MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP
\
Name of Operation Moolarben Coal Complex
Name of Licensee Moolarben Coal Operations Pty Ltd
Environmental Protection Licence 12932
Reporting Period start date 1 December 2016
Reporting Period end date 31 December 2016
Version 1
Author M. Cavanagh
Approver G. Chase
Monthly Environmental
Monitoring Report For the Month Ending 31 December 2016
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 1
1 INTRODUCTION
Moolarben Coal Operations Pty Ltd (MCO) operates the Moolarben Coal Mine located at 4250 Ulan Road, Ulan,
NSW which is approximately 40km north-east of Mudgee, within the Western Coal Field. It is located east of the
Ulan Coal Mine and west of the Wilpinjong Coal Mine.
The purpose of this report is to provide a monthly update of monitoring data in accordance with the requirements
of Environmental Protection Licence (EPL) 12932, section 66(6) of the POEO Act and the MCO Project Approvals
05_0117 and 08_0135.
To view MCO EPL 12932 in full please refer to the link below.
http://www.environment.nsw.gov.au
On 26 May 2016 EPL 12932 Variation was approved. The variation replaces all previous versions of the licence.
2 MONITORING REQUIREMENTS
The Moolarben Environment Protection Licence (EPL) 12932 specifically requires the monitoring of:
Eight dust gauge sites (dust deposition monitoring);
Three Tapered Element Oscillating Microbalance (TEOM) PM10 sites;
One PM10 High Volume Air Sampler (HVAS);
Three water discharge points;
Two surface water quality sites;
Four effluent discharge sites;
Blast monitoring;
Noise monitoring; and
Meteorological monitoring.
Monitoring of sites not required by the EPL are carried out in accordance with MCO Environmental Monitoring
Program (EMP) and Project Approval 05_0117 and 08_0135.
The MCO EPL12932 Environmental Monitoring Network is shown on Figure 1.
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 2
Figure 1: EPL 12932 MCO Environmental Monitoring Network
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 3
3 DUST DEPOSITIONAL GAUGES
During December 2016 samples from eleven dust gauges were collected and analysed by a NATA accredited
laboratory (Table 1). As at 31 December 2016 no depositional dust gauges had recorded an exceedance of the
12-month rolling average criteria of 4 g/m2/month (Figure 2).
Table 1: Dust Deposition Results – December 2016
Note: Contaminated results are not included in the 12 month rolling average
Monthly results above 4g/m2/month are not classed as an exceedance of criteria as the criteria is an annual average of 4g/m2/month
Sampled: 30 December 2016 Licensee: Moolarben Coal Operations Pty Ltd
Obtained: 13 January 2017 EPL No. 12932 Published: 23 January 2017 Monitoring frequency: Monthly
Location EPA ID no. Pollutant Measurement (g/m2/month)
12 month Rolling Average
(g/m2/month)
100 percentile concentration
limit (g/m2/month)
DG01 6 Particulates - Deposited Matter 0.5 0.5 4.0
DG04 9 Particulates - Deposited Matter 0.4 1.2 4.0
DG05 10 Particulates - Deposited Matter 2.0 1.3 4.0
DG06 11 Particulates - Deposited Matter 1.1 0.6 4.0
DG07 12 Particulates - Deposited Matter 1.2 0.9 4.0
DG08 13 Particulates - Deposited Matter 0.9 0.7 4.0
DG09 14 Particulates - Deposited Matter 0.4 0.6 4.0
DG11 NA Particulates - Deposited Matter 0.6 0.7 4.0
DG12 7 Particulates - Deposited Matter 0.7 1.0 4.0
DG13 NA Particulates - Deposited Matter 0.6 0.7 4.0
DG14 NA Particulates - Deposited Matter 0.6 0.7 4.0
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 4
Figure 2: Depositional Dust 12 Month Averages
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 5
4 REAL TIME PM10 MONITORING
Continuous particulate matter less than 10μm (PM10) monitoring was conducted by four tapered element
oscillating microbalance (TEOM) units at Moolarben during December 2016.
The EPA identification numbers 15, 17 and 27 refer to the TEOMs installed on Ulan-Wollar Road (TEOM06), Ulan
Public School (TEOM 1) and Southern Ridge Road (TEOM 5) respectively. In addition, a fourth unit is located on Ulan
Road (TEOM 4) with data used for management purposes only.
No results were above the daily or annual limit (Table 2). Real time PM10 results for December 2016 are illustrated
in Figure 3.
