DAMAC TENORA (P027-DXB-2010)Submittal/Reference No: MEP-054 dated 27 Dec 2014Submittal Content

: Sump pump setsProduct

:

Manufacturer

: Allied Arab trading/ARMSTRONGInstaller

: _______________________________________________________________SCL Engineers review comments: 1. No Objection for proposed make Armstrong for sump pump.2. Provide head loss calculations for sump pump to match duties as per project design.3. Pump room layout with control panel location to be provided for review.4. Control cable length provided with pump shall be suitable as per site requirements.

5. Pump accessories provided with pump shall be highlighted in the submittal.

6. ON/OFF Alarm levels with pit depth shall be coordinated for effective pump performance.

7. Motor electrical load to comply with allotted load in IFC.

8. Warranty details to be provided min 2 years.

9. Separate approval to be taken for control panel and electrical load.10. Motor start/hour to be confirmed as per specs, not clearly identified in the technical literature provided.11. Allowable free solid size passing through impeller not identified clearly in technical literature.

12. Industry standard certification for sump pump viz SSPMA etc.SHANKLAND COX LIMITED

GF/RA/jm/10/12/2014