Deen, Oshleem, Kafr Oshleem, Kafr Al Salamiya. Senior

Also supervising the construction activit ies of sewer

pipelines, Manholes, force mains , valve chambers and pump

stations

Page 68: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 2

Project Name Wastewater Collection System for 9 vil lages in Assuit

Governorate

Project Location Assuit Governorate

Client NOPWASD

Contracted By Senior Consult ing Engineers

Project Duration 2008

Required Expertise Design the wastewater collection system in 9 vil lages in

Assuit Governorate. These vil lages are Bani Ghaleb, Garf

Sarhan, Bani Magd, Al wasta, Magrees, Al Hamam, Al

Eqaal, Al Quasir . Senior Also supervising the construction

activit ies of sewer pipelines, Manholes, force mains , valve

chambers, force mains, 9 pump stations and three

wastewater treatment plants .

Page 69: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 3

Project Name HVAC in Central Laboratory in Shoubra El

Kheima Water Treatment Plant

Project Location Cairo – Egypt

Client Holding Company for Water and Wastewater

Contracted By Senior Consulting Engineers

Project Duration 2008

Required Expertise Supervision Work

Page 70: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 4

Project Name Wastewater project in Warak El Hadar Village Giza, Egypt

Project Location Warak El Hadar Island, Giza Governorate, Egypt

Client CAPW

Contracted By Senior Consult ing Engineers

Project Duration 2007

Required Expertise Design the complete wastewater collection system, force

mains and pump station. Prepare the tender documents and

environmental impact assessment.

Project Description Prepare the preliminary report and complete calculation

sheets for sewerage network. Environmental impact

assessment studies and complete tender documents.

Including album of drawings, general conditions, special

conditions and technical specifications and bil ls of

quanti t ies. The Task includes also the supervision of

construction activit ies of sewers, manholes for ce mains and

pump station.

Project Name Conference Hall in Arab Council for Childhood

and Development

Project Location Cairo – Egypt

Client Arab Council for Childhood and Development

Contracted By Senior Consulting Engineers

Project Duration 2005

Required Expertise Supervision Work

Project Description Our Task is to supervise the followings elements which were

under construction. The project was conference Hall at arab

work as quality control consultant. The work include the

supervision of the following tasks:

Electrical work

Decoration work which include (Marble and painting)

Furniture

HVAC

Audi system

Translation System

Wood Works

Fire fighting system

Page 71: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 5

Project Name Rest House for His Excellency Prince Talal Bin

Abdel Aziz - Arab Council for Childhood and

Development

Project Location Cairo – Egypt

Client Arab Council for Childhood and Development

Contracted By Senior Consulting Engineers

Project Duration 2005

Required Expertise Supervision Work

Project Description Our Task is to supervise the followings elements which were

under construction. The project was rest house at Arab council

for childhood and development. Our work is supervise and

quality control consultant. The work include the supervision of

the following tasks:

Electrical work

Decoration work which include (Marble and painting)

Furniture

HVAC

Audi system

Translation System

Wood Works

Fire fighting system

Page 72: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 6

Project Name Force Main Crossing Under Bahr Youssef Canal

Project Location Fayoum governorates – Egypt

Client General Economic Authority for Water and Sanitation

Contracted By Senior Consulting Engineers

Project Duration 2003

Required Expertise Quality Control Consultant

Project Description Our Task is to work as quality control consultant. The work

include the whole necessary test such as pipe tests, concrete

block tests, backfilling material tests, steel bar tests and final

water pressure tests for the two force mains.

The work also includes providing the daily report tests, request

for variation orders, request for clarifications, request for

information and as-built drawings.

Project Name Trade Center and Workshop

Project Location Cairo

Client PEUGEOT COMPANY, EGYPT

Contracted By Senior Consulting Engineers

Project Duration 1999

Required Expertise Quality Control Consultant

Project Description The work includes the quality control and inspection of the

daily work for finishing the Regional Office Trade Center and

workshop for Peugeot Company in Egypt which includes

painting, decoration, tiles, air conditioning, ceramic, internal

audio system, electricity, internal telephone circuit, lighting

apparatus, etc.

Page 73: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 7

Project Name Villa Soheir

Project Location Cairo

Client PRIVATE

Contracted By Senior Consulting Engineers

Project Duration 1999

Required Expertise Design and Quality Control Consultant

Project Description Design and quality control consultant to inspect and supervisor

the plumbing sanitation work for a villa Soheir Al Hakim in

Pyramids area which includes the hot and cold water system,

fire fighting, water treatment for swimming pools.

Page 74: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 8

Project Name El – Salam Tourist village

Project Location Nuweiba, South Sinai, Egypt

Client PRIVATE

Contracted By Senior Consulting Engineers

Project Duration 1999

Required Expertise Design and Quality Control Consultant for El Salam Tourist

Village in South Sinai

Project Description Design and supervise the extension of El Salam Tourist village

in Nuweiba city. The project includes, Architecture, civil, water

supply, sewerage, lighting, electrical, telephone and

landscaping

Page 75: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 9

Project Name Tourist Compounds in North Coast in Alamein,

North Egypt

Project Location MIENESY AND KHIATE CONTRACTOR COMPANY

Client PRIVATE

Contracted By Senior Consulting Engineers

Project Duration 1999

Required Expertise Prepare the workshop drawings documents

Project Description Prepare the workshop drawings for plumbing and water supply

and sewerage networks for a tourist compounds in North Coast

in Alamein

Page 76: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 10

Project Name Basatin Residential Compounds, Jeddah, Saudi

Arabia

Project Location JEDAH – SAUDI ARABIA

Client TRACO Contractor

Contracted By Senior Consulting Engineers

Project Duration 1999

Required Expertise Prepare the conceptual design

Project Description Prepare conceptual designs and bill of quantities for high-class

residential compound – 200 villas and services (Basatin

Compounds).