Table 2: Explanation of TEOM results above the daily criteria
Figure 3: Daily Results from TEOMs
Site Date Result (μg/m3) Weather Comment
There were no average results above the daily limit
There were no average results above the annual limit
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 6
Table 3: TEOM Data – December 2016
Daily PM10 Monitoring EPL No. 12932
Obtained 03 January 2017 Licensee: Moolarben Coal Operations Pty Ltd
Published 23 January 2017
Sampled 24hr Impact (µg/m3) 12 month Rolling Average (µg/m3)
Measurement Criteria Measurement Criteria
TEOM
01
EPL 1
7
TEOM
04
TEOM
05
EPL2
7
TEOM
06
EPL 1
5
TEOM
01
EPL 1
7
TEOM
04
TEOM
05
EPL2
7
TEOM
06
EPL 1
5
1/12/2016 14.6 20.9 14.0 15.7 50 13.4 11.1 8.5 11.4 30
2/12/2016 16.2 25.6 17.8 26.9 50 13.3 11.1 8.5 11.4 30
3/12/2016 24.9 31.1 20.8 25.5 50 13.3 11.1 8.5 11.5 30
4/12/2016 26.5 29.1 20.1 20.7 50 13.4 11.2 8.5 11.5 30
5/12/2016 26.9 28.1 21.4 23.8 50 13.4 11.2 8.5 11.5 30
6/12/2016 16.2 17.9 11.8 13.0 50 13.4 11.2 8.5 11.5 30
7/12/2016 12.0 13.1 6.7 5.9 50 13.3 11.2 8.5 11.5 30
8/12/2016 12.3 18.6 9.1 15.6 50 13.3 11.2 8.5 11.5 30
9/12/2016 8.2 12.7 6.9 13.3 50 13.2 11.2 8.5 11.5 30
10/12/2016 19.7 22.5 13.9 17.1 50 13.3 11.2 8.5 11.5 30
11/12/2016 21.4 26.2 18.8 17.7 50 13.3 11.3 8.5 11.6 30
12/12/2016 15.4 17.9 11.9 14.0 50 13.2 11.3 8.5 11.6 30
13/12/2016 27.5 18.4 13.1 23.5 50 13.2 11.3 8.5 11.6 30
14/12/2016 22.7 19.0 14.6 20.4 50 13.2 11.3 8.5 11.6 30
15/12/2016 8.3 12.0 4.1 5.5 50 13.1 11.3 8.5 11.5 30
16/12/2016 5.4 9.1 4.6 4.7 50 13.0 11.3 8.4 11.5 30
17/12/2016 4.7 7.7 4.4 6.5 50 13.0 11.3 8.4 11.4 30
18/12/2016 21.7 25.4 19.2 20.3 50 13.0 11.3 8.4 11.5 30
19/12/2016 19.4 22.7 13.8 1.6 50 13.0 11.4 8.4 11.4 30
20/12/2016 14.9 17.6 16.0 14.2 50 13.0 11.4 8.4 11.4 30
21/12/2016 17.2 17.7 17.8 20.8 50 13.0 11.4 8.4 11.5 30
22/12/2016 20.0 24.6 14.8 14.6 50 13.0 11.4 8.4 11.5 30
23/12/2016 18.4 22.2 14.5 3.3 50 13.0 11.4 8.4 11.4 30
24/12/2016 4.6 7.9 3.4 5.9 50 13.0 11.5 8.4 11.4 30
25/12/2016 5.8 8.0 4.3 4.5 50 13.0 11.5 8.4 11.4 30
26/12/2016 5.9 9.8 4.9 5.2 50 13.0 11.5 8.4 11.4 30
27/12/2016 12.4 18.3 10.9 14.4 50 13.0 11.5 8.4 11.4 30
28/12/2016 13.4 17.7 10.9 12.1 50 13.0 11.5 8.4 11.4 30
29/12/2016 10.3 14.6 9.4 19.2 50 13.0 11.6 8.4 11.4 30
30/12/2016 13.8 15.3 11.4 17.5 50 13.0 11.6 8.5 11.5 30
31/12/2016 9.4 12.9 8.3 12.5 50 13.0 11.6 8.5 11.5 30
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 7
5 HIGH VOLUME AIR SAMPLER (HVAS) PM10 MONITORING
Moolarben Coal monitors PM10 with two high volume air sampler (HVAS) units located on John Street in Ulan
Village and on Ridge Road. The Ridge Road HVAS is not required by the EPL. Samples were taken every six days with
a 100% data capture rate for the period. The annual rolling average and PM10 results for December 2016 are
presented graphically in Figure 4.
