GOVERNMENT OF ODISHA WORKS DEPARTMENTODISHA STATE ROADS PROJECT
Construction Supervision of Jagatpur Chandbali Road (0/0 km to 99/0 km of MDR and 52/0 km to 45/0 km of SH 9) of Odisha State Roads Project
MONTHLY PROGRESS REPORT
LEA Associates South Asia Pvt. Ltd., New Delhiin association with
SM Consultants, Bhubaneswar, Odisha
MAY-2017
PACKAGE NO.: OSRP-CW-ICB-OSRP-CW-ICB-P04A1, Jagatpur-Nishintakoli Road (0/00 km to 25/0 km of MDR)- Balance works
Monthly Progress Report May-2017-P04A1
Page 1 of 26
CONTENTS
CHAPTER 1. EXECUTIVE SUMMARY ...................................................................................... 3
1.1 PROJECT BACKGROUND................................................................................................................ 3
1.2 THE PROJECT .................................................................................................................................. 3
1.3 CONTRACT MANAGEMENT FRAME WORK .................................................................................. 4
1.4 PROJECT DETAILS .......................................................................................................................... 4
1.5 SALIENT FEATURES ........................................................................................................................ 5
1.6 MILESTONES .................................................................................................................................... 5
CHAPTER 2. PHYSICAL PERFORMANCE AND PROGRAMME OF WORK ............................ 6
2.1 ROAD WORK ..................................................................................................................................... 6
2.2 PROGRESS OF CD WORKS AND STRUCTURE ............................................................................ 9
2.3 ROUTINE MAINTENANCE .............................................................................................................. 12
2.4 FORECAST FOR NEXT MONTH .................................................................................................... 13
2.5 STATUS OF EXTENSION OF TIME ............................................................................................... 13
CHAPTER 3. FINANCIAL PERFORMANCE ............................................................................ 14
3.1 FINANCIAL PROGRESS ................................................................................................................. 14
3.2 MONTH WISE FINANCIAL PROGRESS ........................................................................................ 14
3.3 MOBILIZATION ADVANCE ............................................................................................................. 14
MOBILIZATION ADVANCE (1ST) PAID RS.5.37 CRORE .......................................................... 14
3.4 STATEMENT OF IPC ...................................................................................................................... 15
CHAPTER 4. STATUS OF RISK .............................................................................................. 16
4.1 HANDING OVER OF SECTION ...................................................................................................... 16
STATUS OF UTILITY SHIFTING .................................................................................................................. 16
4.2 ANY OTHER ISSUES ...................................................................................................................... 16
4.3 RISK INVOLVED .............................................................................................................................. 16
CHAPTER 5. ENVIRONMENTAL MONITORING AND SAFETY ............................................. 17
5.1 ENVIRONMENT MANAGEMENT PLAN ......................................................................................... 17
5.2 ROAD SAFETY ................................................................................................................................ 18
CHAPTER 6. VARIATION AND CHANGES ............................................................................. 19
6.1 SUMMARY OF CHANGE ORDER .................................................................................................. 19
CHAPTER 7. QUALITY CONTROL AND QUALITY ASSURANCE ........................................ 21
7.1 TESTS CONDUCTED ...................................................................................................................... 21
CHAPTER 8. MOBILISATION .................................................................................................. 22
8.1 CONSULTANT’S TEAM................................................................................................................... 22
8.2 CONTRACTOR’S TEAM.................................................................................................................. 22
8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR ......................................................... 23
CHAPTER 9. VISITS AND MEETINGS .................................................................................... 24
Monthly Progress Report May-2017-P04A1
Page 2 of 26
CHAPTER 10. IMPORTANT CORRESPONDENCE DURING THE MONTH.............................. 25
10.1 SUBMISSIONS AND APPROVALS ................................................................................................. 25
10.2 CORRESPONDENCES ................................................................................................................... 25
CHAPTER 11. WEATHER DURING THE MONTH ..................................................................... 26
LIST OF APENDICES
Appendix 1 – Strip Chart of Highways
Appendix 2 – Strip Chart of Structures
Appendix 3– List of GFC Drawings Issued
Appendix 4- Correspondences
Monthly Progress Report May-2017-P04A1
Page 3 of 26
Chapter 1. Executive Summary
1.1 PROJECT BACKGROUND
The Odisha Works Department (OWD) has a medium to long-term comprehensive programme to
rehabilitate, upgrade and expand the road network throughout the state to improve accessibility,
connectivity and enhance the overall development. It is the pre-eminent state level road authority in
Odisha which deals with issues relating to Feasibility Study and preparation of Detailed Project
Report including the Route Selection, even for relatively low volume roads.
The Government of Odisha has secured a loan from International Bank for Reconstruction and
Development (The World Bank) towards the cost of Widening and Strengthening of existing
Jagatpur- Chandbali Road Project (106 km).
Jagatpur-Chandbali Road Project is part of 825 km of roads under Phase-I which aims at
promoting trade and regional integration between districts by improving transport communication. The
project road Jagatpur-Chandbali is a part of the Phase-I road development, which was built several
years ago with two lane configuration and currently serves moderate level of traffic. The project
involves widening of the existing road which has an average carriageway width of 5.5 m to 6.8 m
and 1.5m. Earthen shoulder on both sides, to a 7.0 m carriageway, 1.5m paved shoulder1.0 m
soft shoulders on both sides. The expected outcome of the project include reduced transportation
time of goods and better connectivity between districts along with improved safety standards; reduced
transit time for import and export goods via port
The Jagatpur-Chandbali road was divided earlier into two Packages for the purpose of
improvement. 1st
package was from Jagatpur to Duhuria and 2nd package was from Duhuria to
Chandbali. After termination of the Contract of 1st
package, it is now divided into two
packages, viz., Jagatpur to Nischintakoili (P04A1) and Nischintakoili to Duhuria (P04A2).
1.2 THE PROJECT
The Jagatpur–Nischintakoili(MDR) section km 0/00 to km 25/00 (P04A1) is a part of Jagatpur -
Kendrapara – Chandbali - Bhadrak 152 km project corridor. This road section starts from at Chainage
28/00 km of NH-5 and ends near Nischintakoili at km 25.00 of MDR. Jagatpur an industrial area in
Cuttack district is connected with Kendrapara, a district headquarters of Kendrapara district through
this road.
The total length of the project road is 25.000 Km. The road passes completely through plain terrain.
Major stretch of the road is located in the District of Cuttack This stretch passes through major
settlements at Jagatpur, Salipur and Nischintakoili.
Monthly Progress Report May-2017-P04A1
Page 4 of 26
The location map of the project road is shown below in Figure 1-1;
Figure 1-1: Location Map
1.3 CONTRACT MANAGEMENT FRAME WORK
1.3.1 Employer
Mr. Om Prakash Patel, Chief Engineer, DPI& Roads, Odisha
On behalf of Works Department, Government of Odisha
1.3.2 Employer’s Representative
Mr. B C Dash, -Superintending Engineer, Cuttack, R&B Circle cum Employer’s representative
1.3.3 Engineer
Mr. Shaktidutta Sarangi, Resident Engineer
Lea Associates South Asia Pvt. Ltd.
