Monthly Progress Report December-2014
Independent Engineer services for Two Laning of Khagaria-Purnea Section from Km 270.000
to Km 410.000 in the State of Bihar under NHDP – III on Design, Built, Finance, Operate and
Transfer (DBFOT) Annuity Basis.
Submitted To:
Project Director National Highway Authority of India Khagaria Purnea Road Project (NH-31) Begusarai (Bihar)
Submitting Firm:
BLOOM COMPANIES LLC
Shiva Bhawan Compound
Shiva Laxmi Colony Off Police Line Road Bhagalpur (812001)
December,31- 2014
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY BASIS
TABLE OF CONTENTS
CHAPTER PAGE
1.0 EXECUTIVE SUMMARY�������������������������......1-1
2.0 INTRODUCTION ........................................................................................................ 2-3
3.0 GENERAL PROJECT INFORMATION AND ORGANIZATION STRUCTURE ............ 3-4
4.0 SALIENT FEATURES OF PROJECT .......................................................................... 5-5
5.0 CONTRACT MANAGEMENT FREMEWORK ............................................................. 6-6
6.0 DETAILS OF THE PROJECT ..................................................................................... 7-7
7.0 PRE-CONSTRUCTION ACTIVTIY .............................................................................. 8-9
8.0 STATUS OF SUBMITTALS..................................................................................... 10-10
9.0 PLANT EXTABLISMENT ........................................................................................ 11-11
10.0 SCOPE OF WORK AT A GLANCE ......................................................................... 11-11
11.0 PHYSICAL & FINANCIAL PROGRESS .................................................................. 12-15
12.0 QUANTITY PROGRESS CHART ........................................................................... 16-19
13.0 STRUCTURE PROGRESS & PROGRESS CHART ............................................... 20-21
14.0 MAINTENANCE OF ROAD ..................................................................................... 22-22
15.0 MIX DESIGN & MATERIAL STOCKED AT SITE .................................................... 23-23
16.0 PLANT & MACHINERY DETAILS ........................................................................... 24-24
FIGURES Figure 1: Location Map
Figure 2: Project Organization Structure
Figure 3: List of Staff Employee for IE Team APPENDICES Appendix A - Minutes of Meetings
Appendix B - Site Inspection Report
Appendix C - Summary of Test Results
Appendix D - Non Conformance Report (NCR)
Appendix E - Layer Chart
Appendix F - Weather Report
Appendix G - Site Photo Graphs
December’31, 2014 Page 1
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
1.0 EXECUTIVE SUMMARY
National Highway Authority of India (NHAI), under NHDP Phase - III programme, has
awarded the work of the development Maintenance and management of Khagaria - Purnea
Section of National Highway No. NH-31 from Km 270+000 to KM 410+000 in the state of
Bihar on BOT (annuity) on DBFOT pattern to M/s Khagaria-Purnea Highway Project Ltd. The
date of concession agreement was 08.04.2011 and the Appointment date 04.10.2011 (180 days
after the concession agreement) with Project completion date as 02.04.2014 (910 days form
appointed date)
As per Contract, 34 months (100% of the Contract Period) period has elapsed since the
appointment date and work has been completed by the Concessionaire, except in part of
Pasraha section from Ch. 307+500 to Ch Km 316+200 (Length 8.7 Km). The project highway
between Km 270.000 to Km 307.500 and Km 316.200 to Km 410.000 has already beeHn
declared fit for entry into commercial operation w.e.f 04.11.2013 on the basis of issue of
Provisional Completion Certificate. For completing the balance work in the above mentioned
stretch of project highway, a Supplementary Agreement has been made on 08th Feb. 2014
between the Concessionaire and NHAI. The Operation and Maintenance (O&M) period of the
project for the IE has commenced from 1st December 2014.
The Financial progress achieved and the target for January’2015 is as given below:
Elapsed
contract
period in
% age
Cumulative
planned
progress Up
to Dec-14
(Cr)
Cumulative
planned
progress Up to
Dec -14
% age.
Cumulative
achieved
progress
(Cr)
Cumulative
achieved
progress
% age
Cumulative
Slippage
% age
Target for
Jan-15
% age.
100 613.00 100.00 608.58 99.28 (-) 0.72 0.72
Considering the backlog of -0.72 % the Concessionaire has been notified to augment their
resources so that the project may be completed as per the schedule.
December’31, 2014 Page 2
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
2.0 INTRODUCTION
The National Highway Authority of India has appointed Bloom Companies LLC, USA, to act as
Independent Engineer (IE) for implementation of DBFOT project under NHDP Phase - III
programme, for development Maintenance and management of Khagaria - Purnea Section of National
Highway No. NH-31 from Km 270+000 to KM 410+000 in the state of Bihar. As an IE, Bloom
Companies LLC will independently review activities associated with design, design review, during
construction, required quality assurance and quality control tests and operation and maintenance of the
project on behalf of both NHAI and Concessionaire so as to ensure compliance of the requirements of
the provisions of Concession Agreement.
The works in this project involves construction of 2-lane highway with paved shoulders including
Bridges; widening and rehabilitation of bridges and culverts; construction of high embankment /
elevated structures / wayside amenities etc. along the existing highways including provision of
realignment and bypasses.
Some of the salient features of the project are as follows:
(a) Total length of the project is 140 Km and in the same stretch there is 13.444 Km of service road ( adding both side length of service road).
(b) The realignment had to be done at 5 locations.
(c) There are 2 Toll Plaza in the project.
(d) The other facilities on the project include - 6 Truck Lay-byes, 6 Bus byes / Shelters and 2 traffic aid points etc.
There are 5 Major Bridges on the project which has been rehabilitated. Repair/ widening have been
done for 5 minor bridges. There are 4 ROBs in the project which have been repaired. There are 30
culverts, out of these culverts some were newly proposed, some are retained, some were reconstructed
and some widened.
During construction smooth and safe flow of existing traffic had been ensured. Diversions for Bridges
were provided for smooth and safe movement of traffic on the road.
December’31, 2014 Page 3
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Associated works include construction of Toll Plaza, Bus Lay Byes, Drainage and Protection Works,
Traffic safety features, Road Signs and Road markings, Environmental mitigation measures,
Retaining/Breast walls.
National Highway no. NH-31 is one of the major connecting links of North India with North East and
west Bengal. It connects Assam. East Bengal, Bihar, and Jharkhand. The Khagaria Purnea project
being the part of NH-31 Its shares very large volume of traffic. The Khagaria-Purnea road lays
northern side of the Ganga river. The terrain condition is absolutely plain with intermittent populated
village. Since it lies in the genetic plain, the soil is alluvial.
The contract agreement was signed between National Authority of India and Bloom Companies, LLC
USA on March07, 2012. Independent Engineer was mobilized to the project on 9th March 2012, and
established the offices at Bhagalpur considering the proper & effective communication with the
concessionaire and the field staff.
3.0 General project information and organization structure
Two Laning of Khagaria-Purnea section of NH-31 lies in Gangetic plain, parallel to Ganga River and
Railway track. The road passes through flat terrain on low land. The general ground profile slopes
from north to south in these area water accumulations on general ground profile slopes from northern
to southern in the area water accumulated on north side of the road because of inadequate cross
drainage. Some portion of project stitches is under submergence for long time in a year. The area is
generally flooded with water spill from Kosi and GangaRiver during monsoon and causes
deterioration. One of the stretches called Pashraha area suffers road failure due to subsidence and
depression. Some where the Railway track along the road causes water logging.The project stretch has
fairly straight alignment and a very few curves and there is no drastic change in gradient. There are
number of cross road mostly NH and SH With large number of access road. The road has very poor
road facilities and hazardous junctions.
