6
WELDING SYMBOL 1. How can you tell the difference between an EN/ISO weld symbol and a BS a. The EN/ISO weld symbol will always have the arrow side weld at the b. The EN/ISO symbol has the welds elementary symbol placed on a dash or below the solid reference line to indicate a weld on the other c. The EN/ISO symbol has a fillet weld leg length identified by the l d. The EN/ISO symbol has a fillet weld throat thickness identified by e. both b & d 2. The number 135 is placed at the end of the reference line on a weld sy ISO 2553 what does this number indicate? a. The welding process is stated as MMA b. The welding process is stated as TIG c. The welding process is stated as SAW d. NDT is to be carried out after welding e. The welding process is stated as MAG 3. A tee joint on a support bracket is to be welded both sides using 5 mm each weld is to be intermittent 50 mm in length, and the gap between In accordance with EN 22553 which of the following symbols gives the 5 50 25 5 a. 5 50 25 c. 5 5 5 25 50 5 5 25 50 b. d. 4. According to AWS 2.4 a weld symbol for the other side is placed……… a. above the dashed line b. below the dashed line c. above the solid line d. below the solid line 5. According to BS EN 22553, which of the following symbols requires weld blended on the other side? a. c. b. d.

Multiple Choice 9 Welding Symbol

Embed Size (px)

DESCRIPTION

iijj

Citation preview

Sheet1WELDING SYMBOL1. How can you tell the difference between an EN/ISO weld symbol and a BS weld symbol?a. The EN/ISO weld symbol will always have the arrow side weld at the top of the reference lineb. The EN/ISO symbol has the welds elementary symbol placed on a dashed line lying aboveor below the solid reference line to indicate a weld on the other sidec. The EN/ISO symbol has a fillet weld leg length identified by the letter "a"d. The EN/ISO symbol has a fillet weld throat thickness identified by the letter "z"e. both b & d2. The number 135 is placed at the end of the reference line on a weld symbol. According toISO 2553 what does this number indicate?a. The welding process is stated as MMAb. The welding process is stated as TIGc. The welding process is stated as SAWd. NDT is to be carried out after weldinge. The welding process is stated as MAG3. A tee joint on a support bracket is to be welded both sides using 5 mm leg length fillet welds,each weld is to be intermittent 50 mm in length, and the gap between each weld is to be 25mm.In accordance with EN 22553 which of the following symbols gives the correct representation?550255x 50 (25)a.55025c.5x 50 (25)5x 50 (25)525505x 50 (25)52550b.d.4. According to AWS 2.4 a weld symbol for the other side is placeda. above the dashed lineb. below the dashed linec. above the solid lined. below the solid line5. According to BS EN 22553, which of the following symbols requires weld toes to be smoothlyblended on the other side?a.c.b.d.6. What does the number 141 refer to on this drawing symbol?a. the number of the WPSb. the welding process141c. the number of the NDE procedured. the acceptance standard7. Which of these drawing symbols shows weld penetration depth in accordance withBS EN 22553?10s10sa.c.10ss10s10b.d.8. A tee joint on a support bracket is to be welded both sides using s 5 mm leg length filletweld, each weld is to be intermittent 50 mm in total length, the gap between each weld is tobe 25 mm. Which of the following is the correct symbol in accordance with ISO 2553?55x 50 (25)5255052550a.55x 50 (25)c.550255x 50 (25)b.55025d.5x 50 (25)9. Weld symbol placed on a dotted line in accordance with ISO requirements means:a. weld on arrow sideb. weld on other sidec. weld on sited. full penetration required10. Which British standard relates to welding term and symbolsa. BS 639b. BS 638c. BS 18d. BS 499

Sheet2Q. No.ANSWER1B2E3A4C5C6B7B8B9B10D

Sheet3