B1/E-27, Mohan Co Operative Industrial Estate Mathura Road, New Delhi-110 044
Site Office-Near NH-5A Underpass,Duhuria, P.O.-Pandiri, District – Kendrapara, Odisha ,
Pin – 754211
Email: [email protected]
1.3.4 Contractor
M/s. Backbone-Utkal (JV),
Kalinga Bazar, Kapaleswar, Choudwar,
Cuttack, PIN 754071, Odisha
1.4 PROJECT DETAILS
Contract Value :- Rs.107,38,63,577 Period of Construction :– 18 months Date of Commencement of Work :– 1
st January 2016
Scheduled Date of Completion :- 30th June 2017
Progress Achieved till this month: - 56.80%
Monthly Progress Report May-2017-P04A1
Page 5 of 26
1.5 SALIENT FEATURES
1.5.1 Highways
Total Length of Project Corridor (MDR) – 25.00 km
Type of Carriageway Flexible 16.04km Rigid 8.96 km
Roadway Width 14 m ( Revised)
Carriageway Width 7m+1.5m paved shoulder on both sides
Bus bays and Bus Shelter 30 Nos.
Junctions 57 Nos. 1.5.2 Structures
Minor Bridges New 03 Nos.
Minor Bridges Widening 02 Nos
Box Culverts 13 Nos.
Hume Pipe Culvert s 44 Nos.
Hume Pipe Culverts with Utility 21 Nos.
Hume Pipe Culverts with Reptile pass 03 Nos.
Pipe culverts on access roads 58 Nos.
1.5.3 Crust Details
Flexible Pavement Sub-Grade 500 mm
GSB 200 mm WMM 250 mm DBM 90mm BC 40 mm
Rigid Pavement Sub-grade 500 mm
GSB 150 mm DLC 150 mm PQC 300 mm
1.6 MILESTONES
The project corridor has been divided into two sections for completion of work. Sections provided in the Contract were rescheduled through Supplementary Agreement as Addendum 1 as furnished below.
Section
Name
Length of
Section
Stretch of the Section Scheduled date
of completion As per original contract As Rescheduled
Section I 14 km Km.11.00 to Km 25 14 km in different
stretches
28.02.2017
Section II 11 km Km.00.00 to Km 11 11 km in different
stretches
30.06.2017
Monthly Progress Report May-2017-P04A1
Page 6 of 26
Chapter 2. Physical Performance and Programme of Work 2.1 ROAD WORK
2.1.1 Linear Progress – Total Length- 25.00 km
Sl. No. Items Total
Length Side
Length Completed / In Progress in Lane Km
Completed up to
Previous Month
Completed During the
Month
Completed upto Date
In progress
Cumulative length
(completed + In Progress)
Balance Length to be taken
up
Length Completed Over Full
Width
A B C D E F G=E+F H I=G+H J=C-I K
1 Embankment/ Excavation
25.000 LHS 18.730 2.170 20.900 0.400 21.300 3.700 19.850
25.000 RHS 21.830 0.670 22.500 0.000 22.500 2.500
2 Subgrade 25.000 LHS 18.580 2.090 20.670 0.300 20.970 4.030
19.810 25.000 RHS 21.490 0.810 22.300 0.000 22.300 2.700
3 GSB 25.000 LHS 18.390 2.130 20.520 0.000 20.520 4.480
19.160 25.000 RHS 21.110 1.020 22.130 0.000 22.130 2.870
4 WMM 16.040 LHS 12.960 0.590 13.550 0.300 13.850 2.190
13.040 16.040 RHS 14.100 0.000 14.100 0.000 14.100 1.940
5 DBM 16.040 LHS 12.860 0.510 13.370 0.000 13.370 2.670
12.850 16.040 RHS 13.980 0.000 13.980 0.000 13.980 2.060
6 BC 16.040 LHS 0.000 1.020 1.020 0.000 1.020 15.020
0.930 16.040 RHS 0.000 0.930 0.930 0.000 0.930 15.110
7 DLC 8.960 LHS 5.000 0.700 5.700 0.000 5.700 3.260
5.290 8.960 RHS 6.880 0.730 7.610 0.000 7.610 1.350
8 PQC 8.960 LHS 4.306 0.664 4.970 0.000 4.970 3.990
4.700 8.960 RHS 5.920 0.710 6.630 0.000 6.630 2.330
Monthly Progress Report May-2017-P04A1
Page 7 of 26
2.1.2 Progress in Quantities
Pie chart showing the weightage of major construction items is shown in
Figure 2-1;
Figure 2-1: Weightage of Major Construction Items
0.39%
16.16%
19.32%
36.09%
5.58%
3.20%
12.23%
4.70%
1.14%
1.14% 0.05%
Site clearance (0.39%)
Earthworks (16.16%)
Sub-base and Base courses(19.32%)
Bituminous and Rigid pavementcourses (36.09%)
Culverts and Underpass (5.58%)
Bridges (3.20%)
Retaining wall, Drainage andProtective works (12.23%)
Road Safety and Amenities(4.70%)
Maintenance, Repair andRehabilitation (1.14%)
Environmental MitigationMeasures (1.14%)
Provisional Sum (0.05%)
WEIGHTAGE OF MAJOR ITEMS
Monthly Progress Report May-2017-P04A1
Page 8 of 26
Progress in Quantities
Sl. No. Description Unit Total
Quantity as per BOQ
Quantity Executed
Up to previous
month
During this month
Total Balance
Quantity to be executed
Remarks
1 Embankment in soil Cum 43585 28280 1906 30186 13399
2 Embankment in sand Cum 94262 126347 6720 133067 0
3 Subgrade Cum 190432 117676 6924 124600 65832
4 GSB Cum 63822 51085 4250 55335 8487
5 WMM Cum 47552 34911 1460 36371 11181
6 DBM Cum 15707 11975 471 12446 3261
7 BC Cum 6985 0 526 526 6459
8 DLC Cum 14809 9926 1222 11148 3661
9 PQC Cum 29618 18024 1888 19912 9706
10 Excavation for structures Cum 21061 7333 1020 8353 12708
11 Granular materials Cum 3372 48 105 153 3219
12 PCC M 15 levelling course Cum 3453 1109 29 1138 2315
13 PCC M15 Substructure Cum 1654 1511 38 1548 106
14 M-20 Grade Cum 6471 2220 225 2444 4027
15 M-25 Grade Cum 13 0 0 13
16 M-30 Grade Cum 410 158 158 252
17 HYSD MT 724 222 19 240 484
18 HP 1000 mm ɸ single row RM 2173 636 15 651 1523
19 HP 1200 mm ɸ single row RM 253 104 104 149
20 HP 1000 mm ɸ double row RM 251 125 10 135 116
21 HP 1200 mm ɸ double row RM 244 157 157 88
22 Excavation for Bridges Cum 4906 5238 490 5728 0
23 Sand Filling for Foundation MB Cum 1122 1481 90 1571 0
24 PCC Levelling Course Cum 163 111 13 124 39
Monthly Progress Report May-2017-P04A1
Page 9 of 26
2.2 PROGRESS OF CD WORKS AND STRUCTURE
Sl. No.
Items Total nos.
to be executed
Side
No. Completed / In Progress (Half Width) in number
Number Completed Over Full
Width
Completed up to
Previous Month
Completed During the
Month
Completed upto Date
In progress
Cumulative No.