December’31, 2014 Page 4
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
The Pavement Composition and Condition of Existing road:
Existing Condition:
Existing Carriageway width is about 7.0m with 1.0m Shoulder on either side. By various survey
results carried out these are the following inference.
Existing Pavement conditions is in traffic worthy conditon.
Pavement Composition:
(a) In Widening Area and New Construction:
75MSA-7%CBR:
GSB-230MM 230MM
WMM-250MM 250MM
DBM-137.50MM 140MM
BC-45MM 45MM
75MSA-8%CBR:
GSB-200MM 200MM
WMM-250MM 250MM
DBM-130MM 130MM
BC-45MM 45MM
(b) Crust in Overlay Portion:
DBM BC
70 mm 45 mm
December’31, 2014 Page 5
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
4.0 SALIENT FEATURES OF PROJECT:
Project Title Two laning with paved shoulder of Khagaria - Purnea Section of NH-31 from Km. 270.000 to Km 410.000 in the state of Bihar to be executed as BOT (annuity) on DBFOT pattern under NHDP Phase III project.
Letter of Award No. NHAI/BOT/11012/26/2004/16963
Letter of Award Date 15.02.2011
Concession Agreement no.
Date of Concession agreement 08.04.2011
Client / Employer/Authority NHAI, G-5 & 6, Sector 10, Dwarka, New Delhi -110075.
Concessionaire Khagaria-Purnea Highway Project Ltd, Punj Lloyd House, 17-18, Nehru Place, New Delhi -110019.
EPC Contractor Punj Lloyd Ltd.
Sub Contractor APCO Infratech Ltd
Independent Engineer M/s BLOOM Companies, LLC, USA
Estimated Project Cost 664.00 Crores
Performance Security 33.20 Crores
Appointed Date 05.10.2011 (declared on 19th Dec, 2011)
Schedule Two Lanning Date (Project Completion Date)
02.04.2014 (910 days from Appointed Date)
Concession period 17 years
Pre. COD 4th Nov-2013
Completion Certificate 3rd Feb-2014
December’31, 2014 Page 6
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
5.0 Contract Management Framework
There are three key players in Contract Management frame work
1. NHAI
2. Concessionaire (KPHPL)
3. Independent Engineer (Bloom Companies LLC,USA)
• The Concessionaire has to supervise, monitor, direct and control activities of Construction
Contractor.
• The Concessionaire has appointed M/S Neel Construction Links as Design Consultant.
• The NHAI appointed M/s Bloom Companies LLC as an Independent Engineer. IE has various
duties and roles set out in Concession Agreement. The object is to act independently and on
behalf of NHAI.
Construction
Contractor M/s Apco
Infratech Pvt. Ltd.
NHAI Concessionaire Khagaria-Purnea
Highway Project Ltd.
Design Consultant
M/s Neel
Construction Links
Independent Engineer
Bloom Companies LLC
EPC
Contractor
M/s Punj Lloyd
Ltd.
December’31, 2014 Page 7
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
6.0 DETAILS OF THE PROJECT
6.1 Details of Road Road Length 140.00 Km
Service Road (Adding LHS and RHS) 13.444 Km
Realignment of existing Road 5 Location
Major Intersections 7 Nos.
Minor Junction 11 Nos.
Pavement Type Flexible
6.2 Project Facilities TollPlaza 2 Nos.
Truck Lay –byes 6 Nos.
Bus byes / Shelter 6 Nos.
Traffic Aid post 2 Nos.
6.3 Bridge Details Major Bridges Repair 5 Nos.
Minor Bridge Rehabilitation / Repair / widening 5 Nos.
ROB (Repairs) 4 Nos. (Construction NIL)
Slab Culvert (New, retained and widened) 30 Nos.
6.4 ROW Location Existing ROW as in contract Agreement
270.000 to 287.400 60 m
287.400 to 288.100 45 m
288.100 to 301.000 60m
301.000 to 317.500 60m
317.500 to 410.00 60m
6.5 REALIGNMENT SECTION
Existing Chainage 280.250 – 280.650 length: 400 m
Existing Chainage 352.000 - 352.500 length: 520 m
Existing Chainage 379.270 – 380.320 length: 920 m
Existing Chainage 389.230 – 389.590 length: 360 m
PashrahaZone 301.000- 317.500 length:16.50 Km
Total Realignment: 18.70 km
December’31, 2014 Page 8
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
7.0 PRE-CONSTRUCTION ACTIVITY:
7.1 Land Availability and utility Shifting
Sl.No. Description of Work
STATUS
1
Land Acquisition
3A:- Completed for entire Section. 3D:- Completed 3G:-Completed and submitted to NHAI. Toll Plaza Land and additional 10m ROW required from Km 309- Km 317. Chakrami Village- encumbrance problem Km 313.500 to Km 314.500.
2
Handing over of land
97 % of land (up to Toe) is handed over by NHAI, PIU- Begusarai on 17.11.2011, the balance land in Chakrami section is under process of land acquisition.
3
Utility Shifting Completed
7.2 Design and Investigation Details
Sl.No. Description of Work
STATUS
1 Traffic Survey Completed
2 Inventory Completed
3 Topographical Survey Complete
4 Centre line marking 140 KM
5 OGL 140 KM
December’31, 2014 Page 9
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
7.3 Utility Shifting Status
Sl.No Particulars Work done up to previous Month
Work done During the Month
Cumulative Work done up to this
Month
1 BSEB
Khagaria All Complete Completed
Bhagalpur All Complete Completed
Katihar All Complete Completed
Purnea All Complete Completed
7.4 Status of Permission and Approvals as per schedule – E
Sr. No. Description Remarks
1. Applicable permit as per schedule - E a. Permission of the state Government for extraction of
boulder from quarry NA as aggregate is purchased from suppliers.
b. Permission of Village Panchayat and Pollution control board for installation of crusher.
NA as aggregate is purchased from suppliers.
c. License for use of explosives
NA as aggregate is purchased from suppliers.
d. Permission from State government for drawing water from river/reservoir.
NOC for bore well is granted by village Panchayat. No need of permission for reservoir.
e. License from Inspector of factories or competent authorities for setting up Batching Plant.
Permission granted by PCB, Bihar
f. Clearance from Pollution control board for Setting up Batching Plant.
Permission granted by PCB, Bihar
g. Permission of Village Panchayat and Pollution control board for Asphalt Plant.
NOC from Village Panchayat Obtained Permission granted by PCB, Bihar
h. Permission of Village Panchayat and State Government for Borrow earth.
Obtained
i. Permission of State Government for Cutting trees.
Permission is granted and are under cost estimate of tree cutting.
j. Any other permits or clearances required under Applicable Laws
Concessionaire shall comply with the same as and when required
2 Environmental Clearance for project: NA
December’31, 2014 Page 10
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
8.0 Status of Submittals & Correspondence Table 8.1: Correspondance from the Consessionaire for the M/o December-14
Table 8.2: Correspondance from the I.E. for the M/o December -14
S.No Letter Ref. Description Date of
Received
Response
Date
Comments/Reply
Letter Ref.
