Prepared by : Maintenance dept .
MONTHLYREPORT January2016FC : MARITIM PRIMA 1 EngineMaintenanceActivity
CONTENT
1. Summary report2. Working hour achievement3. Schedule service4. Schedule check list5. Historycal check list6. Schedule replace wire7. Schedule replace pulley8. Critical item wire - NIL9. Critical item pulley10. Activity maintenance11. WO ( Work Order ) open12. WO ( Work order ) closed13. Inventory spare parts14. Issued spare parts
Department : Maintenance
SUMMARY MONTHLY REPORTMaintenance activity
Report to : Technical superitendent
Cc to : ICDS Manager
Report by : Maintenance planner
Vessel : MARITIM PRIMA 1
Periode : January 2016
Carried out Next maintenance RemarksNo
GROUP : CRANE
Penggantian clamping roller winch Bersamaan pada saat docking ( Partssudah ready )
1
Penggantian safety bearing pulley HR4 dan CR3 W/T parts supply2
Telah di lakukan pengukuran wire dan pulleycrane tgl 17 Des 15 HM 5860
Segera di datangkan untuk pulley C4 C5 Percentage > 100 %3
Telah di lakukan pengecekan wire & pulley tgl 18Jan 16 HM 6030
Monitor4
Perbaikan / penggantian auto lub slewing gear5
Telah di lakukan greasing crane tgl 20 Jan 16HM 6032
Monitor6
Ganti sensor ( MR-031 tgl 25 Des 2015 )7
GROUP : GENERATOR
Telah di lakukan cek list 250 jam MGE 1 tgl 22Jan 16 HM 5057
Monitor1
Prepare service 1000 MGE 2 Februari 20162
Telah di lakukan service AE2 tgl 10 Jan 16 HM6160
Next service HM 66603
Telah di lakukan cek list 250 jam AE2 tgl 22 Jan16 HM 6384
Monitor4
Mereadykan AE 1 CAT Fuel system problem5
GROUP : TRIMMING
Prepare service DZ01 dan DZ02 Mid Januari 20161
Plan service WA01 HM 34782
Telah di lakukan service DZ01 tgl 10 Jan 16 HM4050
Next service HM 43003
Penggantian pinion DZ02 gear oleh UT4
Telah di lakukan cek list 250 jam dan greasingDZ01 tgl 10 Jan 16 HM 4050
Monitor5
Prepared by
Eko untung
Maintenance planner
Acknowledge
Iskak salahudin arief
Technical superitendent
Catatan :1 Pencapaian UA crane bulan Januari 2016 19.31 % dengan jumlah jam kerja crane 139 jam.2 Segera di supply untuk kebutuhan pulley C4 C5
3 Kerusakan pada auto lub segera di atasi , karena mengganggu perawatan pada area slewing bearing .4 Kalibrasi injector & fuel pump AE 1
5 Supply oli engine untuk service MGE2
Pages - 01
SUMMARY PERFORMANCEFC :MARITIM PRIMA 1
Periode : January 2016
Code Current EWHEquipment name Model S/N Current UANo Total EWHYtd
CRANE 90CRANE CBG 45 / 32 165199 12.5%1 6,056
MGE 1 112MAIN GENERATOR ENGINE 1 3512 B S2H00576 15.6%2 4,660
MGE 2 1MAIN GENERATOR ENGINE 2 3512 B S2H00577 0.1%3 2,656
AE 2 381AUXILIARY ENGINE 2 YTG75TLV 52.9%4 6,508
DZ01 69BULLDOZER 01 D31E-20 46310 9.6%5 4,102
WA01 59WHEEL LOADER 1 WA180-A3 55449 8.2%6 3,438
