5
MOSUL DAM PROJECT Project / Progetto MOSUL DAM PROJECT Contract no. / Contratto n. : Subcontract Agreement dated August 11 th , 2016 Client / Committente TREVI SpA, Cesena, ITALY Contract amount / Importo dell’appalto : € 10.876.275,00 Executed works / Lavori eseguiti al 31/03/2017: € 7.707.467,21 Delivery Date / Consegna lavori : September 19 th , 2017 Start date / Inizio Lavori : August 11 th , 2016 Completion / Fine lavori : October 30 th , 2017 Works performed by / Lavori realizzati da SELI OVERSEAS SpA Italy/Italia 100% M M A A J J O O R R W W O O R R K K S S O O P P E E R R E E P P R R I I N N C C I I P P A A L L I I Detailed inspection with mapping of cracks, risk assessment and evaluation of any other potential hazard of the bottom outlet tunnels (left and right) concrete lined and steel lined located underneath the dam; Inspection and rehabilitation of the no. 4 bulkheads with their operation in order to dewater and fill again the aforementioned tunnels carried out under pressure (with divers and related equipment); Replacement of the expansion joints into the tunnels; 3D laser scan of the lake bed; Rehabilitation of the Floating Barge; Rehabilitation of the dewatering systems (including the supplies of new pumps, valves, control panels etc.); Rehabilitation of the Guard Gate (indicator shaft replacement; hydraulic unit refurbishment, maintenance of structure) and of all gantry cranes Supplies of the required electrical system (batteries & distribution boards). Ispezione dettagliata delle gallerie di scarico di fondo situate sotto la diga (sinistra e destra): mappatura di fessure, valutazione dei rischi e qualsiasi altro potenziale pericolo sul rivestimento in calcestruzzo e acciaio; Ispezione, riparazione e messa in funzionamento delle 4 paratie, al fine di svuotare e riempire di nuovo i tunnel di cui sopra: le riparazioni sono svolte sotto pressione (con sommozzatori ed attrezzature subacquee); Sostituzione dei giunti di dilatazione dentro le gallerie; Laser scanner 3D del fondale dell’invaso; Messa in servizio della chiatta; Manutenzione e riparazione delle attrezzature per lo svuotamento dell’invaso (inclusa la fornitura di nuove pompe, valvole, pannelli di controllo, ecc.); Messa in funzione del Guard Gate (sostituzione dell’indicatore di posizione; riparazione della parte idraulica, manutenzione della struttura) e di tutti i carriponte. Forniture dei sistemi elettrici richiesti (batterie e quadri di distribuzione).

MOSUL DAM PROJECT - Seli · PDF fileMOSUL DAM PROJECT Project / Progetto MOSUL DAM PROJECT Contract no. / Contratto n. : ... Carrelli elevatori

Embed Size (px)

Citation preview

Page 1: MOSUL DAM PROJECT - Seli  · PDF fileMOSUL DAM PROJECT Project / Progetto MOSUL DAM PROJECT Contract no. / Contratto n. : ... Carrelli elevatori

MOSUL DAM PROJECT

Project / Progetto MOSUL DAM PROJECT

Contract no. / Contratto n. : Subcontract Agreement dated August 11th, 2016Client / Committente TREVI SpA, Cesena, ITALYContract amount / Importo dell’appalto : € 10.876.275,00

Executed works / Lavori eseguiti al 31/03/2017: € 7.707.467,21

Delivery Date / Consegna lavori : September 19th, 2017Start date / Inizio Lavori : August 11th, 2016Completion / Fine lavori : October 30th, 2017

Works performed by / Lavori realizzati da SELI OVERSEAS SpA Italy/Italia 100%

MMMAAAJJJOOORRR WWWOOORRRKKKSSS OOOPPPEEERRREEE PPPRRRIIINNNCCCIIIPPPAAALLLIII

Detailed inspection with mapping of cracks, riskassessment and evaluation of any other potentialhazard of the bottom outlet tunnels (left and right)concrete lined and steel lined located underneaththe dam;

Inspection and rehabilitation of the no. 4bulkheads with their operation in order to dewaterand fill again the aforementioned tunnels carriedout under pressure (with divers and relatedequipment);

Replacement of the expansion joints into thetunnels;

3D laser scan of the lake bed; Rehabilitation of the Floating Barge; Rehabilitation of the dewatering systems (including

the supplies of new pumps, valves, control panelsetc.);

Rehabilitation of the Guard Gate (indicator shaftreplacement; hydraulic unit refurbishment,maintenance of structure) and of all gantry cranes

Supplies of the required electrical system (batteries& distribution boards).

Ispezione dettagliata delle gallerie di scarico di fondosituate sotto la diga (sinistra e destra): mappatura difessure, valutazione dei rischi e qualsiasi altropotenziale pericolo sul rivestimento in calcestruzzo eacciaio;

Ispezione, riparazione e messa in funzionamento delle4 paratie, al fine di svuotare e riempire di nuovo itunnel di cui sopra: le riparazioni sono svolte sottopressione (con sommozzatori ed attrezzaturesubacquee);

Sostituzione dei giunti di dilatazione dentro le gallerie; Laser scanner 3D del fondale dell’invaso; Messa in servizio della chiatta; Manutenzione e riparazione delle attrezzature per lo

svuotamento dell’invaso (inclusa la fornitura di nuovepompe, valvole, pannelli di controllo, ecc.);

Messa in funzione del Guard Gate (sostituzionedell’indicatore di posizione; riparazione della parteidraulica, manutenzione della struttura) e di tutti icarriponte.

Forniture dei sistemi elettrici richiesti (batterie e quadridi distribuzione).

Page 2: MOSUL DAM PROJECT - Seli  · PDF fileMOSUL DAM PROJECT Project / Progetto MOSUL DAM PROJECT Contract no. / Contratto n. : ... Carrelli elevatori

EEEQQQUUUIIIPPPMMMEEENNNTTT AAATTTTTTRRREEEZZZZZZAAATTTUUURRREEETunnel Galleria

Generating set Ventilator Fork-lift & man-lift Bobcat

Generatori Ventilatore Carrelli elevatori Bobcat

Diving Activities Pontoon Portable saturation containerized diving facility Lifting equipment

Attività sottomarine Pontone Impianto containerizzato per immersioni in saturazione Impianti di sollevamento

GGGEEEOOOLLLOOOGGGYYY GGGEEEOOOLLLOOOGGGIIIAAA

gypsum, marl and limestone gesso, marna e calcare

Portable saturation containerized diving facility - layout

Portable saturation containerized diving facility

Page 3: MOSUL DAM PROJECT - Seli  · PDF fileMOSUL DAM PROJECT Project / Progetto MOSUL DAM PROJECT Contract no. / Contratto n. : ... Carrelli elevatori

Pontoon with gantry crane

Cutting task carried out in saturation

Page 4: MOSUL DAM PROJECT - Seli  · PDF fileMOSUL DAM PROJECT Project / Progetto MOSUL DAM PROJECT Contract no. / Contratto n. : ... Carrelli elevatori

3D laser scanning

General layout of the project

Page 5: MOSUL DAM PROJECT - Seli  · PDF fileMOSUL DAM PROJECT Project / Progetto MOSUL DAM PROJECT Contract no. / Contratto n. : ... Carrelli elevatori