1 KPHPL/PM/2014/1645 Submission of MPR for the month of
November 2014 06.12.2014
2 KPHPL/PM/2014/1648 Construction of bus byes and bus
shelter 11.12.2014 17.12.2014
Bloom/Bi/Kha-Pur/TL-
PL/12/2014/ 1060
3 KPHPL/PM/2014/1647
compliance/ clarification on work zone
safety audit report submitted by safety
consultant reply and compliance
11.12.2014
4 KPHPL/PM/2014/1649 Permission for siren for Highway
Patrolling vehicles 20.12.2014
5 KPHPL/PM/2014/1652 Construction of bus byes and bus
shelter -Reg. 27.12.2014
S.N
o Letter Ref. Description
Date of
Received
Response
Date
Comments/Reply
Letter Ref.
1 Bloom/Bi/Kha-Pur/TL-
PD/12/2014/1058
Construction of Bus byes and Bus
Shelter –Reg 11.12.2014
2 Bloom/Bi/Kha-Pur/TL-
PD/12/2014/1059
Submission of Monthly progress
report for the M/o November 2014 &
Quarterly progress report (Quarter
ending from September to November
2014
12.12.2014
3 Bloom/Bi/Kha-Pur/TL-
PL/12/2014/ 1060
Omission of Bus bye and Bus Shelter
at Km 315+390 as per CA schedule C
and Changing location–Reg
17.12.2014
4 Bloom/Bi/Kha-Pur/TL-
PL/12/2014/1061
Site Inspection Report on 15th and
16th December’2014-Reg. 17.12.2014
5 Bloom/Bi/Kha-Pur/TL-
PL/12/2014/1062
Construction of Public facilities, i.e.
Traffic Aid Post, Medical Aid Post and
Washroom at Toll Plaza in the MPR-
Reg.
20.12.2014
December’31, 2014 Page 11
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
9.0 Plant Establishment S.N. Description of plant Status
1 Crusher Plant (200 TPH) Established at Sakrigali and is functioning
2 Camp Establishment / Site Offices
Concessionaire / EPC
Established at ChanakyaVihar, Bhagalpur
Sub-Contractor
1) Established at Rangra (km 348 RHS)
2) Established atDayalpur(Km 324.050 RHS)
3 Hot Mix Plant (200TPH) 1) Established at Dayalpur (Km 324.050 RHS)
10.0 Scope of Work at a Glance
Sr. No. Particulars
Units Scope
Highway (Main Carriage Way)
1 Clearing & Grubbing KM 140.000
2 Embankment KM 140.000
3 Sub grade KM 140.000
4 GSB KM 140.000
5 Kerb Casting KM 25.00
6 DLC @ Both T.P. KM 0.600
7 PQC @ Both T.P. KM 0.600
8 Drainage & Protective Works KM 140.000
Highway (Service Road)
9 Clearing & Grubbing KM 13.444
10 Embankment KM 13.444
11 Sub grade KM 13.444
12 GSB KM 13.444
13 WMM KM 13.444
14 DBM KM 13.444
15 SDBC KM 13.444
Structure
16 ROB (repair) Nos. 4
18 Major Bridges (repair) Nos. 5
19 Minor Bridges (Repair) Nos. 5
21 Slab and Box Culverts Nos. 30
December’31, 2014 Page 12
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
11.0 Physical &Financial Progress
Based on the actual physical progress, the project is behind schedule. The Concessionaire is advised to
take remedial measures to catch the schedule. Concessionaire is requested to increase the resources to
complete the project in time.
11.1 Physical Progress:
S.No.
Road Works
Current Month
Cumulative
A Cleaning and grubbing 0 Lane Km 280.00 Lane Km
B Embankment 0 Lane Km 277.80 Lane Km
C Sub-grade 0 Lane Km 277.80 Lane Km
D GSB I 0 Lane Km 277.70 Lane Km
E GSB II 0 Lane Km 277.70 Lane Km
F WMM I 0 Lane Km 277.70 Lane Km
G WMM II 0 Lane Km 277.70 Lane Km
H DBM I 0 Lane Km 277.70 Lane Km
I DBM II 0 Lane Km 277.70 Lane Km
J BC 0 Lane Km 277.70 Lane Km
K DLC 0 Lane Km 2.00 locations
I PQC 0 Lane Km 2.00 locations
11.2 Financial Progress during the month is tabulated below:
Elapsed contract period in
% age
Cumulative planned
progress Up to this month
(Cr)
Cumulative planned
progress Up to this month %
age.
Cumulative achieved progress
(Cr)
Cumulative achieved progress
% age
Cumulative Slippage
% age
Target for January
2015 % age.
100 613 100.00 608.58 99.28 (-) 0.72 0.72
The concessionaire did not achieve the planned schedule for the month of December’2014. The Concessionaire is advised to take remedial measures to achieve the oval all target in the month of January-2015.
December’31, 2014 Page 13
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
FINANCIAL PROGRAMME WITH S-CURVE
December’31, 2014 Page 14
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
11.3 Cumulative Physical progress
Sr. No.
Description Unit Total Qty
Cumulative Qty
Achieved till Last Month
Qty Planned in This month
Qty Achieved in this month
Cumulative Qty Planned
till This Month
Cumulative Qty
Achieved till this month
% Work Planned till this month
% Work Achieved till this month
Main Carriageway
1 Clearing & Grubbing KM 140.00 140.00 - - 140.00 140.00 100 100
2 Embankment KM 140.00 138.90 - - 140.00 138.90 100 99.21
3 Sub grade KM 140.00 138.90 - - 140.00 138.90 100 99.21
4 GSB KM 140.00 138.85 - - 140.00 138.85 100 99.18
5 WMM KM 140.00 138.85 - - 140.00 138.85 100 99.18
6 DBM KM 140.00 138.85 - - 140.00 138.85 100 98.18
7 BC KM 140.00 138.85 - - 140.00 138.85 100 98.18
8 W-Beam crash Barrier KM 60.00 59.50 - - 60.00 59.50 100 99.17
9 DLC KM 0.600 0.60 - - 0.60 0.60 100 100
10 PQC KM 0.600 0.60 - - 0.60 0.60 100 100
11 Drainage & Protective Works
KM 138.35 137.15 - - 138.35 137.15 100 99.13
Service Road
1 Clearing & Grubbing KM 13.444 13.444 - - 13.444 13.444 100 100
2 Embankment KM 13.444 13.444 - - 13.444 13.444 100 100
3 Sub grade KM 13.444 13.444 - - 13.444 13.444 100 100
4 GSB KM 13.444 13.444 - - 13.444 13.444 100 100
5 WMM KM 13.444 13.444 - - 13.444 13.444 100 100
6 DBM KM 13.444 13.444 - - 13.444 13.444 100 100
7 SDBC KM 13.444 13.444 - - 13.444 13.444 100 100
Note: progress in one side length is converted into both side lengths
December’31, 2014 Page 15
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 16
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
12.0 Quantity Progress Chart:
S.No Activity Unit Tentative Scope
Target Achieved Percentage Achieved
1 Road Work
a Clearing & Grubbing Km 140.00 140.00 140.00 100%
b Emabankment Km 140.00 140.00 138.90 99.21%
c Sub-Grade Km 140.00 140.00 138.90 99.21%
d GSB Km 140.00 140.00 138.85 99.18%
e WMM Km 140.00 140.00 138.85 99.18%
f DBM Km 140.00 140.00 138.85 98.18%
g BC Km 140.00 140.00 138.50 98.93%
h W-Beam Crash Barrier Km 60.00 60.00 59.50 99.17%
i DLC Km 0.600 0.60 0.60 100%
j PQC Km 0.600 0.60 0.60 100%
December’31, 2014 Page 17
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 18
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 19
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 20
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
13.0 Structure Progress& Progress Chart
13.1 Structure Progress
SI.
