8/3/2019 Mono Pitch Installation Guide Type B
1/14
Howells Glazing Systems Ltd
FIXING INSTRUCTIONS
Page 1
ALIVER Thermal Break Roof
Tooling Requirements
1. Electric Drill
2. Battery Drill3. Spirit Level4. Tape Measure5. Hand Tools (Hammer, Rubber Mallet, Large Square, Pozi Screwdriver, Glazing
Knife, Hacksaw)6. Allen Keys 3mm & 6mm7. Drill Bits 4mm & 6.5mm8. 8mm & 10mm Taps (For Tie Bars)
9. Mastic Gun10. 13mm Spanner11. Scaffold Tower.
8/3/2019 Mono Pitch Installation Guide Type B
2/14
Page 2
Step 1
Before the assembly of the conservatory roof,ensure the following dimensions have beenchecked (A & B) to provide a square base.Windows must be vertical and cill must be level.
Step 2
All conservatory roof packs are labelled.
Check that the total of packs match the delivery note.
Open the Accessory Pack first. Then open the Ring-Beam and Main Rafters.
This will avoid any confusion and avoid any sections oraccessories being lost or damaged on site.
Underside of wall plate
Step 3
Locate the wall/plate and fix to the back wall at the
height as shown on the roof plan
8/3/2019 Mono Pitch Installation Guide Type B
3/14
Page 3
Step 5
Place the Ring/Beam/Gutter onto
your windows and secure through
the windows up into the ring beam.
TIP
Before going too far it may be
advisable to try and lift a rafter into
place at this point to see how close
the fit is. You may have to adjustthe wall/plate height or ring beam
position..
Step 6
Once you are happy with the fit of the
rafters, secure each rafter into place
through the holes under the hinge plates atboth the wall/plate and ring beam.
Screw fix under
here into the rafter
at the top & bottom
Step 7
Clip the white plastic T shape isolator
VR514 into the rafter.
VR 514
Important Note
When joining Ring Beam to Ring
Beam (Shaped Roof) it is important
that a silicone seal is applied to ALL
edges prior to assembly.
8/3/2019 Mono Pitch Installation Guide Type B
4/14
Page 4
8/3/2019 Mono Pitch Installation Guide Type B
5/14
Page 5Step 8
Using the plastic spacers set out the top wall
plate cover and bolt to the wall
VR 2426Wall Plate
Plastic Spacers(Provided)
Step 9
Place the end caps and glass stops into position on the
Ring Beam. Screw the end caps onto the end of the
white pvc T section. A packer will be required between
the aluminium glass end stop and the glass.
8/3/2019 Mono Pitch Installation Guide Type B
6/14
Page 6
Step 12
Step 10
Seal with the adhesive strip (flash band)
ACMX09811) between the wall plate and glassas shown.
Step 11
Locate the glass end closer into the correctchannel and bed onto a silicone joint.
8/3/2019 Mono Pitch Installation Guide Type B
7/14
Page 7
Step 13
Clip into place the large flipper gasket (ACVR202)
into the wall plate. This will need to be notched
around each rafter capping.
Step 14
Clip in the finishing sections (SR014) to cover
the screws fixing the rafters to the ring beam
and wall plate.
8/3/2019 Mono Pitch Installation Guide Type B
8/14
2
8/3/2019 Mono Pitch Installation Guide Type B
9/14
8/3/2019 Mono Pitch Installation Guide Type B
10/14
150mm 125mm 105mm 73mm
8/3/2019 Mono Pitch Installation Guide Type B
11/14
8/3/2019 Mono Pitch Installation Guide Type B
12/14
8/3/2019 Mono Pitch Installation Guide Type B
13/14
8/3/2019 Mono Pitch Installation Guide Type B
14/14