Montreal-Blair Road Transit Priority Corridor Planning and Environmental Assessment (EA) Study Public Consultation Group Meeting #1 13 June 2019

Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Montreal-Blair Road Transit Priority Corridor Planning and Environmental

Assessment (EA) Study

Public Consultation Group Meeting #113 June 2019

Page 2: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Welcome

• Introduction of Study Teamo City of Ottawao Parsons

• Introduction of Consultation Group Memberso Roles and Responsibilities

2

Page 3: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Agenda

• Study Overview and Objectives • Need and Opportunities • Existing Corridor Conditions• Planning and Design Principles• Alternative Solutions• Key Design Considerations• Next Steps

3

Page 4: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Project Limits

4

Subject to coordination withBrian Coburn Extension / Cumberland Transitway Westerly Alternate Corridor EA Study

Page 5: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Study Objectives

• Investigate options to improve transit service and travel environment for all modes

• Consult with a broad range of stakeholders

• Connect to Blair and future Montreal Road LRT Stations and other destinations to provide mobility options for the community

• Identify interim and ultimate configurations for corridor modifications

• Establish right-of-way requirements and project cost estimates

• Prepare a Recommended Plan and Environmental Project Report

5

Page 6: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Consultation Strategy• Three consultation groups:

• Agency – city staff, approval authorities, agencies• Business – major institutions, landowners, businesses• Public – community associations, interest groups, advisory

committees• Individual/focused stakeholder meetings• Two Public Open House events• Project mailing list• Project website:

6

www.ottawa.ca/montrealblairroad

Page 7: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Project Schedule

Winter 2018/19 – Spring 2019: Existing Conditions; Transit Priority Best Practices Review;

Develop Alternative Solutions*Consultation Group Meetings 1*

Summer 2019:Evaluate Alternative Solutions;

Develop and Evaluate Alternative Designs

Fall/Winter 2019: Consult on Evaluation of Alternative Solutions and Designs*Consultation Group Meetings 2 and Public Open House 1*

*Present to Urban Design Review Panel*

Spring/Summer 2020: Develop Preliminary Design and Preliminary Recommended Plan

*Consultation Group Meetings 3 and Public Open House 2**Present to Transportation Committee*

Summer 2020: Commence Transit Project Assessment Process

Circulation of draft EPR to Agencies; 30-day public review period; Finalize EPR

Planning Phase

EA Phase

7

Page 8: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Need and OpportunitiesOfficial Plan (2013) • Arterial Mainstreet designation (Montreal Road)• Potential to evolve, over time, into more compact, pedestrian-oriented and transit-

friendly communities• Supports a mix of adjacent land-uses

Page 9: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Transportation Master Plan (2013)• Designated Transit Priority Corridor (Continuous Lanes) as part of Ultimate

Network• Transit Priority Corridors complement the rapid transit network, improve

city-wide transit access to major employment, commercial, and institutional uses

• Infrastructure to accommodate future travel demand and meet modal share objectives

9

Need and Opportunities

Page 10: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Transportation Master Plan: Transit Priority Projects

Identified Corridors Description Rationale

Montreal Road (Affordable Network

and Network Concept)

Affordable: Road widening to provide exclusive bus lanes and transit signals priority between St. Laurent and Blair Road

Concept: Road widening to provide exclusive bus lanes and transit signal priority between Blair Road and Ogilvie Road

• Reduces travel time• Improves reliability on OC Transpo

route #12• Accommodates development at former

CFB Rockcliffe/ Wateridge Village community

Blair Road (Affordable Network

and Network Concept)

Exclusive bus lanes and transit signalpriority between Blair Station andMontreal Road. Bus lanes to beprovided through a combination of roadwidening (north of Ogilvie Road) andconversion of existing traffic lanes (southof Ogilvie Road)

• Improves transit service between the eastern suburbs and Vanier

10

Page 11: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Need and OpportunitiesTransportation Master Plan and Cycling Plan (2013) • Designated Spine Route (Montreal and Blair roads)• Provide access along major road corridors• Connect to other cycling routes• Provide dedicated on-road cycling space (subject to localized constraints), ideally

either a cycle track or a buffered bike lane

Page 12: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Need and OpportunitiesWateridge Village Community• Connections to Montreal Road via

Codd’s Road, Wanaki/Burma, Hemlock Road

• 1.2 km extension of study corridor along Blair Road, north of Montreal Road

• Discuss feasibility of transit service across NRC campus to Wateridge Village

Looking south

CLC LANDS

Former CFB Rockcliffe Community Design Plan

Page 13: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Need and OpportunitiesCurrent transit service operates in mixed traffic, affecting the speed and reliability

Opportunities to improve transit user experience:• Physical measures (bus lanes, queue jumps)• Traffic signal priority, other measures• Bus stop locations and amenities • Bus routing

Opportunities to improve transportation environment for all modes:

• Complete streets design approach• Integrated mobility• Placemaking

13

Page 14: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Integration with Light Rail TransitStudy corridor intersects with two planned LRT Stations:• Blair

(Confederation Line Stage 1 – 2019)• Montreal Road

(Confederation Line Stage 2 – 2024)

Opportunities to improve transit connections between LRT and other destinations

14

Page 15: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Proposed Planning and Design Principles

Transportation Master Plan: Transportation Vision for Ottawa

• Support a reduction in automobile dependence• Support a multi-modal system that is accessible for all

ages and abilities• Support adjacent land uses and future intensification• Sensitive to the natural environment• Enhance the economy• Deliver cost-effective services• A system that can adapt to climate change 15

Page 16: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

16

• Criteria:

• Accessibility for all

• Transportation System Sustainability

• Land-Use and Community Supportive

• Physical and Ecological Sustainability

• Economic Sustainability

Proposed Evaluation Criteria

* Climate Change Mitigation and Adaptation will be considered in all of the categories.