No. Description Side
Total
No’s
Up to Previous
Month
Started during the
month Up to this month
In
Progress Completed
In
Progress Completed
In
Progress Completed
1 ROB (Repair) LHS 4 0 4 0 0 0 4
RHS 4 0 4 0 0 0 4
2 Major Bridges
(Repair)
LHS 5 0 5 0 0 0 5
RHS 5 0 5 0 0 0 5
3 Minor Bridges
(Repair)
LHS 5 0 5 0 0 0 5
RHS 5 0 5 0 0 0 5
4
Slab
and
Box Culverts
R/L 12 0 12 0 0 0 12
B/S 18 0 18 0 0 0 18
13.2 Structure Progress Char
December’31, 2014 Page 21
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 22
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
14.0 Maintenance of Road
In the entire stretch routine maintenance of main carriageway and service
roads are being carried out as and when needed like rectification of patches
and potholes, rain-cuts, damaged crash barriers, kerb etc.
Additonally safety and traffic management system are emplemented at all
required locations as per approved safety & traffic management plans.
Compliannce of work zone safety audit report has been attended. Ambulances
and cranes has been stationed at both toll plaza round the clock.
December’31, 2014 Page 23
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
15.0 MIX DESIGN & MATERIAL STOCKED AT SITE
15.1 Mix Design
1. Mix Design of GSB: Approved 2. Mix Design of WMM: Approved 3. DBM: Approved 4. Concrete Mix Design: Approved 5. BC: Approved 6. DLC : Approved 7. PQC: Approved
15.2 Material Stocked at Site
Sr. No. Materials Unit Quantity Remark
1 GSB (Natural) MT 3600
2 Cement Bags -
3 Stone Aggregate MT -
4 Stone Dust MT -
5 Bitumen MT -
6 Steel MT -
December’31, 2014 Page 24
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
16.0 PLANT & MACHINERY DETAILS:
Description JCB Tractor with trolley
Water Tanker
Excavator Tipper Motor Grader
F.E./Backhoe
Loader Paver
Vibratory Roller
Tandem Roller
PTR HMP
Requirement 4 10 12 12 82 8 7 5 12 4 2 2
Mobilized at Site
1 0 1 1 14 1 1 1 2 2 1 1
Description WMM Plant
Broom Bit.
Sprayer Batching Plant
Transit Mixer
Compressor
Diesel Tank
Crane
Bar Cutting / Bending Machine
Weigh Bridge
Dozer
Requirement 2 2 2 1 4 2 2 1 2 4 -
Mobilized at Site
- 1 1 - - 1 1 2 - 2 1
Description Emulsion Tank
DG Set 500 Kva
DG Set 125Kva
DG Set 62.5 Kva
DG Set 15 Kva
4 wheeler Crusher Core cutter Bump
indicator Trailer
Requirement 2 2 3 3 4 12 1 2 1 2
Mobilized at Site
1 1 2 - 3 5 - 2 1 1
December’31, 2014 Page 25
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 26
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Figure 1: Location Map
Km 410.000
End Point
Km 270.000
Start Point
PIU, NHAI
I.E. Office 1st
CAMP I
CAMP II
QUARRY SITE
I.E. Office 2nd
December’31, 2014 Page 27
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 28
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC, INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
FIGURE 2: SITE ORGANIZATION STRUCTURE
TEAM LEADER CUM SR. HIGHWAY ENGINEER
Pranay Kumar
EMPLOYER NATIONAL HIGHWAYS AUTHORITY OF INIDA
KHAGARIA-PURNEA PROJECT (NH-31)
PROJECT DIRECTOR of IE
SAJID PATEL
SR. BRIDGE DESIGN ENGINEER
TARUN MATHUR
HIGHWAY DESIGN ENGINEER
SR. QUALITY CUM MATERIAL ENGINEER
NIDHI KANT JHA
SR. PAVEMENT SPECIALIST
RESIDENT CUM HIGHWAY ENGINEER
VIJAY KUMAR SINGH
ROAD SAFETY EXPERT
MOHD. ASIF ZAFAR
HIGHWAY DESIGN ENGINEER
RESIDENT CUM HIGHWAY ENGINEER
BRIDGE STRUCTURAL ENGINEER
SUDHIR KUMAR
FINANCIAL EXPERT
PANKAJ CHANDER
LEGAL EXPERT
DEEPAK AGGRAWAL
SURVEY ENGINEER
Santosh Kr Suman
Rana Pratap Singh
ASST. HIGHWAY
ENGINEER
Subodh Kumar
VS Pandey
ASST. MATERIAL
ENGINEER
Amrender Kr
J.P. Sing
ELECTRICAL ENGINEER
Ranjan Kumar
HTMS/TOLL EXPERT
Rakesh Kumar
HORTICULTURE
CUM LANDSCAPING
EXPERT
Nikhil Kumar
EMVIRONMENTAL
ENGINEER
Ashok Kumar
Admin- Support Staff
December-31, 2014 Page 29
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December-31, 2014 Page 30
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Figure 3: List of Staff Employed for IE Team Khagaria-Purnea Highway Project, NH-31:
Si. No. Name of Employee Designation Joining Date Left On
1 Mr. Pranay Kumar Team Leader 08-Oct-14
2 Mr.TarunMathur Sr. Bridge Design Engineer 7-Jan-13
3 Mr. Vijay Kumar Singh Resident Engineer-I 14-Mar-12
4 Mr.Sudhir Kumar Bridge/Str. Engineer 9-Mar-12
5 Mr.Nidhi Kant Jha Sr. Quality cum Material Engineer 11-Aug-12
6 Mr.Mohd. Asif Zafar Road Safety Expert 13-July-13
7 Mr.PankajChander Financial Expert 16-Nov-12
8 Mr. Deepak Aggrawal Legal Expert 9-Apr-12
9 Mr.Rana Pratap Singh Survey Engineer 9-Mar-12
10 Mr.Santosh Kumar Suman Survey Engineer 1-May-12
11 Mr.Subodh Kumar Asst. Highway Engineer 9-Mar-12
12 Mr. Vijay Shankar Pandey Asst. Highway Engineer 1-Apr-12
13 Mr Ashok Kumar Environmental Engineer 9-Oct-13
14 Mr. Amrendra Kumar Asst. Material Engineer 1-Nov-13
15 Mr. Jai PrakashSingh Asst. Material Engineer 18-Jul-12
16 Mr.Ranjan Kumar Electrical Engineer 01-Mar-13
17 Mr. Rakesh Kumar HTMS/Toll Exper 9-Oct-13
18 Mr. Nikhil Kumar Horticulture & Landscaping
Expert 16-June-13
19 Mr.AmeenMansuri Office Manager 9-Mar-12
20 Mr.Md. Shamshul Islam Office Manager 1-Sep-12
21 Mr.Mohd. Naushad Accountant 16-Mar-12
22 Mr. Rajeev Kr. Chaudhary Accountant 1-Sep-12
23 Mr.Rohan Roy Cashier 1-Sep-12
24 Mr.RitchesVerma Cashier 1-Sep-12
25 Ms.SharikaKumari Steno Grapher 16-Mar-12
26 Ms.NiliKumari Steno Grapher 6-Jun-12
27 Mr.Binod Kumar Computer Operator 16-Mar-12
28 Mr.Sunil Sharma Computer Operator 1-May-12
29 Mr.Mohd Daud Photo Copy Opt. 9-Mar-12
30 Mr.AmanVerma Photo Copy Opt. 1-Sep-12
December-31, 2014 Page 31
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
31 Deepak Kumar Office Boy 09.03.12
32 Sachin Kumar Office Boy 09.03.12
33 Vijay Paswan Guard 16.03.12
34 Mithlesh Kumar Guard 10.05.12
35 Vijay Yadav Guard 03.04.12
36 Manoj Kumar Guard 03.04.12
December-31, 2014 Page 32
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December-31, 2014 Page 33
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
3 -
December 31, 2014
Page 34
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
3 -
December 31, 2014
Page 35
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
3 -
December 31, 2014
Page 36
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
3 -
December 31, 2014
Page 37
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
3 -
December 31, 2014
Page 38
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARIA-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December-31, 2014 Page 39
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Appendix C: Summary of Test Report for the Month of Nov-2014
Sr.
