14
Multi-stakeholder risk management in small-scaled water resources project Piriya URAIWONG Kochi University of Technology, Japan

Multi stakeholder risk management in small-scaled water resources project

Embed Size (px)

DESCRIPTION

application of multi-stakeholder risk management in small-scaled water resources project in Thailand. By asking stakeholders identify, asses and propose risk response, this measure was suggested to be effective for public project risk management.

Citation preview

Page 1: Multi stakeholder risk management in small-scaled water resources project

Multi-stakeholder risk management in small-scaled

water resources project

Piriya URAIWONGKochi University of Technology, Japan

Page 2: Multi stakeholder risk management in small-scaled water resources project

Project • Sai Yu channel conservation and rehabilitation project

Location • Songkhla province, Thailand

Project Characteristic • Channel rehabilitation (dredging and construction of

side way) 5,450 meter• Water storage and water distribution system

2012/9/282

Multi-stakeholder risk management process workshop

Page 3: Multi stakeholder risk management in small-scaled water resources project

2012/9/283

Sai Yu channel after rehabilitation

Page 4: Multi stakeholder risk management in small-scaled water resources project

Cooperate with project owner and local administration leader

Introduce multi-stakeholder risk management process to the local leader

Invite locals and beneficiaries to participate in the workshop

Introduce risk management process to the workshop participants

Conduct multi-stakeholder risk management process

2012/9/284

Workshop Process

Page 5: Multi stakeholder risk management in small-scaled water resources project

• What is risk?• Why we need

to do this?• Risk

management processIntroduction to

risk management

• Risk allocation (project life cycle)

• Risk assessment

• Risk ranking (risk consensus)

Stakeholder risk

assessment • Methods dealing with risks

Risk response plan

2012/9/285

Multi-stakeholder risk management process (in this workshop)

Page 6: Multi stakeholder risk management in small-scaled water resources project

Participants

Page 7: Multi stakeholder risk management in small-scaled water resources project

No. Risk allocation

Cause Impact Opportunity (1-5)

Impact (1-5)

Risk score

Land acquisition

Worry to lost benefit from land

Project cannot construct as designed

1 1 1

1 Water shortage

Storage is from rain harvest only

No agriculture activity

5 5 25

4 High pumping in dry season

No water No agriculture activity

5 2 10

Flooding in rain season

Nature Lost income

1 2 2

2 Water demand increasing

need more income

Unstable income

5 4 202012/9/287

Results

Page 8: Multi stakeholder risk management in small-scaled water resources project

No. Risk allocation

Cause Impact Opportunity (1-5)

Impact (1-5)

Risk score

No rule for water consumption

Individual use

No effect to others

1 1 1

3 Saline intrusion

Pumping water from another channel

Agriculture products lost

5 3 15

Water pollution from factory in the area

Polluted water dumped from factory

Ecosystem degradationEndanger to life/ disease

1 1 1

Digging and selling topsoil

Capitalism

Individual benefit/ income

2 3 62012/9/288

Results 2

Page 9: Multi stakeholder risk management in small-scaled water resources project

Ranking

Risk Response

1 Water shortage Extend water distribution systemCommunication among stakeholders

2 Water demand increasing

Underground waterCrop Zoning Effective water usageEstablish water user group/ water use regulationLow water consumption plants

3 Saline intrusion Chronic problem on downstream (no solution yet)Water gate construction

4 High pumping in dry season

Acceptable 2012/9/289

Results 3

Page 10: Multi stakeholder risk management in small-scaled water resources project

Requirement of willingness to participate motivation!!

Leader has a strong influence Unforeseen risk/ lack of experience Not get use to with the word “risk”/ more

familiar with “problem” or “worry”

2012/9/2810

Highlights

Page 11: Multi stakeholder risk management in small-scaled water resources project

Facilitation skill is important/ trusted person

Risk consensus can be achieved by open and sincere discussion

Local language

2012/9/2811

Highlights

Page 12: Multi stakeholder risk management in small-scaled water resources project

Cover all related stakeholders Larger scale project more stakeholders From plan to implementation? Budget? Hierarchical objectives among stakeholders?

2012/9/2812

Challenges

Page 13: Multi stakeholder risk management in small-scaled water resources project

Lam Dang people and Lam Dang Tambon Administration Office

The department of water resource, Regional office 8 (Songkhla province)

Prof.Tsunemi Watanabe, Kochi University of Technology

2012/9/2813

Acknowledgement

Page 14: Multi stakeholder risk management in small-scaled water resources project

2012/9/2814

Thank you