6
Monitoring the JMR Wet Path Delays Shailen Desai Bruce Haines Victor Zlotnicki

Monitoring the JMR Wet Path Delays

Embed Size (px)

DESCRIPTION

Monitoring the JMR Wet Path Delays. Shailen Desai Bruce Haines Victor Zlotnicki. JMR versus ECMWF. +3-4 mm step between cycles 29-32 -5 mm step at cycle 2 caused by change to ECMWF model. Comparisons to GPS observations. Similar +4-5 mm step in JMR path delays found in comparisons to GPS. - PowerPoint PPT Presentation

Citation preview

Page 1: Monitoring the JMR Wet Path Delays

Monitoring the JMR Wet Path Delays

Shailen Desai

Bruce Haines

Victor Zlotnicki

Page 2: Monitoring the JMR Wet Path Delays

November 18, 2003 Jason-1 Science Working Team MeetingCal/Val Splinter Session

SD/BH/VZ - 2

JMR versus ECMWF

• +3-4 mm step between cycles 29-32

• -5 mm step at cycle 2 caused by change to ECMWF model

-6

-4

-2

0

2

4

6

0 10 20 30 40 50 60 70

Differences of Wet Path Delay Corrections, (JMR-ECMWF) (mm)

Jason-1 Repeat Cycle

Smoothed

Page 3: Monitoring the JMR Wet Path Delays

November 18, 2003 Jason-1 Science Working Team MeetingCal/Val Splinter Session

SD/BH/VZ - 3

Comparisons to GPS observations

• Similar +4-5 mm step in JMR path delays found in comparisons to GPS.

• ECMWF model relatively stable in comparison.

• Smaller scatter after cycle 36 when ECMWF model modified.– Smaller scatter in (JMR-

ECMWF) differences (from 1.5 to 1.25 cm).

Page 4: Monitoring the JMR Wet Path Delays

November 18, 2003 Jason-1 Science Working Team MeetingCal/Val Splinter Session

SD/BH/VZ - 4

Comparison to SSM/I and TMI

-8

-6

-4

-2

0

2

4

6

8

0 100 200 300 400 500 600Daily Average of Differences of Wet PD Corrections, (JMR-SSMI) (mm)

Days Since Jan 1, 2002

-8

-6

-4

-2

0

2

4

6

8

0 100 200 300 400 500 600Daily Average of Differences of Wet

PD Corrections, (JMR-TMI) (mm)

Days Since Jan 1, 2002

Page 5: Monitoring the JMR Wet Path Delays

November 18, 2003 Jason-1 Science Working Team MeetingCal/Val Splinter Session

SD/BH/VZ - 5

Attitude Dependence

• Attitude dependence of JMR wet PD correction may have returned after cycle 33.

– Verification by other methods pending (e.g. SSM/I and TMI).

-8

-6

-4

-2

0

2

4

6

8

0 100 200 300 400 500

Pass Averages of Wet PD

Differences, (ECMWF-JMR) (mm)

Passes Since Start of Cycle 48

Fixed to SineSine to Fixed

Page 6: Monitoring the JMR Wet Path Delays

November 18, 2003 Jason-1 Science Working Team MeetingCal/Val Splinter Session

SD/BH/VZ - 6

Geographically Correlated Error?

QuickTime™ and aPNG decompressor

are needed to see this picture.

QuickTime™ and aPNG decompressor

are needed to see this picture.

Cycles 29-59

Cycles 2-27

• Comparisons to SSM/I and TMI suggest possible geographically correlated errors in JMR wet PD.• Color scale is from -9 to +9 mm.

QuickTime™ and aPNG decompressor

are needed to see this picture.