Table 4: HVAS (PM10) RESULTS
Obtained: 13 January 2017 EPL No.12932 Licensee: Moolarben Coal Operations Pty Ltd Published: 23 January 2017
Monitoring frequency: Every 6 days
Sample Date Pollutant Measurement 24hr Impact
Assessment
Criteria
12 Month
Rolling
Average
Yearly Impact
Assessment
Criteria
Units
Sampling Point: PM01 (EPL Point No. 16) – Ulan Village 01-Dec-16 PM10 16 50 11.8 30 µg/m3
07-Dec-16 PM10 24 50 11.7 30 µg/m3
13-Dec-16 PM10 22 50 11.6 30 µg/m3
19-Dec-16 PM10 23 50 11.6 30 µg/m3
25-Dec-16 PM10 8 50 11.6 30 µg/m3
31-Dec-16 PM10 11 50 11.5 30 µg/m3
Sampling Point: PM02 – Ridge Rd 01-Dec-16 PM10 18 50 10.2 30 µg/m3
07-Dec-16 PM10 17 50 10.1 30 µg/m3
13-Dec-16 PM10 18 50 10.0 30 µg/m3
19-Dec-16 PM10 21 50 10.0 30 µg/m3
25-Dec-16 PM10 8 50 10.0 30 µg/m3
31-Dec-16 PM10 11 50 9.9 30 µg/m3
Table 5: Explanation of HVAS Results Above Criteria
Site Date Result
(μg/m3) Weather Comment
There were no daily results above the daily limit
There were no average results above the annual limit
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 8
Figure 4: HVAS Results
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 9
6 SURFACE WATER
Table 6 shows the total suspended solids, electrical conductivity, pH and oil and grease results for the routine
monthly monitoring conducted on 9th December 2016. In accordance with conditions M2.3 of EPL 12932, surface
water quality is monitored at two locations, SW10 (EPL Point 4) and SW11 (EPL Point 3), along Bora Creek on a
monthly basis.
Table 6: Surface Water Results
Sampled: 09 December 2016
Licensee: Moolarben Coal Operations Pty Ltd
EPL No. 12932 Obtained: 13 January 2017
Published: 23 January 2017
Location EPL Sampling
point EPL Monitoring
frequency
Total Suspended Solids (mg/L)
Electrical Conductivity
(μS/cm) pH
Oil & Grease
SW01 – Goulburn River
n/a n/a 6 741 8.1 n/a
SW02 – Goulburn River
n/a n/a <5 725 8.0 n/a
SW04 – Murragamba Creek
n/a n/a 10 523 7.4 n/a
SW05 – Moolarben Creek
n/a n/a 6 714 7.3 n/a
SW07 – Lagoon Creek
n/a n/a 10 1970 8.3 n/a
SW08 – Moolarben Creek
n/a n/a 8 2910 6.7 n/a
SW09 – Moolarben Creek
n/a n/a 12 3690 6.8 n/a
SW10 – Bora Creek
4 Special Frequency 11 Dry Dry Dry Dry
SW11 – Bora Creek
3 Special Frequency 11 46 322 7.1 <5
SW12 – Goulburn River
n/a n/a 5 534 7.2 n/a
SW 15 – Wilpinjong Creek
n/a n/a 42 277 6.6 n/a
SW 16 – Wilpinjong Creek
n/a n/a 15 338 7.1 n/a
SW17 – Eastern Creek
n/a n/a 31 792 6.9 n/a
SW18 – Wilpinjong Creek
n/a n/a Dry Dry Dry n/a
SW19 – Murragamba Creek
n/a n/a <5 622 6.2 n/a
SW20 – Eastern Creek
n/a n/a Dry Dry Dry n/a
Note: Total Suspended Solids limit of Analysis = <5mg/L. Sample result below detectable range. 1: Point 3 is required to be sampled monthly in the event of a flow, and daily during periods of discharge from license point 1 and in the event of a flow at Point 3. Point 4 is required to be sampled monthly in the event of a flow.
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 10
Figure 5: pH Results
Figure 6: EC Results
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 11
Figure 7: Total Suspended Solid Results
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 12
6.1 Water Discharges
Moolarben Coal did not have any licensed discharges during December 2016.
6.2 Effluent System
Moolarben Coal operates four effluent discharges to land, which are identified as Point 5, Point 22, Point 23 and
Point 48 in Condition P1.3 of EPL 12932. Effluent discharge occurs daily and quality sampling occurs on a quarterly
basis.
