    Method Statement for CASTING CONCRETE FOR BOX CULVERT

    REVISION HISTORY

    Rev. No.

    DateCONTRACTOR-MAK

    Revision History ENGINEER

    Status of

    Arova!"reare# Revie$e# Arove#

    0 2016SD HH HM First Submission following

    award of Contract

    TA%&E O' CONTENTS

    1.0 Purpose

  • 7/25/2019 MS Casting Concrete for Box Culvert 20Feb2016

    2/7

    2.0 Scope of Work

    3.0 Definitions

    4.0 References

    5.0 Materials

    6.0 Plant & Euip!ent

    ".0 Safet#

    $.0 Prior %ctiities

    '.0 Proce(ure

    10.0Responsi)ilities

    11.0 %ttac*!ents

    1.0 Purpose

    1.1 To ensure that the box culvert concrete activities after the installation of steelreinforcement, formwork and all specified water stops and joints are executed safely and in

    accordance with the contract requirements and that all quality assurance/ control activitiesare conducted in a systematic manner, works are inspected and conformance is verifiedand documented.

    2

  • 7/25/2019 MS Casting Concrete for Box Culvert 20Feb2016

    3/7

    2.0 Scope of Work

    2.1 This procedure is applicable to the followin works associated with the !roject titled,

    "onstruction, "ompletion and #aintenance of $oads, %rides, &torm 'ater (rainae,&ewers and )ther &ervices for $oads "onnectin &abah al *hmad and +hiran ew Towns

    2.2 This method statement outlines the procedures to be followed in castin of reinforcedconcrete for %ox "ulvert at locations shown on "ontract drawins and as directed by the-nineer.

    3.0 Definitions

    .1 eneral &pecifications #!' eneral &pecifications for +uwait $oads 0 ihways.2 &- ealth, &afety 0 -nvironmental. !!- !ersonal !rotective -quipment. *3" *pproved for "onstruction.4 $35 $equest for 5nspection.6 !# !roject #anaer.7 "# "onstruction #anaer .8 &- &ite -nineer.9 :& :and &urveyor .1;

  • 7/25/2019 MS Casting Concrete for Box Culvert 20Feb2016

    4/7

    6.0 +ools & Euip!ent

    6.1 &urveyin 5nstruments/&pirit level6.2 #easurin tape6. and Tools and ammer

    6. %room6.4 &afety elmet6.6 $ain %oot6.7 and loves6.8 #ask6.9 'ire ails6.1; *ir compressor 6.11 enerator 6.12 rinder 6.1 !ower %endin #achine6.1 &teel "utter 6.14 :adders6.16 &lump cone and "ube #olds6.17 "oncrete Temperature aue6.18 -lectric saw6.19 "oncrete vibrator 6.2; ydraulic "rane6.21 "oncrete #ixers

    ".0 Safet#

    7.1 !rior to the commencement of any activities, the workforce will receive an induction talk on

    the !roject site safety requirements. This induction talk will include both activity safetyissues, as well as eneral safety requirements.

    7.2 &ite 3oreman/&upervisor will enforce that !ersonal !rotective -quipment be worn by sitepersonnel at all times durin construction activities.

    7. !lant and -quipment will be provided with back@up alarms, lihts, and all other applicablesafety devices. "ertificates of worthiness will be provided before the equipment is used.

    $.0 Prior %ctiities

    8.1 -nsure that all related drawins 0 documents are the latest *3" revision.

    8.2 -nsure havin valid calibration certificates for the concrete plant instrument, surveyinstruments and other related measurin 0 testin equipment.

    8. -nsure that the formworks, steel reinforcement 0 embedded items have been fixedaccordin to the approved method statement, inspected 0 approved by the -nineer.

    8. -nsure havin adequate number 0 suitable type of concretin related equipmentAs 0trained and experienced operators and ensure providin stand by equipment as necessary.

    '.0 Proce(ure

    9.1 !ourin

    4

  • 7/25/2019 MS Casting Concrete for Box Culvert 20Feb2016

    5/7

    9.1.1 *t time of placin concrete, ensure that surfaces on which concrete is to beplaced have been protected as specified, cleaned with no debris, tyinwires, free water, and that temporary cleanin openins have been closedand sealed. &teel reinforcement must be washed free of all dust and

    contaminants before concretin.

    9.1.2 (elivery of concrete shall be properly scheduled by a manner that ensuresthe time elapsin between mixin 0 placin is as short as possible incompliance with !roject &pecifications.