No. Description No. of test witnessed by IE
No. of test failed in
presence of IE % of IE
A EARTHWORK
1 Field Density Test for
Embankment -
-
2 Field Density Test for Subgrade - -
3 Max. Dry Density & OMC - -
4 Level of subgrade - -
5 Grain Size Analysis - -
6 CBR - -
7 Liquid Limit & PL - -
8 Free Swell Index - -
Total 0 0
B GSB
-
1 Field Density Test
-
2 Level for GSB
-
3 Gradation/Sieve Analysis - -
4 Liquid Limit & PL - -
5 MDD - -
6 CBR - -
7 10% fines value - -
Total 0 -
C WET MIX MACADAM
-
1 Field Density Test
-
2 Level for WMM
-
3 Gradation/Sieve Analysis - -
4 Liquid Limit & PL - -
5 Flakiness & Elongation Index - -
6 Aggregate Impact Value - -
Total 0 -
D CONCRETE
-
1 Cube Strength - -
2 Flakiness & Elongation Indices - -
3 Gradation CA - -
4 AIV - -
5 Gradation FA - -
Total 0 -
E CEMENT
-
1 Fineness - -
December-31, 2014 Page 40
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
2 Normal Consistency - -
3 Initial Setting & Final Setting Time - -
4 Mortar Cube Test - -
Total - -
F DENSE BITUMINOUS MACADAM
-
1 Gradation - -
2 AIV - -
3 Flakiness & Elongation Test - -
4 Gmm -
5 Bitumen Extraction - -
6 Marshal Stability - -
7 Water Absorption - -
8 Penetration Point - -
9 Softening Point - -
10 Docility Test - -
11 Viscosity Test - -
12 Absolute Viscosity - -
13 Core Density - -
14 Specific Gravity Aggregate -
Total 0 -
G BITUMINOUS CONCRETE
-
1 Gradation - -
2 AIV - -
3 Flakiness & Elongation Test - -
4 Bitumen Extraction - -
5 Marshal Stability - -
6 Penetration Test - -
7 Core Density BC test - -
Total 0 -
H BITUMEN - CRMB 60
-
1 Penetration Test - -
2 Softening Point Test - -
3 Elastic Recovery Test - -
4 Separation Test - -
Thin filimovern test - -
5 Penetration test - -
6 Softening Point test - -
Total 0 -
December-31, 2014 Page 41
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December-31, 2014 Page 42
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Appendix D: Details of Non-Conformance Report (NCR)
NCR
No.
Issued
Ref/Date
Type of NCR
Description of NCR
Remedial Action
Accepted Closed Date
Yes/No
01 Bloom/Bi/Pur-Kha/TL-Con/2012/023,
Dt. Apr-10’2012
DBM Layer
Application
DMB 1st Layer at Ch. 330+00 to Ch. 330+430
(7.04.2012) Ch. 361+110 to Ch. 367+300 (7.04.2012)
Ch. 370+550 to Ch. 371+770 (09.04.2012):
Approximately 15 kms of bituminous work done till
date
Yes 15.05.2012
02 Bloom/Bi/Kha-Pur/VKS/PL/2012/08 /222, Dt.
31-08-12
Construction of Box
Culvert Top Slab
Work
Ch. Km 379+236
The top level of Box Culvert slab has been found
about 400 mm lower than required level as per
design and drawing.
Yes 24.10.2013
03 Bloom/Bi/Pur-Kha/VKS/PD/2012/09 /228, Dt.
03-09-12
Embankment
Construction at
Pashraha Area
Km 308+550 to Km 308+710
The Embankment 14th laye was failed in field
density test (Refer attached test report). The 15th
and 16th layer of embankment was laid without
getting 14th layer compaction test. The 14th layer is
required to get Density test approved in presence of
IE.
Yes 04.09.2012
04 Bloom/Bi/Pur-Kha/TL-Con/2012/239
Dt. 13-09-12
Construction of
WMM Work
Ch. 290+600 to 290+700, RHS
The Thickness has been observed 125 mm only. It is
less than required as per design and drawing
Yes 24.09.2013
December-31, 2014 Page 43
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
05 Bloom/Bi/Kha-Pur/SK-PL/2013/02/409
Dt. 13-02-13 Earth work
Km 302+500 to Km 303+950 RHS, Km 307+200 to
307+850 RHS, Km 308+000 to 308+500
End dumping and layer thickness not maintained
Yes 22.05.2013
06
Bloom/Bi/Kha-Pur/TL/PL/2013/03
/456
Dt. 22-03-13
WMM, 1st
Layer Ch. 380+600 to 380+665 Yes 02.04.2013
07
Bloom/Bi/Kha-Pur/SK/PL/2013/04
/485
Dt.04.04.2013
Embankment
Construction
Km 315+000 to 315+600, RHS
Dumping of successive layer over uncompacted
underneath layer was going on
Yes 22.05.2013
08
/456 Bloom/Bi/Kha-Pur/SK/PL/2013/04
/486
Dt.04.04.2013
Embankment
Construction
Km 307+050 to 307+200, RHS
Dumping of successive layer over uncompacted
underneath layer & dozing of end dumping material
was going on.
Yes 22.05.2013
09
Bloom/Bi/Kha-Pur/SK/PL/2013/04
/487
Dt.04.04.2013
Embankment
Construction
Km 306+500 to 306+900, RHS
Without dewatering end dumping and dozing was
going on.
Yes 22.05.2013
10
Bloom/Bi/Kha-Pur/SK/PL/2013/04
/488
Dt.04.04.2013
Bloom/Bi/Kha-Pur/TL/PL/6/2013/ 590, dated-
4.06.2013
SG/GSB
Km 299+700 to 299+800, LHS & 298+360 to
298+410 LHS
SG/GSB width is less than required
Yes 31.12.2013
11 Bloom/Bi/Kha-Pur/TL/PL/VKS/01/2013/502A
Dt.11.04.2013 Laying of DBM
Km. 380+020 to 380+090 RHS & Km. 380+490 to
380+670 RHS
Laying of WMM by motor grader without complete
scarification of existing BT surface
Yes 15.10.2013
December-31, 2014 Page 44
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
12 Bloom/Bi/Kha-Pur/TL/PL/05/557
Dt.16.05.2013
Embankment work
without C&G and
OGL preparation.
Ch. 312+500 to 313+000, RHS
Embankment 1st
layer dumping has been done
without C&G and OGL preparation.
Yes 03.06.2014
13 Bloom/Bi/Kha-Pur/TL/PL/05/558
Dt.16.05.2013 Embankment work
Ch. 307+810 to 308+000, RHS
Embankment 1st
layer dumping has been done
without C&G and OGL preparation.