Page 17: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Alternative SolutionsAlternative Solution Description

1 Do Nothing For comparison, includes no modifications orenhancements.

2 Expand Road Capacity Widen roadway, with buses continuing to operate in mixed traffic.

3 Expand Active Transportation Network Expand and enhance pedestrian and cycling routes.

4 Isolated Transit Measures May include bus queue jumps, special bus stop arrangements, transit signal priority.

5 Provide Transit-Only Lanes Exclusive bus transit lanes in each direction byreallocating existing traffic lanes or widening theROW.

6 High-Occupancy Vehicle Lanes

Provide high-occupancy vehicle (HOV) lanes on one or both directions.

7 Rapid Transit Separated Facility

Providing a dedicated, continuous rapid transit facility for rapid transit service.

17* Transportation Demand Management measures will be part of every alternative solution.

Page 18: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Existing Corridor Conditions

18

Existing conditions that will be investigated:

• Natural Environment • Landscape and Urban Design character• Traffic and Transit Volumes/Operations • Geotechnical• Noise, Air Quality and Vibration levels • Areas of Potential Contamination

• Archaeological Resources • Cultural Heritage Resources

Page 19: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

19

Existing Corridor ConditionsLand Use Character

Page 20: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

20

Existing Corridor Conditions: Transit Service

Page 21: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

21

Existing Corridor Conditions: Traffic Conditions

• 25 of 26 intersections (as a "whole") operate at a good level of service LoS 'D' or better, the one exception being Shefford/Montreal Road.

Page 22: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

22

Existing Corridor ConditionsTruck Routes

Page 23: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Existing Corridor Conditions

Intersection of St Laurent and Montreal Road

23

Page 24: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Existing Corridor Conditions

Intersection of Montreal Road and Blair Road

24

Page 25: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Existing Corridor Conditions

Montreal Road between Ogilvie and Shefford

25

Page 26: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Existing Corridor Conditions

Intersection of Blair Road and Ogilvie Road

26

Page 27: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Key Design Considerations

• Accessibility for all• Transit Priority• Pedestrian Facilities• Cycling Facilities • Landscaping/Streetscaping• Storm Water Management• Roadway modifications• Multi-Modal approach to accessibility and

access for all people of all ages (Level of Service analysis)

27

Coventry Road

Page 28: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Accessibility

• Options will be designed to meet the Accessibility for Ontarians with Disabilities Act

(AODA) and the City of Ottawa’s Accessibility Design Standards

• Design elements can include: • Passenger loading areas• Tactile Walking Surface Indicators (TWSI)• Unobstructed sidewalks• Ground and floor surfaces• Resting areas

Page 29: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Transit Priority Measures

29

• Undertaking review of current best practices across North America and the world

• Looking at physical measures:• Exclusive lanes• Queue jumps• Signal priority

Page 30: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Transit Priority Measures

30

• Supporting Elements:• Stop location/spacing• Amenities• Multi-modal integration

Page 31: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Complete Streets Design • In October 2015, City Council approved the

Complete Streets Framework

• Complete Streets offer safety, comfort and mobility for all users of the street regardless of their age, ability, or mode of transportation

• Trade-offs are required

31

Churchill Avenue

Page 32: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Complete Streets Design Scott Street (Holland – Bayview)

• Reallocation of general traffic lanes for dedicated transit and cycling facility

• Example of interim roadway modifications in advance of reconstruction

• Low cost• “Quick Win”

32

Page 33: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Complete Streets Design Main Street

• Constrained right-of-way• Reduction in roadway capacity

• Introduction of raised cycle tracks• Buses operate in mixed-traffic• Design solution for

pedestrian/cyclist conflicts at bus stops

33

Page 34: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Key Challenges• Constrained right-of-way• Active development applications • Utility corridors• Need for affordability in recommended design• Trade-offs in multi-modal accommodation• Others?

34

Page 35: Montreal-Blair Road Transit Priority Corridor Planning and ... 1... · Wateridge Village Community • Connections to Montreal Road via Codd’s Road, Wanaki/Burma, Hemlock Road •

Next Steps

• Incorporate initial feedback, complete existing conditions analysis, transit ridership assessment

– Additional ACG feedback requested by June 21

• Evaluation of Alternative Solutions• Identify Alternative Designs and Prepare Demonstration

Plans • Second round of consultation meetings – Fall 2019• Public Open House #1 – Fall 2019