(Completed + In Progress
Balance Number
to be taken up
A B C D E F G=E+F H I=G+H J=C-I K
1 Minor Bridges New 3 BS 0 0 0 2 2 1 0
2 Minor Bridge Widening 2 BS 1 0 1 1 2 0 1
3 Box Culverts 13 BS 2 2 4 6 10 3 4
4 Hume Pipe Culvert main road
44 LHS 41 0 41 0 41 3 40
44 RHS 42 0 42 0 42 2
5 Hume Pipe Culvert with utility
21 LHS 19 1 20 0 20 1 19
21 RHS 18 2 20 0 20 1
6 Hume Pipe Culvert with reptile underpass
3 LHS 3 0 3 0 3 0 3
3 RHS 3 0 3 0 3 0
7 Access road pipe culvert 58 BS 0 0 0 0 0 58 0
Monthly Progress Report May-2017-P04A1
Page 10 of 26
BC Laying at Ch.11+200 RHS PQC Laying at Ch.10+250 RHS
Monthly Progress Report May-2017-P04A1
Page 11 of 26
Ch.2+082 MNB Reinforcement for deck slab in progress
Ch.20+615 BHS MNB wall reinforcement in progress
Monthly Progress Report May-2017-P04A1
Page 12 of 26
2.3 ROUTINE MAINTENANCE
As per contract, the Contractor is required to maintain the portion of road which has been handed
over to him.
PROGRAMME OF WORK
Contractor has not submitted baseline work programme.
A chart showing the time lapsed is given below in Figure 2-2.
Figure 2-2: Total Duration of the Project (Construction Phase)-18 Months
Time Elapsed, 94.44%
Time Remaining,
5.56%
Remaining Time & Elapsed Time
60.72
46.67
Work Done Balance Amount
Work Done & Balance Amount
Monthly Progress Report May-2017-P04A1
Page 13 of 26
2.4 FORECAST FOR NEXT MONTH
Forecast for June 2017
Sl. No. Description Unit
Quantity remaining
to be executed
by the end of the
month
Quantity planned
to be executed
during next
month
Approximate Value of
work (Rs.Cr.)
Remarks
1 Embankment in soil Cum 13399
2 Embankment in sand Cum 0
3 Subgrade Cum 65832
4 GSB Cum 8487
5 WMM Cum 11181
6 DBM Cum 3261
7 BC Cum 6459
8 DLC Cum 3661
9 PQC Cum 9706
10 Excavation for structures Cum 12708
11 Granular materials Cum 3219
12 PCC M 15 leveling course Cum 2315
13 PCC M15 Substructure Cum 106
14 M 20 grade Cum 4027
15 M 25 grade Cum 13
16 M 30 grade Cum 252
17 HYSD MT 484
18 HP 1000 mm single row Lm 1523
19 HP 1200 mm single row Lm 149
20 HP 1000 mm double row Lm 116
21 HP 1200 mm double row Lm 88
22 Excavation for Bridges Cum 0
23 Sand Filling for Foundation MB
Cum 0
24 PCC Levelling Course Cum 39
Total Amount= 0
2.5 STATUS OF EXTENSION OF TIME
The Contractor has not yet applied for Extension of time.
Monthly Progress Report May-2017-P04A1
Page 14 of 26
Chapter 3. Financial Performance
3.1 FINANCIAL PROGRESS
Financial Progress achieved up to the end of this month is furnished below
1. Contract Amount Rs.107.39 Crores
2. Value of work executed up to 31.05.17
a) Gross Amount of Work Rs.60.72 Crores
b) Amount of work excluding Price Adjustment Rs.60.72 Crores
c) Mobilisation Advance - Rs. 5.37 Crores
d) Material advance - Rs. 0.43 Crores
Total (b+c+d) - Rs.66.52 Crores
3. Percentage of work executed (2b/1)*100 56.54%
3.2 MONTH WISE FINANCIAL PROGRESS Month wise financial progress on work proper excluding Escalation and advances is furnished in Table 3-1
below. Table 3-1: Month wise financial Progress
Month
Base target Achievement
Amount (Rs Cr.) Percentage Amount
% achieved (Rs Cr.)
Jan-16 0 0.00% 1.08 1.01%
Feb-16 0 0.00% 1.29 1.20%
Mar-16 0 0.00% 3.96 3.69%
Apr-16 0 0.00% 4.09 3.81%
May-16 0 0.00% 5.42 5.05%
Jun-16 0 0.00% 3.9 3.63%
Jul-16 0 0.00% 2.33 2.17%
Aug-16 0 0.00% 2.57 2.39%
Sep-16 0 0.00% 1.43 1.33%
Oct-16 0 0.00% 3.57 3.32%
Nov-16 0 0.00% 3.42 3.18%
Dec-16 6.69 6.23% 4.26 3.97%
Jan-17 6.74 6.28% 4.22 3.93%
Feb-17 7.84 7.30% 4.80 4.47%
Mar-17 7.84 7.30% 5.76 5.36%
Apr-17 0 0.00% 4.07 3.79%
May-17 0 0.00% 4.55 4.24%
Total 0 0% 60.72 56.54%
3.3 MOBILIZATION ADVANCE
The Contractor has been paid the mobilisation advance as mentioned below
Mobilization Advance (1st) paid Rs.5.37 Crore
Amount of Advance recovered Rs.4.18 Crore
Balance amount to be recovered: Rs.1.19 Crore
Monthly Progress Report May-2017-P04A1
Page 15 of 26
3.4 STATEMENT OF IPC
The details of IPCs are shown in the following table.
IPC
No.
Month
Gross Amount of IPC (Rs.)
Value of BOQ Item
Value of Non BOQ Item
Escl. Secured Advance
Mob. Advance
Gross amou
nt Recovery
Net Amount
Paid
1 Jan-16 1.08 1.08 0.23 0.85
2 Feb-16 1.29 1.29 0.29 1.00
3 Mar-16 3.96 3.96 0.83 3.13
4 Mar-16 5.37 5.37 0.11 5.26
5 Apr-16 4.09 2.15 6.24 0.85 5.39
6 May-16 5.42 -0.45 4.97 1.08 3.89
7 Jun-16 3.9 0.02 3.92 0.86 3.06
8 Jul-16 2.33 -0.23 0.43 -0.21 2.32 0.46 1.86
9 Aug-16 2.57 -0.26 2.31 0.53 1.78
10 Sep-16 1.42 0.01 -0.14 1.29 0.29 1.00
11 Oct-16 2.99 0.57 -0.36 3.20 0.68 2.52
12 Nov-16 3.36 0.06 -0.04 -0.36 3.02 0.60 2.42
13 Dec-16 3.87 0.39 0.32 -0.45 4.13 0.77 3.36
14 Jan-17 3.73 0.48 0.03 -0.42 3.82 0.75 3.07
15 Feb-17 4.11 0.69 -0.48 4.32 0.88 3.44
16 Mar-17 5.23 0.52 0.78 -0.65 5.88 1.38 4.50
17 Apr-17 3.55 0.53 -0.91 -0.40 2.77 1.08 1.69
18 May-17 4.01 0.54 -0.80 -0.45 3.30 0.55 2.75
Total 56.91 3.78 0.88 0.43 1.19 63.19 12.22 50.97
Monthly Progress Report May 2017-P04A1
Page 16 of 26
Chapter 4. Status of Risk
4.1 HANDING OVER OF SECTION
Handing over status of Sections is mentioned below
Section Name Scheduled date of
Handing Over Actual date of handing
over
Section I Km.11/0 to Km.25/0
1-Jan-2016 1-Jan-2016
Section II Km.0/0 to Km.11/0
31-Mar-2016 17-May-2016
STATUS OF UTILITY SHIFTING
Encumbrances Number
existing till last month
Number removed
during this month
Balance remaining for
removal
Tree 0 0 0
R & R 13 0 13
Electric pole 3 0 3
Pipe line 0 0 0
4.2 ANY OTHER ISSUES
The progress of work is slow. This rate of progress is anticipated that project may not be completed by the scheduled date of completion i.e. by 30.06.2017. The major issue for non-completion is for delay in decision by WR Department for providing CD structures over canals.
