3
Most Immediate Government of India Department of Atomic Energy Secretariat Coordination Section Anushakti Bhavan, C.S.M. Marg, Mumbai - 400 001 No. 21/7/2014-SCS/4133 May 22, 2020 OFFICE MEMORANDUM Subject: Deferment of review work of PRIS(G) Achievement 2019-2020 by the Expert Committees on PRIS(G) in respect of R&D and l&M Sector Units / AERB - Regarding The Department has decided to defer the payment of PRIS(G), PRIS(0) and PRISM until further orders (copies of DAE OM dated 15.04.2020 and dated 16.04.2020 enclosed for reference) based on Ministry of Finance vide O.M. No. 12(13)-B(W&M)/2020 dated 08.04.2020 regarding expenditure control. 2. In view of the Lockdown measures enforced by GoI/ various State Governments to contain the spread of COVID-19 and the subsequent restrictions imposed, it will be prudent to avoid travelling, holding meetings, conducting site visits etc in connection with the subject work. It has therefore been decided to defer the review work of PRIS(G) Achievement for 2019-2020 until further notice. 3. The above decision may kindly be conveyed to the Chairman & Members of Expert Committees of PRIS(G) in respect of R&D and l&M Sector participating Units and AERB. 4. The above issues with the approval of the Competent Authority. End: Two Pages. +kl -\/tAet.0 (Sanjay Kumar) Joint Secretary(A&A) Distribution: 1) Non-Member Secretary-Expert Committee PRIS(G) (I&M Sector) & CAO, HWB, V.S. Bhavan, Anushakti Nagar, Mumbai 2) Non-Member Secretary-Expert Committee PRIS(G) (R&D Sector) & Director(P&A), IGCAR, Kalpakkam 3) Non-Member Secretary-Expert Committee PRIS(G) (AERB) & CAO, AERB, Mumbai Copy to: 1) All Heads of Units of R&D/I&M/AERB (Participating Units of PRIS-G) 2) All Officers & Sections in DAE — Through DARPAN 3) Head, CISD — with a request to upload the above OM in DARPAN under SCS corner 4) Office of Secretary, DAE 5) PRIS(G) Expert Committee files (fil , No•2041-2..ota..-scsiost.112 No. 2. )711.7.014-5(0 Page 1 of 1

MOST IMMEDIATE - Department of Atomic Energy · drawn on provisional basis, (excluding claims like TA/Medical etc.) and appropriate arrangements shall be made by the respective Units/PSUs/Aided

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MOST IMMEDIATE - Department of Atomic Energy · drawn on provisional basis, (excluding claims like TA/Medical etc.) and appropriate arrangements shall be made by the respective Units/PSUs/Aided

Most Immediate Government of India

Department of Atomic Energy Secretariat Coordination Section

Anushakti Bhavan, C.S.M. Marg,

Mumbai - 400 001

No. 21/7/2014-SCS/4133

May 22, 2020

OFFICE MEMORANDUM

Subject: Deferment of review work of PRIS(G) Achievement 2019-2020 by the Expert Committees on PRIS(G) in respect of R&D and l&M Sector Units / AERB - Regarding

The Department has decided to defer the payment of PRIS(G), PRIS(0) and PRISM until further orders (copies of DAE OM dated 15.04.2020 and dated 16.04.2020 enclosed for reference) based on Ministry of Finance vide O.M. No. 12(13)-B(W&M)/2020 dated 08.04.2020 regarding expenditure control.

2. In view of the Lockdown measures enforced by GoI/ various State Governments to contain the spread of COVID-19 and the subsequent restrictions imposed, it will be prudent to avoid travelling, holding meetings, conducting site visits etc in connection with the subject work. It has therefore been decided to defer the review work of PRIS(G) Achievement for 2019-2020 until further notice.

3. The above decision may kindly be conveyed to the Chairman & Members of Expert Committees of PRIS(G) in respect of R&D and l&M Sector participating Units and AERB.

4. The above issues with the approval of the Competent Authority.

End: Two Pages. +kl-\/tAet.0 (Sanjay Kumar)

Joint Secretary(A&A) Distribution: 1) Non-Member Secretary-Expert Committee PRIS(G) (I&M Sector)

& CAO, HWB, V.S. Bhavan, Anushakti Nagar, Mumbai 2) Non-Member Secretary-Expert Committee PRIS(G) (R&D Sector)

& Director(P&A), IGCAR, Kalpakkam 3) Non-Member Secretary-Expert Committee PRIS(G) (AERB)

& CAO, AERB, Mumbai

Copy to: 1) All Heads of Units of R&D/I&M/AERB (Participating Units of PRIS-G) 2) All Officers & Sections in DAE — Through DARPAN 3) Head, CISD — with a request to upload the above OM in DARPAN under SCS corner 4) Office of Secretary, DAE 5) PRIS(G) Expert Committee files (fil , No•2041-2..ota..-scsiost.112 No. 2. )711.7.014-5(0

Page 1 of 1

Page 2: MOST IMMEDIATE - Department of Atomic Energy · drawn on provisional basis, (excluding claims like TA/Medical etc.) and appropriate arrangements shall be made by the respective Units/PSUs/Aided

MOST IMMEDIATE

31TiF +itchii/Government of India

u-{371- F42Tt -4/Department of Atomic Energy

+14-o-ci 31-TIPT/Secretariat Coordination Section

3fur3OF131/Anushakti Bhavan.

