MS - Self-Adhesive Membrane Waterproofing Works RA-239

Embed Size (px)

Citation preview

  • 7/25/2019 MS - Self-Adhesive Membrane Waterproofing Works RA-239

    1/6

  • 7/25/2019 MS - Self-Adhesive Membrane Waterproofing Works RA-239

    2/6

    REVISION HISTORY

    Rev. No. DateCONTRACTOR-MAK

    Revision History ENGINEER Status of

    Arova!"reare# Revie$e# Arove#

    0 First Submission following

    award of Contract

    2

  • 7/25/2019 MS - Self-Adhesive Membrane Waterproofing Works RA-239

    3/6

    CONTENTS

    %.& S'oe

    (.& "urose

    ).& Resonsi*i!ities

    +.& Referen'es

    ,.& Safety

    .& "ro'e#ures

    .& Inse'tion an# Testin/

    3

  • 7/25/2019 MS - Self-Adhesive Membrane Waterproofing Works RA-239

    4/6

    %.& S'oe

    This method of statement covers the use of self-adhesive membrane waterproofing on

    areas shown on approved drawings.

    (.& "urose

    This method statement defines the responsibilities and describes the activities and

    procedures to be implemented for the application of self-adhesive waterproofing

    membrane for the Construction, Completion and aintenance of !oads, "ridges,

    Storm #ater $rainage, Sewers and %ther Services for !oads Connecting Sabah al

    &hmad and 'hiran (ew Towns -!&23) *ro+ect to compl with the contract drawings

    and specification.

    ).& Resonsi*i!ities

    3. The Site ngineer shall be responsible for the implementation of the wor/ in

    accordance with this method statement and his responsibilities shall be, but not

    limited, to the following

    3.. *reparation of wor/ schedule

    3..2 Supervising the wor/ to ensure the wor/ is performed properl.

    3..3 *repare the necessar !e1uest for nspection !F4s5 and arrange

    inspection with the consultant ngineer.

    3..6 nsure that wor/ is done in accordance with this method statement and

    with approved drawings and specification.

    3.2 Speciali7ed #aterproofing sub-contractor shall be responsible for the

    implementation of the wor/ in accordance with this method statement and

    their responsibilities shall be, but not limited, to the following

    3.2. %rdering and preparation of onl approved materials and re1uired

    tools.

    3.2.2 $esignating s/illed wor/ers for the wor/.3.2.3 Full supervision to ensure the wor/ is performed properl.

    3.2.6 *roper application of membrane waterproofing as per procedure

    written on aterial $ata Sheet8anufacturer9s recommendation and as

    per approved drawings.

    3.3 The :ualit Control ngineer shall continuousl monitor all activities related

    to the wor/ if implemented in accordance with this method statement and

    approved drawings.

    3.6 The aterial ngineer shall submit to the ngineer for approval all the

    materials to be incorporated in the waterproofing wor/s.

    6

  • 7/25/2019 MS - Self-Adhesive Membrane Waterproofing Works RA-239

    5/6

    +.& Referen'es

    6. Specifications

    6.. *ro+ect $rawings and Specifications.

    6..2 *# ;eneral Specifications

    6.2 $rawings $ocument < =olume , 2, 3

    6.3 "%: "ill (o. >

    ,.& Safety

    The Site ngineer and speciali7ed subcontractor, in coordination with the Safet

    %fficer, shall be ensuring compliance with all safet re1uirements during the

    implementation of this wor/ which shall include, but not limited to the following

    >. *rovision and proper use of safet paraphernalia.

    >.2 aintaining cleanliness at wor/ areas.

    >.3 *roper disposal of e?cess and waste construction materials.

    >.6 *roviding visible warning signs and8or barricades at wor/ areas when

    necessar.

    .& "ro'e#ures

    @. ?amine the concrete substrates and ad+oining construction, and the conditions

    under which the membrane waterproofing is to be installed. $o not proceed

    with the wor/ until unsatisfactor conditions detrimental to the proper and

    timel completion of the wor/ have been corrected.

    @.2 Coordinate with all related subcontractors prior to start of the wor/.

    @.3 Surfaces shall be inspected for readiness to receive the bituminous primer.Surfaces to which the waterproofing materials shall be applied shall be surface

    dr, smooth and free from dirt, grease and oil or other deleterious materials.

    @.6 &ppl bituminous primer following manufacturer9s recommendation and

    allow to dr naturall before appling the self-adhering membrane.

    @.> &fter the primer has dried to the e?tent specified b the manufacturer, appl

    the membrane sheet to the concrete without stretching with 20 mm overlaps

    at edges and ends, and the sheet shall be rolled down firml and completel.

    @.@ nside and outside corners shall be doubled b using an initial strip of 300 mmwide membrane, centered along the a?is of the corner. This strip shall be

    >

  • 7/25/2019 MS - Self-Adhesive Membrane Waterproofing Works RA-239

    6/6

    covered b the regular application of self-adhering membrane. & troweled

    bead of mastic shall be applied over all e?posed edges of the membrane.

    @.A The membrane on blinding slabs shall e?tend to the outer edge of the slab and

    shall be protected. Sidewall membrane shall e?tend down and out to the edge

    of the previousl applied blinding slab membrane.

    @.B &reas around drains, piping and protrusions shall be double covered with an

    additional laer of self-adhering membrane for a minimum of 300 mm in each

    direction beond the limits of the feature. The membrane edges shall be coated

    and the gap between the membrane and protrusions shall be filled with mastic.

    @.) &t e?pansion +oints, an additional pl of membrane >00 mm wide, centered on

    the +oint and e?tending full width of the roadwa and up to the membraneterminating point of the walls shall be applied.

    @.0 "efore an wor/ is allowed to proceed above a waterproof membrane, or

    within five das of its application whichever is the sooner, the membrane shall

    be protected b an approved protection board as shown on the approved

    drawings.

    .& Inse'tion an# Testin/

    !e1uired inspections shall be carried-out as per approved nspection and Test *lan

    T*5 and enough time in the dail wor/ program shall be allocated to permit the

    performance and chec/ing with the consultant before proceeding with an subse1uent