4.3 RISK INVOLVED
The Contractor is yet to submit the resource based work programme for completion.
Monthly Progress Report May 2017-P04A1
Page 17 of 26
Chapter 5. Environmental Monitoring and Safety
5.1 ENVIRONMENT MANAGEMENT PLAN
Sl. No.
Environmental Issue / Aspect
Management Measures
1 Tree Cutting Tree cutting done by other agency.
2 Joint Field Verification Site visit is done time to time by client/CSC/contractor.
3 Location and Installation of Crushers, Hot Mix Plants and Batching Plants
Plants- Obtained CTE/CTO. CTO renewal copy yet to be submitted. Crusher- Obtained CTE/CTO. CTO valid up to 31.03.2018.
4 Construction Camp(s) – Selection, Design and Layout
After approval, camp has been constructed as office, laboratory, guest house, plants; labour camp has not been proposed.
5 Construction Vehicles, Equipment and Machinery
Obtained PUC certificates for vehicles.
6 Identification, Operation and Rehabilitation of Borrow Areas
After approval Atuda, Berhampur & Raghunathpur borrow area are in operation.
7 Identification, Operation and Rehabilitation of Stone Quarry
Material is being procured from vendor.
8 Identification, and Operation of Sand Quarry
Bagulpada & Murukundi sand quarry are in operation.
9 Arrangement for Construction Water
Contractor excavated bore well at camp for water consumption.
10 Clearing and Grubbing Action is being taken as per EMP.
11 Stripping, Stacking and Preservation of Top Soil
After striping, stocked top soil is being used for turfing.
12 Labour Camp Management After approval, constructed office, lab, supervisor guest house with proper drainage system, proper housekeeping, fencing done.
13 Transportation of Construction Materials and Haul Road Management
Material carrying vehicles are covered. Haul road maintenance are done.
14 Worksite Safety Management
Provided safety arrangement at different construction locations. Hard barricading is maintained at opened culvert location.
15 Accessibility Access is maintained during construction work at site.
16 Disruption to Other Users of Water
Any obstructions have not been occurred while working.
17 Labour Requirements Labours engaged are locals.
18 Pollution Management No discharge in water body. Pollution monitoring is yet to be started. Proper housekeeping.
19 Drainage and Flood Control
Not observed any blockage of cross drainage for water accumulation.
20 Slope Protection and Control of Soil Erosion
Slope protection is being done.
21 Waste Management Haul road maintenance, camp access road, diversion, filling work are being done by waste material. Proper sanitation and water closet is with appropriate sewage system.
22 Chance Found Archaeological Property
No archaeological property found.
23 Demobilisation and Decommissioning
No activity during this month
Monthly Progress Report May 2017-P04A1
Page 18 of 26
5.2 ROAD SAFETY
Safety arrangement as safety signages, barricading, delineators, sand bags, caution tapes have been
provided. Provided diversions with barricading for safe passage.
Ch.11+300 (Barricading during BC)
Ch.21+753 (Signages for diversion)
Monthly Progress Report May 2017-P04A1
Page 19 of 26
Chapter 6. Variation and Changes 6.1 SUMMARY OF CHANGE ORDER
Sl. N
o.
Ch
an
ge
Ord
er
No
.
Description of
Change Item
Increase in
Cost (INR)
Saving in
Cost
Revised
Contract
Price (INR)
Percentage Increase/ Decrease
on Contract
Price
Cumulative
%
of
Increase/
Decrease
of
Contract
Price
Re
ma
rks
1 1
Four lane divided
carriageway with
Rigid Pavement
21000000 1094863577 1.95% 1.95%
2 2
Construction of a
two lane bridge
adjacent to
existing bridge
over Khaira
Bridge at
Km.02+082
10700000 1105563577 1.00% 2.95%
3 3
Flexible to Rigid
Pavement ,HPC at
minor junctions &
Box drain
7700000 1113263577 0.72% 3.67%
4 4 Reduction of FRL
consideriong HFL
-70000 1113193577 0.00% 3.67%
5 5
Providing HPC
culverts at three
New location of
size 1x1m dia
1000000 1114193577 0.00% 3.67%
6 6
To provide Box
culverts in place of
Hume Pipe
culverts over canal
crossings
29500000 1143693577 2.75% 6.42%
Monthly Progress Report May 2017-P04A1
Page 20 of 26
7 7
Modify the profile
from Km 0+440 to
Km 0+720 mm)
2000000 1145693577 0.19% 6.63%
8 8
Roadway width to
be increased to
14m from the
original provision
of 12m
39000000 1184693577 3.63% 10.26%
9 9
1. Construction of
box drain and
open line drain on
south side of the
road from
Km.18/200 to
Km.21/600
2. Construction of
box culverts in
place of 2nos. of
HP culverts and
one new HP
culvert over the
above stretch
14900000 1199593577 1.39% 11.65%
10 10 New underpass
1x6x3.5 7500000 1207093577 0.70% 12.35%
11 11
Revision of FRL
from Ch. 22+260
to 22+520
3200000 1210293577 0.30% 12.65%
12 12
Additional Hume
pipe culvert at Km.
6+284 of Size
1x1.00m dia
400000 1210693577 0.03% 12.68%
13 13
Rigid to Flexible
pavement
Km.6+980 to
Km7+200
-2300000 1208393577 -0.21% 12.47%
136270000 -2370000
Monthly Progress Report May 2017-P04A1
Page 21 of 26
Chapter 7. Quality Control and Quality Assurance
7.1 TESTS CONDUCTED
Following tests both at site and at Laboratory have been conducted during the month to ensure Quality
control and Quality Assurance.
Sl. No. Description of Tests conducted Number of
Tests conducted
No. of Tests Failed
Remedial measure adopted
1 Embankment control Tests 240 3
2 Tests in Sub grade 490 6
3 Tests in GSB 222 2
4 Tests in WMM 45 2
5 Tests in DBM 5 -set 0
6 Tests in DLC 0 0
7 Tests on PQC 0 0
8 Tests in BC 6 -set 0
9 Coarse aggregate for Structures (Gradation)
24 0
10 Fine aggregate for Structures (Gradation)
24 0
11 Cement 5 0
12 Cube Compression Tests (28 days) 134-set 0
Monthly Progress Report May-2017-P04A1
Page 22 of 26
Chapter 8. Mobilisation 8.1 CONSULTANT’S TEAM
The staff mobilization is being done in consultation with Employer as per the project requirement. The
following table depicts thecurrent status of staff mobilization.
Sl.
No. Designation Name Joining Date Remark
1. Resident Engineer Mr. Shaktidutta Sarangi 02-Dec-13
2. Quantity Surveyor Mr. Ravi Bhushan Rehalia 01-Nov-2016
3. Highway Engineer Mr. Deepak Kumar 24 -Apr-2017
4. Bridge Engineer Mr. Arun Kumar Ghosh 01-Oct-2016
5. Material Engineer Mr. Nilesh Kumar J. Hapaliya 01-Dec-15
6. Sr. Surveyor Mr. Dilip Kumar De 21-Dec-15
7. Environment & Safety Expert Mr. Mukesh Srivastava 01-Jan-16
8. CADD Engineer Ms. Luin Mohanty 15-Nov-16
9. Asst. Quantity Surveyor Mr. Kella Jagannadha Rao 01-Oct-2016
10. Asst. Highway Engineer-1 Mr. Abhishek Kumar Das 01-Jan-16
11. Asst. Bridge Engineer-1 Mr. Soumya Sarangi 19-Feb-16
12. Asst. Material-cum-Quality
Engineer-1 Mr. Niraj Kumar 01-Jun-16
13. Lab Technician Mr. Saroj Kumar Sahu 04-Dec-15
14. Asst. Surveyor-1 Mr. Vinay Kumar 17-Dec-15
15. Office Manager-cum-Accountant-1 Mr. Jayanta Kumar Sen 01-Aug-14
16. Computer Operator-cum-
Office Assistant-1 Ms. Jyotirmayee Swain 02-Jan-17
17. Office Attendant/Watchman Mr. Madhusudan Pradhan 13-Feb-17
8.2 CONTRACTOR’S TEAM
The Contractor’s Key Mobilisationstatus is as follows:
Sl.