BreakdownOperation Stand by
Total consumption
Trend WO by category
= PA= UA
19.31%
Trendline Error
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
Jan
Trend PA - UA Crane
139
0
557
0
100
200
300
400
500
600
Jan
Trend HM crane
Category Total Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Oil & grease 109 109
Filter 7 7
Gearbox,83%
Wire &pulley,17%
Trend maintenance
Preventive / service Corrective / repair Modification / AccidentOver haul / Recondition Others
-2
Pages - 02
SCHEDULE SERVICE
Up date : Monday-01-February-2016
FC : MARITIM PRIMA 1
RunningCode
HM DateInterval
Last serviceHM Date
Next serviceHM Date
Hyd craneCRANE-HYD 19-Jan-166030 4000 3995 11-Mar-15 7995 23-Sep-16
Hyd trimmingDZ01-HYD 19-Jan-164084 2000 2524 12-Dec-14 4524 06-May-16
DZ02-HYD 30-Nov-152422 2000 1052 12-Dec-14 3052 12-Jun-16
WA01-HYD 19-Jan-163420 2000 2045 24-Dec-14 4045 25-Jun-16
PTO trimmingDZ01-PTO 19-Jan-164084 1000 3087 10-Apr-15 4087 02-Feb-16
WA01-PTO 19-Jan-163420 1000 2576 14-Apr-15 3576 08-Mar-16
DZ02-PTO 30-Nov-152422 1000 1601 08-Apr-15 2601 10-Mar-16
Service craneCRANE 29-Jan-166056 500 5860 17-Dec-15 6360 12-Mar-16
Service generatorAE 2 29-Jan-166508 500 6160 10-Jan-16 6660 13-Feb-16
MGE 2 29-Jan-163098 1000 2198 15-Dec-14 3198 27-Feb-16
MGE 1 29-Jan-165092 1000 4788 27-Nov-15 5788 12-May-16
Service trimmingWA01 29-Jan-163438 250 3228 30-Oct-15 3478 12-Feb-16
DZ02 29-Jan-162422 250 2268 30-Oct-15 2518 27-Feb-16
DZ01 29-Jan-164102 250 4050 10-Jan-16 4300 21-Mar-16
Remarks : ActionWarning
Remarks : OverdueNormal
94.77%104.74%
49.94%
105.40% 103.71% 107.20%119.80%
99.43%
0.00%
30.00%
60.00%
90.00%
120.00%
150.00%
AE 2 CRANE CRANE-HYD DZ01 DZ02 MGE 1 MGE 2 WA01
Accurated service
Pages - 03
PLAN_SCHEDULE_CHECKLIST
FC NAME : MARITIM PRIMA 1 PERIODE : February-2016
Code IntevalActivity check listQuarter 1
Last checkCategoryNoQuarter 2 Quarter 3 Quarter 4
Planning schedule
CRANE 3000PEMERIKSAAN SLW BEARING 26-Jan-16CRANE1 22-Feb-17 21-Mar-18 18-Apr-19
2000CHECK LIST CRANE 2000 JAM 06-Feb-162 24-Oct-16 13-Jul-17 01-Apr-18
1000CHECK LIST CRANE 1000 JAM 06-Feb-163 16-Jun-16 25-Oct-16 05-Mar-17
100CHECK LIST WIRE PULLEY 11-Feb-1618-Jan-164 24-Feb-16 08-Mar-16 21-Mar-16
100CHECK LIST GREASING CRANE 11-Feb-1624-Jan-165 24-Feb-16 08-Mar-16 21-Mar-16
500CHECK LIST CRANE 500 JAM 12-Mar-1616-Dec-156 16-May-16 21-Jul-16 24-Sep-16
AE 2 250CHECK LIST GENERATOR 250 JAM 11-Feb-1622-Jan-16GENERATOR7 01-Mar-16 19-Mar-16 07-Apr-16
1000CHECK LIST GENERATOR 1000 JAM 02-Mar-1628-Dec-158 17-May-16 31-Jul-16 15-Oct-16
2000CHECK LIST GENERATOR 2000 JAM 17-May-1628-Dec-159 15-Oct-16 15-Mar-17 13-Aug-17
4000CHECK LIST GENERATOR 4000 JAM 25-May-1610 23-Mar-17 19-Jan-18 16-Nov-18
