MSX Infrastructure - Heang Hot Water East Campus Drive Work Phase Plan Construcon of Heang Hot Water piping project along the East Campus Drive will start on 3/22/18, and is expected to be completed by 6/8/18. The work involves trenching and underground pipe placement operaons for several weeks causing intermient traffic delays between 7:00 AM and 4:00 PM as the construcon progresses in short segments. One lane would be open at all mes at East Campus Drive with traffic control using flaggers and signage. Please use caution when walking near construcon areas. Pending invesgaon and coordinaon, further updates for remainder of work segments throughout South campus will be provided in near future. S O U T H C A M P U S D R I V E E8 E A S T C A M P U S D R I V E W E S T C A M P U S D R I V E BEACH D R . SEVE N T H STR E ET M M M E11 E10 E7 G15 E9 AS ANNEX BKS CAFE EED FO2 FO3 FO4 FO5 FCS FA1 FA2 FA3 FA4 CLA LAB LH LA1 LA2 LA3 LA4 LA5 LIB MHB MIC MLSC MMC PH1 PH2 PSY SOR TA USU UTC UT HSCI CP HHW work & staging at Hard Fact Hill (3/7/18 - 5/21/18) *One lane will be open at all mes at East Campus Drive LEGEND Future routing and phasing TBD HHW work (3/22/18 - 6/8/18) Fence For questions, please contact PPFM Customer Services at (562) 985-8246

MSX Infrastructure - Heating Hot Wter East a Campus Drive ...daf.csulb.edu/maps/construction/eastcampusdriveHHW-19Mar2018.pdf · MSX Infrastructure - Heating Hot Wter Easta Campus

Embed Size (px)

Citation preview

MSX Infrastructure - Heating Hot Water East Campus Drive Work Phase Plan

Construction of Heating Hot Water piping project along the East Campus Drive will start on 3/22/18, and is expected to be completed by 6/8/18. The work involves trenching and underground pipe placement operations for several weeks causing intermittent traffic delays between 7:00 AM and 4:00 PM as the construction progresses in short segments. One lane would be open at all times at East Campus Drive with traffic control using flaggers and signage. Please use caution when walking near construction areas. Pending investigation and coordination, further updates for remainder of work segments throughout South campus will be provided in near future.

S O U T H C A M P U S D R I V E

E8

EA

ST

C

AM

PU

S

DR

IV

E

WE

ST

C

AM

PU

S

DR

IV

E

B E A C H D R .

S E V E N T H S T R E E T

M

M

M

E11

E10

E7

G15

E9

AS ANNEX

BKS

CAFE

EED

FO2

FO3

FO4

FO5

FCS

FA1

FA2

FA3

FA4

CLA

LAB

LH

LA1

LA2

LA3 LA4

LA5

LIBMHB

MIC

MLSC

MMC

PH1

PH2 PSY

SOR

TA

USU

UTC UT

HSCI

CP

HHW work & staging at Hard Fact Hill (3/7/18 - 5/21/18)

*One lane will beopen at all times at East Campus Drive

LEGEND

Future routing and phasing TBD

HHW work (3/22/18 - 6/8/18)

Fence

For questions, please contact PPFM Customer Services at (562) 985-8246