    9.1. The concrete should be dischared throuh the reinforcement by a mannernot to cause uneven dispersal, sereation or loss of inredients 0 not todamae the formwork or any embedded items.

    9.1. !rovision shall be taken for any expansion, contraction, construction jointsand/or water bar as specified 0 detailed in the *3" drawins.

    9.1.4 o concrete shall be placed while the ambient temp is not within theacceptable rane as specified in "ontract (ocuments.

    9.1.6 !oured concrete shall be properly vibrated by mechanical vibrations for thefull depth of fresh concrete to ensure full compaction, >ibration shall in noaccount be continuous after water or excess rout has appeared on thesurface.

    9.1.7 "oncrete shall not be placed in adverse conditions such as dust storms orheavy rain.

    9.1.8 "oncrete must be finished before settin 0 hardenin as specified oradvised by -nineer.

    9.1.9 (urin the placin of all reinforced concrete, a competent steel fixer and acompetent carpenter shall be in attendance on each concretin an. Theyshall ensure the reinforcement embedded fittins and forms are kept inposition as work proceeds.

    9.1.1; *fter concretin 0upon strikin the formworks, tyin rod holes shall be filledwith an approved, pre@baed, cementitious, non@shrink repair mortar,applied and cured in accordance with manufacturerAs instructions.

    9.2 *ctivity &equence

    9.2.1 The activities pertainin to this #ethod &tatement are=

    9.2.1.1 %ox "ulvert blindin works under bottom slab Bcastin 0curinC.9.2.1.2 %ox "ulvert bottom slab includin bottom haunches Bcastin

    0curinC.9.2.1. %ox "ulvert walls 0 top slab Bcastin 0curinC.

    The sequence of these activities is part of the overall sequence of the box culvertconstruction as shown in item 9.2.2

    9.2.2 %ox "ulvert *ctivity &equence for !anels "onstruction=9.2.2.1 %ox "ulvert *ctivity &equence for a sinle panel=

    aC -xcavation to formation level

    5

  • 7/25/2019 MS Casting Concrete for Box Culvert 20Feb2016

    6/7

    bC &ettin out of blindin under culvert base slab.cC 3ormwork for blindindC "astin of blindineC "urin of blindinfC &ettin out of base slab

    C 3ormwork for base slabhC &teel $einforcement of bottom slab 0 kickeriC 5nstallation of water stopsjC "astin of bottom slab 0 kickerkC &trikin shutters and curin of bottom slablC &ettin out of vertical wallsmC &teel reinforcement of wallsnC 5nner formworks of walls 0 top slaboC &teel reinforcement of top slab and water stops installationpC "lose formwork of wallsqC "ast walls 0 top slabrC &trike external wall shutterssC "ure walls and top slabtC *pply joint filler uC *pply water proofin paintin works for external surfaces to

    start backfillin.vC &trikin internal formwork for walls and top slabwC 5nstall expansion joints.

    $epeat the same sequence for other panels then %ackfill in layers tothe required level.

    9. "urin

    9..1 *s soon as concrete has set or immediately after strikin formwork incompliance with "lause 4;.;1.4, concrete surfaces shall covered withessian cloth and continuously kept wet usin potable water for a period of7 days as specified in "lause 4;.;6 of the eneral &pecifications. essiancloth shall frequently be watered as necessary to be kept wet continuously.!olythene sheets shall be laid on top of the essian clothes, properly sealedto cover all surfaces and edes to preserve and maintain the moisture of theessian clothes and concrete surfaces. &ealin shall be done in such amanner that wind cannot et under the edes of the sheets and all joints inthe sheets must be fully taped toether.

    9..2 The concrete may be further cured by applyin the approved curin

    compound immediately after removin the polythene sheet and hessiancloth, in accordance with "lause 4;.;6 &ub@clause B%. iiC of the eneralspecifications.

    9.. (irect access on the concrete finished surface before hardenin is notallowed &ubsequent protection system should be started after elapsin thecurin period.

    9. Testin

    9..1 &amplin, testin 0 assessment of compliance of concrete shall be done inaccordance with the project particular specifications.

    9..2 Testin shall be carried out in the &ite laboratory.

    6

  • 7/25/2019 MS Casting Concrete for Box Culvert 20Feb2016

    7/7

    9.. *dequate quality control of the concrete mix on site shall be ensured inaccordance with clause 4;.;. 0 .

    9.. The onsite tests must be carried out by a qualified technician under directsupervision of