No. Position Name
Date of
Joining Remark
1 Project Manager Mr. Satyananda Jena 01.01.2016
2 Highway Engineer Mr. Shakti Prasad Sukla 12.11.2015
3 Bridge Engineer Mr. Raj Kishore Jena 11.01.2016
4 Material Engineer Mr. Sarat Kumar Mohanty 13.01.2016
5 Equipment Maintenance
Engineer Mr. Suresh Ku Singh 05.02.2016
6 Quantity Surveyor Mr. Sushanta Kumar Sahoo 27.01.2016
7 Environment & Safety Manager Mr. Bikash Kumar Sahoo 01.01.2016
Monthly Progress Report May-2017-P04A1
Page 23 of 26
8.3 STATUS OF PLANT AND EQUIPMENT OF CONTRACTOR
Sl.
No. Description of Equipment/Plant
Min. No. as
per Contract
(own)
No. Mobilized Remarks
Own Hired
1 Mechanical Bitumen Sensor Paver 01 01
2 Motor Grader 02 02
3 Hydraulic Excavator 02 03 01
4 Vibratory Roller (Tandem Roller) 03 02
5 Pneumatic Tyre Roller 01
6 Transit Mixer 05 05
7 Front end Loader 03 03
8 Dozer 01 03
9 Tipper 30 25
10 Bitumen sprayer 01 01
11 Earth Compactor 03 03
12 Water tanker 05 03 16000 LTR.
05 4000 LTR.
13 Mechanical Paver 01 01
14 Concrete Pump 02 01
15 Concrete fixed from Paver 01 01
Plants
1 Hot Mix Plant (Batch Mix only) 01 01 In operation at Km 12+200
2 Concrete Batch-mix Plant 01 01 In operation at Manguli
(4 Km. From CH: 0+000)
3 Cone Crushing Unit 01 01 In operation at Chadeidhara
(50 Km. From CH: 0+000)
4 WMM Plant 01 01 In operation at Km 12+200
The following survey equipment is available at site;
Sl. No. Name of the equipment Quantity (Nos.)
1 Total station 01
2 Auto level 06
Monthly Progress Report May-2017-P04A1
Page 24 of 26
Chapter 9. Visits and Meetings
Site Visits: No Site Visits
Meetings:
1. Meeting with RDC, Cuttack on dated 15.05.2017
2. Meeting with RDC, Cuttack on dated 24.05.2017
3. Meeting with Collector, Kendrapara for review of the project on dated 25.05.2017
Monthly Progress Report May-2017-P04A1
Page 25 of 26
Chapter 10. Important Correspondence during the Month
10.1 SUBMISSIONS AND APPROVALS
04 Nos
10.2 CORRESPONDENCES
Contractor.
Incoming from the Contractor. 24 Nos.
Outgoing to the Contractor.19 Nos.
Employer
Incoming from OWD: 0 Nos.
Outgoing to OWD: 9 Nos.
The list of important correspondences made during the month is furnished as Annexure-4.
Monthly Progress Report May-2017-P04A1
Page 26 of 26
Chapter 11. Weather during the Month
Sl. No. Date Maximum Temp
Minimum Temp
Rain Fall Remarks
°C °C (mm)
1 01-May-17 37.60 29.40 Nil Sunny
2 02-May-17 38.10 29.00 Nil Sunny
3 03-May-17 39.80 29.00 Nil Sunny
4 04-May-17 39.60 29.30 Nil Sunny
5 05-May-17 38.80 29.60 Nil Sunny
6 06-May-17 37.30 29.20 6.40 Cloudy & sunny
7 07-May-17 38.40 29.20 Nil Sunny
8 08-May-17 38.20 27.80 Nil Sunny
9 09-May-17 36.60 27.80 Nil Cloudy & sunny
10 10-May-17 34.90 28.40 Nil Cloudy & sunny
11 11-May-17 38.40 28.40 Nil Sunny
12 12-May-17 39.80 29.20 Nil Sunny
13 13-May-17 40.10 30.10 Nil Sunny
14 14-May-17 40.30 30.10 Nil Sunny
15 15-May-17 40.50 30.00 Nil Sunny
16 16-May-17 38.90 30.30 Nil Sunny
17 17-May-17 39.60 30.20 Nil Cloudy & sunny
18 18-May-17 39.10 30.40 Nil Cloudy & sunny
19 19-May-17 39.90 29.40 Nil Sunny
20 20-May-17 40.80 30.60 Nil Sunny
21 21-May-17 40.70 30.20 Nil Sunny
22 22-May-17 40.20 30.40 Nil Sunny
23 23-May-17 40.40 30.80 Nil Sunny
24 24-May-17 39.90 30.60 Nil Sunny
25 25-May-17 38.60 30.10 Nil Sunny
26 26-May-17 38.30 30.60 Nil Cloudy & sunny
27 27-May-17 38.80 30.20 Nil Cloudy & sunny
28 28-May-17 39.10 29.60 Nil Cloudy & sunny
29 29-May-17 39.80 29.80 Nil Sunny
30 30-May-17 40.20 30.60 0.67 Cloudy & sunny
31 31-May-17 39.90 30.10 Nil Cloudy & sunny
BC / PQCDBM / DLCWMM.GSB SUB.EMB./EXC
0+00
00+
100
0+19
00+
200
0+30
00+
390
0+40
00+
500
0+60
00+
690
0+70
00+
800
0+90
01+
000
1+02
01+
100
1+20
01+
300
1+40
01+
440
1+50
01+
600
1+70
01+
760
1+80
01+
900
1+92
12+
000
2+08
22+
100
2+20
02+
250
2+30
02+
495
2+50
02+
600
2+70
02+
800
2+90
03+
000
3+06
03+
100
3+20
03+
300
3+35
03+
400
3+50
03+
600
3+70
03+
800
3+85
03+
900
4+00
04+
100
4+20
04+
300
4+40
04+
500
4+60
04+
700
4+80
04+
900
5+00
0
EMB./EXCSUB.GSB WMM.DBM / DLCBC / PQC
BC / PQCDBM / DLCWMM.GSB SUB.EMB./EXC
5+00
05+
059
5+10
05+
200
5+30
05+
400
5+50
05+
600
5+65
05+
700
5+80
05+
875
5+90
06+
100
6+15
66+
200
6+30
06+
353
6+40
06+
490
6+50
06+
600
6+70
06+
790
6+89
07+
100
7+20
07+
300
7+40
07+
465
7+50
07+
600
7+70
07+
800
7+90
07+
900
8+00
08+
100
8+20
08+
300
8+34
08+
400
8+50
08+
600
8+68
08+
700
8+80
08+
840
8+90
09+
000
9+03
09+
100
9+20
09+
265
9+30
09+
400
9+43
69+
500
9+60
09+
700
9+80
010
+000
EMB./EXCSUB.GSB WMM.DBM / DLCBC / PQC
EMB./EXC compltd WMM.compltd
PIPE
CU
LVER
T
DLC
RHS
LEGENDS:
PIPE
CU
LVER
T
PIPE
& U
TILI
TY
PIPE
CU
LVER
T
PIPE
CU
LVER
T
PIPE
& U
TILI
TY
PIPE
CU
LVER
T
1 X
1.0
M
1 X
1.0
M
1 X
1.0
M
PIPE
CU
LVER
T
1 X
1.0
M
GSB compltd BC compltdSUB. Compltd DBM compltd
To be startedIn ProgressPQC
1 X
1.0
M
1 X
1.0
M
PIPE
& U
TILI
TY
PIPE
& U
TILI
TY
1 X
1.0
M
1 X
1.0
M
1 X
1.0
M
PIPE
CU
LVER
T
PIPE
CU
LVER
T
1 X
1.0
M
1 X
1.0
M
PIPE
CU
LVER
T
PIPE
& U
TILI
TY
PIPE
CU
LVER
T
NISCHINTAKOILI
MIN
OR
BRID
GE
In Progress
StructureCompleted
5 X
8.8
M
1 X
1.0
MPI
PE &
UTI
LITY
1 X
1.0
MPI
PE C
ULV
ERT
1 X
1.0
MPI
PE C
ULV
ERT
RUP
1 X
1.0
M
LHS
Chainage
LHS
1 X
1.0
MPI
PE C
ULV
ERT
RHS
PIPE
CU
LVER
T1
X 1.
