    REVISION HISTORY

    Rev. No. DateCONTRACTOR-MAK

    Revision History ENGINEER Status of

    Arova!"reare# Revie$e# Arove#

    0 First Submission following

    award of Contract

    2

  • 7/25/2019 MS - Sub-Base and Base Course Preparation RA-239 17 Mar 2016

    3/8

    CONTENTS

    %.& "urose

    '.& S(oe

    ).& Definitions

    *.& Referen(es

    +.& Safety

    ,.& Materia!s

    .& "!ant an# Eui/ent

    0.& "ersonne! 1 Resonsi2i!ities

    3.& "ro(e#ures

    %&.& Inse(tion an# Testin4

    3

  • 7/25/2019 MS - Sub-Base and Base Course Preparation RA-239 17 Mar 2016

    4/8

    %.& "urose

    The purpose of this method statement is to outline the works sequence for Sub-Base

    and Base Course work actiities and sure!ing actiities during the construction

    process"

    '.& S(oe

    This method statement defines the responsibilities and describes the actiities and

    procedures to be implemented for Sub-Base and Base Course work actiities for the

    Construction# Completion and $aintenance of %oads# Bridges# Storm &ater 'rainage#Sewers and (ther Serices for %oads Connecting Sabah al )hmad and *hiran +ew

    Towns -%)23, ro.ect to compl! with the contract specification and other applicable

    standards"

    ).& Definitions

    3"/ S $& eneral Specifications for *uwait

    %oad 1 ighwa!s

    3"2 S ealth# Safet! 1 nironmental

    3"3 ersonal rotectie quipment

    3"4 )FC )pproed for Construction

    3"5 %F6 )pproed for 6nspection

    3"7 $ ro.ect $anager

    3"8 S Site ngineer

    3"9 :S :and Sure!or

    3", ;)

  • 7/25/2019 MS - Sub-Base and Base Course Preparation RA-239 17 Mar 2016

    5/8

    +.& Safety

    5"/ )ll equipment to be used will be pre-inspected and approed"5"2 quipment driers and operators will hae driing and operating license"

    5"3 The work shall be carried out in accordance with approed ro.ect Safet!

    lan"

    5"4 )ll personal shall be proided with necessar! personal protection equipment

    @A and gien required training to ensure that all personal inoled in the

    work are aware of importance of safet! precautions"

    5"5 The work will be monitored b! safet! staff that will warn# adice# and

    barricade the work location where necessar!"

    5"7 %egular tool-bo meeting will be held on site for construction staff to be

    aware of safet! regulation and precautions to be taken for different operation"

    5"8 +ecessar! warning tapes# temporar! signs# safet! barriers# traffic cones andwarning lights shall be proided during the entire duration of the work"

    ,.& Materia!s

    7"/ Sub base and base course materials shall conform to S Clause 303"02"

    .& "!ant an# Eui/ent

    The contractor shall hae the option to select the appropriate t!pe# capacit! and

    number of equipment necessar! to complete the work in safe working means and to

    compl! with the construction schedule"

    8"/ $iing lant for the sub base and base course materials

    8"2 quipment

    8"2"/ &heel :oaders

    8"2"2 'umper Trucks

    8"2"3 raders

    8"2"4 ?ibrating %ollers

    8"2"5 neumatic-T!red %oller

    8"2"7 &ater Tankers8"2"8 )ir compressors

    8"3 and tools as well as other equipment will be proided

  • 7/25/2019 MS - Sub-Base and Base Course Preparation RA-239 17 Mar 2016

    6/8

    9"2 The Site ngineer @SA will ensure that the site preparation actiities are

    conducted according to the approed $ethod Statement# and S plan"

    9"2"/ nsure all necessar! approals and work permits are obtained prior tostart the work"

    9"2"2 Cone! all technical data to ciil foreman and to ensure that the

    foreman understood the actiities to be eecuted"

    9"2"3 )rrange 1 ensure the required manpower to eecute the work"

    9"2"4 nsure that work is done in accordance with this method statement and

    with approed drawing and specification"

    9"2"5 nsure safe working procedures are followed in accordance with the

    site safet! plan"

    9"2"7 repare the necessar! %equest for 6nspection @%F6sA to arrange the

    consultant ngineer for inspections"

    9"2"8 (rganiDe the work in a safe manner to ensure that safet! and protectieequipment are being properl! utiliDed"

    9"3 The $aterial ngineer @$A will ensure that the materials being used are in

    accordance with the ro.ect Specifications and approed $aterial Submittals"

    e will be in charged with the field laborator! and will undertake the

    necessar! tests as required for the pro.ect with the assistance from :aborator!