51.azr. Marg,

via /Mumbai - 400 001

W022-22022661 Email: sectcolc

No.21/10/2018-SCS/403 9 April 15, 2020

OFFICE MEMORANDUM

Subject: Instructions regarding provisional Salary for the month of April, 2020 and deferment of Payment of PRIS(0) for the period from 01.10.2019 to 31.03.2020, Professional Update Allowance and Update Allowance — Regarding.

•le***r******

Reference is invited to this Departments OM No.21/10/2018-SCS/4438 dated 04.04.2019 conveying therein sanction of the Competent Authority for payment of PRIS(0) © 20% of Basic Pay for the period from 01.10.2018 to 31.03.2020. The payment of PRIS(0) for the period from 01.10.2019 to 31.03.2020 is due in April, 2020. Also, the payment of Professional Update Allowance -and Update Allowance is due from April, 2020.

2. In the light of revised guidelines issued by Ministry of Finance vide OM No.F.No.12(13)-B(W&M)/2020 dated 08.04.2020, regarding expenditure control in view of the present situation arising out of COVID-19 and the consequent lock down, the overall expenditure for Q1 (April-June, 2020) is to be restricted within 15% of approved BE, it has been decided in the Department to defer the payment of (i) PRIS(0) for the period from 01.10.2019 to 31.03.2020; (ii) Professional Update Allowance and (iii) Update Allowance until further orders.

3. Further, the salary for the month of April, 2020, payable on the due date may be drawn on provisional basis, (excluding claims like TA/Medical etc.) and appropriate arrangements shall be made by the respective Units/PSUs/Aided Institutions of DAE for disbursement of the same. Recovery/payment, if any, shall be adjusted in subsequent month.

4. All Heads of Constituent Units / PSUs / Aided Institutions are requested to strictly adhere to the above instructions.

5. This issues with the approval of Competent Authority. c1:5 t/VUA\7 (Sanjay Kumar)

Joint Secretary(A&A)

All Heads of Constituent Units / PSUs / Aided Institutions of DAE

Copy also to: 1. All Administrative Heads of Constituent Units / PSUs / Aided Institutions of DAE 2. Under Secretary (Adm.), DAE — For further necessary action in respect of DAE

Secretariat 3. Head, CISD, DAE — For uploading the above Communication in DAE Website 4. All Officers and Sections in DAE Secretariat = through DARPAN 5. Secretary, Staff Side, DAE Departmental Council

Page 3: MOST IMMEDIATE - Department of Atomic Energy · drawn on provisional basis, (excluding claims like TA/Medical etc.) and appropriate arrangements shall be made by the respective Units/PSUs/Aided

MOST IMMEDIATE

aTR7 /Government of India

7T-Fruj; 34' faliTaT /Department of Atomic Energy

oir+41-84.i.-cm 3fTITui /Secretariat Coordination Section

39qa-B" / Anushakti Bhavan,

TITir /C.S.M Marg,

/Mumbai - 400 001.

2:022-22022661 Email: sectcorda1dae.dov.in

No.21/10/2018-SCS/L101f3 April 16, 2020.

OFFICE MEMORANDUM

Subject: Instructions regarding deferment of Payment of PRIS (I) and PRIS (G) - Regarding.

*********

Ministry of Finance vide O.M. No. F. No. 12(13)-B(W&M)/2020 dated 08/04/2020, have issued revised guidelines regarding expenditure control in view of the present situation arising out of COVID-19 and the consequent lock down, the overall expenditure for Q1 (April-June 2020) is to be restricted within 15% of

approved BE.

2. Accordingly, in continuation of this Department's OM No. 21 /10/2018- SCS/4039 dated 15.04.2020 (copy attached), the following orders are also issued "the payment of PRIS (I) and PRIS (G) also stands deferred until further

orders".

3. All Heads of Constituent Units / PSUs / Aided Institutions are requested to

strictly adhere to the above instructions without fail.

4. This issues with the approval of Competent Authority.

(Sanjay Kumar) Kumar) Joint Secretary (A&A)

All Heads of Constituent Units I PSUs I Aided Institutions of DAE

Copy also to: 1. All Administrative Heads of Constituent Units / PSUs / Aided Institutions of

DAE 2. Under Secretary (Adm.), DAE — For further necessary action in respect of

DAE Secretariat 3. Head, CISD, DAE — For uploading the above communication in DAE Website

4. All Officers and Sections in DAE Secretariat — through DARPAN 5, Secretary, Staff Side. DAE Departmental council