0 M
1 X
1.0
MPI
PE C
ULV
ERT
2 X
1.0
M
1 X
1.0
M
1 X
1.0
M
1 X
1.0
M
1 X
1.0
MPI
PE &
UTI
LITY
1 X
1.0
MPI
PE &
UTI
LITY
1 X
1.0
MPI
PE &
UTI
LITY
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Jagatpur to Nischintakoili (Km. 0/000 to 25/000 of MDR 9A) (Balance work)- Package OSRP - CW - ICB - P04A1)”
1 X
1.0
MPI
PE C
ULV
ERT
1 X
1.0
MPI
PE C
ULV
ERT
1 X
1.0
MPI
PE C
ULV
ERT
2 X
1.0
MPI
PE &
UTI
LITY
LAYER CHART (MDR) (FROM KM. 0+000 TO KM. 10+000)JAGATPUR
Chainage
1 X
1.0
MPI
PE C
ULV
ERT
PIPE
& U
TILI
TY1
X 1.
0 M
BC / PQCDBM / DLCWMM.GSB SUB.EMB./EXC
10+0
0010
+100
10+2
0010
+300
10+4
0010
+545
10+6
0010
+700
10+8
0010
+885
10+9
0011
+000
11+1
0011
+200
11+2
5011
+300
11+4
0011
+500
11+6
0011
+700
11+8
0011
+815
11+9
0012
+000
12+0
1012
+100
12+2
0012
+300
12+3
2612
+400
12+5
0012
+600
12+6
4812
+700
12+8
0012
+900
12+9
83
13+1
0013
+150
13+2
0013
+300
13+3
4013
+400
13+5
0013
+600
13+7
0013
+760
13+8
0013
+900
14+0
0014
+064
14+1
0014
+200
14+2
5014
+300
14+4
0014
+500
14+5
5014
+600
14+7
0014
+800
14+9
0015
+000
EMB./EXCSUB.GSB WMM.DBM / DLCBC / PQC
BC / PQCDBM / DLCWMM.GSB SUB.EMB./EXC
15+0
0015
+100
15+2
0015
+230
15+3
0015
+400
15+5
0015
+600
15+7
0015
+800
15+8
5715
+900
16+0
0016
+100
16+1
2916
+200
16+3
0016
+320
16+4
0016
+423
16+5
0016
+600
16+6
0816
+700
16+8
0016
+884
16+9
0017
+000
17+1
0017
+200
17+3
0017
+315
17+4
0017
+500
17+6
0017
+700
17+8
0017
+900
17+9
6018
+000
18+1
0018
+168
18+2
0018
+300
18+3
8118
+400
18+5
0018
+600
18+7
0018
+800
18+9
0018
+963
19+0
0019
+100
19+2
0019
+300
19+3
4019
+400
19+5
0019
+600
19+6
5019
+700
19+8
0019
+900
19+9
3820
+000
EMB./EXCSUB.GSB WMM.DBM / DLCBC / PQC
Completed
MIN
OR
BRID
GE1
X 7.
5x 2
.5
NISCHINTAKOILI
2 X
1.2
MPI
PE C
ULV
ERT
BOX
CULV
ERT
13+0
00
2 X
1.2
M
1 X
1.2
M
1 X
1.2
M
1 X
1.2
M
1 X
1.0
M
2 X
1.2
M
1.5X
1.5
MBO
X CU
LVER
T
Chainage
RHS
RHS
Chainage
LHS
PIPE
& U
TILI
TY
PIPE
& U
TILI
TY
1 X
1.0
M
PIPE
CU
LVER
T
PIPE
CU
LVER
T
PIPE
CU
LVER
T
PIPE
CU
LVER
T
PIPE
CU
LVER
T
2 X
1.0
MPI
PE &
UTI
LITY
1 X
1.0
M
1 X
1.0
MPI
PE C
ULV
ERT
RUP
1 X
1.0
MPI
PE C
ULV
ERT
MIN
OR
BRID
GE
1X2.
0 X
2.0
MBO
X CU
LVER
T
1 X
8.75
M
1 X
1.0
M
1 X
1.0
MPI
PE &
UTI
LITY
1 X
1.0
MPI
PE C
ULV
ERT
PIPE
CU
LVER
T
PIPE
CU
LVER
T
PIPE
CU
LVER
T
2 X
1.0
M
1 X
(2.0
M x
2.0
M)
PIPE
CU
LVER
T
1X2.
5 X
1.5
MBO
X CU
LVER
T
PIPE
& U
TILI
TY1
X 1.
0 M
PIPE
CU
LVER
T
PIPE
CU
LVER
T
RUP
1 X
1.0
MPI
PE C
ULV
ERT
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Jagatpur to Nischintakoili (Km. 0/000 to 25/000 of MDR) (Balance work)-Package OSRP - CW - ICB - P04A1)”
2 X
1.2
MPI
PE C
ULV
ERT
LAYER CHART (MDR) (FROM KM. 10+000 TO KM. 20+000)JAGATPUR
LHS
PIPE
CU
LVER
T
2 X
1.2
M
1 X
1.0
M
1 X
1.2
M
2 X
1.2
M
1 X
1.2
MPI
PE C
ULV
ERT
1 X
1.2
MPI
PE C
ULV
ERT
2 X
1.2
MPI
PE C
ULV
ERT
1 X
1.0
MPI
PE &
UTI
LITY
1 X
8.15
MM
INO
R BR
IDGE
1 X
(3.0
M x
3.0
M)
BOX
CULV
ERT
To be startedGSB compltd BC compltd In Progress
StructureLEGENDS:EMB./EXC compltd
WMM.compltdIn ProgressPQCSUB. Compltd DBM compltd
DLC
NISCHINTAKOILIBC / PQCDBM / DLCWMM.GSB SUB.EMB./EXC
20+0
0020
+100
20+2
0020
+300
20+4
0020
+500
20+6
0020
+615
20+7
0020
+800
20+9
0021
+000
21+1
0021
+200
21+2
6821
+300
21+4
0021
+500
21+5
2021
+600
21+7
0021
+752
21+8
0021
+900
22+0
0022
+050
22+1
0022
+200
22+3
0022
+400
22+5
0022
+600
22+6
4822
+700
22+8
0022
+895
22+9
0023
+000
23+1
0023
+160
23+2
0023
+300
23+3
6023
+400
23+5
0023
+580
23+6
0023
+700
23+8
0023
+853
23+9
0024
+000
24+1
0024
+114
24+2
0024
+300
24+4
0024
+470
24+5
0024
+600
24+7
0024
+732
24+8
0024
+900
25+0
00
EMB./EXCSUB.GSB WMM.DBM / DLCBC / PQC
1 X
(2.0
M x
2.0
M)
BOX
CULV
ERT
EMB./EXC compltd
WMM.compltd DLC completed
1.5
X 1.