3000CHECK LIST GENERATOR 3000 JAM 31-Jul-1628-Dec-1511 15-Mar-17 27-Oct-17 11-Jun-18
MGE 1 250CHECK LIST GENERATOR 250 JAM 03-Mar-1622-Jan-1612 08-Apr-16 14-May-16 19-Jun-16
1000CHECK LIST GENERATOR 1000 JAM 15-May-1604-Dec-1513 06-Oct-16 28-Feb-17 22-Jul-17
3000CHECK LIST GENERATOR 3000 JAM 12-Jun-1614 19-Aug-17 26-Oct-18 01-Jan-20
2000CHECK LIST GENERATOR 2000 JAM 12-Jun-1615 27-Mar-17 10-Jan-18 26-Oct-18
4000CHECK LIST GENERATOR 4000 JAM 27-Mar-1716 26-Oct-18 25-May-20 23-Dec-21
MGE 2 1000CHECK LIST GENERATOR 1000 JAM 27-Feb-1617 09-Nov-16 23-Jul-17 05-Apr-18
250CHECK LIST GENERATOR 250 JAM 14-Mar-1629-Nov-1518 17-May-16 20-Jul-16 22-Sep-16
4000CHECK LIST GENERATOR 4000 JAM 19-Sep-1619 10-Jul-19 28-Apr-22 15-Feb-25
2000CHECK LIST GENERATOR 2000 JAM 23-Sep-1620 17-Feb-18 14-Jul-19 07-Dec-20
3000CHECK LIST GENERATOR 3000 JAM 20-Feb-1829-Nov-1521 29-Mar-20 06-May-22 11-Jun-24
DZ01 250GREASING CHECK LIST 21-Mar-1610-Jan-16TRIMMING22 21-May-16 22-Jul-16 21-Sep-16
250CHECK LIST DOZER 250 JAM 21-Mar-1610-Jan-1623 21-May-16 22-Jul-16 21-Sep-16
500CHECK LIST DOZER 500 JAM 21-May-1610-Jan-1624 21-Sep-16 22-Jan-17 25-May-17
1000CHECK LIST DOZER 1000 JAM 21-Sep-1610-Jan-1625 25-May-17 26-Jan-18 29-Sep-18
DZ02 500CHECK LIST DOZER 500 JAM 24-Feb-1626 07-Jul-16 18-Nov-16 02-Apr-17
250GREASING CHECK LIST 27-Feb-1627 04-May-16 10-Jul-16 15-Sep-16
250CHECK LIST DOZER 250 JAM 27-Feb-1628 04-May-16 10-Jul-16 15-Sep-16
1000CHECK LIST DOZER 1000 JAM 07-Jul-1629 02-Apr-17 26-Dec-17 20-Sep-18
WA01 250GREASING CHECK LIST 10-Feb-1630 17-Apr-16 22-Jun-16 28-Aug-16
250CHECK LIST LOADER 250 JAM 10-Feb-1631 17-Apr-16 22-Jun-16 28-Aug-16
500CHECK LIST LOADER 500 JAM 21-Feb-1632 03-Jul-16 13-Nov-16 26-Mar-17
1000CHECK LIST LOADER 1000 JAM 03-Jul-1633 26-Mar-17 17-Dec-17 09-Sep-18
Remarks : ActionPrepare
Pages - 04
HISTORYCAL_CHECKLIST
FLOATING NAME : MARITIM PRIMA 1 PERIODE : January - 2016
DATEINTERVAL
HMCODEHM DATE HM
INDICATORACTIVITY_NAMEPLAN ACTUAL
CATEGORY: CRANE
16-Dec-15100CRANE 5960 18-Jan-16 6030 70.00%CHECK LIST WIRE PULLEY
18-Dec-15100CRANE 5860 24-Jan-16 6032 172.00%CHECK LIST GREASING CRANE
CATEGORY: GENERATOR
28-Dec-15250AE 2 5906 22-Jan-16 6384 191.20%CHECK LIST GENERATOR 250 JAM
30-Nov-15250MGE 1 4810 22-Jan-16 5057 98.80%CHECK LIST GENERATOR 250 JAM
CATEGORY: TRIMMING
26-Mar-151000DZ01 3010 10-Jan-16 4050 104.00%CHECK LIST DOZER 1000 JAM
08-Aug-15500DZ01 3513 10-Jan-16 4050 107.40%CHECK LIST DOZER 500 JAM
01-Nov-15250DZ01 3757 10-Jan-16 4050 117.20%CHECK LIST DOZER 250 JAM
01-Nov-15250DZ01 3757 10-Jan-16 4050 117.20%GREASING CHECK LIST
Remarks : OverdueRight
SummaryCATEGORY FREQ ( Ttl ) IND ( Avg )
CRANE 2 121.00%
