MPU Manuals - How to Connect to the Grid v3 12-29-15

Embed Size (px)

Citation preview

  • 8/19/2019 MPU Manuals - How to Connect to the Grid v3 12-29-15

    1/2

    HOW TO CONNECT TO THE GRID AND LOAD

    Phase 1: Conditioning of the MPU for 21 days refer to Users Manual

    ElectricGrid

    House KWHMeter (Single

    Phase)

    IN

    Live(L) (+)

    Neutral (N)(-)

    MP

    Electrical

    Outlet

    Appliances(Max Total

    Load 2.0Kw)

    (+)

    (-)

    Power Factor

    Corrector Device

    OUT

    Breakers

    M AGRAV OWERP

    1

  • 8/19/2019 MPU Manuals - How to Connect to the Grid v3 12-29-15

    2/2

    HOW TO CONNECT TO THE GRID AND LOAD

    Phase 2: After the 21 days of Conditioning, set your system this way.

    ElectricGrid

    House KWHMeter (Single

    Phase)

    IN

    Live(L) (+)

    Neutral (N)(-)

    MP

    Electrical Outlet

    Appliances(Max TotalLoad 500w)

    Appliances(Max TotalLoad 2Kw)

    (+)

    (-)

    Power Factor

    Corrector Device

    OUT

    Breakers

    M AGRAV OWERP

    2