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 13
7 GROUNDWATER
Figure 8: Groundwater Levels
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 14
Figure 9: Groundwater Levels
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 15
Figure 10: Groundwater Levels
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 16
Figure 11: Groundwater Levels
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 17
8 NOISE
In accordance with the MCO Noise Management Plan attended noise compliance monitoring is undertaken
monthly by a suitably qualified and experienced person. Monthly monitoring was conducted in December 2016
with results obtained on 17 January 2017. All monitoring measurements were undertaken during night time, except
for monitoring site NA1 (Ulan School) which was monitored during the day.
A brief description of the measurements at all sites are shown below and full attended noise monitoring results for
December 2016 are shown in Table 7.
NA1, Ulan School
During the day measurement on 14 December 2016, MCO was inaudible. Birds generated the measured LA1, LA10 and LAeq. Breeze in foliage generated the measured LA90. Road traffic noise, aircraft, insects and noise from a nearby school were also noted. The wind speed during this measurement was 3.5 m/s with a stability class of A. NA6, Lower Ridge Road
During the night measurement on 13 December 2016, MCO was inaudible. Dogs were primarily responsible for generating the measured LA1 and contributed to the measured LA10 and LAeq. Insects and frogs were primarily responsible for the measured LA10 and LAeq and generated the measured LA90. Birds, livestock and road traffic noise were also noted. The wind speed during this measurement was 1.1 m/s with a stability class of D. NA12, Winchester Crescent
During the night measurement on 13 December 2016, MCO was inaudible. Frogs and insects were primarily responsible for measured levels. Road traffic noise, aircraft, birds, dogs, livestock and owls were also noted. The wind speed during this measurement was 0.9 m/s with a stability class of D.
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 18
Table 7: Monthly Attended Noise Monitoring Results
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 19
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 20
9 BLASTING
Blast monitoring is required by EPL 12932 at Ulan School (BM1). Monitoring is also undertaken at Ridge Road
(BM5). A total of eight blasts were conducted during December 2016. The blast results are shown in Table 8.
Table 8: Blast Results
Date Time Blast Location
BM1 Ulan School BM5 Ridge Rd
Ground Vibration (mm/s)
Blast Overpressure
(dBL)
Ground Vibration (mm/s)
Blast Overpressure
(dBL)
07/12/16 12:17 OC4 S02 B04 0.27 88.0 0.29 94.5
09/12/16 12:04 OC2 S13 B05 0.27 100.0 0.2 101.9
12/12/16 12:01 OC2 S14 B05 0.13 94.0 0.22 97.5
16/12/16 12:11 OC4 S02 B07 0.41 94.0 0.47 102.8
23/12/16 12:06 OC4 S02 B10 0.34 94.0 0.32 104.2
28/12/16 16:02 OC2 S14 B04 0.14 88.0 0.12 95.9
30/12/16 16:00 OC2 S10 B01 0.12 91.5 0.05 91.5
30/12/16 16:05 OC4 S02 B16 0.50 88.0 0.33 94.0
MONTHLY ENVIRONMENTAL MONITORING REPORT For the Month Ending 31 December 2016
MOOLARBEN COAL OPERATIONS PTY LTD | PART OF THE YANCOAL AUSTRALIA GROUP Page 21
10 METEOROLOGY
Weather data is measured continuously at the Ulan Road Weather Station (Weather Station 3). Temperature (2m)
and rainfall data are presented below. In addition to these parameters the weather station also measures wind,
temperature (10m), solar radiation, humidity, atmospheric pressure, and sigma theta. All data was captured during
December 2016.
Figure 12: Temperature Data
Figure 13: Rainfall Data
-5
0
5
10
15
20
25
30
35
40
45
01
/12/1
6
03
/12/1
6
05
/12/1
6
07
/12/1
6
09
/12/1
6
11
/12/1
6
13
/12/1
6
15
/12/1
6
17
/12/1
6
19
/12/1
6
21
/12/1
6
23
/12/1
6
25
/12/1
6
27
/12/1
6
29
/12/1
6
31
/12/1
6
Deg
ree (
Cels
ius
)
Date
Weather Station 3Temperature (2m)
MaximumTemperature
AverageTemperature
MinimumTemperature
0
5
10
15
20
25
30
35
40
01
/12/1
6
03
/12/1
6
05
/12/1
6
07
/12/1
6
09
/12/1
6
11
/12/1
6
13
/12/1
6
15
/12/1
6
17
/12/1
6
19
/12/1
6
21
/12/1
6
23
/12/1
6
25
/12/1
6
27
/12/1
6
29
/12/1
6
31
/12/1
6
Rain
fall
(m
m)
Date
Weather Station 3Rainfall
DailyRainfall
CumulativeRainfall