Page 77: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 11

M – Training Programs Building Capacity

Project Name Sludge Management in Greater Cairo

Project Location Greater Cairo

Client General Organization for Sanitary Drainage in Greater

Cairo

Contracted By Senior Consulting Engineers

Project Duration 24 Months starts from June 2003

Required Expertise Sludge treatment facili ties and master plan for sludge

treatment, disposal and reuse in greater Cairo

Project Description

Senior held 7 training courses to train the staff in Cairo GOSD in lectures and

on Job training. Every Training Course is 5 working days and the number of

trainees about 15 persons in each course. The titles of courses are as follows:

Design of sludge treatment facil i t ies and environmental guidelines

Laboratory analysis of sludge and compost.

Methods of sludge treatment

Methods of using of composed sludge .

Operation and maintenance of equipment used in sludge composting

Marketing and management

Project Name Project Management for AGOSD staff

Project Location Alexandria

Client General Organization for Sanitary Drainage in Alexandria

Contracted By Career Development Center

Project Duration 2001

Required Expertise Project management Course and provide trainers

Project Description Prepare and submit the project management course of the

senior staff of Alexandria GOSD. The duration of Course was

17 days

Page 78: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 12

Project Name Design of Sewage Collection System for AGOSD

Staff

Project Location Alexandria

Client General Organization for Sanitary Drainage in Alexandria

Contracted By Career Development Center

Project Duration 2001

Required Expertise Design of Sewerage System Course and provide trainers

Project Description Prepare and submit the design of sewage collection works to

the senior staff of Alexandria GOSD. The duration of Course

was 15 days

Page 79: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 13

Project Name Operation and Maintenance of Water Treatment

Plants

Project Location Kafr El Shiekh - Egypt

Client Kafr El Shiekh Water Company

Contracted By Career Development Center

Project Duration 2002

Required Expertise Prepare the O & M of water treatment plants course and

provide trainers

Project Description Prepare and submit the course of O & M of water treatment

plants for Kafr El Shiekh Water Company staff. The duration of

Course was 12 days

Project Name Design of water distribution system

Project Location Kafr El Shiekh - Egypt

Client Kafr El Shiekh Water Company

Contracted By Career Development Center

Project Duration 2002

Required Expertise Prepare the design of water distribution system course and

provide trainers

Project Description Prepare and submit the course of design of water distribution

system for Kafr El Shiekh Water Company staff. The duration

of Course was 5 days

Project Name Master Planning of wastewater works in

Alexandria

Project Location Alexandria

Client General Organization for Sanitary Drainage in Alexandria

Contracted By Arab Designers

Project Duration 2002

Required Expertise Prepare the design of master plan of Alexandria course and

provide trainers

Project Description Prepare and submit the course of master planning of wastewater

works for AGOSD staff. The duration of Course was 12 days

Page 80: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 14

Project Name Master Planning of Wastewater Works in Fayoum,

Minia and Beni Suef

Project Location Fayoum, Minia and Beni Suef

Client Development Training Phase II – American Consultant

Contracted By Senior Consultant Engineers

Project Duration 2002

Required Expertise Prepare the design of master plan of Fayoum, Minia and Beni

Suef course and provide trainers

Project Description Prepare and submit the course of master planning of water and

wastewater works for FEGAWS, MEGAWS, BEGAWS staff.

The duration of Course was 15 days

Page 81: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 15

I – Road Projects

Project Name China Project in Free Zone in Suez Gulf

Project Location Suez Gulf – Egypt

Client Egyptian – China Company

Contracted By Arab Contractors – Consulting Engineering & Technical

Services Department – Environmental Engineering Division

Project Duration 2002

Required Expertise Detailed Engineering Design for Roads Inside the Plant

Project Description Prepare and submit the design of roads and cross section

Page 82: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Project #

Project Name Roads to Abo Diab Village - Qena Governorate

Project Location Qena Governorate

Client NOPWASD

Contractor Mokhtar Ibrahim Company

Year 2009

Project Description The project includes the following tasks:

Prepare the design of road connecting between water

treatment plant and Abo Diab village with total length of

about 7 km and width of about 10m

Prepare the plan and profile details

Prepare the technical specifications

Page 83: MUNICIPAL HARD ENGINEERING PROJECTS - WikiLeaks Projects Fact Sheet... · Municipal Hard Engineering Projects 1 Project # 8 Project Name Rehabilitation of Kafr Soliman Water Treatment

SSEENNIIOORR CCoonnssuullttiinngg EEnnggiinneeeerrss

PROJECT FACT SHEET

Municipal Hard Engineering Projects 1

J – Energy Conservation Studies

Project Name Energy Conservation Study

Project Location Minia, Fayoum and Beni Suef governorates – Egypt

Client PLANNING AND DEVELOPMENT COLLABORATIVE

INTERNATIONAL (PADCO) – American Consultant

Contracted By Senior Consulting Engineers

Project Duration 2002

Required Expertise Study and Implementation

Project Description The consulting work includes the followings:

Measurements of the power factor in water and

wastewater facilities in each governorate.

Measurement of pump efficiency in each facility

Identify the problems which led to high power cost.

Identify the solutions to reduce the electricity costs in

each facility.

Supervision the installations to minimize electricity

cost.