    Name : Walid Salama Mohamed Abdel Salamhttp://eg.linkedin.com/pub/walid-salama/38/862/478

    Total Experience : +14 Years in EPC Projects with multinational companies forPetrochemical, Chemical , Oil & gas, Refinery, Power station, Fertilizer.

    + 7 Years as Project Control Engineer (Estimation, Planning, QS,Technical office Engineer) CCC , Hitachi, Techint, EPP + 5 Years as Project Field Engineer Bechtel, KBR, JGC, Uhde

    + 1 Year as Construction Coordinator VSA Veolia, Saipem S.A andAl Jaber +1 Year as ( PMC ) Project Management Consultant EngineerBechtel

    Qualifications : 1991 1997 Bachelor degree in Mechanical Engineering at BenhaFaculty of engineering

    Languages : English - ArabicDate of Birth : June 4, 1974

    Status : Married (1 children)

    Home address : 14 sedeq shipop sidi bisher bahryAlexandria, Egypt

    Telephone : 00 2 0111 0296968 (mobile)

    Email address : [email protected][email protected]

    Studies : Piping and Mechanical EngineeringProject Planning and control

    Computer experiences : Microsoft office (Word, Excel, Access, Power point).

    Primavera P3/P6, Auto-cadAVEVA (VANTAGE) PLANT DESIGN MANAGEMENT SYSTEM11.4.SP2/11.6.SP2 as a Key userTaliso (CCC spooling software), Talisman (CCC Material, MTO andProgress database) and VBC (CCC document control)SAP PM Consultant (Training Course Stage)

    General:Project Management of EPC Projects in the Petrochemical, Chemical,Oil & gas, Refinery, Power station, Fertilizer.Provide leadership to planning engineers, schedulers and cost engineersto plan, monitor, and control the execution of the project within the timeand budgetary parameters, optimizing resource utilization.

    Contract administrationIssue and review procedures and method of statement as per projectspecificationAnalysis of the Project DocumentationMaterial control managementIT Automation (Material, piping spools, ITP, Progress, Piping Testpackage and mechanical completion systems tracking)Estimation, preparation of quotations, technical interactionsPiping Engineering &technical office, Piping fabrication, Piping erection,Piping Hydro test, Pre-commissioning & Commissioning, Piping paintingand insulation, Materials take off, Isometric bill of material, As built DWG,Piping field engineer, Piping Inspection (Pre-test Punch list &Reinstatements)

    LNG Tank, API 650Tank

    http://eg.linkedin.com/pub/walid-salama/38/862/478http://eg.linkedin.com/pub/walid-salama/38/862/478http://eg.linkedin.com/pub/walid-salama/38/862/478
  • 7/31/2019 Multidisciplinary Engineer CV for Project Engineering and Project Control(QS, Planning, Estimation, Cost Control, Contracts) A

    2/4

    Page 2 of 4

    Work experience

    1) Dec 2010 -PresentEGYPTIAN PROPYLENE & POLYPROPYLENE CO __ CAIRO -EGYPT

    Sr. Project Control Engineer (Estimation, QS, Cost Control andPlanning)Prepares material, labor, and construction equipment cost estimates Performs Cost Estimation and Unit Rate Analysis of Piping, Insulation,Equipment Erection, Fireproofing, Instrument, Electrical, Civil, SteelStructure, and Painting proposed by Bidders based on InquiryDocuments.Prepares Database for all Quotations/Priced BOQs submitted bySubcontractors for work rate & unit rate comparison;Prepares clarification with Bidders in regard to their Tender Proposal. Provide Integrated Project and Operations Plans with 90 day look heads.Provide technical support in the area of planning for input into fielddevelopment, plant or facility upgrades or changes, and relating to everyphase of the Opportunity Realization Process, in terms of screeningstudies, resourcing and man-hours estimates including contingenciesand commitment control.Interface with Project teams, Asset/Area Engineering teams, and majorcontractors, ensure that established processes and procedures forobtaining Engineering/Project schedule inputs and services areimplemented in the project deliveries.Prepare the progress measurement system and review progress Scurves at periodic intervals.Assist QS Manager.Quantity take off for design drawings & design updates / variationsReview Method of Measurement

    Jan 2010 Dec 2010 VSA CONSORTIUM_______ RAS LAFFAN - QATAR (Veolia, Saipem S.A and Al Jaber Transport & General ContractingLLC)GTL PROJECT - Effluent Treatment PlantConstruction Coordinator for Effluent Recovery Unit (ERU)Co-ordinate daily meeting with the discipline Construction Engineersleading up to the Multi-discipline Punch-outAgree the categorization of identified punch list by printing a mastercopy of the punch list & submitting to all parties for approval &signature. Monitor the ongoing closure of punch lists.When all category 'A' punch list items are clear, agree withCommissioning an acceptable amount of outstanding category 'B'punch list items & issue the Handover Dossier as detailed in the CPHandover Procedure.