GENERATOR 2 145.00%
TRIMMING 4 111.45%
Page 1 of 1
Pages - 05
SCHEDULE REPLACE WIREFC : MARITIM PRIMA 1
Code Checked dateHM Date
Last replace
HM Date
Plan replaceMeas Limit %
Lifetime
WIRE CLOSINGC RHL 18-Jan-16 5,362 12-Oct-15 7,362 27-May-16 31.5 30.0 50% 694
C LHL 18-Jan-16 5,362 12-Oct-15 7,362 05-Jun-16 31.6 30.0 47% 694
WIRE GRABGrab RHL-FB 18-Jan-16 5,084 16-Aug-15 6,084 19-Mar-16 31.4 30.0 53% 972
Grab LHL-FB 18-Jan-16 5,084 16-Aug-15 6,084 14-Mar-16 31.3 30.0 57% 972
WIRE HOLDINGH RHL 18-Jan-16 4,309 14-Apr-15 6,309 14-Jun-16 31.7 30.0 43% 1,747
H LHL 18-Jan-16 4,309 14-Apr-15 6,309 23-Jun-16 31.8 30.0 40% 1,747
WIRE LUFFINGLFF 18-Jan-16 5,184 11-Sep-15 7,684 23-Aug-16 34.0 32.0 33% 872
Remarks : ActionWarning
ROB_WIRE ROPE
Part number DescriptionCode ROBNo
32mmx148mtr ( C LHL ) Wire closingC LHL 11
32mmx148mtr ( C RHL ) Wire closingC RHL 12
32mmx19mtr ( Grab LHL ) Wire grabGrab LHL 13
32mmx19mtr ( Grab RHL ) Wire grabGrab RHL 14
32mmx19mtr ( Grab RHL )-FB Wire grab fabrikasiGrab LHL-FB 15
32mmx19mtr ( Grab LHL )-FB Wire grab fabrikasiGrab RHL-FB 16
32mmx148mtr ( H LHL ) Wire holdingH LHL 17
32mmx148mtr ( H RHL ) Wire holdingH RHL 18
Pages - 06
SCHEDULE REPLACE PULLEYFC : MARITIM PRIMA 1
CODE LIMITHM DATE HM DATE
LAST REPLACE PLAN REPLACE
DATE MM % LIFE IMP DEF
MEASUREMENT RESULTNO
C 3 NO60 2193 24-Jul-14 4193 18-Jan-16 57.6 52% 3863 NO22-May-161
C 4 NO165 2193 24-Jul-14 4193 18-Jan-16 173.2 264% 3863 YES14-Nov-142
C 5 NO165 2193 24-Jul-14 4193 18-Jan-16 170.1 202% 3863 YES25-Apr-153
C 6 NO60 2193 24-Jul-14 4193 18-Jan-16 58.6 72% 3863 NO31-Mar-164
CF 6 NO60 0 01-Apr-13 2000 18-Jan-16 57.7 54% 6056 NO17-May-165
CF 7 NO60 2193 24-Jul-14 4193 18-Jan-16 57.1 42% 3863 NO17-Jun-166
CR 2 NO60 0 01-Apr-13 2000 18-Jan-16 58.0 60% 6056 NO01-May-167
CR 3 NO60 3869 24-Feb-15 5869 18-Jan-16 56.5 30% 2187 NO19-Jul-168
E 1-ER NO60 3869 24-Feb-15 5369 18-Jan-16 57.5 50% 2187 YES25-Apr-169
E 2 NO60 3869 24-Feb-15 5869 18-Jan-16 59.7 94% 2187 YES02-Feb-1610
EF 1-ER NO60 5184 11-Sep-15 6684 18-Jan-16 57.2 44% 872 NO06-May-1611
EF 2-ER NO60 5184 11-Sep-15 6684 18-Jan-16 56.4 28% 872 NO07-Jun-1612
ER 1-ER NO60 4710 08-Jun-15 6210 18-Jan-16 57.5 50% 1346 YES25-Apr-1613
H 1 NO100 2193 24-Jul-14 4193 18-Jan-16 97.4 48% 3863 NO02-Jun-1614
H 2 YES60 2193 24-Jul-14 4193 18-Jan-16 58.4 68% 3863 NO10-Apr-1615
H 7 YES60 2193 24-Jul-14 4193 18-Jan-16 58.4 68% 3863 NO10-Apr-1616
H 8 NO100 2193 24-Jul-14 4193 18-Jan-16 98.8 76% 3863 NO20-Mar-1617
HF 5 NO60 0 01-Apr-13 2000 18-Jan-16 57.0 40% 6056 NO23-Jun-1618
HF 8 NO60 2193 24-Jul-14 4193 18-Jan-16 57.0 40% 3863 NO23-Jun-1619
HR 1 NO60 3697 30-Jan-15 5697 18-Jan-16 59.0 80% 2359 NO10-Mar-1620