Yes 18.10.2013
14 Bloom/Bi/Kha-Pur/TL/PL/06/603
Dt.15.06.2013
Construction of
Railing Bridge
Ch. 396+503
A New Crash Barrier is being constructed which is
reducing the width of carriage way and imposing
extra load on the bridge for which it was not
designed
Yes 12.10.2013
15 Bloom/Bi/Kha-Pur/TL/PL/06/605
Dt.15.06.2013 DBM 1
st Layer
Ch. 286+450 to 286+600 (LHS)
MoRTH Clause 507.1
Thickness of DBM layer is not as per specification
Yes 14.10.2013
16 Bloom/Bi/Kha-Pur/TL/PL/06/604
Dt.15.06.2013
Fixing of Metal beam
crash barrier
Ch. 350+900 to 351+200(BHS)
As MoRTH specification clause 810.2.1 & 810.2.2
In between above location nearly 20 numbers of
panels are without galvanization and some are
without Nuts & Bolts
Yes 21.09.2013
17 Bloom/Bi/Kha-Pur/TL/PL/06/606
Dt.15.06.2013 Embankment Work
Ch. 301+500 to 301+600 (LHS) – 1st
Layer
Ch. 302+050 to 302+600 (LHS) – 1st
Layer
Ch. 307+710 to 307+810 (LHS) –2nd
Layer
MoRTH Clause 201, 305.3.1 and 305.30.5
Multiple layer dumping done in layer thickness more
than 20cm without C&G and OGL preparation
Yes 24.10.2013
18 Bloom/Bi/Kha-Pur/TL/PL/07/663
Dt.19.07.2013 Road Marking
Ch. 327+560 to 332+700 (B/S)
Ch. 335+000 to 348+000 (B/S)
Ch. 356+400 to 356+500 (B/S)
Thickness/Colour/Paint/Glass Beads are not
confirming to MoRTH Clause-803, work is being
progress without submitting any third party test
results and without its review.
Yes 07.11.2013
December-31, 2014 Page 45
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
19 Bloom/Bi/Kha-Pur/TL/PL/07/665
Dt. 20.07.2013 DBM 1
st Layer
Ch. 317+480 to 317+900 (RHS)
Ch. 317+500 to 317+800 (LHS)
Failure aof DBM 1st
layer
Yes 30.10.2013
20 Bloom/Bi/Kha-Pur/TL/PL/12/876
Dt. 26.12.2013
Laying of DBM over
unacceptable
underneath layers
Laying of DBM over unacceptable underneath layers
Ch. 304+000 to 304+300, RHS Yes 25.01.2014
21 Bloom/Bi/Kha-Pur/TL/PL/12/877
Dt. 26.12.2013 Earth Work
Earth work
Ch. 309+100 to 310+000 RHS
End dumping of embanknet material without
removal of stagnant water and slush also, the
thickness of dumped material ins more than 200mm
(very much excessive thickness), All emabment work
executed without mainataning layers and following
clause 305 of MoRTH specification
Yes 22.05.2014
22 Bloom/Bi/Kha-Pur/TL/PL/12/878
Dt. 26.12.2013
Construction of
Emabanment
Construction of Emabanment
Ch. 315+150 to 315+600, RHS
Emabankment material dumped (by end dozing with
thickness more than 200 mm, without compaction
of underneath emabankment 10th
layer.
Yes 30.05.2014
December’31, 2014 Page 46
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 47
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Pl See the Layer Chart End of MPR
Page No. From 52 to 58
December’31, 2014 Page 48
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 49
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Appendix E- Weather Report
METROLOGICAL DATA RANGRA LAB
DECEMBER-2014
Date
Temprature
(oC)
Humidity
(%) Rain Fall (mm) Weather Remarks
Max Min Max Min
01-Dec-14 24.0 15.0 81 62 Nil Clear
02-Dec-14 23.0 15.0 79 57 Nil Clear
03-Dec-14 23.0 15.0 69 61 Nil Clear
04-Dec-14 22.0 15.0 70 80 Nil Clear
05-Dec-14 21.0 14.0 76 75 Nil Clear
06-Dec-14 21.0 13.5 80 84 Nil Clear
07-Dec-14 22.0 14.5 82 64 Nil Clear
08-Dec-14 20.0 12.0 83 52 Nil Clear
09-Dec-14 19.0 12.5 81 53 Nil Clear
10-Dec-14 20.0 13.0 88 56 Nil Clear
11-Dec-14 19.0 12.0 89 50 Nil Clear
12-Dec-14 19.0 14.0 90 47 Nil Clear
13-Dec-14 18.0 12.0 70 45 Nil Clear
14-Dec-14 18.0 11.0 68 55 Nil Clear
15-Dec-14 17.0 11.0 65 70 Nil Clear
16-Dec-14 18.0 12.0 69 80 Nil Clear
17-Dec-14 19.0 12.0 80 61 Nil Clear
18-Dec-14 22.0 14.0 65 56 Nil Clear
19-Dec-14 22.0 12.0 74 49 Nil Foggy
20-Dec-14 21.0 12.0 90 68 Nil Foggy
21-Dec-14 22.0 14.0 96 66 Nil Foggy
22-Dec-14 20.0 14.0 80 75 Nil Foggy
23-Dec-14 20.0 12.0 75 64 Nil Foggy
24-Dec-14 20.0 12.0 68 60 Nil Foggy
25-Dec-14 19.0 10.0 80 59 Nil Foggy
26-Dec-14 18.5 9.0 82 75 Nil Foggy
27-Dec-14 17.0 7.5 87 73 Nil Foggy
28-Dec-14 18.0 6.9 92 68 Nil Foggy
29-Dec-14 17.0 7.2 85 80 Nil Foggy
30-Dec-14 17.0 7.0 80 76 Nil Foggy
31-Dec-14 17.0 7.0 80 76 Nil Foggy
December’31, 2014 Page 50
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
December’31, 2014 Page 51
MONTHLY PROGRESS REPORT FOR THE M/O DECEMBER’2014 BLOOM COMPANIES LLC INDEPENDENT ENGINEER
INDEPENDENT ENGINEER SERVICES FOR TWO LANING OF KHAGARI-PURNEA FROM KM 270.00 TO KM 410.000 IN THE STATE OF BIHAR UNDER NHPD-III ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS
Road Cleaning
Gross Cutting
Date:
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
275.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
280.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
285.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
290.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
289.800
289.900
RH
S
289.200
289.300
289.400
289.500
289.600
289.700
288.600
288.700
288.800
288.900
289.000
289.100
288.000
288.100
288.200
288.300
288.400
288.500
287.400
287.500
287.600
287.700
287.800
287.900
286.800
286.900
287.000
287.100
287.200
287.300
286.200
286.300
286.400
286.500
286.600
286.700
285.600
285.700
285.800
285.900
286.000
286.100
284.800
284.900
RH
SLH
S
285.000
285.100
285.200
285.300
285.400
285.500
284.200
284.300
284.400
284.500
284.600
284.700
283.600
283.700
283.800
283.900
280.600
280.700
280.800
280.900
281.000
281.100
279.800
279.900
RH
SLH
S
280.000
280.100
280.200
280.300
280.400
280.500
279.200
279.300
279.400
279.500
279.600
279.700
278.600
278.700
278.800
278.900
284.000
284.100
283.000
283.100
283.200
283.300
279.000
279.100
278.000
278.100
278.200
278.300
278.400
278.500
277.400
277.500
277.600
277.700
281.200
281.300
281.400
281.500
281.600
281.700
283.400
283.500
282.400
282.500
282.600
282.700
282.800
282.900
281.800
281.900
282.000
282.100
282.200
282.300
277.800
277.900
276.800
276.900
277.000
277.100
277.200
277.300
271.200
271.300
271.400
271.500
274.800
274.900
RH
SLH
S
275.000
275.100
275.200
275.300
275.400
275.500
274.200
274.300
274.400
274.500
274.600
274.700
273.600
273.700
273.800
273.900
276.200
276.300
276.400
276.500
276.600
276.700
275.600
275.700
275.800
275.900
276.000
276.100
271.600
271.700
270.600
270.700
270.800
270.900
271.000
271.100
National highways Authority of india Billing Strip Chart PIU -4 , Begusarai
Name of the Work:Two Lanning with Paved Shoulder of khagaria Purnea of Section NH-31.