6 M
BOX
CULV
ERT
1 X
1.2
MPI
PE C
ULV
ERT
2 X
1.2
MPI
PE C
ULV
ERT
PQCSUB. Compltd DBM compltd inprogress
2 X
1.0
MPI
PE C
ULV
ERT
2 X
1.0
MPI
PE C
ULV
ERT
2 .0
X 2.
0 M
BOX
CULV
ERT
1 X
1.0
MPI
PE &
UTI
LITY
2 X
1.0
MPI
PE &
UTI
LITY
1.5X
2.0X
1.0
MBO
X CU
LVER
T
PIPE
CU
LVER
T
PIPE
CU
LVER
T
GSB compltd BC compltd In Progress to be started
“Widening of Strengthening of Existing Carriage Way to 2 lane road from Jagatpur to Nischintakoili (Km. 0/000 to 25/000 of MDR) (Balance work)-Package OSRP - CW - ICB - P04A1)”
LAYER CHART (MDR) (FROM KM. 20+000 TO KM. 25+000)
structuresLEGENDS:
1 X
1.2
M
JAGATPUR
LHS
1 X
7 X
2.5
1 X
(2.0
M x
2.0
M)
BOX
CULV
ERT
2 X
1.0
M
Chainage
RHS
MIN
OR
BRID
GE
APPENDIX-2Jagatpur - Nischintakoli Road Project (Package P04A1)
(km 0+00 TO 25+00)
Culvert Number
ChainageSide L R L R L R L R L R L R L R L R L R L R L R
23+16019+33418+168 24+732
(km 0+00 TO 25+00)Progress Report of Box Culverts
1 3 10 112 4
24+11421+753
6 7 8
22+89516+129
Approach Slab
Wing Wall
9
10+885 16+884
Slab
5
18+669
PCC
Excavation
Raft with key
Side Wall
Haunch/ Stater
Slab
Completed
In Progress
Yet to be taken up
Executed in previous Contract
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0+190 0+390 0+690 1+020 1+440 1+760 1+800 1+900 2+400 2+800 3+060 3+350 3+850 4+300 5+059 5+650 5+875 6+151 6+353 6+450 6+800 7+465 7+900 8+200 8+340 8+680 8+900 9+030 9+265 9+436 9+600
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
10+100 11+250 11+500 11+815 12+010 12+326 12+648 12+983 13+100 13+150 13+340 13+820 14+064 14+250 14+550 14+800 15+230 15+400 16+352 16+423 16+608 17+315 17+500 17+960 18+381 18+778 18+963 19+650
LHS
Culvert Number
Chainage
Head Wall
Pipe Bed filling sand
Pipe bed excavation
Head Wall PCC
Head wall Excavation
Chainage
Head Wall
Pipe Laying
Pipe Bed filling Concrete
APPENDIX-2Jagatpur - Nischintakoli Road Project (Package P04A1)
(km 0+00 TO 25+00)Progress Report of Pipe Culverts
Culvert Number
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
60 61 62 63 64 65 66 6721+268 21+520 22+050 22+648 23+360 23+580 23+853 24+470
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
Pipe Bed Concrete
Head Wall
Pipe Laying
Pipe Bed filling sand
Pipe bed excavation
Head Wall PCC
Pipe Bed concrete
Head Wall PCC
Culvert NumberChainage
Head Wall
Pipe Laying
Head wall Excavation
Pipe Bed filling sand
Pipe bed excavation
LHS
RHS
Completed
In Progress LHSRHS
Yet to be taken up
Executed in previous Contract
Head wall Excavation
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0+190 1+921 2+495 2+800 3+850 4+300 5+650 6+490 7+465 8+200 9+030 10+100 13+760 16+608 17+307 17+500 18+381 22+050 22+648 23+853 24+470
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
Completed
In Progress
Yet to be taken up
Executed in previous Contract
Sand filling
PCC(Bedding
(km 0+00 TO 25+00)Progress Report of Pipe Culverts For Utility Only
APPENDIX-2
PCC(Chamber)
Pipe Laying
Chamber
Chainage
Culvert Number
Jagatpur - Noschintakoli Road Project (Package P04A1)
MAIN ROAD
A B C
A B C
Executed in previous Contract
Progress Report of Reptile Underpass
1 2 3
9+030 12+326 16+325
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
LHS
Completed
In Progress
Yet to be taken up
Executed in previous Contract
Excavation
Chainage
Culvert Number
APPENDIX-2
Head Wall
Pipe Laying
PCC(Head wall)
PCC(Bedding
Jagatpur - Nischintakoli Road Project (Package P04A1)
(km 0+00 TO 25+00)
MAIN ROAD
A B C
A B C
Jagatpur Side
Duhuria Side
Jagatpur Side
Duhuria Side
RHSLHSRHSLHSRHSLHSRHSLHSRHSLHSRHSLHSRHSLHSRHSLHS
Completed
In Progress
Yet to be taken up
Executed in previous Contract
APPENDIX-2
1
10+545
2
15+857
Excavation
Jagatpur - Nischintakoli Road Project (Package P04A1)(km 0+00 To 25+00)
Progress of Minor Bridge (Typical Fig.)
PCC - Leveling
RCC in Deck Slab
RCC in Approach Slab
Finishing Works
RCC In Abutment
RCC In Foundation
RCC in Return Wall
Bridge Number
Chainage
APPENDIX-2
Bridge NumberChainage
Side Jagatpur Side Duhuria Side Jagatpur Side Duhuria Side Jagatpur Side Duhuria Side
Finishing Works RHS
LHSRHSLHS
RCC in Approach Slab
Nischintakoli - Duhuria Road Project (Package P04A)
(km 0+00 To 25+00) Progress of Minor Bridge (Typical Fig.)
2+0821 2
19+9383
20+615
RHSLHSRHSLHSRHSLHSRHSLHSRHSLHSRHSLHSRHSLHSRHSLHS
Completed
Excavation
RCC in Deck Slab
Pier Cap
RCC Pier
RCC in Return Wall
RCC In Abutment
RCC In Foundation
PCC - Leveling
Completed
In Progress
Yet to be taken up
Executed in previous Contract
ANNEXURE-3
Sl. No. Description of Drawing Drawing No.Date of
Submission by Contractor
Letter No. of Submission by ContractorDate of
Approval by CSC
Letter no. of Approval by CSC Status of Approval GFC Drawing No.