HR 4 NO60 0 01-Apr-13 2000 18-Jan-16 57.7 54% 6056 NO17-May-1621
= Warning = ActionRemarks :
ROB_PULLEY ROPE
PARTS NUMBER DESCRIPTIONCODE ROBNO
929796214-C4 ( Ex repair ) Pulley closingC 4-ER 11
929796214-CF6 ( Ex repair ) Pulley closingCF 6-ER 12
Pages - 07
CRITICAL WIRE ROPEFC :
Monday, February 01, 2016
CODE %GROUP LIMITMEAS REASONNO CHECKED LIFE TIME
1
Remarks : Only for percentace 80% - up / life time 2000 hrs - up / Damages
Pages - 08
CRITICAL PULLEY ROPEFC : MARITIM PRIMA 1
Monday, February 01, 2016
CODE %GROUP LIMITMEAS REASONNO CHECKED LIFE TIME
C 4 264%PULLEY CLOSING 165.0173.2 DEPTH1 18-Jan-16 3863
C 5 202%PULLEY CLOSING 165.0170.1 DEPTH2 18-Jan-16 3863
E 2 94%PULLEY LUFFING 60.059.73 18-Jan-16 2187
H 7 68%PULLEY HOLDING 60.058.4 DEFLECTION4 18-Jan-16 3863
H 2 68%PULLEY HOLDING 60.058.4 DEFLECTION5 18-Jan-16 3863
ER 1-ER 50%PULLEY LUFFING 60.057.56 18-Jan-16 1346
E 1-ER 50%PULLEY LUFFING 60.057.57 18-Jan-16 2187
Remarks : Only for percentace 100% - up / Imprint / Deflection
Pages - 09
ACTIVITY MAINTENANCE
Januari 2016PERIODE :
FC NAME : MARITIM PRIMA 1
Start Total hrsEndNo Job descriptionDate
Name : Ahmadi
08.00 4.0012.001 Ganti oli AGG 213-Jan-16
08.00 4.0012.002 Cek oli gearbox dan cek temp14-Jan-16
08.00 4.0012.003 Cek oli gearbox dan cek temp15-Jan-16
08.00 4.0012.004 Cek oli gearbox dan cek temp , naikan boom rest16-Jan-16
08.00 4.0012.005 Check pulley dan wire18-Jan-16
08.00 4.0012.006 Bantu chipping deck19-Jan-16
08.00 4.0012.007 Bantu chipping deck20-Jan-16
08.00 4.0012.008 Bantu chipping deck21-Jan-16
08.00 4.0012.009 Bantu chipping deck , greasing slewing bearing22-Jan-16
08.00 9.0017.0010 Greasing jib dan top crane24-Jan-16
08.00 4.0012.0011 Cek oli gearbox crane , cek temp25-Jan-16
08.00 4.0012.0012 Cek oli gearbox crane , cek temp26-Jan-16
08.00 6.0014.0013 Ganti bushing wire grab29-Jan-16
08.00 6.0014.0014 Greasing slewing bearing30-Jan-16
Name : Handoko
08.00 5.0013.001 Cleaning engine room , cleaning deck11-Jan-16
08.00 5.0013.002 Ganti filter primary MGE 2 , add air accu MGE 1 dan MGE 2 , cleaning MGE 112-Jan-16
08.00 5.0013.003 Cleaning purifier , clamp pipa hyd depan , cek MGE213-Jan-16
08.00 5.0013.004 Ganti lampu halogen , cleaning engine room , cek temp crane14-Jan-16
08.00 5.0013.005 Cleaning enigne room , cek temp crane15-Jan-16
08.00 5.0013.006 Cleaning engine room , cek MGE 116-Jan-16
08.00 4.0012.007 Cleaning engine room17-Jan-16
08.00 9.0017.008 Bantu ukur wire pulley18-Jan-16
08.00 4.0012.009 Cek battery MGE dan repair kepala battery19-Jan-16
08.00 4.0012.0010 Cleaning pump20-Jan-16
08.00 4.0012.0011 Cek AE 221-Jan-16
08.00 4.0012.0012 Cek AE 2 dan bantu greasing slewing crane22-Jan-16