LHS
270.000
270.100
270.200
270.300
270.400
270.500
274.000
274.100
273.000
273.100
273.200
273.300
273.400
273.500
272.400
272.500
272.600
272.700
272.800
272.900
271.800
271.900
272.000
272.100
272.200
272.300
National highways Authority of india Billing Strip Chart PIU -4 , Begusarai
Name of the Work:Two Lanning with Paved Shoulder of khagaria Purnea of Section NH-31.
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
295.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
300.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
305.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
310.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
309.800
309.900
RH
S
309.200
309.300
309.400
309.500
309.600
309.700
308.600
308.700
308.800
308.900
309.000
309.100
308.000
308.100
308.200
308.300
308.400
308.500
307.400
307.500
307.600
307.700
307.800
307.900
306.800
306.900
307.000
307.100
307.200
307.300
306.200
306.300
306.400
306.500
306.600
306.700
305.600
305.700
305.800
305.900
306.000
306.100
304.800
304.900
RH
SLH
S
305.000
305.100
305.200
305.300
305.400
305.500
304.200
304.300
304.400
304.500
304.600
304.700
303.600
303.700
303.800
303.900
304.000
304.100
303.000
303.100
303.200
303.300
303.400
303.500
302.400
302.500
302.600
302.700
302.800
302.900
301.800
301.900
302.000
302.100
302.200
302.300
301.200
301.300
301.400
301.500
301.600
301.700
300.600
300.700
300.800
300.900
301.000
301.100
299.800
299.900
RH
SLH
S
300.000
300.100
300.200
300.300
300.400
300.500
299.200
299.300
299.400
299.500
299.600
299.700
298.600
298.700
298.800
298.900
299.000
299.100
298.000
298.100
298.200
298.300
298.400
298.500
297.400
297.500
297.600
297.700
297.800
297.900
296.800
296.900
297.000
297.100
297.200
297.300
296.200
296.300
296.400
296.500
296.600
296.700
295.600
295.700
295.800
295.900
296.000
296.100
294.800
294.900
RH
SLH
S
295.000
295.100
295.200
295.300
295.400
295.500
294.200
294.300
294.400
294.500
294.600
294.700
293.600
293.700
293.800
293.900
294.000
294.100
293.000
293.100
293.200
293.300
293.400
293.500
292.400
292.500
292.600
292.700
292.800
292.900
291.800
291.900
292.000
292.100
292.200
292.300
291.200
291.300
291.400
291.500
291.600
291.700
290.600
290.700
290.800
290.900
291.000
291.100
LHS
290.000
290.100
290.200
290.300
290.400
290.500
National highways Authority of india Billing Strip Chart PIU -4 , Begusarai
Name of the Work:Two Lanning with Paved Shoulder of khagaria Purnea of Section NH-31.
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
315.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
320.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
325.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
330.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
329.800
329.900
RH
S
329.200
329.300
329.400
329.500
329.600
329.700
328.600
328.700
328.800
328.900
329.000
329.100
328.000
328.100
328.200
328.300
328.400
328.500
327.400
327.500
327.600
327.700
327.800
327.900
326.800
326.900
327.000
327.100
327.200
327.300
326.200
326.300
326.400
326.500
326.600
326.700
325.600
325.700
325.800
325.900
326.000
326.100
324.800
324.900
RH
SLH
S
325.000
325.100
325.200
325.300
325.400
325.500
324.200
324.300
324.400
324.500
324.600
324.700
323.600
323.700
323.800
323.900
324.000
324.100
323.000
323.100
323.200
323.300
323.400
323.500
322.400
322.500
322.600
322.700
322.800
322.900
321.800
321.900
322.000
322.100
322.200
322.300
321.200
321.300
321.400
321.500
321.600
321.700
320.600
320.700
320.800
320.900
321.000
321.100
319.800
319.900
RH
SLH
S
320.000
320.100
320.200
320.300
320.400
320.500
319.200
319.300
319.400
319.500
319.600
319.700
318.600
318.700
318.800
318.900
319.000
319.100
318.000
318.100
318.200
318.300
318.400
318.500
317.400
317.500
317.600
317.700
317.800
317.900
316.800
316.900
317.000
317.100
317.200
317.300
316.200
316.300
316.400
316.500
316.600
316.700
315.600
315.700
315.800
315.900
316.000
316.100
314.800
314.900
RH
SLH
S
315.000
315.100
315.200
315.300
315.400
315.500
314.200
314.300
314.400
314.500
314.600
314.700
313.600
313.700
313.800
313.900
314.000
314.100
313.000
313.100
313.200
313.300
313.400
313.500
312.400
312.500
312.600
312.700
312.800
312.900
311.800
311.900
312.000
312.100
312.200
312.300
311.200
311.300
311.400
311.500
311.600
311.700
310.600
310.700
310.800
310.900
311.000
311.100
LHS
310.000
310.100
310.200
310.300
310.400
310.500
National highways Authority of india Billing Strip Chart PIU -4 , Begusarai
Name of the Work:Two Lanning with Paved Shoulder of khagaria Purnea of Section NH-31.
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
335.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
340.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
345.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
350.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
349.800
349.900
RH
S
349.200
349.300
349.400
349.500
349.600
349.700
348.600
348.700
348.800
348.900
349.000
349.100
348.000
348.100
348.200
348.300
348.400
348.500
347.400
347.500
347.600
347.700
347.800
347.900
346.800
346.900
347.000
347.100
347.200
347.300
346.200
346.300
346.400
346.500
346.600
346.700
345.600
345.700
345.800
345.900
346.000
346.100
344.800
344.900
RH
SLH
S
345.000
345.100
345.200
345.300
345.400
345.500
344.200
344.300
344.400
344.500
344.600
344.700
343.600
343.700
343.800
343.900
344.000
344.100
343.000
343.100
343.200
343.300
343.400
343.500
342.400
342.500
342.600
342.700
342.800
342.900
341.800
341.900
342.000
342.100
342.200
342.300
341.200
341.300
341.400
341.500
341.600
341.700
340.600
340.700
340.800
340.900
341.000
341.100
339.800
339.900
RH
SLH
S
340.000
340.100
340.200
340.300
340.400
340.500
339.200
339.300
339.400
339.500
339.600
339.700
338.600
338.700
338.800
338.900
339.000
339.100
338.000
338.100
338.200
338.300
338.400
338.500
337.400
337.500
337.600
337.700
337.800
337.900
336.800
336.900
337.000
337.100
337.200
337.300
336.200
336.300
336.400
336.500
336.600
336.700
335.600
335.700
335.800
335.900
336.000
336.100
334.800
334.900
RH
SLH
S
335.000
335.100
335.200
335.300
335.400
335.500
334.200
334.300
334.400
334.500
334.600
334.700
333.600
333.700
333.800
333.900
334.000
334.100
333.000
333.100
333.200
333.300
333.400
333.500
332.400
332.500
332.600
332.700
332.800
332.900
331.800
331.900
332.000
332.100
332.200
332.300
331.200
331.300
331.400
331.500
331.600
331.700
330.600
330.700
330.800
330.900
331.000
331.100
LHS
330.000
330.100
330.200
330.300
330.400
330.500
National highways Authority of india Billing Strip Chart PIU -4 , Begusarai
Name of the Work:Two Lanning with Paved Shoulder of khagaria Purnea of Section NH-31.