    Jan 2009 Jan 2010 Bechtel Power Corporation of the USA joint venture with the Ministry of

    Electricity and Energy of Egypt. (PGESCO) Construction/Startup Management for EL TEBBIN THERMAL POWERPLANT

    (PMC) Project Management Consultant EngineerProvide and coordinate responses to contractor(s) Requests for Information.Provide technical guidance to contractors.Prepare field design changes such as field change requests and notices.Verify Contractor(s) installed quantities.Provide input to the project critical action item list as required.Perform Contractor coordination as required including administration of

    back chargesEnsure the latest design documents and shop drawings are being usedto accomplish the work.Participate in weekly project safety walks and meetings

  • 7/31/2019 Multidisciplinary Engineer CV for Project Engineering and Project Control(QS, Planning, Estimation, Cost Control, Contracts) A

    3/4

    Page 3 of 4

    Nov 2006 Jan 2009 Consolidated Contractor Company WLL (CCC) SAUDI ARABIA

    Contract Administrator EPC Project (AL Khafji Field DevelopmentPlant, Phase I, Onshore Facilities Project (KFDP)Collecting data about potential subcontractor quality and capabilityPreparing bid Packages.Recommending if a contractor assessment audit should take placeCarrying out contractor assessments if requiredPreparing contract agreementsCost analysis of bids and preparation of price comparison sheets forfurther management approvalReporting problems and subcontracted work performance to the projectmanager in consultation with Construction, procurements and QA/QCmangersParticipate in tender committee meetingsArranges the Kick of meetings with subcontractors

    Mechanical Completion (MC) Handover Engineer JUBAIL CHEVRONPHILLIPS PROJECT (JCP)Ensure Contractors MC activities are performed in accordance with theMechanical Completion Manual.Ensure contractor completes the correct Mechanical Completion CheckRecords (MCCR's) as detailed in the Responsibility Matrix appended tothe MC Specification ensuring the inspection, witness, hold & approvalpoints are adhered to.Monitor the completion progress of each pre-defined MC Package &issue the Status Index to Contractor, Construction & Commissioningwhen all MCCR's are complete.

    Mechanical and Piping Engineering Office Section Head. IWSPP(250MW POWER & RO DESALINATION PLANT)

    Monitoring and controlling the engineering activities for each unit Special coordination among engineering disciplines (normal coordinationis a function of the discipline lead engineer) Planning and supervising activities Review of technical and procedural documents Review of Contractors and vendors' concession report (CR) and,technical review/comment of vendors' non-conformance report (NCR) Providing technical support to procurement and construction Preparation of engineering section of monthly progress report Review of Project Schedules from engineering point of viewEnsuring engineering activities complete according to scheduleEnsuring engineering deliverables meet project quality requirementsControl of engineering correspondence including preparation of minutesof meetingsAssists Lead Engineer on piping related problems to obtain vendorinformation; substitutions and other design related piping problemsDetermined the scope of any piping areas not shown on the normalpiping drawings, such as package unit interconnection piping andlubrication systems on equipmentProvided technical assistance to the Mechanical Superintendent, PipingSuperintendent, General Superintendent and Lead Engineer and keepsthem informed on matters relating to QC.Established with the commissioning group and client personnel,parameters on testing, installation and turnover of systemsDetermined area priorities for piping installation through consultation withSupervisionEstablished communications with the Piping Design Group to resolvedesign problems

  • 7/31/2019 Multidisciplinary Engineer CV for Project Engineering and Project Control(QS, Planning, Estimation, Cost Control, Contracts) A

    4/4

    Page 4 of 4

    Oct 2005 Nov 2006 Uhde (A company ThyssenKrupp Technologies) (German company)Sr. Piping Field EngineerHELWAN AMMONIA / UREA PROJECT PDMS PIPING DESIGNEREstablished communications with the Piping Design Group to resolvedesign problems

    Jan 2005 Oct 2005 JGC CORPORATION (Japanese company)Sr. Piping Field EngineerDOLPHIN ENERGY LIMITED (Ras laffan Qatar) Performed inspection of all piping work in progress on a continuing basisWitnessedAssisted the Piping Superintendent and Lead Engineer in solving pipingproblems

    Oct 2003 Dec 2005 BECHTEL OVERSEAS CORPORATION (American company).Sr. Piping Field EngineerEGYPTIAN LNG PROJECT

    Performed inspection of all piping work in progress on a continuing basisWitnessedAssisted the Piping Superintendent and Lead Engineer in solving pipingproblemsAssisted the Piping Superintendent and Lead Engineer in solving pipingproblemsIssued job wide inspection criteria that may be over and above thenormal piping inspectionReviewed subcontractor invoices and verifies installed quantities of it.

    Jan 2002 Sep 2003 (KBR) Kellog Brown & RootDSD FERROMETALCO. (German company)

    Sr. Project Engineer (LNG Tanks)Damietta LNG Project, SPANISH EGYPTIAN GAS COMPANY (UNIONFENOSA SEAGAS)Act as deputy to the Project Manager to coordinate and control theconstruction tasks relative to the project

    Feb 2000 Dec 2001 Techint Cimimontubi . (Italian company)Technical office Engineer Maximization of gas oil project (AMOC)

    Dec 1999 Feb 2000 Fincimec Impianti Industrial (Italian company) Technical Office (Piping and Mechanical Engineer)Lube Oil Expansion Project (AMOC)

    Jan 1998 Nov 1999 Hitachi Plant Company. (Japanese company) Technical Office - Piping engineerEZZ Hot Strip Mill AinSukhna Project

    CAREER SYNOPSIS

    Walid Salama being involved in all areas of project management from conceptual design throughconstruction to commissioning and hand-over

    Walid Salama studied mechanical engineering; he matured into the area of project managementconsultancy from periods spent in accountancy, engineering and system development where he hasprovided services directly to major companies in and throughout Gulf and Egypt

    Walid Salama is married with one child, resides in Egypt and communicates native language Arabic andis fluently in English.