Remarks (mention
reason for rejection)
1 Drawing for Hume pipe culvert at Ch.6+284. Sheet 1 11.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/279 16.05.2017 LASA/RE-1/73466/P04A1/502 Approved Sheet 1
2 Drawing for Minor Bridges at Ch.20+620. Sheet 1 06.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/275 16.05.2017 LASA/RE-1/73466/P04A1/504 Approved
3 Drawing for Minor Bridges at Ch.19+938. Sheet 1 06.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/276 16.05.2017 LASA/RE-1/73466/P04A1/504 Approved
4 Drawing for Box Culvert at Ch.22+400. Sheet 1 11.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/281 26.05.2017 LASA/RE-1/73466/P04A1/520 Approved
Widenning & Streangthening of existing carriageway to 2-lane road from Jagatpur to Nischintakoili (Km 00/000 to Km, 25/000 of MDR of SH-9)
ICB Package OSRP-CW-ICB-P04A1List of GFC Drawing
Sl. No. Date Letter Reference No Subject From
1 02.05.2017 BEL-UMSL (JV)/HO/JGT/17-18/283 Drawings and decisions for structures. UMSL
2 02.05.2017 BEL-UMSL (JV)/HO/JGT/17-18/285 Drawings and decisions for structures. UMSL
3 03.05.2017 BEL-UMSL (JV)/HO/JGT/17-18/284 Work stopped due to local strike at Bahugram (Km 10+000) on 02.05.2017 regarding. UMSL
4 02.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/274 Approval of Joint Sealants. UMSL
5 05.05.2017 BEL-UMSL (JV)/HO/JGT/17-18/287 Work stopped due to local strike at Bahugram (Km 10+000) on 02.05.2017 regarding. UMSL
6 05.05.2017 BEL-UMSL (JV)/HO/JGT/17-18/288 Obstruction in structure at Km. 18+168. UMSL
7 06.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/275 Approval of working drawing of Minor Bridge at Ch. 20+620. UMSL
8 06.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/276 Approval of working drawing of Minor Bridge at Ch. 19+938. UMSL
9 06.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/277 Obstruction of road work at Ch. 6+284. UMSL
10 02.05.2017 BEL-UMSL (JV)/HO/JGT/17-18/285 Drawings and decisions for structures. UMSL
11 11.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/278 Obstruction of road work (Saucer drain area, LHS) from Ch. 18+035 to Ch. 18+045. UMSL
12 11.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/279 Approval of working draing of HPC at Ch. 6+284. UMSL
13 11.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/280 Approval of working draing of BC at Ch. 18+669. UMSL
14 11.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/281 Approval of working draing of BC at Ch. 22+400. UMSL
15 12.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/283 Discrepancy of Plan & Profile. UMSL
16 15.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/284 Obstruction of road work at Ch. 10+360. UMSL
17 19.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/285 Submission of BA-08 (Moorum) for Approval. UMSL
18 16.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/287 Submission of Diversion Plans. UMSL
19 16.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/288 Request for Approval of IPA-17. UMSL
20 16.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/289 Request for Approval of IPA-17. UMSL
21 19.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/291 Reinforcement schedule for concrete wearing coarse. UMSL
22 22.05.2017 BEL-UMSL (JV)/HO/JGT/17-18/291 Hindrances of the project. UMSL
23 23.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/293 Approval for Mix Design of Bituminous Concrete (BC) Grade-II. UMSL
24 26.05.2017 BACKBONE-UTKAL (JV)/JN/WB/OSRP/16-17/294 Obstruction of work at Ch. 19+938 (Minor Bridge). UMSL
FROM CONTRACTOR
APPENDIX-4
CLIENT (ODISHA WORKS DEPARTMENT)
Construction super vision of Jagatpur to Nischintakoili (Km.0/0 to Km.25/0 of MDR)(Balance Work) of SH9 of Odisha state Roads Project.
INCOMING CORRESPONDENCES FOR THE MONTH OF MAY-2017
Sl. No. Date Letter Reference No Subject To
1 05.05.2017 LASA/RE-1/73466/P04A1 & P04A2/486 Proceeding on leave. OWD
2 09.05.2017 LASA/RE-1/73466/P04A1/491 Submission of Change Order request No.-11. OWD
3 11.05.2017 LASA/RE-1/73466/P04A1 & P04A2/492 Mobilization of Staff. OWD
4 13.05.2017 LASA/RE-1/73466/P04A1/499 Submission of Change Order request No.-12. OWD
5 18.05.2017 LASA/RE-1/73466/P04A1/508 Details of Junction (P04A1). OWD
6 18.05.2017 LASA/RE-1/73466/P04A1/510 Submission of MPR for the month of April,2017 (P04A1). OWD
7 18.05.2017 LASA/RE-1/73466/P04A1/512 Submission of Change Order request No.-13. OWD
8 22.05.2017 LASA/RE-1/73466/P04A1/514 Submission of Application for IPC-17. OWD
9 23.05.2017 LASA/RE-1/73466/P04A1/516 Compliance Report over observation of IPC-11,13,14 & 15. OWD
1 02.05.2017 LASA/RE-1/73466/P04A1/478 Approval for BA-9 Sand for construction of Embankment UMSL
2 03.05.2017 LASA/RE-1/73466/P04A1/479 Additional cost estimate for revision of profile from 0+440 to 0+740. UMSL
3 03.05.2017 LASA/RE-1/73466/P04A1/480 Observation on IPC-16 regarding. UMSL
4 03.05.2017 LASA/RE-1/73466/P04A1/481 Work stopped due to local strike at Bahugram at Ch. 10+000 Km. UMSL
5 04.05.2017 LASA/RE-1/73466/P04A1/483 Reminder for submission of variation for various items exceeding BOQ Quantities. UMSL
6 05.05.2017 LASA/RE-1/73466/P04A1/487 Structure Details. UMSL
7 06.05.2017 LASA/RE-1/73466/P04A1/489 Slow progress of structures. UMSL
8 11.05.2017 LASA/RE-1/73466/P04A1/493 Slow Progress of Minor Bridge over Khaira at Km. 2+082. UMSL
9 11.05.2017 LASA/RE-1/73466/P04A1/494 Completion of Section-I. UMSL
10 12.05.2017 LASA/RE-1/73466/P04A1/497 Light Vehicular Underpass at Ch. 2+116. UMSL
11 16.05.2017 LASA/RE-1/73466/P04A1/500 Slow progress of Box Drain and Open drain work in between Ch. 18+000 to 22+000 RHS. UMSL
12 16.05.2017 LASA/RE-1/73466/P04A1/501 Additional cost estimate for Box Drain and Lined drain. UMSL
13 16.05.2017 LASA/RE-1/73466/P04A1/502 Issue of Drawing for HPC. UMSL
14 16.05.2017 LASA/RE-1/73466/P04A1/504 Issue of Drawing for Minor Bridges. UMSL
15 17.05.2017 LASA/RE-1/73466/P04A1/506 Approval of Joint Sealants. UMSL
16 18.05.2017 LASA/RE-1/73466/P04A1/513 Deployment of Pneumatic Tyres Roller (PTR) for execution of Bituminous Concrete layer. UMSL
17 25.05.2017 LASA/RE-1/73466/P04A1/518 Approval of Mix Design/Job Mix Formula for Bituminous Concrete Grade-2. UMSL
18 25.05.2017 LASA/RE-1/73466/P04A1/519 Approval of BA-08 (Moorum). UMSL
19 26.05.2017 LASA/RE-1/73466/P04A1/520 Issue of Drawing for BC. UMSL
CONTRACTOR-BACKBONE-UMSL
APPENDIX-4
CLIENT (ODISHA WORKS DEPARTMENT)
Construction super vision of Jagatpur to Nischintakoili (Km.0/0 to Km.25/0 of MDR)(Balance Work) of SH9 of Odisha state Roads Project.
OUTGOING CORRESPONDENCES FOR THE MONTH OF MAY-2017