    Technicians"

    9"4 ;ualit! Control ngineer

    9"4"/ %eiew all documents and test reports"

    9"4"2 nsure that all other discipline actiities that must be inspected within

    the earthworks construction program hae been inspected and read!

    for operating safel!"

    9"4"3 nsure that all tests# as required on the 6nspection and Test lan @6TA

    are implemented"

    9"4"4 (rganiDe and allocate inspection works"

    9"4"5 erform pre inspection to determine acceptabilit! prior to inspections

    or tests"

    9"4"7 Co-ordinate with the consultant inspectors"

    9"5 :aborator! Technician9"5"/ erform sampling and conduct test as per direction from the $aterial

    ngineer"

    9"5"2 %eiew all laborator! results and prepare reports"

    9"7 Ciil Foreman

    Ciil Foremans will report directl! to Site ngineers# their

    responsibilities include# but are not limited to the following=

    9"7"/ Conduct the toolbo meetings and briefing for his crew workers the

    potential haDards and precautionar! measures to be taken during the

    ecaation process"

    7

  • 7/25/2019 MS - Sub-Base and Base Course Preparation RA-239 17 Mar 2016

    7/8

    9"7"2 nsure that all engaged personnel hae right and all equipment

    are eperienced enough to eecute hand ecaation# and backfilling

    actiities"9"7"3 Superision the different actiities during the construction process"

    9"7"4 Control the workmanship qualit! b! directing and instructing his crew

    workers and his operators during the eecution of the work"

    9"7"5 %esponsible for proper eecution of the work# ensuring conformance

    with approed drawings"

    9"7"7 nsure that# all the tools 1 equipment are aailable at site to eecute

    the work"

    9"8 Safet! (fficer

    The Safet! (fficer shall be responsible for safe eecution of work actiities in

    compliance with the approed S plan 1 pro.ect S requirements"9"8"/ nsure that all S requirements are applied and implemented

    according to the eneral Specification requirements while eecuting

    the works"

    9"8"2 nsure that the approals of work permits are obtained prior to start

    actiities"

    9"8"3 nsure that recommendations of workplace precautions are followed

    up strictl!"

    9"8"4 Stop an!

  • 7/25/2019 MS - Sub-Base and Base Course Preparation RA-239 17 Mar 2016

    8/8

    indicated in S Section 2 @arthworksA# and that the surface thereof

    conforms to the leels and slopes indicated in the approed drawings"

    6n all cases the approal of the ngineer shall be obtained beforecommencing spreading of material for the sub-base course"

    ,"2"2 The sub-base material shall be tested for moisture content before

    spreading" 6f the moisture content is less than the optimum moisture

    content# adequate amount of water shall be added to obtain the

    optimum content# likewise# to proide allowance for moisture lost

    due to eaporation in spreading# raking# leeling# and compacting

    process"

    ,"2"3 reliminar! trials shall be conducted at the start of the works to

    determine the optimum number of passes of compaction and to

    control the pre-wetting and water spra!ing for optimum moisture

    content","2"4 The underl!ing surface shall be pre-wetted to increase bonding with

    the new la!er"

    ,"2"5 The material shall be spread in la!ers on the prepared sub grade b!

    motor grader"

    ,"2"7 Compaction shall start immediatel! thereafter# b! means of

    pneumatic and steel rollers or ibrator! rollers"

    ,"2"8 Compaction shall start at the etreme edge sides proceeding graduall!

    toward the road ais"

    ,"2"9 %olling shall continue until the surface has been thoroughl! and

    uniforml! compacted to the required thickness as indicated on

    approed drawings"

    ,"2", Cautions will be taken in order not to cause an! disturbances to

    surrounding eisting installations and