The Complete Portfolio and Programme Management Solution

Mpower 2012

Embed Size (px)

Citation preview

Page 1: Mpower 2012

The CompletePortfolio and Programme ManagementSolution

Page 2: Mpower 2012

Since 1987 Monitor has provided software, training and consultancy for high performance Project Cost Management in the offshore oil and gas industry.

Monitor helps clients deliver their projects on time, on budget and on quality. We do this by seamlessly linking project data to enterprise data.

Clients ranging from large multinationals to local outsourcing partners.

In order to maintain and develop its international success Monitor has developed a culture of change. For Monitor managers, this means remaining open to diversity, to different approaches to solving similar problems and to continuous change.

Monitor

Page 3: Mpower 2012

Monitor Worldwide

Calgary

Houston

Aberdeen

Perth

Page 4: Mpower 2012

Clients

Page 5: Mpower 2012

ArtemisTime

Writing

Integrated Cost &

Planning

EnterpriseController

mpower forMaintenance

mpowerSuite

mpowerScheduling

mpower

20001995 2003 20111987 1989 1990 2006

History of Innovation

Page 6: Mpower 2012

What is mpower?

mpower encompasses many aspects of your business providing an integrated solution for cost control, productivity management and earned value.

With mpower you can:

- manage portfolios of projects- manage individual projects- schedule - cost - time-write - bill - procure - estimate - control - manage HR

mpower lets you see how your business is really performing.

Page 7: Mpower 2012

What Type of Projects?

mpower is designed to manage all types of Field Development, Engineering and Construction projects including:

- Major Capital Projects- Turnaround Projects- Operations and Maintenance Projects

mpower enables you to apply best practice project management across all of your projects.

Page 8: Mpower 2012

The Benefits

Complete control - mpower gives the user total visibility over all aspects of their business.

Lower costs - information is current, accurate and relevant.

Eliminates double entry - reduces errors, data need only be entered once.

Gathers information - you no longer have isolated pockets of knowledge as you readily collect information for all areas of the business.

Shared platform - the same data and the same information can be seen or gathered by anyone, anywhere in the world due to mpower being web based.

Page 9: Mpower 2012

The Results

Monitor understands that if data is worth gathering then it is worth using.

From a small procurement cost to a large manpower deployment, the data is captured, analysed and contributes to give you the overall project picture.

Real time data capture allows the system to not only tell you what happened, but also tell you what is currently happening and, most importantly, what will happen in the future.

mpower allows you to plan and forecast based on the most accurate information available.

Page 10: Mpower 2012

ProgrammeManagementPortfolio

Management

Engineering

HR Management

mpower Functions

CostControl

Scheduling

Time & ExpenseManagement

Procurement

ValuationControl

Page 11: Mpower 2012

mpower Functions

Value Optimisation

RiskManagement

What-IfAnalysis

ProgrammeRanking

Organisational Strategy

Alignment

ProgrammeScheduling

ProgrammeManagement

Page 12: Mpower 2012

CostControl

ProjectBudgets

mpower Functions

Budget Profiling

Actual CostsCommitmentsAnd AccrualsValuation

DataGathering

CostForecasting

Internal and External

CostManagement

Page 13: Mpower 2012

Scheduling

mpower Functions

WorkPlanning

ActivityScheduling

RelationshipsResources

and constraintsActivityProgressing

ScheduleForecasting

Earned Value Management and Reporting

Page 14: Mpower 2012

Engineering

WorkNorms

DesignCTRs

Job Cards

MaterialTake-Offs

Cost Estimating

Man-HourEstimating

mpower Functions

Page 15: Mpower 2012

mpower Functions

Time & ExpenseManagement

TimeRecording

ExpenseManagement

Daily, Weekly, Monthly

Time Sheets

TeamAllocations

Job LabourControl

Project,Activity,

JobTime Booking

Page 16: Mpower 2012

mpower Functions

Procurement

Sub-ContractManagement

PurchaseOrder

Control

PurchaseInvoiceControl

MaterialAllocation

MaterialScheduling

MaterialCommitments, Accruals and

Actuals

Page 17: Mpower 2012

mpower Functions

HR Management

TeamAssignments

ResourceAssignments

SkillsTracking

QualificationsManagement

TrainingRecords

AppraisalManagement

Page 18: Mpower 2012

mpower Functions

ValuationControl

ChangeManagement

ContractorStatements

Actual Costs,CommitmentsAnd AccrualsCharge

Rates

CostForecasting

CostReporting

Page 19: Mpower 2012

Interfaces

Page 20: Mpower 2012

Terminology

A Programme represents a series of projects of similar type which you need to manage and control.

Almost all Programmes are unique in terms of their structure and their deliverables.

Programmes vary in size, complexity and timescale.

Programme

Page 21: Mpower 2012

Terminology

Programmes are broken down into distinct Projects .

For example, an operator may have a variety of projects to monitor and control at any given time for example:

P1 – New LNG FacilityP2 – Pipelines UpgradeP3 – Sub Sea Template InstallationP4 – Mooring Points Replacement

Programme

Project

Page 22: Mpower 2012

Terminology

Phases represent the second level in the progressive breakdown of the work scope associated with each Project.

Phases often represent the typical life cycle components of the Project from the Study Phase through to the Commissioning Phase.

Some companies call these the level ‘2’ activities as collectively they form the master schedule for the project.

Programme

Project

Phase

Page 23: Mpower 2012

Terminology

Activities represent the third level in the progressive breakdown of the work scope associated with each Phase.

Work execution schedules (plans) for the work are established at the Activity level.

The work scope associated with each Activity should be sufficiently detailed to allow adequate monitoring and control.

Programme

Project

Phase

Activity

Page 24: Mpower 2012

Engineering Terminology

Work Pack

Work Packs represent a collection of Engineering CTRs (Cost Time and Resource) that define a scope of work.

Page 25: Mpower 2012

Engineering Terminology

Activity

Work Pack

CTR

Engineering CTRs are created detailing all of the work required.

Man-hour and material estimates are built up using the company work norms.

Deliverables are defined for the CTRs.

Once completed they are transferred to Planning Activities for scheduling and execution.

Transfer Deliverables to

Planning Activities