08.00 4.0012.0013 Bantu cleaning pulley spare23-Jan-16
08.00 4.0012.0014 Cek battery MGE24-Jan-16
08.00 2.0010.0015 Cek MGE 1 , ok25-Jan-16
08.00 2.0010.0016 Cek MGE 1 , ok26-Jan-16
08.00 2.0010.0017 Cek MGE 1 , ok27-Jan-16
08.00 4.0012.0018 Cleaning MGE 1 dan AE 228-Jan-16
08.00 6.0014.0019 Ganti bushing wire grab29-Jan-16
08.00 4.0012.0020 Cek MGE 1 , AE 230-Jan-16
Name : Yohanes S
08.00 4.0012.001 Cleaning air cleaner , cek pin dozer / oader11-Jan-16
Page 1 of 2
Pages - 10
Start Total hrsEndNo Job descriptionDate
08.00 4.0012.002 Greasing slewing dan grab12-Jan-16
08.00 4.0012.003 Greasing dozer / loader12-Jan-16
08.00 4.0012.004 Greasing dozer / loader , cek pin ..??13-Jan-16
08.00 4.0012.005 Cleaning air cleaner , cleaning air cleaner , cek semua oli14-Jan-16
08.00 4.0012.006 Cek semua oli15-Jan-16
08.00 4.0012.007 Cek semua oli16-Jan-16
08.00 6.0014.008 Cleaning air cleaner , cleaning air cleaner , cek semua oli18-Jan-16
08.00 4.0012.009 Add oli TM dozer19-Jan-16
Name : Zainal hairun
13.00 4.0017.001 Ganti oli AGG13-Jan-16
13.00 2.3015.302 Cek oil gear box & instal gear cooler13-Jan-16
08.00 9.0017.003 Cek temp , greasing slewing , cek oil gearbox,14-Jan-16
08.00 9.0017.004 Cek temp , greasing slewing15-Jan-16
08.00 8.0016.005 Cek wire pulley17-Jan-16
08.00 9.0017.006 Cek oil gearbox , greasing slewing bearing24-Jan-16
08.00 2.3010.307 Cek bushing wire grab28-Jan-16
Schedule98%
Unschedule2%
Schedule vs Un schedule
Gearbox86%
Wire & pulley14%
Work by group
PercentageName Total hours
Total working hrs
36.3%Handoko 87.00
27.1%Ahmadi 65.00
18.2%Zainal hairun 43.60
15.8%Yohanes S 38.00
* Productivity = Jumlah mechanic x 8 jam x 30 hari / total jam kerja
Page 2 of 2
WORK ORDER OPEN
Periode : January-2016
FC :MARITIM PRIMA 1
WO date Group Reason of WO DurationNo WO no Code
PPM midlife 6000 hrs engine generator CAT C4.4 ( Readjusting fuel system , valve inlet , outlet )08-Jan-15 PPM midlife 6000 hrs 3901 WO-000163 AE 1
Motor traveler FWD STB broken / crack ( Take seal dan instalto motor traveler ex repair ) dan instal mtr traveler to winchmoring FWD STB
04-Jun-15 Motor traveler 2432 WO-000241 WINCH
Switch shaft moring winch from AFT to FWD14-Sep-15 SHAFT SEAL 1413 WO-000267 WINCH
MORING
Page 1 of 1
Pages - 11
WORK ORDER COMPLETED
January 2016Periode :
FC :MARITIM PRIMA 1
WO NO REASON FOR WO MATERIAL USAGESTART FINISHUNIT CODE AGING
WO-000284Periodical service crane ( PlanHM 5862 )
All filter insert14-Dec-15 17-Jan-16CRANE
34
Oli spirax 90 180 ltr
WO-000286Periodical service Oil filter
11-Jan-16 11-Jan-16AE 20
Fuel filter
Oil engine
WO-000287Periodical service Fuel filter
11-Jan-16 12-Jan-16DZ011
Oil engine
Oil filter
Page 1 of 1