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
355.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
360.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
365.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
370.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
369.800
369.900
RH
S
369.200
369.300
369.400
369.500
369.600
369.700
368.600
368.700
368.800
368.900
369.000
369.100
368.000
368.100
368.200
368.300
368.400
368.500
367.400
367.500
367.600
367.700
367.800
367.900
366.800
366.900
367.000
367.100
367.200
367.300
366.200
366.300
366.400
366.500
366.600
366.700
365.600
365.700
365.800
365.900
366.000
366.100
364.800
364.900
RH
SLH
S
365.000
365.100
365.200
365.300
365.400
365.500
364.200
364.300
364.400
364.500
364.600
364.700
363.600
363.700
363.800
363.900
364.000
364.100
363.000
363.100
363.200
363.300
363.400
363.500
362.400
362.500
362.600
362.700
362.800
362.900
361.800
361.900
362.000
362.100
362.200
362.300
361.200
361.300
361.400
361.500
361.600
361.700
360.600
360.700
360.800
360.900
361.000
361.100
359.800
359.900
RH
SLH
S
360.000
360.100
360.200
360.300
360.400
360.500
359.200
359.300
359.400
359.500
359.600
359.700
358.600
358.700
358.800
358.900
359.000
359.100
358.000
358.100
358.200
358.300
358.400
358.500
357.400
357.500
357.600
357.700
357.800
357.900
356.800
356.900
357.000
357.100
357.200
357.300
356.200
356.300
356.400
356.500
356.600
356.700
355.600
355.700
355.800
355.900
356.000
356.100
354.800
354.900
RH
SLH
S
355.000
355.100
355.200
355.300
355.400
355.500
354.200
354.300
354.400
354.500
354.600
354.700
353.600
353.700
353.800
353.900
354.000
354.100
353.000
353.100
353.200
353.300
353.400
353.500
352.400
352.500
352.600
352.700
352.800
352.900
351.800
351.900
352.000
352.100
352.200
352.300
351.200
351.300
351.400
351.500
351.600
351.700
350.600
350.700
350.800
350.900
351.000
351.100
LHS
350.000
350.100
350.200
350.300
350.400
350.500
National highways Authority of india Billing Strip Chart PIU -4 , Begusarai
Name of the Work:Two Lanning with Paved Shoulder of khagaria Purnea of Section NH-31.
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
375.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
380.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
385.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
390.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
389.800
389.900
RH
S
389.200
389.300
389.400
389.500
389.600
389.700
388.600
388.700
388.800
388.900
389.000
389.100
388.000
388.100
388.200
388.300
388.400
388.500
387.400
387.500
387.600
387.700
387.800
387.900
386.800
386.900
387.000
387.100
387.200
387.300
386.200
386.300
386.400
386.500
386.600
386.700
385.600
385.700
385.800
385.900
386.000
386.100
384.800
384.900
RH
SLH
S
385.000
385.100
385.200
385.300
385.400
385.500
384.200
384.300
384.400
384.500
384.600
384.700
383.600
383.700
383.800
383.900
384.000
384.100
383.000
383.100
383.200
383.300
383.400
383.500
382.400
382.500
382.600
382.700
382.800
382.900
381.800
381.900
382.000
382.100
382.200
382.300
381.200
381.300
381.400
381.500
381.600
381.700
380.600
380.700
380.800
380.900
381.000
381.100
379.800
379.900
RH
SLH
S
380.000
380.100
380.200
380.300
380.400
380.500
379.200
379.300
379.400
379.500
379.600
379.700
378.600
378.700
378.800
378.900
379.000
379.100
378.000
378.100
378.200
378.300
378.400
378.500
377.400
377.500
377.600
377.700
377.800
377.900
376.800
376.900
377.000
377.100
377.200
377.300
376.200
376.300
376.400
376.500
376.600
376.700
375.600
375.700
375.800
375.900
376.000
376.100
374.800
374.900
RH
SLH
S
375.000
375.100
375.200
375.300
375.400
375.500
374.200
374.300
374.400
374.500
374.600
374.700
373.600
373.700
373.800
373.900
374.000
374.100
373.000
373.100
373.200
373.300
373.400
373.500
372.400
372.500
372.600
372.700
372.800
372.900
371.800
371.900
372.000
372.100
372.200
372.300
371.200
371.300
371.400
371.500
371.600
371.700
370.600
370.700
370.800
370.900
371.000
371.100
LHS
370.000
370.100
370.200
370.300
370.400
370.500
National highways Authority of india Billing Strip Chart PIU -4 , Begusarai
Name of the Work:Two Lanning with Paved Shoulder of khagaria Purnea of Section NH-31.
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
395.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
400.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
405.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
Chainage
410.000
BC
DBM II
DBM I
WMM -II
WMM -I
GSB -II
GSB -I
Sub Grade
Embankment
C&G
409.800
409.900
RH
S
409.200
409.300
409.400
409.500
409.600
409.700
408.600
408.700
408.800
408.900
409.000
409.100
408.000
408.100
408.200
408.300
408.400
408.500
407.400
407.500
407.600
407.700
407.800
407.900
406.800
406.900
407.000
407.100
407.200
407.300
406.200
406.300
406.400
406.500
406.600
406.700
405.600
405.700
405.800
405.900
406.000
406.100
404.800
404.900
RH
SLH
S
405.000
405.100
405.200
405.300
405.400
405.500
404.200
404.300
404.400
404.500
404.600
404.700
403.600
403.700
403.800
403.900
404.000
404.100
403.000
403.100
403.200
403.300
403.400
403.500
402.400
402.500
402.600
402.700
402.800
402.900
401.800
401.900
402.000
402.100
402.200
402.300
401.200
401.300
401.400
401.500
401.600
401.700
400.600
400.700
400.800
400.900
401.000
401.100
399.800
399.900
RH
SLH
S
400.000
400.100
400.200
400.300
400.400
400.500
399.200
399.300
399.400
399.500
399.600
399.700
398.600
398.700
398.800
398.900
399.000
399.100
398.000
398.100
398.200
398.300
398.400
398.500
397.400
397.500
397.600
397.700
397.800
397.900
396.800
396.900
397.000
397.100
397.200
397.300
396.200
396.300
396.400
396.500
396.600
396.700
395.600
395.700
395.800
395.900
396.000
396.100
394.800
394.900
RH
SLH
S
395.000
395.100
395.200
395.300
395.400
395.500
394.200
394.300
394.400
394.500
394.600
394.700
393.600
393.700
393.800
393.900
394.000
394.100
393.000
393.100
393.200
393.300
393.400
393.500
392.400
392.500
392.600
392.700
392.800
392.900
391.800
391.900
392.000
392.100
392.200
392.300
391.200
391.300
391.400
391.500
391.600
391.700
390.600
390.700
390.800
390.900
391.000
391.100
LHS
390.000
390.100
390.200
390.300
390.400
390.500